Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

Page 1 Standard type 2062-185

- Section
- Dimensions 160 45
Free space
- Car data PRODUCT DATA
Page 2 Free space
- Width
50
Stack Parker

80
dimension
2062
Page 3
Cutting through 1

- Approach

Height (H) 3
- Load plan

Page 4
- Installation

Clear height

6
- Electrical

(DH)
Dimensions

210
Installation
All space requirements are minimum
Page 5
finished dimensions. Tolerances for
100

- Technical
data
space requirements +30 . Dimensions in cm.
- To be
EB (single platform) = 2 vehicles
performed DB (double platform) = 4 vehicles
by the
customer
- Description
Type H DH**
Drainage channel

190
185

with sump 2062-170 325 156


Grounding 5 2062-185* 340 171
2% 2% 2062-195 350 181
*=standard type **=without car
50
520 (for vehicle up to 5.00 m = 16’4”long)
»540 (for vehicle up to 5.20 m = 17’long)«
Suitable for
Compact type 2062-170 Exclusive type 2062-195 4 Standard passenger car and station
wagon. Height and length according to
contour.
car height
Height (H)

Height (H) Type H Upper Lower


2062-170 325 150 150
2062-185* 340 150 165
2062-195 350 150 175
*=standard type
170

175

195

200

Width 1.90 m (PW 2.3 m)


Weight max. 2000 kg

Garage with door in front of the Notes Wheel load max. 500 kg
car parking system
A1 2 1 For dividing walls: cutting through
Free space for
roller shutter 10 x 10 cm (for pipes). Clearance profile
2 Dimensions A1, A2 and A3 must be
160 30
coordinated with the door supplier.
45

55
see table

3 If the total height is greater, the max.


80

vehicle height for the upper parking space


increases accordingly.
150
0
13
60
Height (H) 3

4 For the greatest possible ease-of-use,we 100 125


recommend platform width of 250 to 270 500 (520)
(EB) or 500 (DB).
5 Potential equalization from foundation
A2 2
grounding connection to system.
5
212

6 10 cm wide yellow-black markings must be


applied by the customer to the edge of the
pit in the entry area to mark the danger
zone (see»load plan«page 3).
Stack Parker 2062 | Indian Version 01.2014

Drainage channel
with sump
Attention KLAUS Multiparking Systems Pvt. Ltd.
For cars up to a length of 5.20m please note: 5/3, Prashant Apartments, Erandwane,
Pit length 5.40 m (with towbar 5.50 m), max. Pune 411 004 INDIA
2% 2%
authorized loading 2000 kg (wheel load max. Phone +91-20-2545 0378 / 8662
500 kg), usable platform width 2.50-2.70m. Fax +91-20-2544 6360

50
A3 2 Only Stack Parker 2062-170/185/195 EB is E-mail info@klausmultiparking.in
possible. special model. Website www.klausindia.com
Stack Parker 2062 | Indian Version 01.2014 Page 2 of 5

Page 1 Width for basement garage


- Section
- Dimensions Dividing walls
- Car data
Single platform (EB) Double platform (DB) Single and double platform (EB + DB) - Example
Page 2
- Width
dimension

Page 3
EB DB EB DB
- Approach
- Load plan

B1 B1 B1 Driveway in accordance
Page 4 with local regulations
- Installation
Usable platform width B1 Usable platform width B1 Usable platform width B1
- Electrical
Installation
230* 260 460* 490 230 + 460* 750
240 270 470 500 240 + 470 770
250 280 480 510 250 + 480 790
Page 5
260 290 490 520 250 + 500 810
- Technical 270 300 500 530 270 + 500 830
data
- To be Columns in pit
performed
by the Single platform (EB) Double platform (DB) Single and double platform (EB + DB) - Example
customer
- Description
max.

max.

max.
30

30

30
EB EB DB DB EB DB EB DB
max.

max.

max.
140

140

140
B2 B3 min. 20 B2 B3 min. 20 B2 B3 min. 20
Driveway in accordance
with local regulations
Usable platform width B2 B3 Usable platform width B2 B3 Usable platform width B2 B3
230* 255 250 460* 485 475 230 + 460* 745 735
240 265 260 470 495 485 240 + 470 765 755
250 275 270 480 505 495 250 + 480 785 775
260 285 280 490 515 505 250 + 500 805 795
270 295 290 500 525 515 270 + 500 825 815

Columns outside pit


Single platform (EB) Double platform (DB) Single and double platform (EB + DB) - Example

EB EB DB DB EB DB EB DB

B4 B5 min. 20 B4 B5 min. 20 B4 B5 min. 20


Driveway in accordance
with local regulations
Usable platform width B4 B5 Usable platform width B4 B5 Usable platform width B4 B5
230* 250 240 460* 480 470 230 + 460* 740 730
240 260 250 470 490 480 240 + 470 760 750
250 270 260 480 500 490 250 + 480 780 770
260 280 270 490 510 500 250 + 500 800 790
270 290 280 500 520 510 270 + 500 820 810

Width for garage with door in front of car parking system


Single platform (EB) Double platform (EB)

A3 = seat-engaging
surface (dimensions
require coordination
EB EB EB with door supplier.) DB DB DB

All round door


A3

dimensions require
coordination between
L L L S S door supplier and L L L S S
DF DF DF DF DF DF
local agency of
Driveway in accordance
KLAUS Multiparking.
with local regulations
Usable platform width Door entrance width DF L S Usable platform width Door entrance width DF L S
230* 2375 125 25 460* 460 1 15 30
240 250 125 25 470 475 125 25
250 250 15 30 480 475 175 35
260 260 15 30 490 500 125 25
270 270 15 30 500 500 15 30

* = standard width (parking space width 2.30 m) 1 = no standard width for doors.

Please note:

! End parking spaces are generally more difficult to drive into. Therefore we recommend for end parking spaces of wider platforms. Parking
on standard width platforms with larger vehicles may make getting into and out of the vehicle difficult. This depends on type of vehicle,
approach and above all on the individual driver’s skill.
Stack Parker 2062 | Indian Version 01.2014 Page 3 of 5

Page 1 Approach
- Section
- Dimensions The illustrated maximum approach angles must not be
- Car data ! exceeded. Incorrect approach angles will cause serious
maneuvering & positioning problems on the parking system
Page 2 for which the local agency of KLAUS Multiparking accepts no
- Width responsibility.
dimension

Page 3
- Approach
- Load plan

Page 4
- Installation 4%
- Electrical
Installation

14%
Page 5
- Technical
data
- To be
performed
by the
customer
- Description

Load plan
Forces in kN (static loads)

see page 1
Height

±2.5
~190

±2.5
see page 1
Pit depth
Pit depth
-10

270 180

520 »540«

+5 +5 +10 +10
±1.5 ±1.5 ±1.5 ±1.5

+27 +27 +54 +54

EB DB
10

7.5 7.5 7.5 7.5


B1 B1

! Units are doweled to the floor. Drilling depth: approx. 15 cm.


Floor and walls below the drives-in level are to be made of concrete (quality minimum C20/25)!
* = Colors used in this illustration are representative
Stack Parker 2062 | Indian Version 01.2014 Page 4 of 5

Page 1 Installation data


- Section
- Dimensions Free space for longitudinal and vertical ducts (e.g. ventilation)
- Car data
+5 +2.5 +2.5 +5
B1 0 B1 0 B1 0 B1 0
Page 2 (265) (262.5) (492.5) (495) B1, B2, B3 = (see table on page 2)
- Width 10 35 10 35 10 35 10 35
dimension
Free space for vertical pipelines,
Page 3 ventilation branch canals
- Approach

30
- Load plan Free space for horizontal ducting

Page 4
- Installation
Approach level
- Electrical
Installation

Page 5 20 20
- Technical
data
Free space only applicable if vehicle
- To be
performed
is parked forward = FRONT FIRST
by the and driver’s door on the right side.
customer
( ) = dimensions in brackets illustrate
- Description
an example for usable platform width
EB EB DB DB 230/460cm.
Example
. for ventilation branch canal
and/or vertical pipelines
max.140

B2 B3 B2
(255) _ (735) _ (485)
> 20 > 20

Electrical installation
Installation diagram Electrical data (to be performed by the customer )
No. Qunatity Description Position Frequency
1 1 1 Electricity meter In the
2 supply line
2 1 Main power point: 4 pole RCBO In the 1 per unit
3 (or MCB + ELCB), 16 Amp IDN supply line
(sensitivity/leakage current) 100 mA
4 3 1 Supply line 5 x 4.0mm2, copper To main 1 per unit
(3PH + N + PE) with marked wire switch
and protective conductor
13 5
4 1 N.A.
5 1 Supply line 5 x 4.0mm2 From 1 per unit
(3PH + N + PE) with marked wire main
11
180

and protective conductor switch to


unit
12 6 every Foundation earth connector Corner pit
120

10 10 m floor
7 1 Equipotential bonding from foundation 1 per
0,00 system
earth connector to the system

Electrical data (included in delivery of KLAUS Multiparking)


8 No. Description
14 9
8 Terminal box
2
9 Control line 3 x 0.75 mm (PH + N + PE)
2
10 Control line 5 x 0.75 mm with marked wire and protective conductor
11 Operating device
6 7 2
12 Control line 5 x 0.75 mm with marked wire and protective conductor
to the next 13 Hydraulic unit 3.0 kW, three-phase current, 415 V / 50 Hz
system 2
14 Control line 5 x 0.75 mm with marked wire and protective conductor

Technical data
Range of application Railings
Generally parking system is suitable for same car for which wheel stop If the permissible drop opening is exceeded, railings are to be
is adjusted at the time of installation. In case different car is to be mounted on the systems. If there are traffic routes next to or behind the
parked, wheel stop adjustment/confirmation from KLAUS installations, railings must be installed by the customer. Railings must
Multiparking shall be required. also be in place during construction.
Available documents Environmental conditions
- Wall recess plans Environmental conditions for the area of multiparking systems:
Temperature range 50 C to +400 C. Maximum outside temperature of
- Maintenance offer/contract +450 C.
Corrosion protection If the local circumstances differ from the above, please contact
KLAUS Multiparking.
See separate sheet regarding corrosion protection.
Stack Parker 2062 | Indian Version 01.2014 Page 5 of 5

Page 1
To be performed by the customer
- Section
- Dimensions
Safety fences Strip footings
- Car data
Any constraints that may be necessary in order to provide protection If due to structural conditions strip footings must be effected, the
Page 2 for the park pits for pathways directly in front, next to or behind the unit. customer shall provide an accessible platform reaching to the top of
- Width This is also valid during construction. the said strip footings to enable and facilitate the mounting work.
dimension

Page 3 Numbering of parking spaces Marking


- Approach
Consecutive numbering of parking spaces. A warning that identifies this danger area must be placed in the
- Load plan
entrance area. This must be done for systems with a pit (platforms
Page 4
Building services within the pit) 10 cm from the edge of the pit.
- Installation Lighting, ventilation, fire extinguishing and fire alarm systems. Wall cuttings
- Electrical
Installation
Drainage Any necessary wall cuttings according to page 1.
Page 5 For the front area of the pit we recommend a drainage channel, which Electrical supply to the power point
- Technical you connect to a floor drain system or sump (50 x 50 x 20 cm). The
data
drainage channel may be inclined to the side, however not the pit floor A 3 phase, 415 V (±10%) 50 Hz (±2%) 4 wire (3 PH + N + PE) electrical
- To be
itself (longitudinal incline is available). For reasons of environmental supply to the main power point and the control wire line (5 x 2.5 mm2,
performed
by the protection we recommend to paint the pit floor, and to provide oil and copper 3 PH + N + PE) with marked wire and protective conductor
customer petrol separators in the connections to the public sewage network. must be provided by customer during installation.
- Description The functionality can be monitored on site by our filters together with
the electrician. If this cannot be done during installation for some
reason for which the customer is responsible, the customer must
commission an electrician at his own expense and risk.

Description Single platform (EB) and Double platform (DB)


General description Platforms consist of
Multiparking system providing independent parking spaces for 2 cars - Platform base sections
(EB), 2 X 2 cars (DB),one on top of the other each. - Adjustable wheel stops
Dimensions are in accordance with the underlying dimensions of - Canted access plates
parking pit, height and width
- Side members
Parking bays are accessed horizontally (installation deviation ±1%).
- Central side member (only DB)
Vehicles are positioned on each parking space using wheel stops on
the left side (adjust according to operating instructions). - Cross members (DB long and short cross members)
The user is responsible for positioning the vehicle. - Safety railings - along the upper and lower platform (if required)
Operation via operating device with hold-to-run-device using master - Screws, nuts, washers, distance tubes, etc.
keys.
Hydraulic system consists of
The operating elements are usually mounted either in front of the
column or on the outside of the door frame - Hydraulic cylinder
Operating instructions are attached to each operator’s stand. - Solenoid valve
For safety reasons, it is recommended to install safety doors at the - Safety valve
entrance. - Hydraulic pipe & fittings
For garages with doors at the front of the parking system, special - Screwed joints
dimensional requirements have to be taken into account.
- High-pressure hoses
- Installation material
Electric system consists of
Multiparking system consists of
- Operating device (Emergency Stop, lock, 1 master key per parking
- 2 steel pillars (mounted on the floor) space)
- 2 sliding platforms (mounted to the steel pillars with sliding bearings) - Terminal box at wall valve
- 2 platforms Hydraulic unit consists of
- 1 mechanic synchronization control system (to ensure synchronous - Hydraulic power unit (low-noise, installed onto a console with a
operation on the hydraulic cylinders while lowering and lifting the metal mounting)
platform)
- Hydraulic oil reservoir
- 2 hydraulic cylinder
- Oil filling
- 2 rigid supports (connect the platforms)
- Internal geared wheel pump
- 2 chains and sprocket wheels
- 3-phase-AC-motor (3.0 kW, 415 V, 50 Hz)
- 1 automatic hydraulic safety valve (prevents accidental lowering of
the platform while accessing the platform) - Pressure gauge
- Dowels, screws, connecting elements, bolts, etc. - Pressure relief valve
- Platforms and parking spaces are end-to-end accessible for - Hydraulic hoses (which reduce noise transmission onto the
parking. hydraulic pipe)

We reserve the right to change these specifications without prior notice.


KLAUS Multiparking reserves the right in the course of the technical progress to use newer or other technologies, system, processes, procedures
or standards in the fulfillment of their obligations other than those originally offered.

You might also like