Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Name:-Rhishikesh Laxman Ludbe.

Ph No:- +91-9082237375/ +91-9420888567.


Address:-65/F,Shree Sheetal Chaya Apt., R.B.S.K Bole Road, Dadar (w),Mumbai-400028.
E-mail ID -rhishikeshludbe71@gmail.com

Academic Qualification:
College/Board/ Percentage or
Examination Year of Passing
University CGPI (out of 10)
BE in Mechanical
2019. Mumbai University. 8.90 CGPI.
Engineering.
Diploma in Mechanical Government
2016. 87.68%
Engineering. Polytechnic Malvan.
Maharashtra State
S.S.C. 2013. 94.76%
Board.

Internship:
 Worked as an Intern in EMU Carshed, Mahalaxmi, for 30 days (15th June 2017-14th July
2017)
 Worked as an Intern in JNPT, Uran , for 15 days (24th Dec 2018-7th Jan 2019)
Academic Projects Undertaken:
 Mechanical Power Hammer- Final year Diploma project (August 2015- May 2016).
 Human Powered cycle in HPVC 2018- ASME’s Asia pacific competition (DTU, Delhi)
(November 2017-March 2018).
 Hydraulic Power Pump- For state level competition (In Diploma) (July 2015-August 2016)
 Tilt Sensor in 2nd year of BE (10th February 2018-25th March 2018).
Technical Skills:
 Tools: Basic AutoCAD, Solid works , CATIA , Basic CNC Programming,
 Database Technology: MySQL, SQL Server.
 Languages: Basic Python.
Academic Achievements:
 Class topper in all 3 years of Diploma.
 Among top 5 in 10th Board Exams.
 Class Topper in 6th Semester of BE.
Co-Curricular Activities:
 State Level Basketball player (December 2014).
 Participated in CNC Workshop held in TCET (2016).
 Participated in the District level Badminton Competition (2015).
Work Experience:-
 Company Name:-Nikhil Comforts PVT. LTD.
 Designation:-Hvac Design Engineer.
 Duration:-16 August 2019 To Till Date.
 Location:-Mulund, Mumbai.
Projects undertaken:
 Motilal interface-11.
 Jhunjhunwala Hospital.
 Venus Safety.

Designing Work Abilities:


 Heat load calculation after the proper building survey using CARRIER & ISHRAE standards &
manuals.
 Selection of suitable machine as per site condition & requirement like FCU’s, AHU’s, chiller,
cassette, HI wall etc. on the basis of heat load calculated for the particular zone.
 Preparation of the VRF schematic for the particular system respective of software from
companies like LG, Toshiba, Mitsubishi etc.
 Calculation of AHU’s, Fans static head calculation for selection purpose.
 Incorporating the standards in the shop drawings & section.
 Estimations of ducting, air terminals & other required elements.
 Preparation of BOQ for the particular projects.

-------------------------------------------------------------***----------------------------------------------------------------

You might also like