Professional Documents
Culture Documents
Installation Guide: AK 95 / AK 95 S
Installation Guide: AK 95 / AK 95 S
AK 95 / AK 95 S
January 2004
Installation Guide
1. Installation Guide
Contents
Installation
Unpacking and inspection .......................... 1:2
Environment and ........................................ 1:2
Physical Data .............................................. 1:2
Operating Environment ........................ 1:2
Transport and Storage Environment .... 1:2
Physical Data ......................................... 1:2
Mains Voltage and Power ...................... 1:3
Consumption .......................................... 1:3
Service Outlets ....................................... 1:3
Line Fuses .............................................. 1:3
Mains Water Supply .............................. 1:3
Tools ............................................................. 1:3
Top Tray ....................................................... 1:3
Connection to the Water Supply ................ 1:4
Connection to the Power Supply ................ 1:4
Connection of the battery ........................... 1:4
How to remove the cover to
connect the battery ..................................... 1:5
Installation of RP 95 S ................................ 1:6
Back-up battery ........................................... 1:8
Turn on the AK 95 S .................................... 1:9
Functional check - Fch............................... 1:9
Recommended start-up procedure .............. 1:9
Checklist ..................................................... 1:11
Note!
This installation Guide provides the information needed to
install both AK 95 and AK 95 S.
The text from this point forward only states AK 95 S.
AK 95 / AK 95 S Service Manual
1:1
HCEN 9133 Rev. 01. 2004
Installation Guide
Installation
Unpacking and Environment and
inspection Physical Data
When unpacking, the equipment should be The AK 95 S can be installed in most environ-
checked. If the equipment is in any way dam- ments if certain conditions as the temperature,
aged, proper operation cannot be guaranteed. relative humidity, mains voltage etc. are met.
Please contact your Gambro Service
representative.
Operating Environment
The packages contain the units and components
shown in Figure 1. AK 95 S:
Ambient temperature: +18 °C to + 35 °C
Relative humidity: 15 % - 85 %
Air pressure: 70 - 106 kPa
AK 95:
Ambient temperature: +10°C to + 35 °C
Relative humidity: 30% - 85 %
Air pressure: 70 - 106 kPa
Figure 1. AK 95 S Units.
Physical Data
Ensure that the specified equipment has been
delivered. Do the packages contain the specified
monitor and options? Are there any units/ AK 95 S:
components missing? Check the additional Depth Width Height Weight
packing list (inside the additional package box). mm mm mm kg
If in doubt, please contact your Gambro Serv-
ice representative. Machine 600 480 1270 78
Stand 625 580 (all options
Ensure that the voltage specified on the voltage included)
tag matches the mains voltage. If in doubt,
please contact your Gambro Service AK 95:
representative. Depth Width Height Weight
mm mm mm kg
Line Fuses
Never overload the line fuses and do not supply
too many systems via a single line fuse.
Pressure:
1.2 - 6 bar to the pressure regulator mounted in
the MM 95. A
B
Acetate
Consumption in treatment:
AK 95 S: 500 ml/min
AK 95: 550 ml/min
AK 95 / AK 95 S Service Manual
1:3
HCEN 9133 Rev. 01. 2004
Installation Guide
Water in
Drain
NOTE! The battery must be connected during
the installation according to the instruction on
next page.
BATTERY FAILURE
Change battery or press SELECT
Cover B
A Acetate
A A
Front
1070
AK 95 / AK 95 S Service Manual
1:5
HCEN 9133 Rev. 01. 2004
Installation Guide
Installation of RP 95 S
NOTE! This instruction is for AK 95 S equipped with RP 95 S at delivery.
RP 95 S can also be ordered and installed as a kit, K23054. Refer to rebuilding instruction K23055.
Step 1
3 4
1. Loosen the two screws (with
MB
RO
Step 2
180°
Step 3
Step 4
AK 95 / AK 95 S Service Manual
1:7
HCEN 9133 Rev. 01. 2004
Installation Guide
Back-up Battery
The optional back-up battery is pre-assembled
under the monitor stand at delivery.
Fuse: T15 A
Running time: 30 minutes
AK 95 / AK 95 S Service Manual
1:9
HCEN 9133 Rev. 01. 2004
Installation Guide
Check that the additional package box Ensure that the machine is correctly
contains the specified components. connected to the Power Supply.
Mains power must be connected to a
Check, by visual inspection that the grounded power socket.
machine shows no sign of damage.
Connection of the Battery
Environment and Physical Data Ensure that the rechargeable 9V battery is
Ensure that the Operating Environment correctly connected according to the instruc-
is according to the specifications. tions.
Gambro Lundia AB
Ensure that the water fulfils all require- Monitor Division
ments set out under Environment and Magistratsvägen 16
Physical Data. PO Box 10101
SE-220 10 Lund
Ensure that the machine is correctly Sweden
connected to the drain.
This record is to be signed and filed by the Service Engineer responsible for the installation.
Date............................Signature........................................................................
AK 95 / AK 95 S Service Manual
1:11
HCEN 9133 Rev. 01. 2004
Installation Guide
Tel: +46 46 16 90 00
Fax: +46 46 16 96 96
www.gambro.com