NAM CON SON 2 GAS PIPELINE PROJECT

EPC PIPELINES & FACILITIES PACKAGE (EPC3)

Approved by
Deputy General Director
“VIETSOVPETRO”

Signed by: Trần Xuân Hoàng


Date: 05/03/2021 14:55:12
Certified by: Vietsovpetro
Certification Authority

TRAN XUAN HOANG


______ / _____/2021

TECHNICAL EVALUATION
FOR ICCP POWER CABLES

ISSUED FOR BID


DATE :
NAM CON SON 2 GAS PIPELINE PROJECT
EPC PIPELINES & FACILITIES PACKAGE (EPC3)
TECHNICAL REQUIREMENT FOR
ICCP POWER CABLES

Agreed by:

Director of Offshore Construction Signed by: Đặng Đức Phong


Date: 05/03/2021 13:55:07 Dang Duc Phong
Division Certified by: Vietsovpetro
Certification Authority

Project Director Signed by: Lê Quốc Anh Le Quoc Anh


Date: 05/03/2021 13:30:34
Certified by: Vietsovpetro
Certification Authority

Checked by OCD:

Deputy of Project Director Signed by: Nguyễn Mạnh Hùng


Date: 05/03/2021 08:56:42
Nguyen Manh Hung
Certified by: Vietsovpetro
Certification Authority

Prepared by OCD:

Signed by: Nguyễn Văn Sâm


Engineer of PMD Date: 04/03/2021 16:39:06
Certified by: Vietsovpetro
Nguyen Van Sam
Certification Authority

Engineer of PMD Signed by: Nguyễn Thanh Tùng


Date: 04/03/2021 16:06:38
Nguyen Thanh Tung
Certified by: Vietsovpetro
Certification Authority
NAM CON SON 2 GAS PIPELINE PROJECT
EPC PIPELINES & FACILITIES PACKAGE (EPC3)
TECHNICAL REQUIREMENT FOR
ICCP POWER CABLES
Tender technical proposal shall be evaluated through 2 steps, detailed as below:
Step 1 : Technical proposal shall be passed Step 1 if it meets ALL the conditions as below:
1. Scope of supply (Section 1 of Technical Requirement): Comply as required in Technical Requirement Document.
2. Year of Manufacture (Section 3 of Technical Requirement): Comply as required in Technical Requirement Document.
3. Warranty (Section 6 of Technical Requirement): Comply as required in Technical Requirement Document.
Step 2 : Step 2 shall be evaluated in case the Technical tender proposal passed conditions in Step 1
Detailed scores of Technical evaluation for Step 2 described as table below:

Reject point
Levels
Index Requirements Remark
I II III
Technical Specification:
- Technical Requirement (Section 2 of Technical Requirement) 50 100% Note 1
- Document Requirement (Section 8 of Technical Requirement)
I 1 Fully comply as required in Technical Requirement. 100%
"Comply with minor concern" but acceptable or "Fully not comply"
2 10% ~ 90% Note 4
( check for each state)
3 Not comply with requirements and can't be acceptable 0%
Delivery Term & Time (Section 4 of Technical Requirement) 10 100% Note 2
II 1 Fully comply as required in Technical Requirement. 100%
2 Not comply with requirements and can't be acceptable 0% R
Recommended Country of Origin (Section 5 of Technical
III 20 100% Note 3, 5
Requirement)
Certification (Section 7 of Technical Requirement) 20 100%
1 Fully Comply as required in Technical Requirement 100%
IV "Comply with minor concern" but acceptable or "Fully not comply"
10% ~ 90% Note 4
( check for each state)
2 Not fully comply as required in Technical Requirement. 0% R
V TOTAL SCORES (100 as maximum) 100
Notes:
1. For this item is subject to evaluate in range of 0-100% that correspond to bidder's technical proposal
2. Fully meet the requirements will be evaluated as 100% and 0% if not
3. For this item is picked from each stated case that correspond to bidder's technical proposal
4. a. Each "minor concern" shall be minus 10%. "Minor concern" is defined as not fully comply as required in Technical
Requirement Document but acceptable( check for each Requirement).
b. Each "Fully not comply" shall be minus 20%. "Fully not comply" is defined as completely not comply as required in
Technical Requirement Document ( check for each Requirement).
5. Recommended Original Countries for Cables: EU/G7: 100%; KALRE TURKEY/Australia / Thailand/ Korea/ Singapore/
Vietnam : 60%; Other countries: 20%

Passed Conditions: All of the below conditions:


- Passed in "Step 1"
- No "R" designated point
- And total score of Item "V" of Step 2 is equal or higher than 80 points
Disqualified Conditions: One of the below conditions:
- Disqualified in "Step 1"
- One (01) "R" designated point
- Passed in "Step 1" but Total score of Item "V" of Step 2 is below 80 points