Stim Star Brasil - Bridge:engin

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Stim Star Brasil DPS-2 Special Trials DD MMM 2021

2.3 Personnel Onboard During Trials


Name Title Company
Captan
Chief Officer
Mate
Chief Engineer
Second Engineer

2.4 DP Operator Details

MASTER MATE MATE


Name
STCW ’95 License
DP Cert. Type
DP Cert. Number
DP Cert. Issued
DP Training Center
DP Experience
DP Vessel Log
DP Log Updated

2.5 Trial Location and Conditions

Trial Begin Date Depth

Trial End Date Current

Location Wind

Remote Monitoring Center 23 NAV137-ST-2021


Stim Star Brasil DPS-2 Special Trials DD MMM 2021

3. EQUIPMENT STATUS

3.1 Thrusters
BTT1  BTT2  DDT  Port Z-Drive  Stbd Z-Drive 
Maintenance records checked
Outstanding maintenance
Last oil analysis (date)
Last oil analysis OK
Running hours: at present
Remarks: N/A

3.2 Generators
DG1  DG2  DG3  DG4  HG  EDG 
Maintenance records
checked
Outstanding maintenance
Last oil analysis (date)
Last oil analysis OK
Running hours: at present
Last major overhaul
Remarks: N/A

3.3 Electrical Protection


Circuit Breakers Date Company
Switchboard bus tie
Generator breakers
Thruster breakers
Remarks:

Remote Monitoring Center 24 NAV137-ST-2021

You might also like