2x45KL TANK INSTALLATION WORKS AT M/s. BHUSHAN STEEL LIMITED, DHENKANAL, ORISSA.
2 P.C.C. 1:2:4 for Grouting & Poles 75 0.45 0.45 0.900 13.67 Cu.M.
3 Structural steel for fencing Poles ISA 65x65x6 75 2.00 5.800 870.00
10 R.C.C. 1:2:4 Tank truck unloading platform 1 9.00 4.00 0.150 5.40 Cu.M.
4 P.C.C. 1:3:6
for T / Foundations 6 4.50 1.50 0.150 6.08
2 21.00 1.20 0.100 5.04
2 7.70 1.20 0.100 1.85
for pump foundations 2 2.50 1.35 0.150 1.01
inside dyke 1 21.00 7.50 0.125 19.69
33.66 Cu.M.
7 P.C.C. 1:2:4 flooring inside dyke 1 21.00 7.50 0.125 19.69 Cu.M.
OFFICE BUILDING
1 Earthwork in for R.C.C. Columns 6 1.50 1.50 1.800 24.30 Cu.M.
17 Partly glazed and partly panelled door 1 1.20 2.100 2.52 Sq.M.
ELECTRICAL WORKS
RATE AMOUNT
S.No. ITEM DESCRIPTION QTY. UNIT
Rs. - Ps. Rs. - Ps.
IV ELECTRICAL WORKS
19 Light & Fan points 6.00 Nos 530.00 3180.00
20 5A switches 3.00 Nos 350.00 1050.00
21 15 Amps A.C. points 2.00 Nos 2700.00 5400.00
22 32 Amps MDB 1.00 Nos 6500.00 6500.00
23 4X2.5 Sq.m. cable 60.00 Rmt 200.00 12000.00
24 48" Fan 2.00 Nos 2000.00 4000.00
25 2X18 Watt CFL 4.00 Nos 0.00
26 Tube lights (single tube) 2.00 Nos 1050.00 2100.00
27 Earth pits 10.00 Nos 5500.00 55000.00
28 10 SWG copper wire for earthing 200.00 Rmt 90.00 18000.00
29 25X3 copper flat earth for tanks 40.00 Rmt 475.00 19000.00
V INSTALLATION OF PUMPS
1 Construction of pump island 7.50 Rmt 5800.00 43500.00
2 450 wide Pipe line trench 35.00 Rmt 2000.00 70000.00
3 50 n/b suction lines 130.00 Rmt 750.00 97500.00
4 80 n/b suction header 75.00 Rmt 950.00 71250.00
5 Instalaltion of single pumps 3.00 Nos 1750.00 5250.00
RATE AMOUNT
S.No. ITEM DESCRIPTION QTY. UNIT
Rs. - Ps. Rs. - Ps.
RATE AMOUNT
S.No. ITEM DESCRIPTION QTY. UNIT
Rs. - Ps. Rs. - Ps.
IV ELECTRICAL WORKS
19 Light & Fan points 6.00 Nos
20 5A switches 3.00 Nos
21 15 Amps A.C. points 2.00 Nos
22 32 Amps MDB 1.00 Nos
23 4X2.5 Sq.m. cable 60.00 Rmt
24 48" Fan 2.00 Nos
25 2X18 Watt CFL 4.00 Nos
26 Tube lights (single tube) 2.00 Nos
27 Earth pits 10.00 Nos
28 10 SWG copper wire for earthing 200.00 Rmt
29 25X3 copper flat earth for tanks 40.00 Rmt
V INSTALLATION OF PUMPS
1 Construction of pump island 7.50 Rmt
2 450 wide Pipe line trench 35.00 Rmt
3 50 n/b suction lines 130.00 Rmt
4 80 n/b suction header 75.00 Rmt
5 Instalaltion of single pumps 3.00 Nos
6 Instalaltion of Dual pumps 1.00 Nos
7 3X2.5 Sq.m. cables 120.00 Rmt
8 150 dia NP2 class Humepipe for cables 40.00 Rmt
9 300 dia NP2 class hume pipes 20.00 Rmt
10 450x450 inspection chamber 3.00 Nos
11 Structural steel for chamber cover plates 500.00 Kg
12 4x2.5 Sq.m copper armoured cable 150.00 Rmt
NOTE:
* All quantities are approximate.
* Actual quantities shall be based on work done.
* Contractor shall visit the site before quoting.