Schedule_B

Special Repair Work for Damaged Portion Canal lining from CH 7.50 to 15.00 in Selected reaches at of MLI West Canal for the year 2021-22( Work_Indent
No.20909)
Description of item
I No Unit Quantity Rate Amount in Rs
1 Dismantling cement concrete flooring or plain cement concrete work including removing and conveying the
debries to distance up to 200m( with in avarge thickness of 15CM) etc., complete with all lead and lift and as cum 24.30 584.85 14211.86
per the direction of the Engineer in charge
2 Providing cohesive non-swelling ( CNS ) soil lining to canals using soil from approved borrow area including
spreading soil in layers of thickness not more than 150 mm, breaking clods, watering, compacting to density
control of not less than 95 percent or as stipulated, dressing to required profile etc., complete with all lead and Cum 36.45 436.64 15915.53
lift and as per the direction of the Engineer in charge

3 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm )
grade cement concrete using 20 mm down size approved, clean, hard, graded coarse aggregates for bed lining
of canal including finishing the junction of bed and sides to required curveture, cost of all materials,
machinery, labour, formwork including supports, cleaning, batching, mixing, placing in position, levelling, cum 6.80 6405.06 43554.41
vibrating, finishing, curing Cement content: 270 kg / cum with use of super plasticiser ) etc., complete with all
lead and lift and as per the direction of the Engineer in charge

4 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm )
grade cement concrete using 20 mm down size approved, clean, hard, graded coarse aggregates for side lining
of canal including finishing the junction of bed and sides to required curveture, cost of all materials,
machinery, labour, formwork including supports, cleaning, batching, mixing, placing in position, levelling, cum 17.50 7506.45 131362.88
vibrating, finishing, curing Cement content: 270.70 kg / cum with use of super plasticiser ) etc., complete with
all lead and lift and as per the direction of the Engineer in charge

5 Excavation in all kinds of soil including boulders up to 0.6m diameter (0.113 cum) for foundations of canal
and cross drainage and other appurtenant structures and placing excavated stuff neatly in specified dump area
or disposing off the same as directed etc., complete with initial lead up to 50 m and initial lift up to 1.50 m. Cum 19.20 245.00 4704.00
6 Providing and laying insitu vibrated M-10(28 days cube compressive strength not less than 15 N/Sq mm) grade
cement concrete using 40 mm down size approved, clean, hard, graded aggregates for gravity type retaining
walls/abutments etc., including cost of all materials, machinary, labour, formwork, scaffolding, cleaning,
batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto Cum 4.80 5977.79 28693.39
50 m and lift upto 1.50 m from surface

7 Providing, fabricating and placing in position reinforcement steel bars for RCC works including cost of all
materials, machinary, labour, cleaning, straightening, cutting, bending, hooking, lapping, welding whervever kg 953.01 73.78 70313.08
required, tying with 1.25 mm dia soft annealed steel wire etc., complete with lead upto 50 and all lifts

8 Providing and laying insitu vibrated M-20 (28 days cube compressive strength not less than 20 N/Sq mm)
grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for Sub Structures
including cost of all materials, machinary, labour, formwork, scaffolding, cleaning, batching, mixing, placing
in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and lift upto 1.50 m cum 18.00 7469.22 134445.96
from surface.(Cement content: 330kg/cum with use of super plasticiser)

Total 443201.10

Contractor Executive Engineer


KBJNL, MLI Division - 1