Date: 11/29/2020 Revision: 1


Created by: Mark Dehnert

Consumer/Producer DM Project Load [MW] Notes


2020 2022 2023 2025 2030 2035 2040 2045
Demand Connected Production Demand Connected Production Demand Connected Production Demand Connected Production Demand Connected Production Demand Connected Production Demand Connected Production Demand Connected Production
Warsan Sewage Treatment Plant (extension 1-3) DS 51, DS 100, DS 167 11 25.15 11 25.15 11 25.15 11 25.15 11 25.15 11 25.15 11 25.15 11 25.15 Connected Load to DEWA's 33/6.6 kV Substation build app. 30 years ago
Warsan Sewage Treatment Plant (Biogas) GS-006 0.4 0.8 6 0.4 0.8 6 0.4 0.8 6 0.4 0.8 6 0.4 0.8 6 0.4 0.8 6 0.4 0.8 6
Warsan Sewage Treatment Plant (extension 4) DS 203 15.43 21.7 15.43 21.7 15.43 21.7 15.43 21.7 15.43 21.7 15.43 21.7 15.43 21.7 At the same time it I splanned to change all internal substations from 6.6 kV to 11kV
Warsan Sewage Treatment Plant (extension 5) 100.000 m3/d 6 8 6 8
Warsan Sewage Treatment Plant (extension 6) 100.000 m3/d 6 8
Dubai Strategic Sewer Tunnel Program, Terminal PS (Bur Dubai) DS 215 12.09 18.5 12.09 18.5 12.09 18.5 12.09 18.5 12.09 18.5 Peak Flow resiliency condition
Dubai Waste Management Center - Demand GS-003 35 35 185 35 35 185 35 35 185 35 35 185 35 35 185 35 35 185
Summary Plot Warsan Total 11 25.15 0 26.83 47.65 6 61.83 82.65 191 73.92 101.15 191 73.92 101.15 191 73.92 101.15 191 79.92 109.15 191 85.92 117.15 191
Summary Plot Warsan Total [kwH/a] 96,360 220,314 - 235,031 417,414 52,560 541,631 724,014 1,673,160 647,539 886,074 1,673,160 647,539 886,074 1,673,160 647,539 886,074 1,673,160 700,099 956,154 1,673,160 752,659 1,026,234 1,673,160
Summary Plot Warsan Total Utilized Green Power [%] 100% 32% 39% 39% 39% 42% 45%