Two 910 KVA diesel generator sets are proposed along with acoustic insulation for one and installation in an existing room for the other. Other site work includes excavation for earth pits, dismantling and removal of existing electrical equipment, installation of new electrical panels, plumbing work including additional water tanks, and interior renovation including painting, lighting, and washrooms.
Two 910 KVA diesel generator sets are proposed along with acoustic insulation for one and installation in an existing room for the other. Other site work includes excavation for earth pits, dismantling and removal of existing electrical equipment, installation of new electrical panels, plumbing work including additional water tanks, and interior renovation including painting, lighting, and washrooms.
Two 910 KVA diesel generator sets are proposed along with acoustic insulation for one and installation in an existing room for the other. Other site work includes excavation for earth pits, dismantling and removal of existing electrical equipment, installation of new electrical panels, plumbing work including additional water tanks, and interior renovation including painting, lighting, and washrooms.
2. DG-1 require acoustic room(L shape room) 3. DG-2 be proposed in the LT-Panel-2 room 4. Exhaust ventilation 1 no. extra required in DG-1 room 5. 8 no earth Pits to be proposed outside the building 6. Excavation and foundation for DGs 7. Gypsum partion dismantling 280sqft(LTpanel-2 room) 8. Wire,cables,conduits,cable trays,lights dismantling(LTpanel-2 room) 9. FM200 shifting-1nos. 10. Dismantling of MLTP-2 11. Existing MLTP-2 cable shifting to new MLTP(incomers and outgoings) 12. 2 nos DG placing,unloading manually 13. Brick work 230mm 280 Sqft 14. Fire door dismantling-1 nos 15. Revised floor alignment with tile 600mmx800mm.Need to change to 600mmx600mm tiles.Existing pedestal availability less.( Proposed switch room). Room size:7.5mx11.5m 16. Old panels near toilet dismantling with cabling(Need to confirm) 17. (If new transformer proposed then 1no servo and LT kiosk not required) 18. Diesel storage yard -Location to be finalized in GF(990litres) 19. Water tanks with MS base to be sifted with lines 20. 2nos additional water tanks with fittings to be proposed(1000Lx2) 21. MS railing removing and refixing 22. Cement plaster on outer wall approx..700sqft. 23. MS Staircase with fittings approx..3 ton 24. 3HP motor for waterline with all fittings for PAC services-2nos 25. Waterline shifting in proposed panel room 26. Fire door opening-1nos 27. Fire door-double door(5ftx5ft) 28. Brick wall dismantling 200sqft(proposed MLTP-2 room) 29. MLTP-2 to be proposed in two parts considering space availability. 30. Glass door dismantling-2 nos(proposed MLTP-2 room) 31. Aluminium partition dismantling 32. Fire door supply and installation(5ftx8ft) 33. Fire door for proposed MLTP-1 room-(5ftx8ft) 34. Split ac dismantling,false ceiling dismantling,Gypsum partition with paint(150sqft),floor tile dismantling(100sqft),Antistatic mat(700sqft),PCC for floor leveling(300sqft) 35. Light fixtures(2ftx2ft)-50 nos 36. Light points-50 37. Industrial sockets-20 nos 38. Paint interior-(5000sqft) or as per drawing 39. Paint exterior-(1000sqft) or as per drawing 40. 1nos. wash room renovation with required fittings 41. 1nos. new wash room with required fittings 42. PAC panel removal-2 nos 43. Existing 3DG dismantling with exhaust pipe 44. Approx.22m exhaust with 350mm dia pipe including all fittings and aluminium cladding(or approx. 120m) 45. MS material for exhaust system-3ton 46. Hard soil(50 trolley)removal + earth pits