12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal
Short-Circuit Analysis
Output Filename: D:\PEE APPLICATION\EP17009\MCSET\7 Doc Sub\8 EP17009 SC AND RC STUDY REV03\01
ETAP\sc impedance.SI2
Project: ETAP Page: 2
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Cable Length: No
Apply Individual
Temperature Correction Adjustments /Global Degree C
73 Buses Total
Ohms or Siemens per 1000 m per Conductor (Cable) or per Phase (Line)
Line/Cable Length
Cable A1 1.0MCUN4 120 23.0 0.0 1 0 0.1416394 0.073 0.0001499 0.4461643 0.17958
Cable A2 1.0MCUN4 240 19.0 0.0 1 0 0.0700971 0.072 0.0001565 0.2208058 0.17712
Cable A6 1.0MCUN3 120 138.0 0.0 1 0 0.1416394 0.073 0.0001499 0.4461643 0.17958
Cable A8 1.0MCUN2 2.5 138.0 0.0 1 0 6.821818 0.1188 0.0000588 21.48873 0.292248
Cable A10 1.0MCUN4 120 19.0 0.0 1 0 0.1416394 0.073 0.0001499 0.4461643 0.17958
Cable A11 1.0MCUN4 240 23.0 0.0 1 0 0.0700971 0.072 0.0001565 0.2208058 0.17712
Cable A12 1.0MCUN4 50 27.0 0.0 1 0 0.3569892 0.079 0.0001188 1.124516 0.19434
Cable A13 1.0MCUN4 35 19.0 0.0 1 0 0.483453 0.08 0.0001015 1.522913 0.1968
Cable A14 1.0MCUN4 95 30.0 0.0 1 0 0.1784946 0.073 0.0001433 0.562258 0.17958
Cable A15 1.0MCUN3 70 131.0 0.0 1 0 0.2471464 0.075 0.0001307 0.778511 0.1845
Cable A16 1.0MCUN3 120 131.0 0.0 1 0 0.1416394 0.073 0.0001499 0.4461643 0.17958
Cable A18 1.0MCUN2 2.5 131.0 0.0 1 0 6.821818 0.099 0.000049 21.48873 0.24354
Cable B1 1.0MCUN3 2.5 139.0 0.0 1 0 6.821818 0.099 0.000049 21.48873 0.24354
Cable B2 1.0MCUN3 2.5 140.0 0.0 1 0 6.821818 0.099 0.000049 21.48873 0.24354
Cable B3 1.0MCUN3 2.5 141.0 0.0 1 0 6.821818 0.099 0.000049 21.48873 0.24354
Cable B4 1.0MCUN3 2.5 140.0 0.0 1 0 6.821818 0.099 0.000049 21.48873 0.24354
Cable B5 1.0MCUN3 2.5 144.0 0.0 1 0 6.821818 0.099 0.000049 21.48873 0.24354
Cable B6 1.0MCUN3 2.5 145.0 0.0 1 0 6.821818 0.099 0.000049 21.48873 0.24354
Cable B7 1.0MCUN3 2.5 149.0 0.0 1 0 6.821818 0.099 0.000049 21.48873 0.24354
Cable B8 1.0MCUN3 2.5 144.0 0.0 1 0 6.821818 0.099 0.000049 21.48873 0.24354
Cable B9 1.0MCUN3 2.5 145.0 0.0 1 0 6.821818 0.099 0.000049 21.48873 0.24354
Cable B10 1.0MCUN3 2.5 147.0 0.0 1 0 6.821818 0.099 0.000049 21.48873 0.24354
Cable B11 1.0MCUN3 2.5 148.0 0.0 1 0 6.821818 0.099 0.000049 21.48873 0.24354
Cable B12 1.0MCUN3 2.5 99.0 0.0 1 0 6.821818 0.099 0.000049 21.48873 0.24354
Cable B13 1.0MCUN4 10 182.0 0.0 1 0 1.683775 0.084 0.0000807 5.303891 0.20664
Cable B14 1.0MCUN4 16 26.0 0.0 1 0 1.055069 0.08 0.0000971 3.323468 0.1968
Cable B16 1.0MCUN3 35 180.0 0.0 1 0 0.483453 0.08 0.0001015 1.522877 0.1968
Cable B20 1.0MCUN3 2.5 144.0 0.0 1 0 6.821818 0.099 0.000049 21.48873 0.24354
Cable B21 1.0MCUN3 2.5 146.0 0.0 1 0 6.821818 0.099 0.000049 21.48873 0.24354
Project: ETAP Page: 7
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal
Ohms or Siemens per 1000 m per Conductor (Cable) or per Phase (Line)
Line/Cable Length
Cable B22 1.0MCUN3 2.5 146.0 0.0 1 0 6.821818 0.099 0.000049 21.48873 0.24354
Cable B23 1.0MCUN3 2.5 145.0 0.0 1 0 6.821818 0.099 0.000049 21.48873 0.24354
Cable B24 1.0MCUN3 2.5 147.0 0.0 1 0 6.821818 0.099 0.000049 21.48873 0.24354
Cable B25 1.0MCUN3 2.5 149.0 0.0 1 0 6.821818 0.099 0.000049 21.48873 0.24354
Cable B26 1.0MCUN3 2.5 152.0 0.0 1 0 6.821818 0.099 0.000049 21.48873 0.24354
Cable B27 1.0MCUN3 2.5 148.0 0.0 1 0 6.821818 0.099 0.000049 21.48873 0.24354
Cable B28 1.0MCUN3 2.5 149.0 0.0 1 0 6.821818 0.099 0.000049 21.48873 0.24354
Cable B29 1.0MCUN3 2.5 151.0 0.0 1 0 6.821818 0.099 0.000049 21.48873 0.24354
Cable B30 1.0MCUN3 2.5 152.0 0.0 1 0 6.821818 0.099 0.000049 21.48873 0.24354
Cable B31 1.0MCUN3 2.5 102.0 0.0 1 0 6.821818 0.099 0.000049 21.48873 0.24354
Cable B32 1.0MCUN4 10 185.0 0.0 1 0 1.683775 0.084 0.0000807 5.303891 0.20664
Cable B33 1.0MCUN4 16 29.0 0.0 1 0 1.055069 0.08 0.0000971 3.323468 0.1968
Cable B37 1.0MCUN4 25 185.0 0.0 1 0 0.6698968 0.082 0.0000889 2.110211 0.20172
Cable B38 1.0MCUN4 10 170.0 0.0 1 0 1.683775 0.084 0.0000807 5.303891 0.20664
Cable C2 1.0MCUN4 120 159.0 0.0 1 0 0.1416394 0.073 0.0001499 0.4461643 0.17958
Cable1-INC CAB 15NCUS1 240 390.0 0.0 1 0 0.0708197 0.1356 0.1126034 0.344424
Cable7-TRF HV CAB 15NCUS3 120 42.0 0.0 1 0 0.1416394 0.119 0.2252067 0.30226
Cable8-TRF LV CAB 1.0MCUN1 630 33.0 0.0 1 0 0.0303513 0.1032 0.0002428 0.0956066 0.253872
Cable9 1.0MCUN1 630 29.0 0.0 1 0 0.0303513 0.1032 0.0002428 0.0956066 0.253872
T1 1.000 13.800 0.400 6.00 3.50 0 0 0 0 0 6.0000 Dyn 30.000
T2 1.000 13.800 0.400 6.00 3.50 0 0 0 0 0 6.0000 Dyn 30.000
Grounding
Branch Connections
Cable A10 Cable Main Bus A2 Bus77 168.20 86.69 189.22 0.0000005
Cable A11 Cable Main Bus A2 Bus78 100.76 103.50 144.45 0.0000006
Cable A12 Cable Main Bus A2 Bus70 602.42 133.31 616.99 0.0000005
Cable A13 Cable Main Bus A2 Bus72 574.10 95.00 581.91 0.0000003
Cable A14 Cable Main Bus A2 Bus73 334.68 136.88 361.59 0.0000007
Cable A15 Cable Main Bus A2 Bus74 2023.51 614.06 2114.63 0.0000027
Cable A16 Cable Main Bus A2 Bus75 1159.67 597.69 1304.64 0.0000031
Cable A18 Cable Main Bus A2 Bus76 55853.63 810.56 55859.51 0.0000010
Cable B10 Cable Main Bus B1 Bus37 62675.45 909.56 62682.05 0.0000012
Cable B11 Cable Main Bus B1 Bus38 63101.81 915.75 63108.46 0.0000012
Cable B12 Cable Main Bus B1 Bus39 42210.00 612.56 42214.44 0.0000008
Cable B13 Cable Main Bus B1 Bus40 19152.94 955.50 19176.76 0.0000023
Cable B14 Cable Main Bus B1 Bus41 1714.49 130.00 1719.41 0.0000004
Cable B16 Cable Main Bus B1 Bus42 5438.85 900.00 5512.81 0.0000029
Cable B20 Cable Main Bus B2 Bus43 61396.36 891.00 61402.82 0.0000011
Cable B21 Cable Main Bus B2 Bus45 62249.09 903.37 62255.64 0.0000011
Cable B22 Cable Main Bus B2 Bus46 62249.09 903.37 62255.64 0.0000011
Cable B23 Cable Main Bus B2 Bus47 61822.72 897.19 61829.23 0.0000011
Project: ETAP Page: 10
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal
Cable B24 Cable Main Bus B2 Bus48 62675.45 909.56 62682.05 0.0000012
Cable B25 Cable Main Bus B2 Bus49 63528.18 921.94 63534.87 0.0000012
Cable B26 Cable Main Bus B2 Bus50 64807.27 940.50 64814.09 0.0000012
Cable B27 Cable Main Bus B2 Bus51 63101.81 915.75 63108.46 0.0000012
Cable B28 Cable Main Bus B2 Bus53 63528.18 921.94 63534.87 0.0000012
Cable B29 Cable Main Bus B2 Bus54 64380.90 934.31 64387.68 0.0000012
Cable B30 Cable Main Bus B2 Bus55 64807.27 940.50 64814.09 0.0000012
Cable B31 Cable Main Bus B2 Bus56 43489.09 631.13 43493.67 0.0000008
Cable B32 Cable Main Bus B2 Bus57 19468.65 971.25 19492.86 0.0000024
Cable B33 Cable Main Bus B2 Bus58 1912.31 145.00 1917.80 0.0000005
Cable B37 Cable Main Bus B2 Bus59 7745.68 948.13 7803.49 0.0000026
Cable B38 Cable Main Bus B2 Bus60 17890.11 892.50 17912.36 0.0000022
Cable8-TRF LV CAB Cable Bus10 Main Bus A1 62.60 212.85 221.86 0.0000013
% Impedance
Power Grid Connected Bus Rating 100 MVA Base Grounding
ID ID MVASC kV R X" R/X" Type
Induction Machine Connected Bus Rating PosSeqImp (Mtr Base Grounding mFact.
ID Type Qty ID HP/kW kVA kV Amp PF %R % X" R/X" Conn. Type Amp MW/PP
Mtr1 Motor 1 Bus5 1580.00 1969.55 13.800 82.40 92.68 2.11 16.53 0.13 Wye Open 0.32
Mtr2 Motor 1 Bus6 660.00 901.12 13.800 37.70 80.13 2.69 16.45 0.16 Wye Open 0.07
Mtr3 Motor 1 Bus7 1050.00 1405.46 13.800 58.80 88.41 13.17 10.22 1.29 Wye Open 0.18
Mtr4 Motor 1 Bus8 280.00 337.02 13.800 14.10 89.00 14.83 7.60 1.95 Wye Open 0.14
Mtr5 Motor 1 Bus13 280.00 327.12 13.800 13.69 91.97 14.83 7.60 1.95 Wye Open 0.14
Mtr6 Motor 1 Bus14 1050.00 1273.48 13.800 53.28 88.41 13.17 10.22 1.29 Wye Open 0.17
Mtr7 Motor 1 Bus15 660.00 764.44 13.200 33.44 92.32 2.48 15.18 0.16 Wye Open 0.33
Mtr8 Motor 1 Bus16 1580.00 1814.19 13.200 79.35 92.68 1.95 15.26 0.13 Wye Open 0.79
Mtr B1 Motor 1 Bus27 2.20 3.04 0.400 4.40 85.00 7.84 13.24 0.59 Wye Open 0.00
Mtr B2 Motor 1 Bus29 1.50 2.08 0.400 3.00 85.00 7.84 13.24 0.59 Wye Open 0.00
Mtr B3 Motor 1 Bus30 0.25 0.35 0.400 0.50 85.00 7.84 13.24 0.59 Wye Open 0.00
Mtr B4 Motor 1 Bus31 2.20 3.04 0.400 4.40 85.00 7.84 13.24 0.59 Wye Open 0.00
Mtr B5 Motor 1 Bus32 1.50 2.08 0.400 3.00 85.00 7.84 13.24 0.59 Wye Open 0.00
Mtr B6 Motor 1 Bus33 2.20 3.04 0.400 4.40 85.00 7.84 13.24 0.59 Wye Open 0.00
Mtr B7 Motor 1 Bus34 1.50 2.08 0.400 3.00 85.00 7.84 13.24 0.59 Wye Open 0.00
Mtr B8 Motor 1 Bus35 0.40 0.55 0.400 0.80 85.00 7.84 13.24 0.59 Wye Open 0.00
Mtr B9 Motor 1 Bus36 0.25 0.35 0.400 0.50 85.00 7.84 13.24 0.59 Wye Open 0.00
Mtr B10 Motor 1 Bus37 0.40 0.55 0.400 0.80 85.00 7.84 13.24 0.59 Wye Open 0.00
Mtr B11 Motor 1 Bus38 0.25 0.35 0.400 0.50 85.00 7.84 13.24 0.59 Wye Open 0.00
Mtr B12 Motor 1 Bus39 2.20 2.75 0.400 3.97 80.00 7.84 13.24 0.59 Wye Open 0.00
Mtr B16 Motor 1 Bus42 30.00 37.50 0.400 54.13 80.00 7.84 13.24 0.59 Wye Open 0.02
Mtr B20 Motor 1 Bus43 2.20 3.04 0.400 4.40 85.00 7.84 13.24 0.59 Wye Open 0.00
Mtr B21 Motor 1 Bus45 1.50 2.08 0.400 3.00 85.00 7.84 13.24 0.59 Wye Open 0.00
Mtr B22 Motor 1 Bus46 0.25 0.35 0.400 0.50 85.00 7.84 13.24 0.59 Wye Open 0.00
Mtr B23 Motor 1 Bus47 2.20 3.04 0.400 4.40 85.00 7.84 13.24 0.59 Wye Open 0.00
Mtr B24 Motor 1 Bus48 1.50 2.08 0.400 3.00 85.00 7.84 13.24 0.59 Wye Open 0.00
Mtr B25 Motor 1 Bus49 2.20 3.04 0.400 4.40 85.00 7.84 13.24 0.59 Wye Open 0.00
Mtr B26 Motor 1 Bus50 1.50 2.08 0.400 3.00 85.00 7.84 13.24 0.59 Wye Open 0.00
Mtr B27 Motor 1 Bus51 0.40 0.55 0.400 0.80 85.00 7.84 13.24 0.59 Wye Open 0.00
Mtr B28 Motor 1 Bus53 0.25 0.35 0.400 0.50 85.00 7.84 13.24 0.59 Wye Open 0.00
Mtr B29 Motor 1 Bus54 0.40 0.55 0.400 0.80 85.00 7.84 13.24 0.59 Wye Open 0.00
Mtr B30 Motor 1 Bus55 0.25 0.35 0.400 0.50 85.00 7.84 13.24 0.59 Wye Open 0.00
Mtr B31 Motor 1 Bus56 2.20 2.75 0.400 3.97 80.00 7.84 13.24 0.59 Wye Open 0.00
Mtr A5 Motor 1 Bus66 55.00 76.12 0.400 109.88 85.00 7.84 13.24 0.59 Wye Open 0.03
Project: ETAP Page: 13
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal
Induction Machine Connected Bus Rating PosSeqImp (Mtr Base Grounding mFact.
ID Type Qty ID HP/kW kVA kV Amp PF %R % X" R/X" Conn. Type Amp MW/PP
Mtr A6 Motor 1 Bus67 90.00 124.57 0.400 179.80 85.00 7.84 13.24 0.59 Wye Open 0.04
Mtr A15 Motor 1 Bus74 55.00 76.12 0.400 109.88 85.00 7.84 13.24 0.59 Wye Open 0.03
Mtr A16 Motor 1 Bus75 90.00 124.57 0.400 179.80 85.00 7.84 13.24 0.59 Wye Open 0.04
Lump A4 67.0 0.400 96.71 100.00 80 20 53.60 0.00 6.46 15.37 0.42 Delta 0.05
Lump A5 67.0 0.400 96.71 100.00 80 20 53.60 0.00 6.46 15.37 0.42 Delta 0.05
Lump A6 52.5 0.400 75.72 76.25 80 20 32.00 27.15 6.46 15.37 0.42 Delta 0.03
Lump A7 40.0 0.400 57.74 100.00 80 20 32.00 0.00 6.46 15.37 0.42 Delta 0.03
Lump A8 0.2 0.400 0.40 100.00 80 20 0.13 0.00 6.46 15.37 0.42 Delta 0.00
Lump A10 52.5 0.400 75.72 76.25 80 20 32.00 27.15 6.46 15.37 0.42 Delta 0.03
Lump A18 2.2 0.400 5.48 7.30 80 20 0.13 1.75 6.46 15.37 0.42 Delta 0.00
Lump B13 5.0 0.400 7.22 100.00 80 20 4.00 0.00 6.46 15.37 0.42 Delta 0.00
Lump B14 22.0 0.400 31.75 100.00 80 20 17.60 0.00 6.46 15.37 0.42 Delta 0.02
Lump B32 5.0 0.400 7.22 100.00 80 20 4.00 0.00 6.46 15.37 0.42 Delta 0.00
Lump B33 22.0 0.400 31.75 100.00 80 20 17.60 0.00 6.46 15.37 0.42 Delta 0.02
Lump B37 15.0 0.400 21.65 100.00 80 20 12.00 0.00 6.46 15.37 0.42 Delta 0.01
Lump B38 9.0 0.400 12.99 100.00 80 20 7.20 0.00 6.46 15.37 0.42 Delta 0.01
Lump C1 200.0 0.400 288.68 85.00 80 20 136.00 84.29 6.46 15.37 0.42 Delta 0.14
Lump C2 211.5 0.400 305.20 85.13 80 20 144.00 88.77 6.46 15.37 0.42 Delta 0.14
Lump C3 20.0 0.400 28.87 100.00 80 20 16.00 0.00 6.46 15.37 0.42 Delta 0.02
Lump C4 40.0 0.400 57.74 100.00 80 20 32.00 0.00 6.46 15.37 0.42 Delta 0.03
Lump C5 40.0 0.400 57.74 100.00 80 20 32.00 0.00 6.46 15.37 0.42 Delta 0.03
Bus1 Total 0.00 22.023 0.00 101.32 100.43 21.645 21.645 1.04E+000 1.90E+001 6.66E-001 2.00E+001
Bus2 Bus1 0.90 1.197 0.58 101.44 100.62 0.771 0.000 1.49E+002 3.16E+002
U1 Bus1 100.00 20.918 100.00 100.00 100.00 20.918 21.645 6.66E-001 2.00E+001 6.66E-001 2.00E+001
Bus2 Total 0.00 19.439 0.00 104.20 104.36 17.866 17.866 2.44E+000 2.14E+001 2.97E+000 2.70E+001
Bus1 Bus2 13.70 18.298 18.88 101.25 100.39 17.167 17.866 2.12E+000 2.28E+001 2.97E+000 2.70E+001
Bus5 Bus2 0.20 0.494 0.13 104.19 104.42 0.314 0.000 1.08E+002 8.41E+002
Bus6 Bus2 0.10 0.226 0.06 104.20 104.39 0.131 0.000 3.00E+002 1.83E+003
Bus7 Bus2 0.12 0.352 0.07 104.22 104.39 0.196 0.000 9.38E+002 7.28E+002
Bus8 Bus2 0.04 0.085 0.02 104.21 104.37 0.043 0.000 4.40E+003 2.26E+003
Bus9 Bus2 0.01 0.140 0.01 104.20 104.37 0.081 0.000 1.29E+003 2.69E+003
Bus3 Total 0.00 21.994 0.00 101.27 100.50 21.608 21.608 1.01E+000 1.90E+001 6.66E-001 2.00E+001
Bus4 Bus3 0.92 1.155 0.58 101.40 100.71 0.727 0.000 1.46E+002 3.32E+002
U2 Bus3 100.00 20.918 100.00 100.00 100.00 20.918 21.608 6.66E-001 2.00E+001 6.66E-001 2.00E+001
Bus4 Total 0.00 19.260 0.00 104.31 104.63 17.633 17.633 2.49E+000 2.16E+001 3.12E+000 2.75E+001
Bus3 Bus4 14.46 18.151 19.85 101.20 100.46 16.972 17.633 2.21E+000 2.29E+001 3.12E+000 2.75E+001
Bus11 Bus4 0.01 0.084 0.00 104.32 104.63 0.047 0.000 2.28E+003 4.40E+003
Bus13 Bus4 0.03 0.082 0.02 104.32 104.64 0.042 0.000 4.54E+003 2.32E+003
Bus14 Bus4 0.09 0.319 0.05 104.33 104.65 0.177 0.000 1.03E+003 8.03E+002
Bus15 Bus4 0.10 0.227 0.05 104.32 104.66 0.127 0.000 2.98E+002 1.82E+003
Bus16 Bus4 0.20 0.538 0.12 104.31 104.69 0.328 0.000 9.94E+001 7.71E+002
Bus5 Total 0.00 18.397 0.00 104.98 105.69 16.566 16.566 3.70E+000 2.24E+001 5.08E+000 2.99E+001
Bus2 Bus5 7.40 17.903 9.03 104.19 103.74 16.258 16.566 3.82E+000 2.31E+001 5.08E+000 2.99E+001
Mtr1 Bus5 100.00 0.494 100.00 100.00 100.00 0.308 0.000 1.07E+002 8.39E+002
Bus6 Total 0.00 18.299 0.00 105.06 105.68 16.465 16.465 3.82E+000 2.25E+001 5.22E+000 3.01E+001
Bus2 Bus6 7.97 18.073 9.65 104.20 103.66 16.336 16.465 3.87E+000 2.28E+001 5.22E+000 3.01E+001
Mtr2 Bus6 100.00 0.226 100.00 100.00 100.00 0.128 0.000 2.98E+002 1.83E+003
Bus7 Total 0.00 18.589 0.00 104.89 105.40 16.798 16.798 3.51E+000 2.22E+001 4.68E+000 2.93E+001
Bus2 Bus7 6.13 18.333 7.45 104.23 103.82 16.647 16.798 3.26E+000 2.26E+001 4.68E+000 2.93E+001
Mtr3 Bus7 100.00 0.353 100.00 100.00 100.00 0.193 0.000 9.37E+002 7.27E+002
Bus8 Total 0.00 18.313 0.00 105.05 105.60 16.491 16.491 3.82E+000 2.25E+001 5.16E+000 3.00E+001
Bus2 Bus8 7.84 18.263 9.46 104.21 103.65 16.461 16.491 3.75E+000 2.26E+001 5.16E+000 3.00E+001
Mtr4 Bus8 100.00 0.085 100.00 100.00 100.00 0.042 0.000 4.40E+003 2.25E+003
Bus9 Total 0.00 19.178 0.00 104.38 104.68 17.540 17.540 2.75E+000 2.16E+001 3.47E+000 2.77E+001
Bus2 Bus9 1.86 19.045 2.28 104.21 104.19 17.463 17.540 2.72E+000 2.18E+001 3.47E+000 2.77E+001
Bus10 Bus9 19.37 0.140 65.56 67.29 100.58 0.081 0.000 1.29E+003 2.69E+003
Bus10 Total 0.00 28.410 0.00 104.17 102.94 26.457 26.457 1.50E+002 4.59E+002 1.59E+002 5.56E+002
Main Bus A1 Bus10 9.17 5.669 5.40 106.08 104.35 3.335 0.000 1.13E+003 2.14E+003
Bus9 Bus10 96.38 22.846 98.15 100.02 98.46 23.165 26.457 * 1.62E+002 5.78E+002 1.59E+002 5.56E+002
Bus11 Total 0.00 19.063 0.00 104.45 104.86 17.389 17.389 2.73E+000 2.18E+001 3.50E+000 2.80E+001
Bus4 Bus11 1.41 18.984 1.72 104.32 104.49 17.345 17.389 2.71E+000 2.19E+001 3.50E+000 2.80E+001
Bus12 Bus11 11.68 0.084 63.50 64.33 100.72 0.046 0.000 2.28E+003 4.40E+003
Bus12 Total 0.00 25.895 0.00 102.02 101.76 24.929 24.929 1.57E+002 5.06E+002 1.59E+002 5.56E+002
Main Bus A2 Bus12 4.44 3.125 2.57 102.96 102.52 1.808 0.000 2.12E+003 3.84E+003
Bus11 Bus12 96.37 22.844 98.07 100.03 98.41 23.144 24.929 * 1.62E+002 5.78E+002 1.59E+002 5.56E+002
Bus13 Total 0.00 18.194 0.00 105.13 105.79 16.339 16.339 3.82E+000 2.27E+001 5.23E+000 3.03E+001
Bus4 Bus13 7.50 18.145 9.01 104.32 103.92 16.309 16.339 3.75E+000 2.28E+001 5.23E+000 3.03E+001
Mtr5 Bus13 100.00 0.082 100.00 100.00 100.00 0.041 0.000 4.53E+003 2.32E+003
Bus14 Total 0.00 18.529 0.00 104.90 105.51 16.722 16.722 3.42E+000 2.23E+001 4.60E+000 2.95E+001
Bus4 Bus14 5.31 18.299 6.44 104.34 104.13 16.585 16.722 3.19E+000 2.26E+001 4.60E+000 2.95E+001
Mtr6 Bus14 100.00 0.320 100.00 100.00 100.00 0.175 0.000 1.03E+003 8.02E+002
Bus15 Total 0.00 18.163 0.00 105.16 105.88 16.292 16.292 3.84E+000 2.27E+001 5.32E+000 3.04E+001
Bus4 Bus15 7.75 17.936 9.35 104.31 103.92 16.168 16.292 3.89E+000 2.30E+001 5.32E+000 3.04E+001
Mtr7 Bus15 104.55 0.227 104.55 104.55 104.55 0.124 0.000 2.97E+002 1.82E+003
Bus16 Total 0.00 18.353 0.00 105.01 105.79 16.501 16.501 3.60E+000 2.25E+001 4.99E+000 3.00E+001
Bus4 Bus16 6.54 17.814 7.98 104.31 104.06 16.179 16.501 3.73E+000 2.32E+001 4.99E+000 3.00E+001
Mtr8 Bus16 104.55 0.539 104.55 104.55 104.55 0.322 0.000 9.82E+001 7.70E+002
Bus21 Total 0.00 7.577 0.00 121.32 133.13 4.362 4.362 1.36E+003 1.19E+003 5.19E+003 2.75E+003
Main Bus C Bus21 73.35 6.419 78.73 107.16 101.36 3.912 4.362 1.73E+003 1.26E+003 5.19E+003 2.75E+003
Lump C1 Bus21 100.00 1.316 100.00 100.00 100.00 0.506 0.000 4.04E+003 9.60E+003
Bus22 Total 0.00 7.535 0.00 121.44 133.09 4.332 4.332 1.30E+003 1.28E+003 5.05E+003 3.07E+003
Main Bus C Bus22 72.45 6.274 77.79 106.94 101.81 3.843 4.332 1.68E+003 1.39E+003 5.05E+003 3.07E+003
Lump C2 Bus22 100.00 1.392 100.00 100.00 100.00 0.534 0.000 3.82E+003 9.08E+003
Bus24 Total 0.00 5.851 0.00 122.15 128.17 3.500 3.500 2.22E+003 7.57E+002 6.92E+003 1.54E+003
Main Bus C Bus24 84.17 5.765 87.19 106.10 98.61 3.465 3.500 2.26E+003 7.30E+002 6.92E+003 1.54E+003
Lump C3 Bus24 100.00 0.132 100.00 100.00 100.00 0.052 0.000 4.04E+004 9.60E+004
Bus25 Total 0.00 15.244 0.00 114.72 123.71 10.390 10.390 5.47E+002 7.14E+002 1.54E+003 1.51E+003
Main Bus C Bus25 33.53 14.990 39.21 113.56 107.69 10.273 10.390 5.59E+002 7.24E+002 1.54E+003 1.51E+003
Lump C4 Bus25 100.00 0.263 100.00 100.00 100.00 0.121 0.000 2.02E+004 4.80E+004
Bus26 Total 0.00 15.244 0.00 114.72 123.71 10.390 10.390 5.47E+002 7.14E+002 1.54E+003 1.51E+003
Main Bus C Bus26 33.53 14.990 39.21 113.56 107.69 10.273 10.390 5.59E+002 7.24E+002 1.54E+003 1.51E+003
Lump C5 Bus26 100.00 0.263 100.00 100.00 100.00 0.121 0.000 2.02E+004 4.80E+004
Bus27 Total 0.00 0.245 0.00 126.09 129.53 0.136 0.136 5.55E+004 6.66E+003 1.88E+005 3.45E+003
Main Bus B1 Bus27 99.32 0.230 99.42 100.30 99.95 0.132 0.136 5.97E+004 1.53E+003 1.88E+005 3.45E+003
Mtr B1 Bus27 100.00 0.027 100.00 100.00 100.00 0.008 0.000 2.57E+005 4.35E+005
Bus29 Total 0.00 0.238 0.00 126.02 128.51 0.135 0.135 5.73E+004 5.24E+003 1.89E+005 3.47E+003
Main Bus B1 Bus29 99.33 0.228 99.42 100.29 99.94 0.132 0.135 6.01E+004 1.53E+003 1.89E+005 3.47E+003
Mtr B2 Bus29 100.00 0.019 100.00 100.00 100.00 0.005 0.000 3.77E+005 6.38E+005
Bus30 Total 0.00 0.228 0.00 125.95 126.68 0.132 0.132 6.00E+004 2.21E+003 1.90E+005 3.48E+003
Main Bus B1 Bus30 99.33 0.227 99.42 100.28 99.93 0.132 0.132 6.05E+004 1.54E+003 1.90E+005 3.48E+003
Mtr B3 Bus30 100.00 0.003 100.00 100.00 100.00 0.001 0.000 2.26E+006 3.83E+006
Bus31 Total 0.00 0.244 0.00 126.09 129.55 0.135 0.135 5.59E+004 6.74E+003 1.89E+005 3.47E+003
Main Bus B1 Bus31 99.33 0.228 99.42 100.30 99.95 0.131 0.135 6.01E+004 1.53E+003 1.89E+005 3.47E+003
Mtr B4 Bus31 100.00 0.027 100.00 100.00 100.00 0.008 0.000 2.57E+005 4.35E+005
Bus32 Total 0.00 0.232 0.00 126.02 128.57 0.131 0.131 5.88E+004 5.47E+003 1.94E+005 3.53E+003
Main Bus B1 Bus32 99.34 0.222 99.43 100.28 99.95 0.128 0.131 6.18E+004 1.56E+003 1.94E+005 3.53E+003
Mtr B5 Bus32 100.00 0.019 100.00 100.00 100.00 0.005 0.000 3.77E+005 6.38E+005
Bus33 Total 0.00 0.236 0.00 126.10 129.66 0.131 0.131 5.77E+004 7.12E+003 1.96E+005 3.55E+003
Main Bus B1 Bus33 99.35 0.220 99.44 100.29 99.95 0.127 0.131 6.22E+004 1.56E+003 1.96E+005 3.55E+003
Mtr B6 Bus33 100.00 0.027 100.00 100.00 100.00 0.008 0.000 2.57E+005 4.35E+005
Bus34 Total 0.00 0.225 0.00 126.03 128.65 0.127 0.127 6.07E+004 5.76E+003 2.01E+005 3.61E+003
Main Bus B1 Bus34 99.37 0.214 99.45 100.27 99.95 0.124 0.127 6.39E+004 1.59E+003 2.01E+005 3.61E+003
Mtr B7 Bus34 100.00 0.019 100.00 100.00 100.00 0.005 0.000 3.77E+005 6.38E+005
Bus35 Total 0.00 0.225 0.00 125.95 126.91 0.130 0.130 6.10E+004 2.67E+003 1.94E+005 3.53E+003
Main Bus B1 Bus35 99.35 0.222 99.43 100.27 99.93 0.129 0.130 6.18E+004 1.56E+003 1.94E+005 3.53E+003
Mtr B8 Bus35 100.00 0.005 100.00 100.00 100.00 0.001 0.000 1.42E+006 2.39E+006
Bus36 Total 0.00 0.222 0.00 125.95 126.69 0.129 0.129 6.17E+004 2.28E+003 1.96E+005 3.55E+003
Main Bus B1 Bus36 99.35 0.220 99.43 100.27 99.93 0.128 0.129 6.22E+004 1.56E+003 1.96E+005 3.55E+003
Mtr B9 Bus36 100.00 0.003 100.00 100.00 100.00 0.001 0.000 2.26E+006 3.83E+006
Bus37 Total 0.00 0.220 0.00 125.96 126.92 0.127 0.127 6.23E+004 2.74E+003 1.98E+005 3.58E+003
Main Bus B1 Bus37 99.36 0.217 99.44 100.27 99.93 0.126 0.127 6.31E+004 1.57E+003 1.98E+005 3.58E+003
Mtr B10 Bus37 100.00 0.005 100.00 100.00 100.00 0.001 0.000 1.42E+006 2.39E+006
Bus38 Total 0.00 0.218 0.00 125.95 126.69 0.126 0.126 6.30E+004 2.33E+003 2.00E+005 3.59E+003
Main Bus B1 Bus38 99.36 0.216 99.44 100.26 99.93 0.126 0.126 6.35E+004 1.58E+003 2.00E+005 3.59E+003
Mtr B11 Bus38 100.00 0.003 100.00 100.00 100.00 0.001 0.000 2.26E+006 3.83E+006
Bus39 Total 0.00 0.335 0.00 125.96 128.41 0.190 0.190 4.07E+004 3.74E+003 1.34E+005 2.84E+003
Main Bus B1 Bus39 99.05 0.322 99.18 100.41 99.92 0.186 0.190 4.26E+004 1.28E+003 1.34E+005 2.84E+003
Mtr B12 Bus39 100.00 0.025 100.00 100.00 100.00 0.007 0.000 2.85E+005 4.81E+005
Bus40 Total 0.00 0.715 0.00 125.05 128.20 0.412 0.412 1.90E+004 2.36E+003 6.13E+004 3.69E+003
Main Bus B1 Bus40 97.78 0.699 98.10 100.86 99.84 0.406 0.412 1.95E+004 1.62E+003 6.13E+004 3.69E+003
Lump B13 Bus40 100.00 0.033 100.00 100.00 100.00 0.013 0.000 1.61E+005 3.84E+005
Bus41 Total 0.00 6.178 0.00 121.32 128.25 3.729 3.729 2.06E+003 8.21E+002 6.40E+003 1.66E+003
Main Bus B1 Bus41 76.21 6.078 79.70 107.04 100.62 3.689 3.729 2.11E+003 7.99E+002 6.40E+003 1.66E+003
Lump B14 Bus41 100.00 0.145 100.00 100.00 100.00 0.058 0.000 3.67E+004 8.73E+004
Bus42 Total 0.00 2.518 0.00 124.64 131.63 1.389 1.389 5.10E+003 1.90E+003 1.81E+004 3.55E+003
Main Bus B1 Bus42 91.19 2.268 92.74 102.86 100.21 1.321 1.389 5.84E+003 1.58E+003 1.81E+004 3.55E+003
Mtr B16 Bus42 100.00 0.334 100.00 100.00 100.00 0.098 0.000 2.09E+004 3.53E+004
Bus43 Total 0.00 0.237 0.00 126.06 129.67 0.132 0.132 5.73E+004 7.09E+003 1.94E+005 3.42E+003
Main Bus B2 Bus43 99.38 0.222 99.50 100.23 99.98 0.128 0.132 6.18E+004 1.61E+003 1.94E+005 3.42E+003
Mtr B20 Bus43 100.00 0.027 100.00 100.00 100.00 0.008 0.000 2.57E+005 4.35E+005
Bus45 Total 0.00 0.229 0.00 125.99 128.63 0.129 0.129 5.95E+004 5.63E+003 1.97E+005 3.45E+003
Main Bus B2 Bus45 99.39 0.219 99.50 100.22 99.97 0.127 0.129 6.26E+004 1.62E+003 1.97E+005 3.45E+003
Mtr B21 Bus45 100.00 0.019 100.00 100.00 100.00 0.005 0.000 3.77E+005 6.38E+005
Bus46 Total 0.00 0.221 0.00 125.91 126.72 0.128 0.128 6.21E+004 2.35E+003 1.97E+005 3.45E+003
Main Bus B2 Bus46 99.39 0.219 99.49 100.21 99.95 0.127 0.128 6.26E+004 1.62E+003 1.97E+005 3.45E+003
Mtr B22 Bus46 100.00 0.003 100.00 100.00 100.00 0.001 0.000 2.26E+006 3.83E+006
Bus47 Total 0.00 0.236 0.00 126.06 129.69 0.131 0.131 5.77E+004 7.16E+003 1.96E+005 3.44E+003
Main Bus B2 Bus47 99.39 0.220 99.50 100.23 99.98 0.127 0.131 6.22E+004 1.62E+003 1.96E+005 3.44E+003
Mtr B23 Bus47 100.00 0.027 100.00 100.00 100.00 0.008 0.000 2.57E+005 4.35E+005
Bus48 Total 0.00 0.228 0.00 125.99 128.64 0.128 0.128 5.99E+004 5.69E+003 1.98E+005 3.47E+003
Main Bus B2 Bus48 99.40 0.217 99.51 100.22 99.97 0.126 0.128 6.30E+004 1.63E+003 1.98E+005 3.47E+003
Mtr B24 Bus48 100.00 0.019 100.00 100.00 100.00 0.005 0.000 3.77E+005 6.38E+005
Bus49 Total 0.00 0.230 0.00 126.08 129.78 0.128 0.128 5.91E+004 7.48E+003 2.01E+005 3.50E+003
Main Bus B2 Bus49 99.40 0.215 99.52 100.22 99.98 0.123 0.128 6.39E+004 1.64E+003 2.01E+005 3.50E+003
Mtr B25 Bus49 100.00 0.027 100.00 100.00 100.00 0.008 0.000 2.57E+005 4.35E+005
Bus50 Total 0.00 0.221 0.00 126.00 128.72 0.124 0.124 6.18E+004 5.99E+003 2.05E+005 3.54E+003
Main Bus B2 Bus50 99.42 0.210 99.52 100.21 99.97 0.122 0.124 6.52E+004 1.66E+003 2.05E+005 3.54E+003
Mtr B26 Bus50 100.00 0.019 100.00 100.00 100.00 0.005 0.000 3.77E+005 6.38E+005
Bus51 Total 0.00 0.219 0.00 125.92 126.95 0.126 0.126 6.27E+004 2.81E+003 2.00E+005 3.48E+003
Main Bus B2 Bus51 99.40 0.216 99.50 100.21 99.96 0.126 0.126 6.35E+004 1.64E+003 2.00E+005 3.48E+003
Mtr B27 Bus51 100.00 0.005 100.00 100.00 100.00 0.001 0.000 1.42E+006 2.39E+006
Bus53 Total 0.00 0.216 0.00 125.91 126.72 0.125 0.125 6.34E+004 2.40E+003 2.01E+005 3.50E+003
Main Bus B2 Bus53 99.40 0.215 99.51 100.20 99.96 0.125 0.125 6.39E+004 1.64E+003 2.01E+005 3.50E+003
Mtr B28 Bus53 100.00 0.003 100.00 100.00 100.00 0.001 0.000 2.26E+006 3.83E+006
Bus54 Total 0.00 0.214 0.00 125.92 126.96 0.124 0.124 6.39E+004 2.88E+003 2.04E+005 3.53E+003
Main Bus B2 Bus54 99.41 0.212 99.51 100.20 99.96 0.123 0.124 6.47E+004 1.65E+003 2.04E+005 3.53E+003
Mtr B29 Bus54 100.00 0.005 100.00 100.00 100.00 0.001 0.000 1.42E+006 2.39E+006
Bus55 Total 0.00 0.212 0.00 125.92 126.73 0.123 0.123 6.46E+004 2.44E+003 2.05E+005 3.54E+003
Main Bus B2 Bus55 99.42 0.210 99.51 100.20 99.96 0.122 0.123 6.52E+004 1.66E+003 2.05E+005 3.54E+003
Mtr B30 Bus55 100.00 0.003 100.00 100.00 100.00 0.001 0.000 2.26E+006 3.83E+006
Bus56 Total 0.00 0.326 0.00 125.91 128.51 0.184 0.184 4.18E+004 3.96E+003 1.38E+005 2.78E+003
Main Bus B2 Bus56 99.13 0.313 99.29 100.31 99.96 0.181 0.184 4.39E+004 1.35E+003 1.38E+005 2.78E+003
Mtr B31 Bus56 100.00 0.025 100.00 100.00 100.00 0.007 0.000 2.85E+005 4.81E+005
Bus57 Total 0.00 0.705 0.00 124.92 128.30 0.407 0.407 1.93E+004 2.45E+003 6.22E+004 3.62E+003
Main Bus B2 Bus57 97.91 0.689 98.32 100.65 99.91 0.400 0.407 1.98E+004 1.69E+003 6.22E+004 3.62E+003
Lump B32 Bus57 100.00 0.033 100.00 100.00 100.00 0.013 0.000 1.61E+005 3.84E+005
Bus58 Total 0.00 5.714 0.00 120.31 128.76 3.477 3.477 2.23E+003 8.96E+002 6.89E+003 1.59E+003
Main Bus B2 Bus58 78.51 5.613 82.85 105.03 100.59 3.436 3.477 2.28E+003 8.71E+002 6.89E+003 1.59E+003
Lump B33 Bus58 100.00 0.145 100.00 100.00 100.00 0.059 0.000 3.67E+004 8.73E+004
Bus59 Total 0.00 1.713 0.00 123.76 129.31 0.992 0.992 7.76E+003 1.99E+003 2.53E+004 3.56E+003
Main Bus B2 Bus59 94.19 1.655 95.44 101.54 99.97 0.970 0.992 8.11E+003 1.67E+003 2.53E+004 3.56E+003
Lump B37 Bus59 100.00 0.099 100.00 100.00 100.00 0.038 0.000 5.38E+004 1.28E+005
Bus60 Total 0.00 0.778 0.00 124.68 129.37 0.445 0.445 1.74E+004 2.73E+003 5.72E+004 3.43E+003
Main Bus B2 Bus60 97.72 0.748 98.18 100.73 99.92 0.433 0.445 1.83E+004 1.61E+003 5.72E+004 3.43E+003
Lump B38 Bus60 100.00 0.059 100.00 100.00 100.00 0.023 0.000 8.97E+004 2.13E+005
Bus61 Total 0.00 17.785 0.00 112.91 120.34 12.748 12.748 3.92E+002 6.64E+002 9.97E+002 1.34E+003
Main Bus A1 Bus61 28.62 17.135 35.14 112.35 106.08 12.480 12.748 4.06E+002 6.90E+002 9.97E+002 1.34E+003
Bus27 Main Bus B1 11.01 0.025 4.21 113.42 122.77 0.010 0.000 3.17E+005 4.36E+005
Bus29 Main Bus B1 7.71 0.018 2.94 113.24 122.00 0.007 0.000 4.37E+005 6.39E+005
Bus30 Main Bus B1 1.34 0.003 0.51 112.96 120.62 0.001 0.000 2.32E+006 3.83E+006
Bus31 Main Bus B1 11.08 0.025 4.24 113.42 122.79 0.010 0.000 3.17E+005 4.36E+005
Bus32 Main Bus B1 7.92 0.018 3.02 113.25 122.05 0.007 0.000 4.39E+005 6.39E+005
Bus33 Main Bus B1 11.45 0.025 4.39 113.44 122.88 0.010 0.000 3.19E+005 4.36E+005
Bus34 Main Bus B1 8.19 0.018 3.12 113.27 122.11 0.007 0.000 4.41E+005 6.39E+005
Bus35 Main Bus B1 2.18 0.005 0.83 112.99 120.79 0.002 0.000 1.48E+006 2.39E+006
Bus36 Main Bus B1 1.38 0.003 0.52 112.96 120.62 0.001 0.000 2.33E+006 3.83E+006
Bus37 Main Bus B1 2.23 0.005 0.84 113.00 120.80 0.002 0.000 1.48E+006 2.39E+006
Bus38 Main Bus B1 1.41 0.003 0.53 112.96 120.63 0.001 0.000 2.33E+006 3.83E+006
Bus39 Main Bus B1 7.25 0.024 2.76 113.22 121.90 0.009 0.000 3.27E+005 4.82E+005
Bus40 Main Bus B1 4.51 0.032 2.19 112.59 121.40 0.016 0.000 1.81E+005 3.85E+005
Bus41 Main Bus B1 1.80 0.144 0.87 112.78 120.76 0.070 0.000 3.84E+004 8.74E+004
Bus42 Main Bus B1 12.31 0.306 4.73 113.76 123.22 0.118 0.000 2.63E+004 3.62E+004
Bus63 Total 0.00 20.188 0.00 113.87 118.00 14.658 14.658 2.63E+002 6.26E+002 6.18E+002 1.29E+003
Main Bus A1 Bus63 14.91 17.128 19.15 112.46 110.12 13.157 14.658 2.99E+002 7.42E+002 6.18E+002 1.29E+003
Bus21 Main Bus C 13.53 1.184 6.64 114.09 121.18 0.581 0.000 5.49E+003 1.02E+004
Bus22 Main Bus C 14.25 1.234 6.99 114.40 121.27 0.605 0.000 5.22E+003 9.81E+003
Bus24 Main Bus C 1.91 0.131 0.94 113.70 118.45 0.064 0.000 4.23E+004 9.61E+004
Bus25 Main Bus C 0.59 0.262 0.29 113.85 118.14 0.129 0.000 2.05E+004 4.81E+004
Bus26 Main Bus C 0.59 0.262 0.29 113.85 118.14 0.129 0.000 2.05E+004 4.81E+004
Bus64 Total 0.00 14.060 0.00 114.62 125.06 9.479 9.479 6.98E+002 6.81E+002 1.97E+003 1.36E+003
Main Bus A1 Bus64 52.97 13.818 61.58 110.85 100.65 9.369 9.479 7.15E+002 6.88E+002 1.97E+003 1.36E+003
Lump A3 Bus64 100.00 0.263 100.00 100.00 100.00 0.119 0.000 2.02E+004 4.80E+004
Bus65 Total 0.00 16.480 0.00 113.07 122.02 11.624 11.624 4.77E+002 6.82E+002 1.27E+003 1.37E+003
Main Bus A1 Bus65 36.68 16.049 44.31 111.94 104.10 11.419 11.624 4.93E+002 6.97E+002 1.27E+003 1.37E+003
Lump A4 Bus65 100.00 0.441 100.00 100.00 100.00 0.209 0.000 1.20E+004 2.87E+004
Bus66 Total 0.00 5.756 0.00 122.05 131.20 3.302 3.302 2.04E+003 1.24E+003 7.12E+003 2.68E+003
Main Bus A1 Bus66 84.55 5.167 88.88 104.36 99.31 3.131 3.302 2.35E+003 1.24E+003 7.12E+003 2.68E+003
Mtr A5 Bus66 100.00 0.678 100.00 100.00 100.00 0.207 0.000 1.03E+004 1.74E+004
Bus67 Total 0.00 8.359 0.00 119.99 130.45 4.949 4.949 1.20E+003 1.12E+003 4.20E+003 2.63E+003
Main Bus A1 Bus67 73.16 7.300 79.56 106.19 100.38 4.624 4.949 1.42E+003 1.22E+003 4.20E+003 2.63E+003
Mtr A6 Bus67 100.00 1.110 100.00 100.00 100.00 0.351 0.000 6.29E+003 1.06E+004
Bus68 Total 0.00 12.957 0.00 115.66 126.15 8.545 8.545 8.15E+002 6.75E+002 2.35E+003 1.34E+003
Main Bus A1 Bus68 59.68 12.724 68.09 110.10 99.57 8.442 8.545 8.37E+002 6.79E+002 2.35E+003 1.34E+003
Lump A7 Bus68 100.00 0.263 100.00 100.00 100.00 0.116 0.000 2.02E+004 4.80E+004
Bus69 Total 0.00 0.233 0.00 125.88 126.47 0.135 0.135 5.89E+004 1.83E+003 1.86E+005 3.60E+003
Main Bus A1 Bus69 99.64 0.232 99.74 100.17 99.89 0.135 0.135 5.90E+004 1.59E+003 1.86E+005 3.60E+003
Lump A8 Bus69 100.00 0.001 100.00 100.00 100.00 0.000 0.000 5.04E+006 1.20E+007
Bus70 Total 0.00 12.476 0.00 111.94 126.05 8.612 8.612 7.83E+002 7.71E+002 2.23E+003 1.34E+003
Main Bus A2 Bus70 54.71 12.158 65.46 107.21 100.49 8.464 8.612 8.12E+002 7.83E+002 2.23E+003 1.34E+003
Lump A10 Bus70 100.00 0.345 100.00 100.00 100.00 0.160 0.000 1.54E+004 3.66E+004
Bus72 Total 0.00 13.003 0.00 111.53 126.09 9.016 9.016 7.57E+002 7.34E+002 2.14E+003 1.25E+003
Main Bus A2 Bus72 53.83 12.686 64.83 107.57 100.44 8.868 9.016 7.84E+002 7.45E+002 2.14E+003 1.25E+003
Lump A6 Bus72 100.00 0.345 100.00 100.00 100.00 0.160 0.000 1.54E+004 3.66E+004
Bus73 Total 0.00 14.725 0.00 109.34 122.00 10.841 10.841 5.24E+002 7.70E+002 1.39E+003 1.35E+003
Main Bus A2 Bus73 37.69 14.293 47.62 108.05 102.99 10.627 10.841 5.45E+002 7.90E+002 1.39E+003 1.35E+003
Lump A5 Bus73 100.00 0.441 100.00 100.00 100.00 0.218 0.000 1.20E+004 2.87E+004
Bus74 Total 0.00 5.937 0.00 120.53 131.37 3.471 3.471 1.94E+003 1.26E+003 6.71E+003 2.53E+003
Main Bus A2 Bus74 82.32 5.338 88.11 103.43 99.75 3.294 3.471 2.23E+003 1.27E+003 6.71E+003 2.53E+003
Mtr A15 Bus74 100.00 0.678 100.00 100.00 100.00 0.211 0.000 1.03E+004 1.74E+004
Bus75 Total 0.00 8.414 0.00 117.80 130.34 5.134 5.134 1.15E+003 1.15E+003 3.99E+003 2.49E+003
Main Bus A2 Bus75 69.87 7.344 78.32 104.77 100.75 4.794 5.134 1.37E+003 1.27E+003 3.99E+003 2.49E+003
Mtr A16 Bus75 100.00 1.110 100.00 100.00 100.00 0.362 0.000 6.29E+003 1.06E+004
Bus76 Total 0.00 0.251 0.00 125.30 128.28 0.144 0.144 5.45E+004 4.28E+003 1.76E+005 3.01E+003
Main Bus A2 Bus76 99.61 0.245 99.74 100.14 99.92 0.142 0.144 5.61E+004 1.45E+003 1.76E+005 3.01E+003
Lump A18 Bus76 100.00 0.014 100.00 100.00 100.00 0.006 0.000 3.68E+005 8.77E+005
Bus77 Total 0.00 16.978 0.00 108.16 117.70 13.149 13.149 3.67E+002 7.20E+002 8.62E+002 1.23E+003
Main Bus A2 Bus77 22.74 16.480 29.99 108.63 105.58 12.907 13.149 3.77E+002 7.42E+002 8.62E+002 1.23E+003
Bus43 Main Bus B2 11.37 0.025 4.70 108.70 120.49 0.011 0.000 3.19E+005 4.36E+005
Bus45 Main Bus B2 8.03 0.018 3.31 108.51 119.62 0.007 0.000 4.40E+005 6.39E+005
Bus46 Main Bus B2 1.39 0.003 0.57 108.21 118.02 0.001 0.000 2.33E+006 3.83E+006
Bus47 Main Bus B2 11.45 0.025 4.73 108.70 120.51 0.010 0.000 3.19E+005 4.36E+005
Bus48 Main Bus B2 8.08 0.018 3.33 108.52 119.64 0.007 0.000 4.40E+005 6.39E+005
Bus49 Main Bus B2 11.74 0.025 4.86 108.72 120.58 0.010 0.000 3.21E+005 4.36E+005
Bus50 Main Bus B2 8.34 0.018 3.44 108.53 119.70 0.007 0.000 4.42E+005 6.39E+005
Bus51 Main Bus B2 2.24 0.005 0.92 108.25 118.22 0.002 0.000 1.48E+006 2.39E+006
Bus53 Main Bus B2 1.42 0.003 0.58 108.21 118.03 0.001 0.000 2.33E+006 3.83E+006
Bus54 Main Bus B2 2.29 0.005 0.94 108.25 118.23 0.002 0.000 1.48E+006 2.39E+006
Bus55 Main Bus B2 1.45 0.003 0.59 108.21 118.03 0.001 0.000 2.33E+006 3.83E+006
Bus56 Main Bus B2 7.46 0.024 3.07 108.48 119.48 0.010 0.000 3.28E+005 4.82E+005
Bus57 Main Bus B2 4.58 0.032 2.40 107.79 118.87 0.017 0.000 1.81E+005 3.85E+005
Bus58 Main Bus B2 2.01 0.143 1.05 108.00 118.22 0.075 0.000 3.86E+004 8.74E+004
Bus59 Main Bus B2 5.46 0.096 2.85 107.83 119.10 0.050 0.000 6.15E+004 1.29E+005
Bus60 Main Bus B2 7.47 0.057 3.91 107.62 119.62 0.030 0.000 1.08E+005 2.14E+005
Bus78 Total 0.00 17.072 0.00 108.89 114.84 13.481 13.481 3.08E+002 7.42E+002 6.50E+002 1.27E+003
Main Bus A2 Bus78 17.98 17.072 22.76 107.89 106.82 13.481 13.481 3.08E+002 7.42E+002 6.50E+002 1.27E+003
Main Bus A1 Total 0.00 22.786 0.00 113.25 113.47 17.420 17.420 2.00E+002 5.67E+002 3.56E+002 1.08E+003
Bus61 Main Bus A1 1.08 0.645 0.48 113.33 113.75 0.285 0.000 1.15E+004 1.79E+004
Bus63 Main Bus A1 2.61 2.995 1.35 113.49 114.02 1.553 0.000 2.12E+003 4.06E+003
Bus64 Main Bus A1 1.00 0.262 0.52 113.17 113.73 0.136 0.000 2.07E+004 4.81E+004
Bus65 Main Bus A1 1.00 0.438 0.52 113.21 113.73 0.227 0.000 1.23E+004 2.88E+004
Bus66 Main Bus A1 10.24 0.626 4.20 113.96 116.05 0.257 0.000 1.24E+004 1.80E+004
Bus67 Main Bus A1 10.15 1.013 4.17 114.24 116.08 0.416 0.000 7.51E+003 1.13E+004
Bus68 Main Bus A1 1.23 0.262 0.64 113.14 113.78 0.136 0.000 2.08E+004 4.81E+004
Bus69 Main Bus A1 0.45 0.001 0.23 113.19 113.59 0.001 0.000 5.10E+006 1.20E+007
Bus10 Main Bus A1 26.99 16.680 37.69 104.07 102.65 14.451 17.420 2.24E+002 7.91E+002 3.56E+002 1.08E+003
Main Bus A2 Total 0.00 20.432 0.00 108.68 110.24 16.904 16.904 2.07E+002 6.38E+002 3.32E+002 1.02E+003
Bus77 Main Bus A2 0.68 0.496 0.36 108.70 110.42 0.259 0.000 1.32E+004 2.43E+004
Bus78 Main Bus A2 0.00 0.000 0.00 108.68 110.24 0.000 0.000
Bus70 Main Bus A2 1.54 0.342 0.86 108.54 110.66 0.192 0.000 1.60E+004 3.67E+004
Bus72 Main Bus A2 1.45 0.343 0.82 108.52 110.64 0.192 0.000 1.60E+004 3.67E+004
Bus73 Main Bus A2 1.15 0.437 0.65 108.63 110.55 0.245 0.000 1.24E+004 2.88E+004
Bus74 Main Bus A2 9.69 0.629 4.30 109.36 112.90 0.279 0.000 1.23E+004 1.80E+004
Bus75 Main Bus A2 9.68 1.018 4.30 109.65 112.93 0.452 0.000 7.45E+003 1.12E+004
Bus76 Main Bus A2 5.73 0.014 3.21 107.92 111.79 0.008 0.000 4.24E+005 8.78E+005
Bus12 Main Bus A2 24.52 17.243 33.94 102.03 101.64 15.300 16.904 2.17E+002 7.65E+002 3.32E+002 1.02E+003
Main Bus B1 Total 0.00 17.785 0.00 112.91 120.34 12.748 12.748 3.92E+002 6.64E+002 9.97E+002 1.34E+003
Bus27 Main Bus B1 11.01 0.025 4.21 113.42 122.77 0.010 0.000 3.17E+005 4.36E+005
Bus29 Main Bus B1 7.71 0.018 2.94 113.24 122.00 0.007 0.000 4.37E+005 6.39E+005
Bus30 Main Bus B1 1.34 0.003 0.51 112.96 120.62 0.001 0.000 2.32E+006 3.83E+006
Bus31 Main Bus B1 11.08 0.025 4.24 113.42 122.79 0.010 0.000 3.17E+005 4.36E+005
Bus32 Main Bus B1 7.92 0.018 3.02 113.25 122.05 0.007 0.000 4.39E+005 6.39E+005
Bus33 Main Bus B1 11.45 0.025 4.39 113.44 122.88 0.010 0.000 3.19E+005 4.36E+005
Bus34 Main Bus B1 8.19 0.018 3.12 113.27 122.11 0.007 0.000 4.41E+005 6.39E+005
Bus35 Main Bus B1 2.18 0.005 0.83 112.99 120.79 0.002 0.000 1.48E+006 2.39E+006
Bus36 Main Bus B1 1.38 0.003 0.52 112.96 120.62 0.001 0.000 2.33E+006 3.83E+006
Bus37 Main Bus B1 2.23 0.005 0.84 113.00 120.80 0.002 0.000 1.48E+006 2.39E+006
Bus38 Main Bus B1 1.41 0.003 0.53 112.96 120.63 0.001 0.000 2.33E+006 3.83E+006
Bus39 Main Bus B1 7.25 0.024 2.76 113.22 121.90 0.009 0.000 3.27E+005 4.82E+005
Bus40 Main Bus B1 4.51 0.032 2.19 112.59 121.40 0.016 0.000 1.81E+005 3.85E+005
Bus41 Main Bus B1 1.80 0.144 0.87 112.78 120.76 0.070 0.000 3.84E+004 8.74E+004
Bus42 Main Bus B1 12.31 0.306 4.73 113.76 123.22 0.118 0.000 2.63E+004 3.62E+004
Main Bus A1 Bus61 28.62 17.135 35.14 112.35 106.08 12.480 12.748 4.06E+002 6.90E+002 9.97E+002 1.34E+003
Main Bus B2 Total 0.00 16.978 0.00 108.16 117.70 13.149 13.149 3.67E+002 7.20E+002 8.62E+002 1.23E+003
Bus43 Main Bus B2 11.37 0.025 4.70 108.70 120.49 0.011 0.000 3.19E+005 4.36E+005
Bus45 Main Bus B2 8.03 0.018 3.31 108.51 119.62 0.007 0.000 4.40E+005 6.39E+005
Bus46 Main Bus B2 1.39 0.003 0.57 108.21 118.02 0.001 0.000 2.33E+006 3.83E+006
Bus47 Main Bus B2 11.45 0.025 4.73 108.70 120.51 0.010 0.000 3.19E+005 4.36E+005
Bus48 Main Bus B2 8.08 0.018 3.33 108.52 119.64 0.007 0.000 4.40E+005 6.39E+005
Bus49 Main Bus B2 11.74 0.025 4.86 108.72 120.58 0.010 0.000 3.21E+005 4.36E+005
Bus50 Main Bus B2 8.34 0.018 3.44 108.53 119.70 0.007 0.000 4.42E+005 6.39E+005
Bus51 Main Bus B2 2.24 0.005 0.92 108.25 118.22 0.002 0.000 1.48E+006 2.39E+006
Bus53 Main Bus B2 1.42 0.003 0.58 108.21 118.03 0.001 0.000 2.33E+006 3.83E+006
Bus54 Main Bus B2 2.29 0.005 0.94 108.25 118.23 0.002 0.000 1.48E+006 2.39E+006
Bus55 Main Bus B2 1.45 0.003 0.59 108.21 118.03 0.001 0.000 2.33E+006 3.83E+006
Bus56 Main Bus B2 7.46 0.024 3.07 108.48 119.48 0.010 0.000 3.28E+005 4.82E+005
Bus57 Main Bus B2 4.58 0.032 2.40 107.79 118.87 0.017 0.000 1.81E+005 3.85E+005
Bus58 Main Bus B2 2.01 0.143 1.05 108.00 118.22 0.075 0.000 3.86E+004 8.74E+004
Bus59 Main Bus B2 5.46 0.096 2.85 107.83 119.10 0.050 0.000 6.15E+004 1.29E+005
Bus60 Main Bus B2 7.47 0.057 3.91 107.62 119.62 0.030 0.000 1.08E+005 2.14E+005
Main Bus A2 Bus77 22.74 16.480 29.99 108.63 105.58 12.907 13.149 3.77E+002 7.42E+002 8.62E+002 1.23E+003
Main Bus C Total 0.00 20.188 0.00 113.87 118.00 14.658 14.658 2.63E+002 6.26E+002 6.18E+002 1.29E+003
Bus21 Main Bus C 13.53 1.184 6.64 114.09 121.18 0.581 0.000 5.49E+003 1.02E+004
Bus22 Main Bus C 14.25 1.234 6.99 114.40 121.27 0.605 0.000 5.22E+003 9.81E+003
Bus24 Main Bus C 1.91 0.131 0.94 113.70 118.45 0.064 0.000 4.23E+004 9.61E+004
Bus25 Main Bus C 0.59 0.262 0.29 113.85 118.14 0.129 0.000 2.05E+004 4.81E+004
Bus26 Main Bus C 0.59 0.262 0.29 113.85 118.14 0.129 0.000 2.05E+004 4.81E+004
Main Bus A1 Bus63 14.91 17.128 19.15 112.46 110.12 13.157 14.658 2.99E+002 7.42E+002 6.18E+002 1.29E+003
Bus1 13.800 22.023 58.725 20.918 21.645 57.717 21.645 21.645 19.076 50.865 19.076 19.076 21.937 58.494 21.937 21.937
Bus2 13.800 19.439 47.996 18.298 17.866 44.112 17.866 17.866 16.834 41.564 16.834 16.834 18.768 46.340 18.768 18.768
Bus3 13.800 21.994 58.697 20.918 21.608 57.668 21.608 21.608 19.026 50.777 19.026 19.026 21.889 58.416 21.889 21.889
Bus4 13.800 19.260 47.409 18.151 17.633 43.402 17.633 17.633 16.655 40.995 16.655 16.655 18.577 45.726 18.577 18.577
Bus5 13.800 18.397 42.762 17.342 16.566 38.505 16.566 16.566 15.937 37.042 15.937 15.937 17.683 41.102 17.683 17.683
Bus6 13.800 18.299 42.298 17.280 16.465 38.058 16.465 16.465 15.848 36.633 15.848 15.848 17.576 40.628 17.576 17.576
Bus7 13.800 18.589 43.556 17.520 16.798 39.361 16.798 16.798 16.097 37.717 16.097 16.097 17.871 41.875 17.871 17.871
Bus8 13.800 18.313 42.340 17.306 16.491 38.128 16.491 16.491 15.861 36.669 15.861 15.861 17.590 40.667 17.590 17.590
Bus9 13.800 19.178 46.598 18.067 17.540 42.619 17.540 17.540 16.609 40.355 16.609 16.609 18.496 44.941 18.496 18.496
Bus10 0.400 28.410 56.517 22.804 26.457 52.632 26.457 26.457 24.322 48.384 24.322 24.322 27.652 55.009 27.652 27.652
Bus11 13.800 19.063 46.357 17.977 17.389 42.286 17.389 17.389 16.485 40.088 16.485 16.485 18.372 44.675 18.372 18.372
Bus12 0.400 25.895 52.048 22.800 24.929 50.106 24.929 24.929 22.161 44.543 22.161 22.161 25.451 51.154 25.451 25.451
Bus13 13.800 18.194 42.066 17.207 16.339 37.776 16.339 16.339 15.736 36.381 15.736 15.736 17.462 40.372 17.462 17.462
Bus14 13.800 18.529 43.591 17.482 16.722 39.338 16.722 16.722 16.023 37.695 16.023 16.023 17.807 41.892 17.807 17.807
Bus15 13.800 18.163 41.944 17.166 16.292 37.623 16.292 16.292 15.708 36.274 15.708 15.708 17.430 40.251 17.430 17.430
Bus16 13.800 18.353 42.836 17.310 16.501 38.513 16.501 16.501 15.874 37.049 15.874 15.874 17.631 41.151 17.631 17.631
Bus21 0.400 7.577 11.551 5.983 4.362 6.650 4.362 4.362 6.554 9.991 6.554 6.554 7.034 10.723 7.034 7.034
Bus22 0.400 7.535 11.645 5.842 4.332 6.694 4.332 4.332 6.516 10.070 6.516 6.516 6.989 10.801 6.989 6.989
Bus24 0.400 5.851 8.444 5.473 3.500 5.051 3.500 3.500 5.068 7.314 5.068 5.068 5.342 7.710 5.342 5.342
Bus25 0.400 15.244 24.286 12.048 10.390 16.552 10.390 10.390 13.102 20.873 13.102 13.102 14.212 22.641 14.212 14.212
Bus26 0.400 15.244 24.286 12.048 10.390 16.552 10.390 10.390 13.102 20.873 13.102 13.102 14.212 22.641 14.212 14.212
Bus27 0.400 0.245 0.354 0.230 0.136 0.197 0.136 0.136 0.208 0.300 0.208 0.208 0.217 0.313 0.217 0.217
Bus29 0.400 0.238 0.344 0.228 0.135 0.194 0.135 0.135 0.204 0.294 0.204 0.204 0.212 0.305 0.212 0.212
Bus30 0.400 0.228 0.329 0.226 0.132 0.191 0.132 0.132 0.197 0.284 0.197 0.197 0.203 0.293 0.203 0.203
Bus31 0.400 0.244 0.351 0.228 0.135 0.195 0.135 0.135 0.207 0.298 0.207 0.207 0.216 0.311 0.216 0.216
Bus32 0.400 0.232 0.335 0.222 0.131 0.189 0.131 0.131 0.198 0.286 0.198 0.198 0.206 0.297 0.206 0.206
Bus33 0.400 0.236 0.340 0.220 0.131 0.189 0.131 0.131 0.200 0.288 0.200 0.200 0.209 0.301 0.209 0.209
Bus34 0.400 0.225 0.324 0.214 0.127 0.183 0.127 0.127 0.192 0.277 0.192 0.192 0.199 0.288 0.199 0.199
Bus35 0.400 0.225 0.324 0.222 0.130 0.187 0.130 0.130 0.194 0.279 0.194 0.194 0.200 0.288 0.200 0.200
Bus36 0.400 0.222 0.320 0.220 0.129 0.186 0.129 0.129 0.192 0.277 0.192 0.192 0.198 0.285 0.198 0.198
Bus37 0.400 0.220 0.317 0.217 0.127 0.183 0.127 0.127 0.190 0.274 0.190 0.190 0.196 0.283 0.196 0.196
Bus38 0.400 0.218 0.314 0.216 0.126 0.182 0.126 0.126 0.188 0.271 0.188 0.188 0.194 0.280 0.194 0.194
Bus39 0.400 0.335 0.484 0.321 0.190 0.274 0.190 0.190 0.287 0.413 0.287 0.287 0.298 0.430 0.298 0.298
Bus40 0.400 0.715 1.031 0.697 0.412 0.595 0.412 0.412 0.619 0.893 0.619 0.619 0.644 0.929 0.644 0.644
Bus41 0.400 6.178 8.922 5.772 3.729 5.386 3.729 3.729 5.345 7.719 5.345 5.345 5.660 8.174 5.660 5.660
Bus42 0.400 2.518 3.642 2.235 1.389 2.009 1.389 1.389 2.118 3.062 2.118 2.118 2.243 3.243 2.243 2.243
Bus43 0.400 0.237 0.343 0.222 0.132 0.190 0.132 0.132 0.201 0.290 0.201 0.201 0.210 0.303 0.210 0.210
Project: ETAP Page: 88
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal
Bus45 0.400 0.229 0.331 0.219 0.129 0.186 0.129 0.129 0.196 0.282 0.196 0.196 0.203 0.293 0.203 0.203
Bus46 0.400 0.221 0.318 0.219 0.128 0.185 0.128 0.128 0.191 0.275 0.191 0.191 0.197 0.283 0.197 0.197
Bus47 0.400 0.236 0.340 0.220 0.131 0.189 0.131 0.131 0.200 0.288 0.200 0.200 0.209 0.301 0.209 0.209
Bus48 0.400 0.228 0.329 0.217 0.128 0.185 0.128 0.128 0.194 0.280 0.194 0.194 0.202 0.292 0.202 0.202
Bus49 0.400 0.230 0.332 0.214 0.128 0.184 0.128 0.128 0.195 0.281 0.195 0.195 0.204 0.294 0.204 0.204
Bus50 0.400 0.221 0.318 0.210 0.124 0.179 0.124 0.124 0.188 0.271 0.188 0.188 0.196 0.282 0.196 0.196
Bus51 0.400 0.219 0.315 0.216 0.126 0.182 0.126 0.126 0.189 0.272 0.189 0.189 0.195 0.281 0.195 0.195
Bus53 0.400 0.216 0.312 0.214 0.125 0.181 0.125 0.125 0.187 0.269 0.187 0.187 0.193 0.278 0.193 0.193
Bus54 0.400 0.214 0.309 0.212 0.124 0.179 0.124 0.124 0.185 0.267 0.185 0.185 0.191 0.275 0.191 0.191
Bus55 0.400 0.212 0.306 0.210 0.123 0.177 0.123 0.123 0.183 0.264 0.183 0.183 0.189 0.272 0.189 0.189
Bus56 0.400 0.326 0.471 0.312 0.184 0.266 0.184 0.184 0.279 0.402 0.279 0.279 0.290 0.418 0.290 0.290
Bus57 0.400 0.705 1.016 0.688 0.407 0.587 0.407 0.407 0.610 0.880 0.610 0.610 0.635 0.916 0.635 0.635
Bus58 0.400 5.714 8.253 5.475 3.477 5.022 3.477 3.477 4.947 7.145 4.947 4.947 5.271 7.613 5.271 5.271
Bus59 0.400 1.713 2.471 1.647 0.992 1.432 0.992 0.992 1.484 2.141 1.484 1.484 1.557 2.247 1.557 1.557
Bus60 0.400 0.778 1.122 0.747 0.445 0.642 0.445 0.445 0.673 0.972 0.673 0.673 0.704 1.015 0.704 0.704
Bus61 0.400 17.785 30.159 13.799 12.748 21.616 12.748 12.748 15.187 25.752 15.187 15.187 16.548 28.061 16.548 16.548
Bus63 0.400 20.188 37.539 14.747 14.658 27.255 14.658 14.658 17.247 32.069 17.247 17.247 18.584 34.555 18.584 18.584
Bus64 0.400 14.060 21.325 11.743 9.479 14.377 9.479 9.479 12.106 18.360 12.106 12.106 13.173 19.980 13.173 13.173
Bus65 0.400 16.480 26.851 13.112 11.624 18.939 11.624 11.624 14.141 23.039 14.141 14.141 15.426 25.134 15.426 15.426
Bus66 0.400 5.756 8.410 4.940 3.302 4.824 3.302 3.302 4.845 7.079 4.845 4.845 5.188 7.580 5.188 5.188
Bus67 0.400 8.359 12.625 6.763 4.949 7.475 4.949 4.949 7.001 10.573 7.001 7.001 7.566 11.428 7.566 7.566
Bus68 0.400 12.957 19.274 11.043 8.545 12.711 8.545 8.545 11.171 16.618 11.171 11.171 12.117 18.025 12.117 12.117
Bus69 0.400 0.233 0.336 0.232 0.135 0.195 0.135 0.135 0.201 0.291 0.201 0.201 0.208 0.299 0.208 0.208
Bus70 0.400 12.476 18.934 11.272 8.612 13.070 8.612 8.612 10.750 16.315 10.750 10.750 11.892 18.049 11.892 11.892
Bus72 0.400 13.003 19.694 11.728 9.016 13.656 9.016 9.016 11.202 16.967 11.202 11.202 12.422 18.814 12.422 12.422
Bus73 0.400 14.725 24.063 12.959 10.841 17.716 10.841 10.841 12.644 20.662 12.644 12.644 14.089 23.023 14.089 14.089
Bus74 0.400 5.937 8.696 5.211 3.471 5.085 3.471 3.471 5.001 7.326 5.001 5.001 5.397 7.905 5.397 5.397
Bus75 0.400 8.414 12.801 7.077 5.134 7.810 5.134 5.134 7.049 10.725 7.049 7.049 7.702 11.717 7.702 7.702
Bus76 0.400 0.251 0.362 0.244 0.144 0.208 0.144 0.144 0.217 0.313 0.217 0.217 0.226 0.325 0.226 0.226
Bus77 0.400 16.978 29.834 14.653 13.149 23.107 13.149 13.149 14.519 25.514 14.519 14.519 16.187 28.444 16.187 16.187
Bus78 0.400 17.072 31.761 14.809 13.481 25.080 13.481 13.481 14.597 27.155 14.597 14.597 16.112 29.974 16.112 16.112
Main Bus A1 0.400 22.786 44.640 16.658 17.420 34.129 17.420 17.420 19.398 38.003 19.398 19.398 20.796 40.741 20.796 20.796
Main Bus A2 0.400 20.432 40.706 17.218 16.904 33.677 16.904 16.904 17.408 34.681 17.408 17.408 19.118 38.088 19.118 19.118
Main Bus B1 0.400 17.785 30.159 13.799 12.748 21.616 12.748 12.748 15.187 25.752 15.187 15.187 16.548 28.061 16.548 16.548
Main Bus B2 0.400 16.978 29.834 14.653 13.149 23.107 13.149 13.149 14.519 25.514 14.519 14.519 16.187 28.444 16.187 16.187
Main Bus C 0.400 20.188 37.539 14.747 14.658 27.255 14.658 14.658 17.247 32.069 17.247 17.247 18.584 34.555 18.584 18.584
All fault currents are in rms kA. Current ip is calculated using Method C.
* LLG fault current is the larger of the two faulted line currents.
Project: ETAP Page: 89
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal
Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus1 13.800 0.01982 0.36123 0.36177 0.01759 0.36124 0.36166 0.01269 0.38067 0.38088 0.00000 0.00000 0.00000
Bus2 13.800 0.04656 0.40722 0.40987 0.04366 0.40758 0.40991 0.05660 0.51499 0.51810 0.00000 0.00000 0.00000
Bus3 13.800 0.01916 0.36175 0.36226 0.01688 0.36266 0.36306 0.01269 0.38067 0.38088 0.00000 0.00000 0.00000
Bus4 13.800 0.04746 0.41094 0.41367 0.04461 0.41252 0.41492 0.05942 0.52360 0.52697 0.00000 0.00000 0.00000
Bus5 13.800 0.07044 0.42731 0.43307 0.06747 0.42756 0.43285 0.09669 0.56880 0.57696 0.00000 0.00000 0.00000
Bus6 13.800 0.07283 0.42927 0.43541 0.07000 0.42970 0.43536 0.09939 0.57242 0.58099 0.00000 0.00000 0.00000
Bus7 13.800 0.06686 0.42337 0.42862 0.06382 0.42393 0.42871 0.08903 0.55852 0.56557 0.00000 0.00000 0.00000
Bus8 13.800 0.07278 0.42893 0.43506 0.06979 0.42939 0.43502 0.09827 0.57091 0.57931 0.00000 0.00000 0.00000
Bus9 13.800 0.05245 0.41212 0.41544 0.04955 0.41249 0.41546 0.06606 0.52769 0.53181 0.00000 0.00000 0.00000
Bus10 0.400 0.00240 0.00734 0.00772 0.00233 0.00755 0.00790 0.00254 0.00890 0.00926 0.00000 0.00000 0.00000
Bus11 13.800 0.05197 0.41470 0.41794 0.04912 0.41629 0.41918 0.06663 0.53328 0.53742 0.00000 0.00000 0.00000
Bus12 0.400 0.00251 0.00809 0.00847 0.00242 0.00833 0.00868 0.00254 0.00890 0.00926 0.00000 0.00000 0.00000
Bus13 13.800 0.07270 0.43183 0.43791 0.06976 0.43351 0.43908 0.09951 0.57741 0.58592 0.00000 0.00000 0.00000
Bus14 13.800 0.06509 0.42503 0.42999 0.06213 0.42678 0.43127 0.08757 0.56139 0.56818 0.00000 0.00000 0.00000
Bus15 13.800 0.07318 0.43252 0.43867 0.07043 0.43421 0.43988 0.10131 0.57982 0.58861 0.00000 0.00000 0.00000
Bus16 13.800 0.06855 0.42867 0.43412 0.06571 0.43025 0.43524 0.09500 0.57136 0.57921 0.00000 0.00000 0.00000
Bus21 0.400 0.02176 0.01911 0.02896 0.02160 0.01938 0.02903 0.08299 0.04399 0.09392 0.00000 0.00000 0.00000
Bus22 0.400 0.02075 0.02042 0.02912 0.02061 0.02069 0.02920 0.08083 0.04920 0.09463 0.00000 0.00000 0.00000
Bus24 0.400 0.03548 0.01212 0.03749 0.03535 0.01248 0.03749 0.11067 0.02457 0.11336 0.00000 0.00000 0.00000
Bus25 0.400 0.00875 0.01143 0.01439 0.00863 0.01179 0.01461 0.02468 0.02415 0.03453 0.00000 0.00000 0.00000
Bus26 0.400 0.00875 0.01143 0.01439 0.00863 0.01179 0.01461 0.02468 0.02415 0.03453 0.00000 0.00000 0.00000
Bus27 0.400 0.88812 0.10659 0.89449 0.92922 0.08270 0.93289 3.00289 0.05526 3.00340 0.00000 0.00000 0.00000
Bus29 0.400 0.91610 0.08384 0.91993 0.94447 0.06560 0.94674 3.02438 0.05550 3.02489 0.00000 0.00000 0.00000
Bus30 0.400 0.96079 0.03541 0.96144 0.96544 0.03210 0.96598 3.04587 0.05575 3.04638 0.00000 0.00000 0.00000
Bus31 0.400 0.89398 0.10780 0.90046 0.93567 0.08362 0.93940 3.02438 0.05550 3.02489 0.00000 0.00000 0.00000
Bus32 0.400 0.94077 0.08752 0.94484 0.97077 0.06830 0.97317 3.11034 0.05648 3.11085 0.00000 0.00000 0.00000
Bus33 0.400 0.92319 0.11392 0.93019 0.96787 0.08825 0.97188 3.13183 0.05672 3.13234 0.00000 0.00000 0.00000
Bus34 0.400 0.97150 0.09222 0.97587 1.00361 0.07177 1.00618 3.21778 0.05770 3.21830 0.00000 0.00000 0.00000
Bus35 0.400 0.97628 0.04278 0.97721 0.98412 0.03708 0.98481 3.11034 0.05648 3.11085 0.00000 0.00000 0.00000
Bus36 0.400 0.98766 0.03643 0.98833 0.99258 0.03290 0.99313 3.13183 0.05672 3.13234 0.00000 0.00000 0.00000
Bus37 0.400 0.99623 0.04382 0.99719 1.00440 0.03787 1.00511 3.17480 0.05721 3.17532 0.00000 0.00000 0.00000
Bus38 0.400 1.00781 0.03720 1.00849 1.01294 0.03351 1.01349 3.19629 0.05745 3.19681 0.00000 0.00000 0.00000
Bus39 0.400 0.65124 0.05992 0.65399 0.67019 0.04791 0.67190 2.14334 0.04552 2.14383 0.00000 0.00000 0.00000
Bus40 0.400 0.30452 0.03782 0.30686 0.30441 0.03825 0.30680 0.98127 0.05902 0.98304 0.00000 0.00000 0.00000
Bus41 0.400 0.03299 0.01314 0.03551 0.03290 0.01358 0.03559 0.10237 0.02652 0.10575 0.00000 0.00000 0.00000
Project: ETAP Page: 90
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal
Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus42 0.400 0.08164 0.03041 0.08712 0.08719 0.03044 0.09234 0.29008 0.05683 0.29559 0.00000 0.00000 0.00000
Bus43 0.400 0.91687 0.11338 0.92385 0.96090 0.08808 0.96493 3.10817 0.05474 3.10865 0.00000 0.00000 0.00000
Bus45 0.400 0.95261 0.09014 0.95686 0.98341 0.07048 0.98593 3.15115 0.05523 3.15163 0.00000 0.00000 0.00000
Bus46 0.400 0.99396 0.03755 0.99467 0.99891 0.03396 0.99948 3.15115 0.05523 3.15163 0.00000 0.00000 0.00000
Bus47 0.400 0.92269 0.11462 0.92979 0.96733 0.08902 0.97142 3.12966 0.05499 3.13014 0.00000 0.00000 0.00000
Bus48 0.400 0.95876 0.09108 0.96307 0.98997 0.07117 0.99253 3.17264 0.05547 3.17312 0.00000 0.00000 0.00000
Bus49 0.400 0.94593 0.11962 0.95346 0.99303 0.09282 0.99736 3.21561 0.05596 3.21610 0.00000 0.00000 0.00000
Bus50 0.400 0.98941 0.09585 0.99405 1.02278 0.07470 1.02550 3.28008 0.05669 3.28057 0.00000 0.00000 0.00000
Bus51 0.400 1.00246 0.04503 1.00347 1.01069 0.03898 1.01144 3.19412 0.05572 3.19461 0.00000 0.00000 0.00000
Bus53 0.400 1.01411 0.03832 1.01483 1.01926 0.03457 1.01984 3.21561 0.05596 3.21610 0.00000 0.00000 0.00000
Bus54 0.400 1.02240 0.04609 1.02344 1.03097 0.03978 1.03174 3.25859 0.05645 3.25908 0.00000 0.00000 0.00000
Bus55 0.400 1.03424 0.03911 1.03499 1.03961 0.03518 1.04020 3.28008 0.05669 3.28057 0.00000 0.00000 0.00000
Bus56 0.400 0.66939 0.06330 0.67237 0.68945 0.05064 0.69131 2.20564 0.04451 2.20609 0.00000 0.00000 0.00000
Bus57 0.400 0.30886 0.03927 0.31135 0.30870 0.03968 0.31124 0.99501 0.05790 0.99670 0.00000 0.00000 0.00000
Bus58 0.400 0.03562 0.01434 0.03840 0.03547 0.01476 0.03842 0.11017 0.02538 0.11306 0.00000 0.00000 0.00000
Bus59 0.400 0.12409 0.03178 0.12809 0.12392 0.03218 0.12803 0.40418 0.05699 0.40818 0.00000 0.00000 0.00000
Bus60 0.400 0.27876 0.04373 0.28217 0.27858 0.04412 0.28205 0.91545 0.05480 0.91709 0.00000 0.00000 0.00000
Bus61 0.400 0.00627 0.01063 0.01234 0.00618 0.01108 0.01269 0.01596 0.02141 0.02670 0.00000 0.00000 0.00000
Bus63 0.400 0.00420 0.01002 0.01087 0.00408 0.01039 0.01117 0.00989 0.02064 0.02289 0.00000 0.00000 0.00000
Bus64 0.400 0.01117 0.01090 0.01560 0.01104 0.01129 0.01579 0.03156 0.02175 0.03833 0.00000 0.00000 0.00000
Bus65 0.400 0.00763 0.01091 0.01331 0.00750 0.01130 0.01356 0.02032 0.02195 0.02991 0.00000 0.00000 0.00000
Bus66 0.400 0.03257 0.01980 0.03812 0.03454 0.02079 0.04031 0.11391 0.04292 0.12173 0.00000 0.00000 0.00000
Bus67 0.400 0.01915 0.01795 0.02625 0.02031 0.01932 0.02804 0.06727 0.04206 0.07933 0.00000 0.00000 0.00000
Bus68 0.400 0.01304 0.01080 0.01693 0.01292 0.01118 0.01708 0.03768 0.02141 0.04334 0.00000 0.00000 0.00000
Bus69 0.400 0.94273 0.02932 0.94319 0.94261 0.02971 0.94308 2.97114 0.05761 2.97170 0.00000 0.00000 0.00000
Bus70 0.400 0.01253 0.01234 0.01759 0.01237 0.01275 0.01777 0.03568 0.02151 0.04166 0.00000 0.00000 0.00000
Bus72 0.400 0.01211 0.01175 0.01687 0.01195 0.01216 0.01705 0.03425 0.02000 0.03966 0.00000 0.00000 0.00000
Bus73 0.400 0.00839 0.01231 0.01490 0.00824 0.01272 0.01516 0.02218 0.02165 0.03100 0.00000 0.00000 0.00000
Bus74 0.400 0.03101 0.02011 0.03696 0.03279 0.02116 0.03903 0.10730 0.04043 0.11466 0.00000 0.00000 0.00000
Bus75 0.400 0.01842 0.01845 0.02607 0.01948 0.01988 0.02783 0.06376 0.03979 0.07516 0.00000 0.00000 0.00000
Bus76 0.400 0.87215 0.06842 0.87483 0.87197 0.06880 0.87468 2.82034 0.04817 2.82075 0.00000 0.00000 0.00000
Bus77 0.400 0.00587 0.01151 0.01292 0.00573 0.01195 0.01325 0.01379 0.01967 0.02403 0.00000 0.00000 0.00000
Bus78 0.400 0.00493 0.01187 0.01285 0.00478 0.01229 0.01318 0.01039 0.02034 0.02284 0.00000 0.00000 0.00000
Main Bus A1 0.400 0.00320 0.00908 0.00963 0.00308 0.00947 0.00996 0.00570 0.01728 0.01819 0.00000 0.00000 0.00000
Main Bus A2 0.400 0.00331 0.01021 0.01074 0.00317 0.01063 0.01109 0.00532 0.01626 0.01711 0.00000 0.00000 0.00000
Main Bus B1 0.400 0.00627 0.01063 0.01234 0.00618 0.01108 0.01269 0.01596 0.02141 0.02670 0.00000 0.00000 0.00000
Main Bus B2 0.400 0.00587 0.01151 0.01292 0.00573 0.01195 0.01325 0.01379 0.01967 0.02403 0.00000 0.00000 0.00000
Project: ETAP Page: 91
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal
Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Main Bus C 0.400 0.00420 0.01002 0.01087 0.00408 0.01039 0.01117 0.00989 0.02064 0.02289 0.00000 0.00000 0.00000