Project: ETAP Page: 1

12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Electrical Transient Analyzer Program

Short-Circuit Analysis

IEC 60909 Standard


3-Phase, LG, LL, & LLG Fault Currents

Swing V-Control Load Total


Number of Buses:  2  0  71  73

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches:  2  0  0  66  0  3  71

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load
Total
Number of Machines:  0  2  0  37  19  58

System Frequency: 60.00 Hz

Unit System: Metric

Project Filename: EP17009 IMPEDANCE

Output Filename: D:\PEE APPLICATION\EP17009\MCSET\7 Doc Sub\8 EP17009 SC AND RC STUDY REV03\01
ETAP\sc impedance.SI2
Project: ETAP Page: 2
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Global  0

Cable Resistance: Yes Global  0


Project: ETAP Page: 3
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

Bus1 SWNG  13.800  13.800  1  100.00  0.00

Bus2 Load  13.800  13.800  1  100.00  0.00

Bus3 SWNG  13.800  13.800  2  100.00  0.00

Bus4 Load  13.800  13.800  2  100.00  0.00

Bus5 Load  13.800  13.800  1  100.00  0.00

Bus6 Load  13.800  13.800  1  100.00  0.00

Bus7 Load  13.800  13.800  1  100.00  0.00

Bus8 Load  13.800  13.800  1  100.00  0.00

Bus9 Load  13.800  13.800  1  100.00  0.00

Bus10 Load  0.400  0.400  1  100.00 -30.00

Bus11 Load  13.800  13.800  2  100.00  0.00

Bus12 Load  0.400  0.400  2  100.00 -30.00

Bus13 Load  13.800  13.800  2  100.00  0.00

Bus14 Load  13.800  13.800  2  100.00  0.00

Bus15 Load  13.800  13.800  2  100.00  0.00

Bus16 Load  13.800  13.800  2  100.00  0.00

Bus21 Load  0.400  0.400  1  100.00 -30.00

Bus22 Load  0.400  0.400  1  100.00 -30.00

Bus24 Load  0.400  0.400  1  100.00 -30.00

Bus25 Load  0.400  0.400  1  100.00 -30.00

Bus26 Load  0.400  0.400  1  100.00 -30.00

Bus27 Load  0.400  0.400  1  100.00 -30.00

Bus29 Load  0.400  0.400  1  100.00 -30.00

Bus30 Load  0.400  0.400  1  100.00 -30.00

Bus31 Load  0.400  0.400  1  100.00 -30.00

Bus32 Load  0.400  0.400  1  100.00 -30.00

Bus33 Load  0.400  0.400  1  100.00 -30.00

Bus34 Load  0.400  0.400  1  100.00 -30.00

Bus35 Load  0.400  0.400  1  100.00 -30.00

Bus36 Load  0.400  0.400  1  100.00 -30.00

Bus37 Load  0.400  0.400  1  100.00 -30.00

Bus38 Load  0.400  0.400  1  100.00 -30.00

Bus39 Load  0.400  0.400  1  100.00 -30.00

Bus40 Load  0.400  0.400  1  100.00 -30.00

Bus41 Load  0.400  0.400  1  100.00 -30.00


Project: ETAP Page: 4
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

Bus42 Load  0.400  0.400  1  100.00 -30.00

Bus43 Load  0.400  0.400  2  100.00 -30.00

Bus45 Load  0.400  0.400  2  100.00 -30.00

Bus46 Load  0.400  0.400  2  100.00 -30.00

Bus47 Load  0.400  0.400  2  100.00 -30.00

Bus48 Load  0.400  0.400  2  100.00 -30.00

Bus49 Load  0.400  0.400  2  100.00 -30.00

Bus50 Load  0.400  0.400  2  100.00 -30.00

Bus51 Load  0.400  0.400  2  100.00 -30.00

Bus53 Load  0.400  0.400  2  100.00 -30.00

Bus54 Load  0.400  0.400  2  100.00 -30.00

Bus55 Load  0.400  0.400  2  100.00 -30.00

Bus56 Load  0.400  0.400  2  100.00 -30.00

Bus57 Load  0.400  0.400  2  100.00 -30.00

Bus58 Load  0.400  0.400  2  100.00 -30.00

Bus59 Load  0.400  0.400  2  100.00 -30.00

Bus60 Load  0.400  0.400  2  100.00 -30.00

Bus61 Load  0.400  0.400  1  100.00 -30.00

Bus63 Load  0.400  0.400  1  100.00 -30.00

Bus64 Load  0.400  0.400  1  100.00 -30.00

Bus65 Load  0.400  0.400  1  100.00 -30.00

Bus66 Load  0.400  0.400  1  100.00 -30.00

Bus67 Load  0.400  0.400  1  100.00 -30.00

Bus68 Load  0.400  0.400  1  100.00 -30.00

Bus69 Load  0.400  0.400  1  100.00 -30.00

Bus70 Load  0.400  0.400  2  100.00 -30.00

Bus72 Load  0.400  0.400  2  100.00 -30.00

Bus73 Load  0.400  0.400  2  100.00 -30.00

Bus74 Load  0.400  0.400  2  100.00 -30.00

Bus75 Load  0.400  0.400  2  100.00 -30.00

Bus76 Load  0.400  0.400  2  100.00 -30.00

Bus77 Load  0.400  0.400  2  100.00 -30.00

Bus78 Load  0.400  0.400  2  100.00 -30.00

Main Bus A1 Load  0.400  0.400  1  1.00 -30.00

Main Bus A2 Load  0.400  0.400  2  1.00 -30.00

Main Bus B1 Load  0.400  0.400  1  1.00 -30.00

Main Bus B2 Load  0.400  0.400  2  1.00 -30.00


Project: ETAP Page: 5
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

Main Bus C Load  0.400  0.400  1  1.00 -30.00

73 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP.
Project: ETAP Page: 6
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Line/Cable Input Data

Ohms or Siemens per 1000 m per Conductor (Cable) or per Phase (Line)
Line/Cable Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R1 X1 Y1 R0 X0 Y0

Cable A1 1.0MCUN4 120  23.0  0.0  1  0  0.1416394  0.073  0.0001499  0.4461643  0.17958

Cable A2 1.0MCUN4 240  19.0  0.0  1  0  0.0700971  0.072  0.0001565  0.2208058  0.17712

Cable A3 1.0MCUN4 50  23.0  0.0  1  0  0.3569892  0.079  0.0001188  1.124516  0.19434

Cable A4 1.0MCUN4 95  26.0  0.0  1  0  0.1784946  0.073  0.0001433  0.562258  0.17958

Cable A5 1.0MCUN3 70  139.0  0.0  1  0  0.2471464  0.075  0.0001307  0.778511  0.1845

Cable A6 1.0MCUN3 120  138.0  0.0  1  0  0.1416394  0.073  0.0001499  0.4461643  0.17958

Cable A7 1.0MCUN4 35  21.0  0.0  1  0  0.483453  0.08  0.0001015  1.522913  0.1968

Cable A8 1.0MCUN2 2.5  138.0  0.0  1  0  6.821818  0.1188  0.0000588  21.48873  0.292248

Cable A10 1.0MCUN4 120  19.0  0.0  1  0  0.1416394  0.073  0.0001499  0.4461643  0.17958

Cable A11 1.0MCUN4 240  23.0  0.0  1  0  0.0700971  0.072  0.0001565  0.2208058  0.17712

Cable A12 1.0MCUN4 50  27.0  0.0  1  0  0.3569892  0.079  0.0001188  1.124516  0.19434

Cable A13 1.0MCUN4 35  19.0  0.0  1  0  0.483453  0.08  0.0001015  1.522913  0.1968

Cable A14 1.0MCUN4 95  30.0  0.0  1  0  0.1784946  0.073  0.0001433  0.562258  0.17958

Cable A15 1.0MCUN3 70  131.0  0.0  1  0  0.2471464  0.075  0.0001307  0.778511  0.1845

Cable A16 1.0MCUN3 120  131.0  0.0  1  0  0.1416394  0.073  0.0001499  0.4461643  0.17958

Cable A18 1.0MCUN2 2.5  131.0  0.0  1  0  6.821818  0.099  0.000049  21.48873  0.24354

Cable B1 1.0MCUN3 2.5  139.0  0.0  1  0  6.821818  0.099  0.000049  21.48873  0.24354

Cable B2 1.0MCUN3 2.5  140.0  0.0  1  0  6.821818  0.099  0.000049  21.48873  0.24354

Cable B3 1.0MCUN3 2.5  141.0  0.0  1  0  6.821818  0.099  0.000049  21.48873  0.24354

Cable B4 1.0MCUN3 2.5  140.0  0.0  1  0  6.821818  0.099  0.000049  21.48873  0.24354

Cable B5 1.0MCUN3 2.5  144.0  0.0  1  0  6.821818  0.099  0.000049  21.48873  0.24354

Cable B6 1.0MCUN3 2.5  145.0  0.0  1  0  6.821818  0.099  0.000049  21.48873  0.24354

Cable B7 1.0MCUN3 2.5  149.0  0.0  1  0  6.821818  0.099  0.000049  21.48873  0.24354

Cable B8 1.0MCUN3 2.5  144.0  0.0  1  0  6.821818  0.099  0.000049  21.48873  0.24354

Cable B9 1.0MCUN3 2.5  145.0  0.0  1  0  6.821818  0.099  0.000049  21.48873  0.24354

Cable B10 1.0MCUN3 2.5  147.0  0.0  1  0  6.821818  0.099  0.000049  21.48873  0.24354

Cable B11 1.0MCUN3 2.5  148.0  0.0  1  0  6.821818  0.099  0.000049  21.48873  0.24354

Cable B12 1.0MCUN3 2.5  99.0  0.0  1  0  6.821818  0.099  0.000049  21.48873  0.24354

Cable B13 1.0MCUN4 10  182.0  0.0  1  0  1.683775  0.084  0.0000807  5.303891  0.20664

Cable B14 1.0MCUN4 16  26.0  0.0  1  0  1.055069  0.08  0.0000971  3.323468  0.1968

Cable B16 1.0MCUN3 35  180.0  0.0  1  0  0.483453  0.08  0.0001015  1.522877  0.1968

Cable B20 1.0MCUN3 2.5  144.0  0.0  1  0  6.821818  0.099  0.000049  21.48873  0.24354

Cable B21 1.0MCUN3 2.5  146.0  0.0  1  0  6.821818  0.099  0.000049  21.48873  0.24354
Project: ETAP Page: 7
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Ohms or Siemens per 1000 m per Conductor (Cable) or per Phase (Line)
Line/Cable Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R1 X1 Y1 R0 X0 Y0

Cable B22 1.0MCUN3 2.5  146.0  0.0  1  0  6.821818  0.099  0.000049  21.48873  0.24354

Cable B23 1.0MCUN3 2.5  145.0  0.0  1  0  6.821818  0.099  0.000049  21.48873  0.24354

Cable B24 1.0MCUN3 2.5  147.0  0.0  1  0  6.821818  0.099  0.000049  21.48873  0.24354

Cable B25 1.0MCUN3 2.5  149.0  0.0  1  0  6.821818  0.099  0.000049  21.48873  0.24354

Cable B26 1.0MCUN3 2.5  152.0  0.0  1  0  6.821818  0.099  0.000049  21.48873  0.24354

Cable B27 1.0MCUN3 2.5  148.0  0.0  1  0  6.821818  0.099  0.000049  21.48873  0.24354

Cable B28 1.0MCUN3 2.5  149.0  0.0  1  0  6.821818  0.099  0.000049  21.48873  0.24354

Cable B29 1.0MCUN3 2.5  151.0  0.0  1  0  6.821818  0.099  0.000049  21.48873  0.24354

Cable B30 1.0MCUN3 2.5  152.0  0.0  1  0  6.821818  0.099  0.000049  21.48873  0.24354

Cable B31 1.0MCUN3 2.5  102.0  0.0  1  0  6.821818  0.099  0.000049  21.48873  0.24354

Cable B32 1.0MCUN4 10  185.0  0.0  1  0  1.683775  0.084  0.0000807  5.303891  0.20664

Cable B33 1.0MCUN4 16  29.0  0.0  1  0  1.055069  0.08  0.0000971  3.323468  0.1968

Cable B37 1.0MCUN4 25  185.0  0.0  1  0  0.6698968  0.082  0.0000889  2.110211  0.20172

Cable B38 1.0MCUN4 10  170.0  0.0  1  0  1.683775  0.084  0.0000807  5.303891  0.20664

Cable C1 1.0MCUN4 95  130.0  0.0  1  0  0.1784946  0.073  0.0001433  0.562258  0.17958

Cable C2 1.0MCUN4 120  159.0  0.0  1  0  0.1416394  0.073  0.0001499  0.4461643  0.17958

Cable C3 1.0MCUN4 10  19.0  0.0  1  0  1.683775  0.084  0.0000807  5.303891  0.20664

Cable C4 1.0MCUN4 70  19.0  0.0  1  0  0.2471464  0.075  0.0001307  0.778511  0.1845

Cable C5 1.0MCUN4 70  19.0  0.0  1  0  0.2471464  0.075  0.0001307  0.778511  0.1845

Cable1-INC CAB 15NCUS1 240  390.0  0.0  1  0  0.0708197  0.1356  0.1126034  0.344424

Cable2 15NCUS1 240  415.0  0.0  1  0  0.0708197  0.1356  0.1126034  0.344424

Cable3 15NCUS3 120  178.0  0.0  1  0  0.1416394  0.119  0.2252067  0.30226

Cable4 15NCUS3 120  190.0  0.0  1  0  0.1416394  0.119  0.2252067  0.30226

Cable5 15NCUS3 120  144.0  0.0  1  0  0.1416394  0.119  0.2252067  0.30226

Cable6 15NCUS3 120  185.0  0.0  1  0  0.1416394  0.119  0.2252067  0.30226

Cable7-TRF HV CAB 15NCUS3 120  42.0  0.0  1  0  0.1416394  0.119  0.2252067  0.30226

Cable8-TRF LV CAB 1.0MCUN1 630  33.0  0.0  1  0  0.0303513  0.1032  0.0002428  0.0956066  0.253872

Cable9 1.0MCUN1 630  29.0  0.0  1  0  0.0303513  0.1032  0.0002428  0.0956066  0.253872

Cable10 15NCUS3 120  32.0  0.0  1  0  0.1416394  0.119  0.2252067  0.30226

Cable11 15NCUS3 120  178.0  0.0  1  0  0.1416394  0.119  0.2252067  0.30226

Cable12 15NCUS3 120  125.0  0.0  1  0  0.1416394  0.119  0.2252067  0.30226

Cable13 15NCUS3 120  186.0  0.0  1  0  0.1416394  0.119  0.2252067  0.30226

Cable14 15NCUS3 120  158.0  0.0  1  0  0.1416394  0.119  0.2252067  0.30226

Line / Cable resistances are listed at the specified temperatures.


Project: ETAP Page: 8
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

T1  1.000  13.800  0.400  6.00  3.50  0    0    0   0     0     6.0000 Dyn  30.000

T2  1.000  13.800  0.400  6.00  3.50  0    0    0   0     0     6.0000 Dyn  30.000

2-Winding Transformer Grounding Input Data

Grounding

Transformer Rating Conn. Primary Secondary


ID MVA Prim. kV Sec. kV Type Type kV Amp Ohm Type kV Amp Ohm

T1  1.000  13.800  0.400 D/Y Solid

T2  1.000  13.800  0.400 D/Y Solid


Project: ETAP Page: 9
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

T1 2W XFMR Bus9 Bus10  158.92  556.22  578.48

T2 2W XFMR Bus11 Bus12  158.92  556.22  578.48

Cable A1 Cable Main Bus A1 Bus61  203.61  104.94  229.06  0.0000006

Cable A2 Cable Main Bus A1 Bus63  83.24  85.50  119.33  0.0000005

Cable A3 Cable Main Bus A1 Bus64  513.17  113.56  525.59  0.0000004

Cable A4 Cable Main Bus A1 Bus65  290.05  118.63  313.37  0.0000006

Cable A5 Cable Main Bus A1 Bus66  2147.08  651.56  2243.77  0.0000029

Cable A6 Cable Main Bus A1 Bus67  1221.64  629.63  1374.35  0.0000033

Cable A7 Cable Main Bus A1 Bus68  634.53  105.00  643.16  0.0000003

Cable A8 Cable Main Bus A1 Bus69  58838.18  1024.65  58847.10  0.0000013

Cable A10 Cable Main Bus A2 Bus77  168.20  86.69  189.22  0.0000005

Cable A11 Cable Main Bus A2 Bus78  100.76  103.50  144.45  0.0000006

Cable A12 Cable Main Bus A2 Bus70  602.42  133.31  616.99  0.0000005

Cable A13 Cable Main Bus A2 Bus72  574.10  95.00  581.91  0.0000003

Cable A14 Cable Main Bus A2 Bus73  334.68  136.88  361.59  0.0000007

Cable A15 Cable Main Bus A2 Bus74  2023.51  614.06  2114.63  0.0000027

Cable A16 Cable Main Bus A2 Bus75  1159.67  597.69  1304.64  0.0000031

Cable A18 Cable Main Bus A2 Bus76  55853.63  810.56  55859.51  0.0000010

Cable B1 Cable Main Bus B1 Bus27  59264.54  860.06  59270.78  0.0000011

Cable B2 Cable Main Bus B1 Bus29  59690.91  866.25  59697.19  0.0000011

Cable B3 Cable Main Bus B1 Bus30  60117.27  872.44  60123.60  0.0000011

Cable B4 Cable Main Bus B1 Bus31  59690.91  866.25  59697.19  0.0000011

Cable B5 Cable Main Bus B1 Bus32  61396.36  891.00  61402.82  0.0000011

Cable B6 Cable Main Bus B1 Bus33  61822.72  897.19  61829.23  0.0000011

Cable B7 Cable Main Bus B1 Bus34  63528.18  921.94  63534.87  0.0000012

Cable B8 Cable Main Bus B1 Bus35  61396.36  891.00  61402.82  0.0000011

Cable B9 Cable Main Bus B1 Bus36  61822.72  897.19  61829.23  0.0000011

Cable B10 Cable Main Bus B1 Bus37  62675.45  909.56  62682.05  0.0000012

Cable B11 Cable Main Bus B1 Bus38  63101.81  915.75  63108.46  0.0000012

Cable B12 Cable Main Bus B1 Bus39  42210.00  612.56  42214.44  0.0000008

Cable B13 Cable Main Bus B1 Bus40  19152.94  955.50  19176.76  0.0000023

Cable B14 Cable Main Bus B1 Bus41  1714.49  130.00  1719.41  0.0000004

Cable B16 Cable Main Bus B1 Bus42  5438.85  900.00  5512.81  0.0000029

Cable B20 Cable Main Bus B2 Bus43  61396.36  891.00  61402.82  0.0000011

Cable B21 Cable Main Bus B2 Bus45  62249.09  903.37  62255.64  0.0000011

Cable B22 Cable Main Bus B2 Bus46  62249.09  903.37  62255.64  0.0000011

Cable B23 Cable Main Bus B2 Bus47  61822.72  897.19  61829.23  0.0000011
Project: ETAP Page: 10
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

Cable B24 Cable Main Bus B2 Bus48  62675.45  909.56  62682.05  0.0000012

Cable B25 Cable Main Bus B2 Bus49  63528.18  921.94  63534.87  0.0000012

Cable B26 Cable Main Bus B2 Bus50  64807.27  940.50  64814.09  0.0000012

Cable B27 Cable Main Bus B2 Bus51  63101.81  915.75  63108.46  0.0000012

Cable B28 Cable Main Bus B2 Bus53  63528.18  921.94  63534.87  0.0000012
Cable B29 Cable Main Bus B2 Bus54  64380.90  934.31  64387.68  0.0000012

Cable B30 Cable Main Bus B2 Bus55  64807.27  940.50  64814.09  0.0000012

Cable B31 Cable Main Bus B2 Bus56  43489.09  631.13  43493.67  0.0000008

Cable B32 Cable Main Bus B2 Bus57  19468.65  971.25  19492.86  0.0000024

Cable B33 Cable Main Bus B2 Bus58  1912.31  145.00  1917.80  0.0000005

Cable B37 Cable Main Bus B2 Bus59  7745.68  948.13  7803.49  0.0000026

Cable B38 Cable Main Bus B2 Bus60  17890.11  892.50  17912.36  0.0000022

Cable C1 Cable Main Bus C Bus21  1450.27  593.13  1566.87  0.0000030

Cable C2 Cable Main Bus C Bus22  1407.54  725.44  1583.49  0.0000038

Cable C3 Cable Main Bus C Bus24  1999.48  99.75  2001.97  0.0000002

Cable C4 Cable Main Bus C Bus25  293.49  89.06  306.70  0.0000004

Cable C5 Cable Main Bus C Bus26  293.49  89.06  306.70  0.0000004

Cable1-INC CAB Cable Bus1 Bus2  1.45  2.78  3.13

Cable2 Cable Bus3 Bus4  1.54  2.95  3.33

Cable3 Cable Bus2 Bus5  1.32  1.11  1.73

Cable4 Cable Bus2 Bus6  1.41  1.19  1.85

Cable5 Cable Bus2 Bus7  1.07  0.90  1.40

Cable6 Cable Bus2 Bus8  1.38  1.16  1.80

Cable7-TRF HV CAB Cable Bus2 Bus9  0.31  0.26  0.41

Cable8-TRF LV CAB Cable Bus10 Main Bus A1  62.60  212.85  221.86  0.0000013

Cable9 Cable Bus12 Main Bus A2  55.01  187.05  194.97  0.0000011

Cable10 Cable Bus4 Bus11  0.24  0.20  0.31

Cable11 Cable Bus4 Bus13  1.32  1.11  1.73

Cable12 Cable Bus4 Bus14  0.93  0.78  1.21

Cable13 Cable Bus4 Bus15  1.38  1.16  1.81

Cable14 Cable Bus4 Bus16  1.18  0.99  1.53

QM2A - MED MCC INCOMER-1 Tie Breakr Bus61 Main Bus B1

QM2B Tie Breakr Bus77 Main Bus B2

QM3A - GEN DB INCOMER Tie Breakr Bus63 Main Bus C


Project: ETAP Page: 11
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Power Grid Input Data

% Impedance
Power Grid Connected Bus Rating 100 MVA Base Grounding
ID ID MVASC kV R X" R/X" Type

U1 Bus1  500.000  13.800  0.66630  19.98890  0.03 Wye - Solid


U2 Bus3  500.000  13.800  0.66630  19.98890  0.03 Wye - Solid

Total Connected Power Grids ( = 2 ): 1000.000 MVA


Project: ETAP Page: 12
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Induction Machine Input Data

Induction Machine Connected Bus Rating PosSeqImp (Mtr Base Grounding mFact.
ID Type Qty ID HP/kW kVA kV Amp PF %R % X" R/X" Conn. Type Amp MW/PP
Mtr1 Motor  1 Bus5  1580.00  1969.55  13.800  82.40  92.68  2.11  16.53  0.13 Wye Open  0.32

Mtr2 Motor  1 Bus6  660.00  901.12  13.800  37.70  80.13  2.69  16.45  0.16 Wye Open  0.07

Mtr3 Motor  1 Bus7  1050.00  1405.46  13.800  58.80  88.41  13.17  10.22  1.29 Wye Open  0.18

Mtr4 Motor  1 Bus8  280.00  337.02  13.800  14.10  89.00  14.83  7.60  1.95 Wye Open  0.14

Mtr5 Motor  1 Bus13  280.00  327.12  13.800  13.69  91.97  14.83  7.60  1.95 Wye Open  0.14

Mtr6 Motor  1 Bus14  1050.00  1273.48  13.800  53.28  88.41  13.17  10.22  1.29 Wye Open  0.17

Mtr7 Motor  1 Bus15  660.00  764.44  13.200  33.44  92.32  2.48  15.18  0.16 Wye Open  0.33

Mtr8 Motor  1 Bus16  1580.00  1814.19  13.200  79.35  92.68  1.95  15.26  0.13 Wye Open  0.79

Mtr B1 Motor  1 Bus27  2.20  3.04  0.400  4.40  85.00  7.84  13.24  0.59 Wye Open  0.00

Mtr B2 Motor  1 Bus29  1.50  2.08  0.400  3.00  85.00  7.84  13.24  0.59 Wye Open  0.00

Mtr B3 Motor  1 Bus30  0.25  0.35  0.400  0.50  85.00  7.84  13.24  0.59 Wye Open  0.00

Mtr B4 Motor  1 Bus31  2.20  3.04  0.400  4.40  85.00  7.84  13.24  0.59 Wye Open  0.00

Mtr B5 Motor  1 Bus32  1.50  2.08  0.400  3.00  85.00  7.84  13.24  0.59 Wye Open  0.00

Mtr B6 Motor  1 Bus33  2.20  3.04  0.400  4.40  85.00  7.84  13.24  0.59 Wye Open  0.00

Mtr B7 Motor  1 Bus34  1.50  2.08  0.400  3.00  85.00  7.84  13.24  0.59 Wye Open  0.00

Mtr B8 Motor  1 Bus35  0.40  0.55  0.400  0.80  85.00  7.84  13.24  0.59 Wye Open  0.00

Mtr B9 Motor  1 Bus36  0.25  0.35  0.400  0.50  85.00  7.84  13.24  0.59 Wye Open  0.00

Mtr B10 Motor  1 Bus37  0.40  0.55  0.400  0.80  85.00  7.84  13.24  0.59 Wye Open  0.00

Mtr B11 Motor  1 Bus38  0.25  0.35  0.400  0.50  85.00  7.84  13.24  0.59 Wye Open  0.00

Mtr B12 Motor  1 Bus39  2.20  2.75  0.400  3.97  80.00  7.84  13.24  0.59 Wye Open  0.00

Mtr B16 Motor  1 Bus42  30.00  37.50  0.400  54.13  80.00  7.84  13.24  0.59 Wye Open  0.02

Mtr B20 Motor  1 Bus43  2.20  3.04  0.400  4.40  85.00  7.84  13.24  0.59 Wye Open  0.00

Mtr B21 Motor  1 Bus45  1.50  2.08  0.400  3.00  85.00  7.84  13.24  0.59 Wye Open  0.00

Mtr B22 Motor  1 Bus46  0.25  0.35  0.400  0.50  85.00  7.84  13.24  0.59 Wye Open  0.00

Mtr B23 Motor  1 Bus47  2.20  3.04  0.400  4.40  85.00  7.84  13.24  0.59 Wye Open  0.00

Mtr B24 Motor  1 Bus48  1.50  2.08  0.400  3.00  85.00  7.84  13.24  0.59 Wye Open  0.00

Mtr B25 Motor  1 Bus49  2.20  3.04  0.400  4.40  85.00  7.84  13.24  0.59 Wye Open  0.00

Mtr B26 Motor  1 Bus50  1.50  2.08  0.400  3.00  85.00  7.84  13.24  0.59 Wye Open  0.00

Mtr B27 Motor  1 Bus51  0.40  0.55  0.400  0.80  85.00  7.84  13.24  0.59 Wye Open  0.00

Mtr B28 Motor  1 Bus53  0.25  0.35  0.400  0.50  85.00  7.84  13.24  0.59 Wye Open  0.00

Mtr B29 Motor  1 Bus54  0.40  0.55  0.400  0.80  85.00  7.84  13.24  0.59 Wye Open  0.00

Mtr B30 Motor  1 Bus55  0.25  0.35  0.400  0.50  85.00  7.84  13.24  0.59 Wye Open  0.00

Mtr B31 Motor  1 Bus56  2.20  2.75  0.400  3.97  80.00  7.84  13.24  0.59 Wye Open  0.00

Mtr A5 Motor  1 Bus66  55.00  76.12  0.400  109.88  85.00  7.84  13.24  0.59 Wye Open  0.03
Project: ETAP Page: 13
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Induction Machine Input Data

Induction Machine Connected Bus Rating PosSeqImp (Mtr Base Grounding mFact.
ID Type Qty ID HP/kW kVA kV Amp PF %R % X" R/X" Conn. Type Amp MW/PP
Mtr A6 Motor  1 Bus67  90.00  124.57  0.400  179.80  85.00  7.84  13.24  0.59 Wye Open  0.04

Mtr A15 Motor  1 Bus74  55.00  76.12  0.400  109.88  85.00  7.84  13.24  0.59 Wye Open  0.03

Mtr A16 Motor  1 Bus75  90.00  124.57  0.400  179.80  85.00  7.84  13.24  0.59 Wye Open  0.04

Total Connected Induction Machines ( = 37 ): 9271.8 kVA

Lumped Load Input Data


Motor Loads
Lumped Load % Impedance
Lumped Load Rating % Load Loading Machine Base Grounding mFact.
ID kVA kV Amp % PF MTR STAT kW kvar R X" R/X" Conn. Type Amp MW/PP
Lump A3  40.0  0.400  57.74  100.00  80  20  32.00  0.00  6.46  15.37  0.42 Delta  0.03

Lump A4  67.0  0.400  96.71  100.00  80  20  53.60  0.00  6.46  15.37  0.42 Delta  0.05

Lump A5  67.0  0.400  96.71  100.00  80  20  53.60  0.00  6.46  15.37  0.42 Delta  0.05

Lump A6  52.5  0.400  75.72  76.25  80  20  32.00  27.15  6.46  15.37  0.42 Delta  0.03

Lump A7  40.0  0.400  57.74  100.00  80  20  32.00  0.00  6.46  15.37  0.42 Delta  0.03

Lump A8  0.2  0.400  0.40  100.00  80  20  0.13  0.00  6.46  15.37  0.42 Delta  0.00

Lump A10  52.5  0.400  75.72  76.25  80  20  32.00  27.15  6.46  15.37  0.42 Delta  0.03

Lump A18  2.2  0.400  5.48  7.30  80  20  0.13  1.75  6.46  15.37  0.42 Delta  0.00

Lump B13  5.0  0.400  7.22  100.00  80  20  4.00  0.00  6.46  15.37  0.42 Delta  0.00

Lump B14  22.0  0.400  31.75  100.00  80  20  17.60  0.00  6.46  15.37  0.42 Delta  0.02

Lump B32  5.0  0.400  7.22  100.00  80  20  4.00  0.00  6.46  15.37  0.42 Delta  0.00

Lump B33  22.0  0.400  31.75  100.00  80  20  17.60  0.00  6.46  15.37  0.42 Delta  0.02

Lump B37  15.0  0.400  21.65  100.00  80  20  12.00  0.00  6.46  15.37  0.42 Delta  0.01

Lump B38  9.0  0.400  12.99  100.00  80  20  7.20  0.00  6.46  15.37  0.42 Delta  0.01

Lump C1  200.0  0.400  288.68  85.00  80  20  136.00  84.29  6.46  15.37  0.42 Delta  0.14

Lump C2  211.5  0.400  305.20  85.13  80  20  144.00  88.77  6.46  15.37  0.42 Delta  0.14

Lump C3  20.0  0.400  28.87  100.00  80  20  16.00  0.00  6.46  15.37  0.42 Delta  0.02

Lump C4  40.0  0.400  57.74  100.00  80  20  32.00  0.00  6.46  15.37  0.42 Delta  0.03

Lump C5  40.0  0.400  57.74  100.00  80  20  32.00  0.00  6.46  15.37  0.42 Delta  0.03

Total Connected Lumped Loads ( = 19 ): 910.7 kVA


Project: ETAP Page: 14
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

SHORT- CIRCUIT REPORT

Fault at bus: Bus1


Nominal kV =  13.800
Voltage c Factor = 1.00 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus1 Total  0.00  22.023  0.00  101.32  100.43  21.645  21.645 1.04E+000 1.90E+001 6.66E-001 2.00E+001

Bus2 Bus1  0.90  1.197  0.58  101.44  100.62  0.771  0.000 1.49E+002 3.16E+002

U1 Bus1  100.00  20.918  100.00  100.00  100.00  20.918  21.645 6.66E-001 2.00E+001 6.66E-001 2.00E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  22.023  21.645  19.076  21.937
Peak Current (kA), Method C :  58.725  57.717  50.865  58.494
Breaking Current (kA, rms, symm) :  21.645  19.076  21.937
Steady State Current (kA, rms) :  20.918  21.645  19.076  21.937

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 15
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus2


Nominal kV =  13.800
Voltage c Factor = 1.00 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus2 Total  0.00  19.439  0.00  104.20  104.36  17.866  17.866 2.44E+000 2.14E+001 2.97E+000 2.70E+001

Bus1 Bus2  13.70  18.298  18.88  101.25  100.39  17.167  17.866 2.12E+000 2.28E+001 2.97E+000 2.70E+001

Bus5 Bus2  0.20  0.494  0.13  104.19  104.42  0.314  0.000 1.08E+002 8.41E+002

Bus6 Bus2  0.10  0.226  0.06  104.20  104.39  0.131  0.000 3.00E+002 1.83E+003

Bus7 Bus2  0.12  0.352  0.07  104.22  104.39  0.196  0.000 9.38E+002 7.28E+002

Bus8 Bus2  0.04  0.085  0.02  104.21  104.37  0.043  0.000 4.40E+003 2.26E+003

Bus9 Bus2  0.01  0.140  0.01  104.20  104.37  0.081  0.000 1.29E+003 2.69E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  19.439  17.866  16.834  18.768
Peak Current (kA), Method C :  47.996  44.112  41.564  46.340
Breaking Current (kA, rms, symm) :  17.866  16.834  18.768
Steady State Current (kA, rms) :  18.298  17.866  16.834  18.768

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 16
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus3


Nominal kV =  13.800
Voltage c Factor = 1.00 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus3 Total  0.00  21.994  0.00  101.27  100.50  21.608  21.608 1.01E+000 1.90E+001 6.66E-001 2.00E+001

Bus4 Bus3  0.92  1.155  0.58  101.40  100.71  0.727  0.000 1.46E+002 3.32E+002

U2 Bus3  100.00  20.918  100.00  100.00  100.00  20.918  21.608 6.66E-001 2.00E+001 6.66E-001 2.00E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  21.994  21.608  19.026  21.889
Peak Current (kA), Method C :  58.697  57.668  50.777  58.416
Breaking Current (kA, rms, symm) :  21.608  19.026  21.889
Steady State Current (kA, rms) :  20.918  21.608  19.026  21.889

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 17
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus4


Nominal kV =  13.800
Voltage c Factor = 1.00 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus4 Total  0.00  19.260  0.00  104.31  104.63  17.633  17.633 2.49E+000 2.16E+001 3.12E+000 2.75E+001

Bus3 Bus4  14.46  18.151  19.85  101.20  100.46  16.972  17.633 2.21E+000 2.29E+001 3.12E+000 2.75E+001

Bus11 Bus4  0.01  0.084  0.00  104.32  104.63  0.047  0.000 2.28E+003 4.40E+003

Bus13 Bus4  0.03  0.082  0.02  104.32  104.64  0.042  0.000 4.54E+003 2.32E+003

Bus14 Bus4  0.09  0.319  0.05  104.33  104.65  0.177  0.000 1.03E+003 8.03E+002

Bus15 Bus4  0.10  0.227  0.05  104.32  104.66  0.127  0.000 2.98E+002 1.82E+003

Bus16 Bus4  0.20  0.538  0.12  104.31  104.69  0.328  0.000 9.94E+001 7.71E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  19.260  17.633  16.655  18.577
Peak Current (kA), Method C :  47.409  43.402  40.995  45.726
Breaking Current (kA, rms, symm) :  17.633  16.655  18.577
Steady State Current (kA, rms) :  18.151  17.633  16.655  18.577

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 18
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus5


Nominal kV =  13.800
Voltage c Factor = 1.00 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus5 Total  0.00  18.397  0.00  104.98  105.69  16.566  16.566 3.70E+000 2.24E+001 5.08E+000 2.99E+001

Bus2 Bus5  7.40  17.903  9.03  104.19  103.74  16.258  16.566 3.82E+000 2.31E+001 5.08E+000 2.99E+001

Mtr1 Bus5  100.00  0.494  100.00  100.00  100.00  0.308  0.000 1.07E+002 8.39E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  18.397  16.566  15.937  17.683
Peak Current (kA), Method C :  42.762  38.505  37.042  41.102
Breaking Current (kA, rms, symm) :  16.566  15.937  17.683
Steady State Current (kA, rms) :  17.342  16.566  15.937  17.683

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 19
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus6


Nominal kV =  13.800
Voltage c Factor = 1.00 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus6 Total  0.00  18.299  0.00  105.06  105.68  16.465  16.465 3.82E+000 2.25E+001 5.22E+000 3.01E+001

Bus2 Bus6  7.97  18.073  9.65  104.20  103.66  16.336  16.465 3.87E+000 2.28E+001 5.22E+000 3.01E+001

Mtr2 Bus6  100.00  0.226  100.00  100.00  100.00  0.128  0.000 2.98E+002 1.83E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  18.299  16.465  15.848  17.576
Peak Current (kA), Method C :  42.298  38.058  36.633  40.628
Breaking Current (kA, rms, symm) :  16.465  15.848  17.576
Steady State Current (kA, rms) :  17.280  16.465  15.848  17.576

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 20
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus7


Nominal kV =  13.800
Voltage c Factor = 1.00 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus7 Total  0.00  18.589  0.00  104.89  105.40  16.798  16.798 3.51E+000 2.22E+001 4.68E+000 2.93E+001

Bus2 Bus7  6.13  18.333  7.45  104.23  103.82  16.647  16.798 3.26E+000 2.26E+001 4.68E+000 2.93E+001

Mtr3 Bus7  100.00  0.353  100.00  100.00  100.00  0.193  0.000 9.37E+002 7.27E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  18.589  16.798  16.097  17.871
Peak Current (kA), Method C :  43.556  39.361  37.717  41.875
Breaking Current (kA, rms, symm) :  16.798  16.097  17.871
Steady State Current (kA, rms) :  17.520  16.798  16.097  17.871

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 21
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus8


Nominal kV =  13.800
Voltage c Factor = 1.00 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus8 Total  0.00  18.313  0.00  105.05  105.60  16.491  16.491 3.82E+000 2.25E+001 5.16E+000 3.00E+001

Bus2 Bus8  7.84  18.263  9.46  104.21  103.65  16.461  16.491 3.75E+000 2.26E+001 5.16E+000 3.00E+001

Mtr4 Bus8  100.00  0.085  100.00  100.00  100.00  0.042  0.000 4.40E+003 2.25E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  18.313  16.491  15.861  17.590
Peak Current (kA), Method C :  42.340  38.128  36.669  40.667
Breaking Current (kA, rms, symm) :  16.491  15.861  17.590
Steady State Current (kA, rms) :  17.306  16.491  15.861  17.590

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 22
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus9


Nominal kV =  13.800
Voltage c Factor = 1.00 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus9 Total  0.00  19.178  0.00  104.38  104.68  17.540  17.540 2.75E+000 2.16E+001 3.47E+000 2.77E+001

Bus2 Bus9  1.86  19.045  2.28  104.21  104.19  17.463  17.540 2.72E+000 2.18E+001 3.47E+000 2.77E+001

Bus10 Bus9  19.37  0.140  65.56  67.29  100.58  0.081  0.000 1.29E+003 2.69E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  19.178  17.540  16.609  18.496
Peak Current (kA), Method C :  46.598  42.619  40.355  44.941
Breaking Current (kA, rms, symm) :  17.540  16.609  18.496
Steady State Current (kA, rms) :  18.067  17.540  16.609  18.496

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 23
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus10


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus10 Total  0.00  28.410  0.00  104.17  102.94  26.457  26.457 1.50E+002 4.59E+002 1.59E+002 5.56E+002

Main Bus A1 Bus10  9.17  5.669  5.40  106.08  104.35  3.335  0.000 1.13E+003 2.14E+003

Bus9 Bus10  96.38  22.846  98.15  100.02  98.46  23.165  26.457 * 1.62E+002 5.78E+002 1.59E+002 5.56E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  28.410  26.457  24.322  27.652
Peak Current (kA), Method C :  56.517  52.632  48.384  55.009
Breaking Current (kA, rms, symm) :  26.457  24.322  27.652
Steady State Current (kA, rms) :  22.804  26.457  24.322  27.652

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 24
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus11


Nominal kV =  13.800
Voltage c Factor = 1.00 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus11 Total  0.00  19.063  0.00  104.45  104.86  17.389  17.389 2.73E+000 2.18E+001 3.50E+000 2.80E+001

Bus4 Bus11  1.41  18.984  1.72  104.32  104.49  17.345  17.389 2.71E+000 2.19E+001 3.50E+000 2.80E+001

Bus12 Bus11  11.68  0.084  63.50  64.33  100.72  0.046  0.000 2.28E+003 4.40E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  19.063  17.389  16.485  18.372
Peak Current (kA), Method C :  46.357  42.286  40.088  44.675
Breaking Current (kA, rms, symm) :  17.389  16.485  18.372
Steady State Current (kA, rms) :  17.977  17.389  16.485  18.372

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 25
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus12


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus12 Total  0.00  25.895  0.00  102.02  101.76  24.929  24.929 1.57E+002 5.06E+002 1.59E+002 5.56E+002

Main Bus A2 Bus12  4.44  3.125  2.57  102.96  102.52  1.808  0.000 2.12E+003 3.84E+003

Bus11 Bus12  96.37  22.844  98.07  100.03  98.41  23.144  24.929 * 1.62E+002 5.78E+002 1.59E+002 5.56E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  25.895  24.929  22.161  25.451
Peak Current (kA), Method C :  52.048  50.106  44.543  51.154
Breaking Current (kA, rms, symm) :  24.929  22.161  25.451
Steady State Current (kA, rms) :  22.800  24.929  22.161  25.451

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 26
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus13


Nominal kV =  13.800
Voltage c Factor = 1.00 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus13 Total  0.00  18.194  0.00  105.13  105.79  16.339  16.339 3.82E+000 2.27E+001 5.23E+000 3.03E+001

Bus4 Bus13  7.50  18.145  9.01  104.32  103.92  16.309  16.339 3.75E+000 2.28E+001 5.23E+000 3.03E+001

Mtr5 Bus13  100.00  0.082  100.00  100.00  100.00  0.041  0.000 4.53E+003 2.32E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  18.194  16.339  15.736  17.462
Peak Current (kA), Method C :  42.066  37.776  36.381  40.372
Breaking Current (kA, rms, symm) :  16.339  15.736  17.462
Steady State Current (kA, rms) :  17.207  16.339  15.736  17.462

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 27
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus14


Nominal kV =  13.800
Voltage c Factor = 1.00 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus14 Total  0.00  18.529  0.00  104.90  105.51  16.722  16.722 3.42E+000 2.23E+001 4.60E+000 2.95E+001

Bus4 Bus14  5.31  18.299  6.44  104.34  104.13  16.585  16.722 3.19E+000 2.26E+001 4.60E+000 2.95E+001

Mtr6 Bus14  100.00  0.320  100.00  100.00  100.00  0.175  0.000 1.03E+003 8.02E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  18.529  16.722  16.023  17.807
Peak Current (kA), Method C :  43.591  39.338  37.695  41.892
Breaking Current (kA, rms, symm) :  16.722  16.023  17.807
Steady State Current (kA, rms) :  17.482  16.722  16.023  17.807

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 28
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus15


Nominal kV =  13.800
Voltage c Factor = 1.00 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus15 Total  0.00  18.163  0.00  105.16  105.88  16.292  16.292 3.84E+000 2.27E+001 5.32E+000 3.04E+001

Bus4 Bus15  7.75  17.936  9.35  104.31  103.92  16.168  16.292 3.89E+000 2.30E+001 5.32E+000 3.04E+001

Mtr7 Bus15  104.55  0.227  104.55  104.55  104.55  0.124  0.000 2.97E+002 1.82E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  18.163  16.292  15.708  17.430
Peak Current (kA), Method C :  41.944  37.623  36.274  40.251
Breaking Current (kA, rms, symm) :  16.292  15.708  17.430
Steady State Current (kA, rms) :  17.166  16.292  15.708  17.430

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 29
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus16


Nominal kV =  13.800
Voltage c Factor = 1.00 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus16 Total  0.00  18.353  0.00  105.01  105.79  16.501  16.501 3.60E+000 2.25E+001 4.99E+000 3.00E+001

Bus4 Bus16  6.54  17.814  7.98  104.31  104.06  16.179  16.501 3.73E+000 2.32E+001 4.99E+000 3.00E+001

Mtr8 Bus16  104.55  0.539  104.55  104.55  104.55  0.322  0.000 9.82E+001 7.70E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  18.353  16.501  15.874  17.631
Peak Current (kA), Method C :  42.836  38.513  37.049  41.151
Breaking Current (kA, rms, symm) :  16.501  15.874  17.631
Steady State Current (kA, rms) :  17.310  16.501  15.874  17.631

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 30
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus21


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus21 Total  0.00  7.577  0.00  121.32  133.13  4.362  4.362 1.36E+003 1.19E+003 5.19E+003 2.75E+003

Main Bus C Bus21  73.35  6.419  78.73  107.16  101.36  3.912  4.362 1.73E+003 1.26E+003 5.19E+003 2.75E+003

Lump C1 Bus21  100.00  1.316  100.00  100.00  100.00  0.506  0.000 4.04E+003 9.60E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  7.577  4.362  6.554  7.034
Peak Current (kA), Method C :  11.551  6.650  9.991  10.723
Breaking Current (kA, rms, symm) :  4.362  6.554  7.034
Steady State Current (kA, rms) :  5.983  4.362  6.554  7.034

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 31
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus22


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus22 Total  0.00  7.535  0.00  121.44  133.09  4.332  4.332 1.30E+003 1.28E+003 5.05E+003 3.07E+003

Main Bus C Bus22  72.45  6.274  77.79  106.94  101.81  3.843  4.332 1.68E+003 1.39E+003 5.05E+003 3.07E+003

Lump C2 Bus22  100.00  1.392  100.00  100.00  100.00  0.534  0.000 3.82E+003 9.08E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  7.535  4.332  6.516  6.989
Peak Current (kA), Method C :  11.645  6.694  10.070  10.801
Breaking Current (kA, rms, symm) :  4.332  6.516  6.989
Steady State Current (kA, rms) :  5.842  4.332  6.516  6.989

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 32
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus24


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus24 Total  0.00  5.851  0.00  122.15  128.17  3.500  3.500 2.22E+003 7.57E+002 6.92E+003 1.54E+003

Main Bus C Bus24  84.17  5.765  87.19  106.10  98.61  3.465  3.500 2.26E+003 7.30E+002 6.92E+003 1.54E+003

Lump C3 Bus24  100.00  0.132  100.00  100.00  100.00  0.052  0.000 4.04E+004 9.60E+004

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  5.851  3.500  5.068  5.342
Peak Current (kA), Method C :  8.444  5.051  7.314  7.710
Breaking Current (kA, rms, symm) :  3.500  5.068  5.342
Steady State Current (kA, rms) :  5.473  3.500  5.068  5.342

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 33
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus25


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus25 Total  0.00  15.244  0.00  114.72  123.71  10.390  10.390 5.47E+002 7.14E+002 1.54E+003 1.51E+003

Main Bus C Bus25  33.53  14.990  39.21  113.56  107.69  10.273  10.390 5.59E+002 7.24E+002 1.54E+003 1.51E+003

Lump C4 Bus25  100.00  0.263  100.00  100.00  100.00  0.121  0.000 2.02E+004 4.80E+004

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  15.244  10.390  13.102  14.212
Peak Current (kA), Method C :  24.286  16.552  20.873  22.641
Breaking Current (kA, rms, symm) :  10.390  13.102  14.212
Steady State Current (kA, rms) :  12.048  10.390  13.102  14.212

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 34
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus26


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus26 Total  0.00  15.244  0.00  114.72  123.71  10.390  10.390 5.47E+002 7.14E+002 1.54E+003 1.51E+003

Main Bus C Bus26  33.53  14.990  39.21  113.56  107.69  10.273  10.390 5.59E+002 7.24E+002 1.54E+003 1.51E+003

Lump C5 Bus26  100.00  0.263  100.00  100.00  100.00  0.121  0.000 2.02E+004 4.80E+004

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  15.244  10.390  13.102  14.212
Peak Current (kA), Method C :  24.286  16.552  20.873  22.641
Breaking Current (kA, rms, symm) :  10.390  13.102  14.212
Steady State Current (kA, rms) :  12.048  10.390  13.102  14.212

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 35
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus27


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus27 Total  0.00  0.245  0.00  126.09  129.53  0.136  0.136 5.55E+004 6.66E+003 1.88E+005 3.45E+003

Main Bus B1 Bus27  99.32  0.230  99.42  100.30  99.95  0.132  0.136 5.97E+004 1.53E+003 1.88E+005 3.45E+003

Mtr B1 Bus27  100.00  0.027  100.00  100.00  100.00  0.008  0.000 2.57E+005 4.35E+005

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.245  0.136  0.208  0.217
Peak Current (kA), Method C :  0.354  0.197  0.300  0.313
Breaking Current (kA, rms, symm) :  0.136  0.208  0.217
Steady State Current (kA, rms) :  0.230  0.136  0.208  0.217

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 36
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus29


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus29 Total  0.00  0.238  0.00  126.02  128.51  0.135  0.135 5.73E+004 5.24E+003 1.89E+005 3.47E+003

Main Bus B1 Bus29  99.33  0.228  99.42  100.29  99.94  0.132  0.135 6.01E+004 1.53E+003 1.89E+005 3.47E+003

Mtr B2 Bus29  100.00  0.019  100.00  100.00  100.00  0.005  0.000 3.77E+005 6.38E+005

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.238  0.135  0.204  0.212
Peak Current (kA), Method C :  0.344  0.194  0.294  0.305
Breaking Current (kA, rms, symm) :  0.135  0.204  0.212
Steady State Current (kA, rms) :  0.228  0.135  0.204  0.212

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 37
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus30


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus30 Total  0.00  0.228  0.00  125.95  126.68  0.132  0.132 6.00E+004 2.21E+003 1.90E+005 3.48E+003

Main Bus B1 Bus30  99.33  0.227  99.42  100.28  99.93  0.132  0.132 6.05E+004 1.54E+003 1.90E+005 3.48E+003

Mtr B3 Bus30  100.00  0.003  100.00  100.00  100.00  0.001  0.000 2.26E+006 3.83E+006

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.228  0.132  0.197  0.203
Peak Current (kA), Method C :  0.329  0.191  0.284  0.293
Breaking Current (kA, rms, symm) :  0.132  0.197  0.203
Steady State Current (kA, rms) :  0.226  0.132  0.197  0.203

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 38
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus31


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus31 Total  0.00  0.244  0.00  126.09  129.55  0.135  0.135 5.59E+004 6.74E+003 1.89E+005 3.47E+003

Main Bus B1 Bus31  99.33  0.228  99.42  100.30  99.95  0.131  0.135 6.01E+004 1.53E+003 1.89E+005 3.47E+003

Mtr B4 Bus31  100.00  0.027  100.00  100.00  100.00  0.008  0.000 2.57E+005 4.35E+005

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.244  0.135  0.207  0.216
Peak Current (kA), Method C :  0.351  0.195  0.298  0.311
Breaking Current (kA, rms, symm) :  0.135  0.207  0.216
Steady State Current (kA, rms) :  0.228  0.135  0.207  0.216

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 39
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus32


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus32 Total  0.00  0.232  0.00  126.02  128.57  0.131  0.131 5.88E+004 5.47E+003 1.94E+005 3.53E+003

Main Bus B1 Bus32  99.34  0.222  99.43  100.28  99.95  0.128  0.131 6.18E+004 1.56E+003 1.94E+005 3.53E+003

Mtr B5 Bus32  100.00  0.019  100.00  100.00  100.00  0.005  0.000 3.77E+005 6.38E+005

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.232  0.131  0.198  0.206
Peak Current (kA), Method C :  0.335  0.189  0.286  0.297
Breaking Current (kA, rms, symm) :  0.131  0.198  0.206
Steady State Current (kA, rms) :  0.222  0.131  0.198  0.206

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 40
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus33


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus33 Total  0.00  0.236  0.00  126.10  129.66  0.131  0.131 5.77E+004 7.12E+003 1.96E+005 3.55E+003

Main Bus B1 Bus33  99.35  0.220  99.44  100.29  99.95  0.127  0.131 6.22E+004 1.56E+003 1.96E+005 3.55E+003

Mtr B6 Bus33  100.00  0.027  100.00  100.00  100.00  0.008  0.000 2.57E+005 4.35E+005

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.236  0.131  0.200  0.209
Peak Current (kA), Method C :  0.340  0.189  0.288  0.301
Breaking Current (kA, rms, symm) :  0.131  0.200  0.209
Steady State Current (kA, rms) :  0.220  0.131  0.200  0.209

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 41
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus34


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus34 Total  0.00  0.225  0.00  126.03  128.65  0.127  0.127 6.07E+004 5.76E+003 2.01E+005 3.61E+003

Main Bus B1 Bus34  99.37  0.214  99.45  100.27  99.95  0.124  0.127 6.39E+004 1.59E+003 2.01E+005 3.61E+003

Mtr B7 Bus34  100.00  0.019  100.00  100.00  100.00  0.005  0.000 3.77E+005 6.38E+005

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.225  0.127  0.192  0.199
Peak Current (kA), Method C :  0.324  0.183  0.277  0.288
Breaking Current (kA, rms, symm) :  0.127  0.192  0.199
Steady State Current (kA, rms) :  0.214  0.127  0.192  0.199

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 42
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus35


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus35 Total  0.00  0.225  0.00  125.95  126.91  0.130  0.130 6.10E+004 2.67E+003 1.94E+005 3.53E+003

Main Bus B1 Bus35  99.35  0.222  99.43  100.27  99.93  0.129  0.130 6.18E+004 1.56E+003 1.94E+005 3.53E+003

Mtr B8 Bus35  100.00  0.005  100.00  100.00  100.00  0.001  0.000 1.42E+006 2.39E+006

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.225  0.130  0.194  0.200
Peak Current (kA), Method C :  0.324  0.187  0.279  0.288
Breaking Current (kA, rms, symm) :  0.130  0.194  0.200
Steady State Current (kA, rms) :  0.222  0.130  0.194  0.200

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 43
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus36


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus36 Total  0.00  0.222  0.00  125.95  126.69  0.129  0.129 6.17E+004 2.28E+003 1.96E+005 3.55E+003

Main Bus B1 Bus36  99.35  0.220  99.43  100.27  99.93  0.128  0.129 6.22E+004 1.56E+003 1.96E+005 3.55E+003

Mtr B9 Bus36  100.00  0.003  100.00  100.00  100.00  0.001  0.000 2.26E+006 3.83E+006

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.222  0.129  0.192  0.198
Peak Current (kA), Method C :  0.320  0.186  0.277  0.285
Breaking Current (kA, rms, symm) :  0.129  0.192  0.198
Steady State Current (kA, rms) :  0.220  0.129  0.192  0.198

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 44
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus37


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus37 Total  0.00  0.220  0.00  125.96  126.92  0.127  0.127 6.23E+004 2.74E+003 1.98E+005 3.58E+003

Main Bus B1 Bus37  99.36  0.217  99.44  100.27  99.93  0.126  0.127 6.31E+004 1.57E+003 1.98E+005 3.58E+003

Mtr B10 Bus37  100.00  0.005  100.00  100.00  100.00  0.001  0.000 1.42E+006 2.39E+006

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.220  0.127  0.190  0.196
Peak Current (kA), Method C :  0.317  0.183  0.274  0.283
Breaking Current (kA, rms, symm) :  0.127  0.190  0.196
Steady State Current (kA, rms) :  0.217  0.127  0.190  0.196

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 45
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus38


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus38 Total  0.00  0.218  0.00  125.95  126.69  0.126  0.126 6.30E+004 2.33E+003 2.00E+005 3.59E+003

Main Bus B1 Bus38  99.36  0.216  99.44  100.26  99.93  0.126  0.126 6.35E+004 1.58E+003 2.00E+005 3.59E+003

Mtr B11 Bus38  100.00  0.003  100.00  100.00  100.00  0.001  0.000 2.26E+006 3.83E+006

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.218  0.126  0.188  0.194
Peak Current (kA), Method C :  0.314  0.182  0.271  0.280
Breaking Current (kA, rms, symm) :  0.126  0.188  0.194
Steady State Current (kA, rms) :  0.216  0.126  0.188  0.194

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 46
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus39


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus39 Total  0.00  0.335  0.00  125.96  128.41  0.190  0.190 4.07E+004 3.74E+003 1.34E+005 2.84E+003

Main Bus B1 Bus39  99.05  0.322  99.18  100.41  99.92  0.186  0.190 4.26E+004 1.28E+003 1.34E+005 2.84E+003

Mtr B12 Bus39  100.00  0.025  100.00  100.00  100.00  0.007  0.000 2.85E+005 4.81E+005

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.335  0.190  0.287  0.298
Peak Current (kA), Method C :  0.484  0.274  0.413  0.430
Breaking Current (kA, rms, symm) :  0.190  0.287  0.298
Steady State Current (kA, rms) :  0.321  0.190  0.287  0.298

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 47
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus40


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus40 Total  0.00  0.715  0.00  125.05  128.20  0.412  0.412 1.90E+004 2.36E+003 6.13E+004 3.69E+003

Main Bus B1 Bus40  97.78  0.699  98.10  100.86  99.84  0.406  0.412 1.95E+004 1.62E+003 6.13E+004 3.69E+003

Lump B13 Bus40  100.00  0.033  100.00  100.00  100.00  0.013  0.000 1.61E+005 3.84E+005

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.715  0.412  0.619  0.644
Peak Current (kA), Method C :  1.031  0.595  0.893  0.929
Breaking Current (kA, rms, symm) :  0.412  0.619  0.644
Steady State Current (kA, rms) :  0.697  0.412  0.619  0.644

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 48
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus41


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus41 Total  0.00  6.178  0.00  121.32  128.25  3.729  3.729 2.06E+003 8.21E+002 6.40E+003 1.66E+003

Main Bus B1 Bus41  76.21  6.078  79.70  107.04  100.62  3.689  3.729 2.11E+003 7.99E+002 6.40E+003 1.66E+003

Lump B14 Bus41  100.00  0.145  100.00  100.00  100.00  0.058  0.000 3.67E+004 8.73E+004

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  6.178  3.729  5.345  5.660
Peak Current (kA), Method C :  8.922  5.386  7.719  8.174
Breaking Current (kA, rms, symm) :  3.729  5.345  5.660
Steady State Current (kA, rms) :  5.772  3.729  5.345  5.660

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 49
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus42


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus42 Total  0.00  2.518  0.00  124.64  131.63  1.389  1.389 5.10E+003 1.90E+003 1.81E+004 3.55E+003

Main Bus B1 Bus42  91.19  2.268  92.74  102.86  100.21  1.321  1.389 5.84E+003 1.58E+003 1.81E+004 3.55E+003

Mtr B16 Bus42  100.00  0.334  100.00  100.00  100.00  0.098  0.000 2.09E+004 3.53E+004

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  2.518  1.389  2.118  2.243
Peak Current (kA), Method C :  3.642  2.009  3.062  3.243
Breaking Current (kA, rms, symm) :  1.389  2.118  2.243
Steady State Current (kA, rms) :  2.235  1.389  2.118  2.243

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 50
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus43


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus43 Total  0.00  0.237  0.00  126.06  129.67  0.132  0.132 5.73E+004 7.09E+003 1.94E+005 3.42E+003

Main Bus B2 Bus43  99.38  0.222  99.50  100.23  99.98  0.128  0.132 6.18E+004 1.61E+003 1.94E+005 3.42E+003

Mtr B20 Bus43  100.00  0.027  100.00  100.00  100.00  0.008  0.000 2.57E+005 4.35E+005

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.237  0.132  0.201  0.210
Peak Current (kA), Method C :  0.343  0.190  0.290  0.303
Breaking Current (kA, rms, symm) :  0.132  0.201  0.210
Steady State Current (kA, rms) :  0.222  0.132  0.201  0.210

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 51
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus45


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus45 Total  0.00  0.229  0.00  125.99  128.63  0.129  0.129 5.95E+004 5.63E+003 1.97E+005 3.45E+003

Main Bus B2 Bus45  99.39  0.219  99.50  100.22  99.97  0.127  0.129 6.26E+004 1.62E+003 1.97E+005 3.45E+003

Mtr B21 Bus45  100.00  0.019  100.00  100.00  100.00  0.005  0.000 3.77E+005 6.38E+005

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.229  0.129  0.196  0.203
Peak Current (kA), Method C :  0.331  0.186  0.282  0.293
Breaking Current (kA, rms, symm) :  0.129  0.196  0.203
Steady State Current (kA, rms) :  0.219  0.129  0.196  0.203

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 52
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus46


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus46 Total  0.00  0.221  0.00  125.91  126.72  0.128  0.128 6.21E+004 2.35E+003 1.97E+005 3.45E+003

Main Bus B2 Bus46  99.39  0.219  99.49  100.21  99.95  0.127  0.128 6.26E+004 1.62E+003 1.97E+005 3.45E+003

Mtr B22 Bus46  100.00  0.003  100.00  100.00  100.00  0.001  0.000 2.26E+006 3.83E+006

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.221  0.128  0.191  0.197
Peak Current (kA), Method C :  0.318  0.185  0.275  0.283
Breaking Current (kA, rms, symm) :  0.128  0.191  0.197
Steady State Current (kA, rms) :  0.219  0.128  0.191  0.197

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 53
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus47


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus47 Total  0.00  0.236  0.00  126.06  129.69  0.131  0.131 5.77E+004 7.16E+003 1.96E+005 3.44E+003

Main Bus B2 Bus47  99.39  0.220  99.50  100.23  99.98  0.127  0.131 6.22E+004 1.62E+003 1.96E+005 3.44E+003

Mtr B23 Bus47  100.00  0.027  100.00  100.00  100.00  0.008  0.000 2.57E+005 4.35E+005

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.236  0.131  0.200  0.209
Peak Current (kA), Method C :  0.340  0.189  0.288  0.301
Breaking Current (kA, rms, symm) :  0.131  0.200  0.209
Steady State Current (kA, rms) :  0.220  0.131  0.200  0.209

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 54
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus48


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus48 Total  0.00  0.228  0.00  125.99  128.64  0.128  0.128 5.99E+004 5.69E+003 1.98E+005 3.47E+003

Main Bus B2 Bus48  99.40  0.217  99.51  100.22  99.97  0.126  0.128 6.30E+004 1.63E+003 1.98E+005 3.47E+003

Mtr B24 Bus48  100.00  0.019  100.00  100.00  100.00  0.005  0.000 3.77E+005 6.38E+005

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.228  0.128  0.194  0.202
Peak Current (kA), Method C :  0.329  0.185  0.280  0.292
Breaking Current (kA, rms, symm) :  0.128  0.194  0.202
Steady State Current (kA, rms) :  0.217  0.128  0.194  0.202

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 55
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus49


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus49 Total  0.00  0.230  0.00  126.08  129.78  0.128  0.128 5.91E+004 7.48E+003 2.01E+005 3.50E+003

Main Bus B2 Bus49  99.40  0.215  99.52  100.22  99.98  0.123  0.128 6.39E+004 1.64E+003 2.01E+005 3.50E+003

Mtr B25 Bus49  100.00  0.027  100.00  100.00  100.00  0.008  0.000 2.57E+005 4.35E+005

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.230  0.128  0.195  0.204
Peak Current (kA), Method C :  0.332  0.184  0.281  0.294
Breaking Current (kA, rms, symm) :  0.128  0.195  0.204
Steady State Current (kA, rms) :  0.214  0.128  0.195  0.204

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 56
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus50


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus50 Total  0.00  0.221  0.00  126.00  128.72  0.124  0.124 6.18E+004 5.99E+003 2.05E+005 3.54E+003

Main Bus B2 Bus50  99.42  0.210  99.52  100.21  99.97  0.122  0.124 6.52E+004 1.66E+003 2.05E+005 3.54E+003

Mtr B26 Bus50  100.00  0.019  100.00  100.00  100.00  0.005  0.000 3.77E+005 6.38E+005

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.221  0.124  0.188  0.196
Peak Current (kA), Method C :  0.318  0.179  0.271  0.282
Breaking Current (kA, rms, symm) :  0.124  0.188  0.196
Steady State Current (kA, rms) :  0.210  0.124  0.188  0.196

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 57
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus51


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus51 Total  0.00  0.219  0.00  125.92  126.95  0.126  0.126 6.27E+004 2.81E+003 2.00E+005 3.48E+003

Main Bus B2 Bus51  99.40  0.216  99.50  100.21  99.96  0.126  0.126 6.35E+004 1.64E+003 2.00E+005 3.48E+003

Mtr B27 Bus51  100.00  0.005  100.00  100.00  100.00  0.001  0.000 1.42E+006 2.39E+006

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.219  0.126  0.189  0.195
Peak Current (kA), Method C :  0.315  0.182  0.272  0.281
Breaking Current (kA, rms, symm) :  0.126  0.189  0.195
Steady State Current (kA, rms) :  0.216  0.126  0.189  0.195

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 58
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus53


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus53 Total  0.00  0.216  0.00  125.91  126.72  0.125  0.125 6.34E+004 2.40E+003 2.01E+005 3.50E+003

Main Bus B2 Bus53  99.40  0.215  99.51  100.20  99.96  0.125  0.125 6.39E+004 1.64E+003 2.01E+005 3.50E+003

Mtr B28 Bus53  100.00  0.003  100.00  100.00  100.00  0.001  0.000 2.26E+006 3.83E+006

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.216  0.125  0.187  0.193
Peak Current (kA), Method C :  0.312  0.181  0.269  0.278
Breaking Current (kA, rms, symm) :  0.125  0.187  0.193
Steady State Current (kA, rms) :  0.214  0.125  0.187  0.193

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 59
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus54


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus54 Total  0.00  0.214  0.00  125.92  126.96  0.124  0.124 6.39E+004 2.88E+003 2.04E+005 3.53E+003

Main Bus B2 Bus54  99.41  0.212  99.51  100.20  99.96  0.123  0.124 6.47E+004 1.65E+003 2.04E+005 3.53E+003

Mtr B29 Bus54  100.00  0.005  100.00  100.00  100.00  0.001  0.000 1.42E+006 2.39E+006

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.214  0.124  0.185  0.191
Peak Current (kA), Method C :  0.309  0.179  0.267  0.275
Breaking Current (kA, rms, symm) :  0.124  0.185  0.191
Steady State Current (kA, rms) :  0.212  0.124  0.185  0.191

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 60
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus55


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus55 Total  0.00  0.212  0.00  125.92  126.73  0.123  0.123 6.46E+004 2.44E+003 2.05E+005 3.54E+003

Main Bus B2 Bus55  99.42  0.210  99.51  100.20  99.96  0.122  0.123 6.52E+004 1.66E+003 2.05E+005 3.54E+003

Mtr B30 Bus55  100.00  0.003  100.00  100.00  100.00  0.001  0.000 2.26E+006 3.83E+006

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.212  0.123  0.183  0.189
Peak Current (kA), Method C :  0.306  0.177  0.264  0.272
Breaking Current (kA, rms, symm) :  0.123  0.183  0.189
Steady State Current (kA, rms) :  0.210  0.123  0.183  0.189

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 61
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus56


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus56 Total  0.00  0.326  0.00  125.91  128.51  0.184  0.184 4.18E+004 3.96E+003 1.38E+005 2.78E+003

Main Bus B2 Bus56  99.13  0.313  99.29  100.31  99.96  0.181  0.184 4.39E+004 1.35E+003 1.38E+005 2.78E+003

Mtr B31 Bus56  100.00  0.025  100.00  100.00  100.00  0.007  0.000 2.85E+005 4.81E+005

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.326  0.184  0.279  0.290
Peak Current (kA), Method C :  0.471  0.266  0.402  0.418
Breaking Current (kA, rms, symm) :  0.184  0.279  0.290
Steady State Current (kA, rms) :  0.312  0.184  0.279  0.290

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 62
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus57


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus57 Total  0.00  0.705  0.00  124.92  128.30  0.407  0.407 1.93E+004 2.45E+003 6.22E+004 3.62E+003

Main Bus B2 Bus57  97.91  0.689  98.32  100.65  99.91  0.400  0.407 1.98E+004 1.69E+003 6.22E+004 3.62E+003

Lump B32 Bus57  100.00  0.033  100.00  100.00  100.00  0.013  0.000 1.61E+005 3.84E+005

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.705  0.407  0.610  0.635
Peak Current (kA), Method C :  1.016  0.587  0.880  0.916
Breaking Current (kA, rms, symm) :  0.407  0.610  0.635
Steady State Current (kA, rms) :  0.688  0.407  0.610  0.635

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 63
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus58


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus58 Total  0.00  5.714  0.00  120.31  128.76  3.477  3.477 2.23E+003 8.96E+002 6.89E+003 1.59E+003

Main Bus B2 Bus58  78.51  5.613  82.85  105.03  100.59  3.436  3.477 2.28E+003 8.71E+002 6.89E+003 1.59E+003

Lump B33 Bus58  100.00  0.145  100.00  100.00  100.00  0.059  0.000 3.67E+004 8.73E+004

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  5.714  3.477  4.947  5.271
Peak Current (kA), Method C :  8.253  5.022  7.145  7.613
Breaking Current (kA, rms, symm) :  3.477  4.947  5.271
Steady State Current (kA, rms) :  5.475  3.477  4.947  5.271

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 64
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus59


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus59 Total  0.00  1.713  0.00  123.76  129.31  0.992  0.992 7.76E+003 1.99E+003 2.53E+004 3.56E+003

Main Bus B2 Bus59  94.19  1.655  95.44  101.54  99.97  0.970  0.992 8.11E+003 1.67E+003 2.53E+004 3.56E+003

Lump B37 Bus59  100.00  0.099  100.00  100.00  100.00  0.038  0.000 5.38E+004 1.28E+005

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  1.713  0.992  1.484  1.557
Peak Current (kA), Method C :  2.471  1.432  2.141  2.247
Breaking Current (kA, rms, symm) :  0.992  1.484  1.557
Steady State Current (kA, rms) :  1.647  0.992  1.484  1.557

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 65
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus60


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus60 Total  0.00  0.778  0.00  124.68  129.37  0.445  0.445 1.74E+004 2.73E+003 5.72E+004 3.43E+003

Main Bus B2 Bus60  97.72  0.748  98.18  100.73  99.92  0.433  0.445 1.83E+004 1.61E+003 5.72E+004 3.43E+003

Lump B38 Bus60  100.00  0.059  100.00  100.00  100.00  0.023  0.000 8.97E+004 2.13E+005

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.778  0.445  0.673  0.704
Peak Current (kA), Method C :  1.122  0.642  0.972  1.015
Breaking Current (kA, rms, symm) :  0.445  0.673  0.704
Steady State Current (kA, rms) :  0.747  0.445  0.673  0.704

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 66
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus61


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus61 Total  0.00  17.785  0.00  112.91  120.34  12.748  12.748 3.92E+002 6.64E+002 9.97E+002 1.34E+003

Main Bus A1 Bus61  28.62  17.135  35.14  112.35  106.08  12.480  12.748 4.06E+002 6.90E+002 9.97E+002 1.34E+003

Bus27 Main Bus B1  11.01  0.025  4.21  113.42  122.77  0.010  0.000 3.17E+005 4.36E+005

Bus29 Main Bus B1  7.71  0.018  2.94  113.24  122.00  0.007  0.000 4.37E+005 6.39E+005

Bus30 Main Bus B1  1.34  0.003  0.51  112.96  120.62  0.001  0.000 2.32E+006 3.83E+006

Bus31 Main Bus B1  11.08  0.025  4.24  113.42  122.79  0.010  0.000 3.17E+005 4.36E+005

Bus32 Main Bus B1  7.92  0.018  3.02  113.25  122.05  0.007  0.000 4.39E+005 6.39E+005

Bus33 Main Bus B1  11.45  0.025  4.39  113.44  122.88  0.010  0.000 3.19E+005 4.36E+005

Bus34 Main Bus B1  8.19  0.018  3.12  113.27  122.11  0.007  0.000 4.41E+005 6.39E+005

Bus35 Main Bus B1  2.18  0.005  0.83  112.99  120.79  0.002  0.000 1.48E+006 2.39E+006

Bus36 Main Bus B1  1.38  0.003  0.52  112.96  120.62  0.001  0.000 2.33E+006 3.83E+006

Bus37 Main Bus B1  2.23  0.005  0.84  113.00  120.80  0.002  0.000 1.48E+006 2.39E+006

Bus38 Main Bus B1  1.41  0.003  0.53  112.96  120.63  0.001  0.000 2.33E+006 3.83E+006

Bus39 Main Bus B1  7.25  0.024  2.76  113.22  121.90  0.009  0.000 3.27E+005 4.82E+005

Bus40 Main Bus B1  4.51  0.032  2.19  112.59  121.40  0.016  0.000 1.81E+005 3.85E+005

Bus41 Main Bus B1  1.80  0.144  0.87  112.78  120.76  0.070  0.000 3.84E+004 8.74E+004

Bus42 Main Bus B1  12.31  0.306  4.73  113.76  123.22  0.118  0.000 2.63E+004 3.62E+004

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  17.785  12.748  15.187  16.548
Peak Current (kA), Method C :  30.159  21.616  25.752  28.061
Breaking Current (kA, rms, symm) :  12.748  15.187  16.548
Steady State Current (kA, rms) :  13.799  12.748  15.187  16.548

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 67
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus63


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus63 Total  0.00  20.188  0.00  113.87  118.00  14.658  14.658 2.63E+002 6.26E+002 6.18E+002 1.29E+003

Main Bus A1 Bus63  14.91  17.128  19.15  112.46  110.12  13.157  14.658 2.99E+002 7.42E+002 6.18E+002 1.29E+003

Bus21 Main Bus C  13.53  1.184  6.64  114.09  121.18  0.581  0.000 5.49E+003 1.02E+004

Bus22 Main Bus C  14.25  1.234  6.99  114.40  121.27  0.605  0.000 5.22E+003 9.81E+003

Bus24 Main Bus C  1.91  0.131  0.94  113.70  118.45  0.064  0.000 4.23E+004 9.61E+004

Bus25 Main Bus C  0.59  0.262  0.29  113.85  118.14  0.129  0.000 2.05E+004 4.81E+004

Bus26 Main Bus C  0.59  0.262  0.29  113.85  118.14  0.129  0.000 2.05E+004 4.81E+004

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  20.188  14.658  17.247  18.584
Peak Current (kA), Method C :  37.539  27.255  32.069  34.555
Breaking Current (kA, rms, symm) :  14.658  17.247  18.584
Steady State Current (kA, rms) :  14.747  14.658  17.247  18.584

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 68
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus64


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus64 Total  0.00  14.060  0.00  114.62  125.06  9.479  9.479 6.98E+002 6.81E+002 1.97E+003 1.36E+003

Main Bus A1 Bus64  52.97  13.818  61.58  110.85  100.65  9.369  9.479 7.15E+002 6.88E+002 1.97E+003 1.36E+003

Lump A3 Bus64  100.00  0.263  100.00  100.00  100.00  0.119  0.000 2.02E+004 4.80E+004

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  14.060  9.479  12.106  13.173
Peak Current (kA), Method C :  21.325  14.377  18.360  19.980
Breaking Current (kA, rms, symm) :  9.479  12.106  13.173
Steady State Current (kA, rms) :  11.743  9.479  12.106  13.173

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 69
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus65


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus65 Total  0.00  16.480  0.00  113.07  122.02  11.624  11.624 4.77E+002 6.82E+002 1.27E+003 1.37E+003

Main Bus A1 Bus65  36.68  16.049  44.31  111.94  104.10  11.419  11.624 4.93E+002 6.97E+002 1.27E+003 1.37E+003

Lump A4 Bus65  100.00  0.441  100.00  100.00  100.00  0.209  0.000 1.20E+004 2.87E+004

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  16.480  11.624  14.141  15.426
Peak Current (kA), Method C :  26.851  18.939  23.039  25.134
Breaking Current (kA, rms, symm) :  11.624  14.141  15.426
Steady State Current (kA, rms) :  13.112  11.624  14.141  15.426

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 70
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus66


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus66 Total  0.00  5.756  0.00  122.05  131.20  3.302  3.302 2.04E+003 1.24E+003 7.12E+003 2.68E+003

Main Bus A1 Bus66  84.55  5.167  88.88  104.36  99.31  3.131  3.302 2.35E+003 1.24E+003 7.12E+003 2.68E+003

Mtr A5 Bus66  100.00  0.678  100.00  100.00  100.00  0.207  0.000 1.03E+004 1.74E+004

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  5.756  3.302  4.845  5.188
Peak Current (kA), Method C :  8.410  4.824  7.079  7.580
Breaking Current (kA, rms, symm) :  3.302  4.845  5.188
Steady State Current (kA, rms) :  4.940  3.302  4.845  5.188

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 71
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus67


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus67 Total  0.00  8.359  0.00  119.99  130.45  4.949  4.949 1.20E+003 1.12E+003 4.20E+003 2.63E+003

Main Bus A1 Bus67  73.16  7.300  79.56  106.19  100.38  4.624  4.949 1.42E+003 1.22E+003 4.20E+003 2.63E+003

Mtr A6 Bus67  100.00  1.110  100.00  100.00  100.00  0.351  0.000 6.29E+003 1.06E+004

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  8.359  4.949  7.001  7.566
Peak Current (kA), Method C :  12.625  7.475  10.573  11.428
Breaking Current (kA, rms, symm) :  4.949  7.001  7.566
Steady State Current (kA, rms) :  6.763  4.949  7.001  7.566

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 72
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus68


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus68 Total  0.00  12.957  0.00  115.66  126.15  8.545  8.545 8.15E+002 6.75E+002 2.35E+003 1.34E+003

Main Bus A1 Bus68  59.68  12.724  68.09  110.10  99.57  8.442  8.545 8.37E+002 6.79E+002 2.35E+003 1.34E+003

Lump A7 Bus68  100.00  0.263  100.00  100.00  100.00  0.116  0.000 2.02E+004 4.80E+004

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  12.957  8.545  11.171  12.117
Peak Current (kA), Method C :  19.274  12.711  16.618  18.025
Breaking Current (kA, rms, symm) :  8.545  11.171  12.117
Steady State Current (kA, rms) :  11.043  8.545  11.171  12.117

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 73
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus69


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus69 Total  0.00  0.233  0.00  125.88  126.47  0.135  0.135 5.89E+004 1.83E+003 1.86E+005 3.60E+003

Main Bus A1 Bus69  99.64  0.232  99.74  100.17  99.89  0.135  0.135 5.90E+004 1.59E+003 1.86E+005 3.60E+003

Lump A8 Bus69  100.00  0.001  100.00  100.00  100.00  0.000  0.000 5.04E+006 1.20E+007

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.233  0.135  0.201  0.208
Peak Current (kA), Method C :  0.336  0.195  0.291  0.299
Breaking Current (kA, rms, symm) :  0.135  0.201  0.208
Steady State Current (kA, rms) :  0.232  0.135  0.201  0.208

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 74
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus70


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus70 Total  0.00  12.476  0.00  111.94  126.05  8.612  8.612 7.83E+002 7.71E+002 2.23E+003 1.34E+003

Main Bus A2 Bus70  54.71  12.158  65.46  107.21  100.49  8.464  8.612 8.12E+002 7.83E+002 2.23E+003 1.34E+003

Lump A10 Bus70  100.00  0.345  100.00  100.00  100.00  0.160  0.000 1.54E+004 3.66E+004

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  12.476  8.612  10.750  11.892
Peak Current (kA), Method C :  18.934  13.070  16.315  18.049
Breaking Current (kA, rms, symm) :  8.612  10.750  11.892
Steady State Current (kA, rms) :  11.272  8.612  10.750  11.892

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 75
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus72


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus72 Total  0.00  13.003  0.00  111.53  126.09  9.016  9.016 7.57E+002 7.34E+002 2.14E+003 1.25E+003

Main Bus A2 Bus72  53.83  12.686  64.83  107.57  100.44  8.868  9.016 7.84E+002 7.45E+002 2.14E+003 1.25E+003

Lump A6 Bus72  100.00  0.345  100.00  100.00  100.00  0.160  0.000 1.54E+004 3.66E+004

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  13.003  9.016  11.202  12.422
Peak Current (kA), Method C :  19.694  13.656  16.967  18.814
Breaking Current (kA, rms, symm) :  9.016  11.202  12.422
Steady State Current (kA, rms) :  11.728  9.016  11.202  12.422

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 76
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus73


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus73 Total  0.00  14.725  0.00  109.34  122.00  10.841  10.841 5.24E+002 7.70E+002 1.39E+003 1.35E+003

Main Bus A2 Bus73  37.69  14.293  47.62  108.05  102.99  10.627  10.841 5.45E+002 7.90E+002 1.39E+003 1.35E+003

Lump A5 Bus73  100.00  0.441  100.00  100.00  100.00  0.218  0.000 1.20E+004 2.87E+004

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  14.725  10.841  12.644  14.089
Peak Current (kA), Method C :  24.063  17.716  20.662  23.023
Breaking Current (kA, rms, symm) :  10.841  12.644  14.089
Steady State Current (kA, rms) :  12.959  10.841  12.644  14.089

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 77
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus74


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus74 Total  0.00  5.937  0.00  120.53  131.37  3.471  3.471 1.94E+003 1.26E+003 6.71E+003 2.53E+003

Main Bus A2 Bus74  82.32  5.338  88.11  103.43  99.75  3.294  3.471 2.23E+003 1.27E+003 6.71E+003 2.53E+003

Mtr A15 Bus74  100.00  0.678  100.00  100.00  100.00  0.211  0.000 1.03E+004 1.74E+004

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  5.937  3.471  5.001  5.397
Peak Current (kA), Method C :  8.696  5.085  7.326  7.905
Breaking Current (kA, rms, symm) :  3.471  5.001  5.397
Steady State Current (kA, rms) :  5.211  3.471  5.001  5.397

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 78
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus75


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus75 Total  0.00  8.414  0.00  117.80  130.34  5.134  5.134 1.15E+003 1.15E+003 3.99E+003 2.49E+003

Main Bus A2 Bus75  69.87  7.344  78.32  104.77  100.75  4.794  5.134 1.37E+003 1.27E+003 3.99E+003 2.49E+003

Mtr A16 Bus75  100.00  1.110  100.00  100.00  100.00  0.362  0.000 6.29E+003 1.06E+004

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  8.414  5.134  7.049  7.702
Peak Current (kA), Method C :  12.801  7.810  10.725  11.717
Breaking Current (kA, rms, symm) :  5.134  7.049  7.702
Steady State Current (kA, rms) :  7.077  5.134  7.049  7.702

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 79
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus76


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus76 Total  0.00  0.251  0.00  125.30  128.28  0.144  0.144 5.45E+004 4.28E+003 1.76E+005 3.01E+003

Main Bus A2 Bus76  99.61  0.245  99.74  100.14  99.92  0.142  0.144 5.61E+004 1.45E+003 1.76E+005 3.01E+003

Lump A18 Bus76  100.00  0.014  100.00  100.00  100.00  0.006  0.000 3.68E+005 8.77E+005

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  0.251  0.144  0.217  0.226
Peak Current (kA), Method C :  0.362  0.208  0.313  0.325
Breaking Current (kA, rms, symm) :  0.144  0.217  0.226
Steady State Current (kA, rms) :  0.244  0.144  0.217  0.226

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 80
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus77


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus77 Total  0.00  16.978  0.00  108.16  117.70  13.149  13.149 3.67E+002 7.20E+002 8.62E+002 1.23E+003

Main Bus A2 Bus77  22.74  16.480  29.99  108.63  105.58  12.907  13.149 3.77E+002 7.42E+002 8.62E+002 1.23E+003

Bus43 Main Bus B2  11.37  0.025  4.70  108.70  120.49  0.011  0.000 3.19E+005 4.36E+005

Bus45 Main Bus B2  8.03  0.018  3.31  108.51  119.62  0.007  0.000 4.40E+005 6.39E+005

Bus46 Main Bus B2  1.39  0.003  0.57  108.21  118.02  0.001  0.000 2.33E+006 3.83E+006

Bus47 Main Bus B2  11.45  0.025  4.73  108.70  120.51  0.010  0.000 3.19E+005 4.36E+005

Bus48 Main Bus B2  8.08  0.018  3.33  108.52  119.64  0.007  0.000 4.40E+005 6.39E+005

Bus49 Main Bus B2  11.74  0.025  4.86  108.72  120.58  0.010  0.000 3.21E+005 4.36E+005

Bus50 Main Bus B2  8.34  0.018  3.44  108.53  119.70  0.007  0.000 4.42E+005 6.39E+005

Bus51 Main Bus B2  2.24  0.005  0.92  108.25  118.22  0.002  0.000 1.48E+006 2.39E+006

Bus53 Main Bus B2  1.42  0.003  0.58  108.21  118.03  0.001  0.000 2.33E+006 3.83E+006

Bus54 Main Bus B2  2.29  0.005  0.94  108.25  118.23  0.002  0.000 1.48E+006 2.39E+006

Bus55 Main Bus B2  1.45  0.003  0.59  108.21  118.03  0.001  0.000 2.33E+006 3.83E+006

Bus56 Main Bus B2  7.46  0.024  3.07  108.48  119.48  0.010  0.000 3.28E+005 4.82E+005

Bus57 Main Bus B2  4.58  0.032  2.40  107.79  118.87  0.017  0.000 1.81E+005 3.85E+005

Bus58 Main Bus B2  2.01  0.143  1.05  108.00  118.22  0.075  0.000 3.86E+004 8.74E+004

Bus59 Main Bus B2  5.46  0.096  2.85  107.83  119.10  0.050  0.000 6.15E+004 1.29E+005

Bus60 Main Bus B2  7.47  0.057  3.91  107.62  119.62  0.030  0.000 1.08E+005 2.14E+005

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  16.978  13.149  14.519  16.187
Peak Current (kA), Method C :  29.834  23.107  25.514  28.444
Breaking Current (kA, rms, symm) :  13.149  14.519  16.187
Steady State Current (kA, rms) :  14.653  13.149  14.519  16.187

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 81
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Bus78


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus78 Total  0.00  17.072  0.00  108.89  114.84  13.481  13.481 3.08E+002 7.42E+002 6.50E+002 1.27E+003

Main Bus A2 Bus78  17.98  17.072  22.76  107.89  106.82  13.481  13.481 3.08E+002 7.42E+002 6.50E+002 1.27E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  17.072  13.481  14.597  16.112
Peak Current (kA), Method C :  31.761  25.080  27.155  29.974
Breaking Current (kA, rms, symm) :  13.481  14.597  16.112
Steady State Current (kA, rms) :  14.809  13.481  14.597  16.112

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 82
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Main Bus A1


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Main Bus A1 Total  0.00  22.786  0.00  113.25  113.47  17.420  17.420 2.00E+002 5.67E+002 3.56E+002 1.08E+003

Bus61 Main Bus A1  1.08  0.645  0.48  113.33  113.75  0.285  0.000 1.15E+004 1.79E+004

Bus63 Main Bus A1  2.61  2.995  1.35  113.49  114.02  1.553  0.000 2.12E+003 4.06E+003

Bus64 Main Bus A1  1.00  0.262  0.52  113.17  113.73  0.136  0.000 2.07E+004 4.81E+004

Bus65 Main Bus A1  1.00  0.438  0.52  113.21  113.73  0.227  0.000 1.23E+004 2.88E+004

Bus66 Main Bus A1  10.24  0.626  4.20  113.96  116.05  0.257  0.000 1.24E+004 1.80E+004

Bus67 Main Bus A1  10.15  1.013  4.17  114.24  116.08  0.416  0.000 7.51E+003 1.13E+004

Bus68 Main Bus A1  1.23  0.262  0.64  113.14  113.78  0.136  0.000 2.08E+004 4.81E+004

Bus69 Main Bus A1  0.45  0.001  0.23  113.19  113.59  0.001  0.000 5.10E+006 1.20E+007

Bus10 Main Bus A1  26.99  16.680  37.69  104.07  102.65  14.451  17.420 2.24E+002 7.91E+002 3.56E+002 1.08E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  22.786  17.420  19.398  20.796
Peak Current (kA), Method C :  44.640  34.129  38.003  40.741
Breaking Current (kA, rms, symm) :  17.420  19.398  20.796
Steady State Current (kA, rms) :  16.658  17.420  19.398  20.796

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 83
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Main Bus A2


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Main Bus A2 Total  0.00  20.432  0.00  108.68  110.24  16.904  16.904 2.07E+002 6.38E+002 3.32E+002 1.02E+003

Bus77 Main Bus A2  0.68  0.496  0.36  108.70  110.42  0.259  0.000 1.32E+004 2.43E+004

Bus78 Main Bus A2  0.00  0.000  0.00  108.68  110.24  0.000  0.000

Bus70 Main Bus A2  1.54  0.342  0.86  108.54  110.66  0.192  0.000 1.60E+004 3.67E+004

Bus72 Main Bus A2  1.45  0.343  0.82  108.52  110.64  0.192  0.000 1.60E+004 3.67E+004

Bus73 Main Bus A2  1.15  0.437  0.65  108.63  110.55  0.245  0.000 1.24E+004 2.88E+004

Bus74 Main Bus A2  9.69  0.629  4.30  109.36  112.90  0.279  0.000 1.23E+004 1.80E+004

Bus75 Main Bus A2  9.68  1.018  4.30  109.65  112.93  0.452  0.000 7.45E+003 1.12E+004

Bus76 Main Bus A2  5.73  0.014  3.21  107.92  111.79  0.008  0.000 4.24E+005 8.78E+005

Bus12 Main Bus A2  24.52  17.243  33.94  102.03  101.64  15.300  16.904 2.17E+002 7.65E+002 3.32E+002 1.02E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  20.432  16.904  17.408  19.118
Peak Current (kA), Method C :  40.706  33.677  34.681  38.088
Breaking Current (kA, rms, symm) :  16.904  17.408  19.118
Steady State Current (kA, rms) :  17.218  16.904  17.408  19.118

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 84
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Main Bus B1


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Main Bus B1 Total  0.00  17.785  0.00  112.91  120.34  12.748  12.748 3.92E+002 6.64E+002 9.97E+002 1.34E+003

Bus27 Main Bus B1  11.01  0.025  4.21  113.42  122.77  0.010  0.000 3.17E+005 4.36E+005

Bus29 Main Bus B1  7.71  0.018  2.94  113.24  122.00  0.007  0.000 4.37E+005 6.39E+005

Bus30 Main Bus B1  1.34  0.003  0.51  112.96  120.62  0.001  0.000 2.32E+006 3.83E+006

Bus31 Main Bus B1  11.08  0.025  4.24  113.42  122.79  0.010  0.000 3.17E+005 4.36E+005

Bus32 Main Bus B1  7.92  0.018  3.02  113.25  122.05  0.007  0.000 4.39E+005 6.39E+005

Bus33 Main Bus B1  11.45  0.025  4.39  113.44  122.88  0.010  0.000 3.19E+005 4.36E+005

Bus34 Main Bus B1  8.19  0.018  3.12  113.27  122.11  0.007  0.000 4.41E+005 6.39E+005

Bus35 Main Bus B1  2.18  0.005  0.83  112.99  120.79  0.002  0.000 1.48E+006 2.39E+006

Bus36 Main Bus B1  1.38  0.003  0.52  112.96  120.62  0.001  0.000 2.33E+006 3.83E+006

Bus37 Main Bus B1  2.23  0.005  0.84  113.00  120.80  0.002  0.000 1.48E+006 2.39E+006

Bus38 Main Bus B1  1.41  0.003  0.53  112.96  120.63  0.001  0.000 2.33E+006 3.83E+006

Bus39 Main Bus B1  7.25  0.024  2.76  113.22  121.90  0.009  0.000 3.27E+005 4.82E+005

Bus40 Main Bus B1  4.51  0.032  2.19  112.59  121.40  0.016  0.000 1.81E+005 3.85E+005

Bus41 Main Bus B1  1.80  0.144  0.87  112.78  120.76  0.070  0.000 3.84E+004 8.74E+004

Bus42 Main Bus B1  12.31  0.306  4.73  113.76  123.22  0.118  0.000 2.63E+004 3.62E+004

Main Bus A1 Bus61  28.62  17.135  35.14  112.35  106.08  12.480  12.748 4.06E+002 6.90E+002 9.97E+002 1.34E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  17.785  12.748  15.187  16.548
Peak Current (kA), Method C :  30.159  21.616  25.752  28.061
Breaking Current (kA, rms, symm) :  12.748  15.187  16.548
Steady State Current (kA, rms) :  13.799  12.748  15.187  16.548

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 85
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Main Bus B2


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Main Bus B2 Total  0.00  16.978  0.00  108.16  117.70  13.149  13.149 3.67E+002 7.20E+002 8.62E+002 1.23E+003

Bus43 Main Bus B2  11.37  0.025  4.70  108.70  120.49  0.011  0.000 3.19E+005 4.36E+005

Bus45 Main Bus B2  8.03  0.018  3.31  108.51  119.62  0.007  0.000 4.40E+005 6.39E+005

Bus46 Main Bus B2  1.39  0.003  0.57  108.21  118.02  0.001  0.000 2.33E+006 3.83E+006

Bus47 Main Bus B2  11.45  0.025  4.73  108.70  120.51  0.010  0.000 3.19E+005 4.36E+005

Bus48 Main Bus B2  8.08  0.018  3.33  108.52  119.64  0.007  0.000 4.40E+005 6.39E+005

Bus49 Main Bus B2  11.74  0.025  4.86  108.72  120.58  0.010  0.000 3.21E+005 4.36E+005

Bus50 Main Bus B2  8.34  0.018  3.44  108.53  119.70  0.007  0.000 4.42E+005 6.39E+005

Bus51 Main Bus B2  2.24  0.005  0.92  108.25  118.22  0.002  0.000 1.48E+006 2.39E+006

Bus53 Main Bus B2  1.42  0.003  0.58  108.21  118.03  0.001  0.000 2.33E+006 3.83E+006

Bus54 Main Bus B2  2.29  0.005  0.94  108.25  118.23  0.002  0.000 1.48E+006 2.39E+006

Bus55 Main Bus B2  1.45  0.003  0.59  108.21  118.03  0.001  0.000 2.33E+006 3.83E+006

Bus56 Main Bus B2  7.46  0.024  3.07  108.48  119.48  0.010  0.000 3.28E+005 4.82E+005

Bus57 Main Bus B2  4.58  0.032  2.40  107.79  118.87  0.017  0.000 1.81E+005 3.85E+005

Bus58 Main Bus B2  2.01  0.143  1.05  108.00  118.22  0.075  0.000 3.86E+004 8.74E+004

Bus59 Main Bus B2  5.46  0.096  2.85  107.83  119.10  0.050  0.000 6.15E+004 1.29E+005

Bus60 Main Bus B2  7.47  0.057  3.91  107.62  119.62  0.030  0.000 1.08E+005 2.14E+005

Main Bus A2 Bus77  22.74  16.480  29.99  108.63  105.58  12.907  13.149 3.77E+002 7.42E+002 8.62E+002 1.23E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  16.978  13.149  14.519  16.187
Peak Current (kA), Method C :  29.834  23.107  25.514  28.444
Breaking Current (kA, rms, symm) :  13.149  14.519  16.187
Steady State Current (kA, rms) :  14.653  13.149  14.519  16.187

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 86
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Fault at bus: Main Bus C


Nominal kV =  0.400
Voltage c Factor = 0.95 (Minimum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Main Bus C Total  0.00  20.188  0.00  113.87  118.00  14.658  14.658 2.63E+002 6.26E+002 6.18E+002 1.29E+003

Bus21 Main Bus C  13.53  1.184  6.64  114.09  121.18  0.581  0.000 5.49E+003 1.02E+004

Bus22 Main Bus C  14.25  1.234  6.99  114.40  121.27  0.605  0.000 5.22E+003 9.81E+003

Bus24 Main Bus C  1.91  0.131  0.94  113.70  118.45  0.064  0.000 4.23E+004 9.61E+004

Bus25 Main Bus C  0.59  0.262  0.29  113.85  118.14  0.129  0.000 2.05E+004 4.81E+004

Bus26 Main Bus C  0.59  0.262  0.29  113.85  118.14  0.129  0.000 2.05E+004 4.81E+004

Main Bus A1 Bus63  14.91  17.128  19.15  112.46  110.12  13.157  14.658 2.99E+002 7.42E+002 6.18E+002 1.29E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) :  20.188  14.658  17.247  18.584
Peak Current (kA), Method C :  37.539  27.255  32.069  34.555
Breaking Current (kA, rms, symm) :  14.658  17.247  18.584
Steady State Current (kA, rms) :  14.747  14.658  17.247  18.584

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 87
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Short-Circuit Summary Report

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

Bus1  13.800  22.023  58.725  20.918  21.645  57.717  21.645  21.645  19.076  50.865  19.076  19.076  21.937  58.494  21.937  21.937
Bus2  13.800  19.439  47.996  18.298  17.866  44.112  17.866  17.866  16.834  41.564  16.834  16.834  18.768  46.340  18.768  18.768
Bus3  13.800  21.994  58.697  20.918  21.608  57.668  21.608  21.608  19.026  50.777  19.026  19.026  21.889  58.416  21.889  21.889
Bus4  13.800  19.260  47.409  18.151  17.633  43.402  17.633  17.633  16.655  40.995  16.655  16.655  18.577  45.726  18.577  18.577
Bus5  13.800  18.397  42.762  17.342  16.566  38.505  16.566  16.566  15.937  37.042  15.937  15.937  17.683  41.102  17.683  17.683
Bus6  13.800  18.299  42.298  17.280  16.465  38.058  16.465  16.465  15.848  36.633  15.848  15.848  17.576  40.628  17.576  17.576
Bus7  13.800  18.589  43.556  17.520  16.798  39.361  16.798  16.798  16.097  37.717  16.097  16.097  17.871  41.875  17.871  17.871
Bus8  13.800  18.313  42.340  17.306  16.491  38.128  16.491  16.491  15.861  36.669  15.861  15.861  17.590  40.667  17.590  17.590
Bus9  13.800  19.178  46.598  18.067  17.540  42.619  17.540  17.540  16.609  40.355  16.609  16.609  18.496  44.941  18.496  18.496
Bus10  0.400  28.410  56.517  22.804  26.457  52.632  26.457  26.457  24.322  48.384  24.322  24.322  27.652  55.009  27.652  27.652
Bus11  13.800  19.063  46.357  17.977  17.389  42.286  17.389  17.389  16.485  40.088  16.485  16.485  18.372  44.675  18.372  18.372
Bus12  0.400  25.895  52.048  22.800  24.929  50.106  24.929  24.929  22.161  44.543  22.161  22.161  25.451  51.154  25.451  25.451
Bus13  13.800  18.194  42.066  17.207  16.339  37.776  16.339  16.339  15.736  36.381  15.736  15.736  17.462  40.372  17.462  17.462
Bus14  13.800  18.529  43.591  17.482  16.722  39.338  16.722  16.722  16.023  37.695  16.023  16.023  17.807  41.892  17.807  17.807
Bus15  13.800  18.163  41.944  17.166  16.292  37.623  16.292  16.292  15.708  36.274  15.708  15.708  17.430  40.251  17.430  17.430
Bus16  13.800  18.353  42.836  17.310  16.501  38.513  16.501  16.501  15.874  37.049  15.874  15.874  17.631  41.151  17.631  17.631
Bus21  0.400  7.577  11.551  5.983  4.362  6.650  4.362  4.362  6.554  9.991  6.554  6.554  7.034  10.723  7.034  7.034
Bus22  0.400  7.535  11.645  5.842  4.332  6.694  4.332  4.332  6.516  10.070  6.516  6.516  6.989  10.801  6.989  6.989
Bus24  0.400  5.851  8.444  5.473  3.500  5.051  3.500  3.500  5.068  7.314  5.068  5.068  5.342  7.710  5.342  5.342
Bus25  0.400  15.244  24.286  12.048  10.390  16.552  10.390  10.390  13.102  20.873  13.102  13.102  14.212  22.641  14.212  14.212
Bus26  0.400  15.244  24.286  12.048  10.390  16.552  10.390  10.390  13.102  20.873  13.102  13.102  14.212  22.641  14.212  14.212
Bus27  0.400  0.245  0.354  0.230  0.136  0.197  0.136  0.136  0.208  0.300  0.208  0.208  0.217  0.313  0.217  0.217
Bus29  0.400  0.238  0.344  0.228  0.135  0.194  0.135  0.135  0.204  0.294  0.204  0.204  0.212  0.305  0.212  0.212
Bus30  0.400  0.228  0.329  0.226  0.132  0.191  0.132  0.132  0.197  0.284  0.197  0.197  0.203  0.293  0.203  0.203
Bus31  0.400  0.244  0.351  0.228  0.135  0.195  0.135  0.135  0.207  0.298  0.207  0.207  0.216  0.311  0.216  0.216
Bus32  0.400  0.232  0.335  0.222  0.131  0.189  0.131  0.131  0.198  0.286  0.198  0.198  0.206  0.297  0.206  0.206
Bus33  0.400  0.236  0.340  0.220  0.131  0.189  0.131  0.131  0.200  0.288  0.200  0.200  0.209  0.301  0.209  0.209
Bus34  0.400  0.225  0.324  0.214  0.127  0.183  0.127  0.127  0.192  0.277  0.192  0.192  0.199  0.288  0.199  0.199
Bus35  0.400  0.225  0.324  0.222  0.130  0.187  0.130  0.130  0.194  0.279  0.194  0.194  0.200  0.288  0.200  0.200
Bus36  0.400  0.222  0.320  0.220  0.129  0.186  0.129  0.129  0.192  0.277  0.192  0.192  0.198  0.285  0.198  0.198
Bus37  0.400  0.220  0.317  0.217  0.127  0.183  0.127  0.127  0.190  0.274  0.190  0.190  0.196  0.283  0.196  0.196
Bus38  0.400  0.218  0.314  0.216  0.126  0.182  0.126  0.126  0.188  0.271  0.188  0.188  0.194  0.280  0.194  0.194
Bus39  0.400  0.335  0.484  0.321  0.190  0.274  0.190  0.190  0.287  0.413  0.287  0.287  0.298  0.430  0.298  0.298
Bus40  0.400  0.715  1.031  0.697  0.412  0.595  0.412  0.412  0.619  0.893  0.619  0.619  0.644  0.929  0.644  0.644
Bus41  0.400  6.178  8.922  5.772  3.729  5.386  3.729  3.729  5.345  7.719  5.345  5.345  5.660  8.174  5.660  5.660
Bus42  0.400  2.518  3.642  2.235  1.389  2.009  1.389  1.389  2.118  3.062  2.118  2.118  2.243  3.243  2.243  2.243
Bus43  0.400  0.237  0.343  0.222  0.132  0.190  0.132  0.132  0.201  0.290  0.201  0.201  0.210  0.303  0.210  0.210
Project: ETAP Page: 88
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

Bus45  0.400  0.229  0.331  0.219  0.129  0.186  0.129  0.129  0.196  0.282  0.196  0.196  0.203  0.293  0.203  0.203
Bus46  0.400  0.221  0.318  0.219  0.128  0.185  0.128  0.128  0.191  0.275  0.191  0.191  0.197  0.283  0.197  0.197
Bus47  0.400  0.236  0.340  0.220  0.131  0.189  0.131  0.131  0.200  0.288  0.200  0.200  0.209  0.301  0.209  0.209
Bus48  0.400  0.228  0.329  0.217  0.128  0.185  0.128  0.128  0.194  0.280  0.194  0.194  0.202  0.292  0.202  0.202
Bus49  0.400  0.230  0.332  0.214  0.128  0.184  0.128  0.128  0.195  0.281  0.195  0.195  0.204  0.294  0.204  0.204
Bus50  0.400  0.221  0.318  0.210  0.124  0.179  0.124  0.124  0.188  0.271  0.188  0.188  0.196  0.282  0.196  0.196
Bus51  0.400  0.219  0.315  0.216  0.126  0.182  0.126  0.126  0.189  0.272  0.189  0.189  0.195  0.281  0.195  0.195
Bus53  0.400  0.216  0.312  0.214  0.125  0.181  0.125  0.125  0.187  0.269  0.187  0.187  0.193  0.278  0.193  0.193
Bus54  0.400  0.214  0.309  0.212  0.124  0.179  0.124  0.124  0.185  0.267  0.185  0.185  0.191  0.275  0.191  0.191
Bus55  0.400  0.212  0.306  0.210  0.123  0.177  0.123  0.123  0.183  0.264  0.183  0.183  0.189  0.272  0.189  0.189
Bus56  0.400  0.326  0.471  0.312  0.184  0.266  0.184  0.184  0.279  0.402  0.279  0.279  0.290  0.418  0.290  0.290
Bus57  0.400  0.705  1.016  0.688  0.407  0.587  0.407  0.407  0.610  0.880  0.610  0.610  0.635  0.916  0.635  0.635
Bus58  0.400  5.714  8.253  5.475  3.477  5.022  3.477  3.477  4.947  7.145  4.947  4.947  5.271  7.613  5.271  5.271
Bus59  0.400  1.713  2.471  1.647  0.992  1.432  0.992  0.992  1.484  2.141  1.484  1.484  1.557  2.247  1.557  1.557
Bus60  0.400  0.778  1.122  0.747  0.445  0.642  0.445  0.445  0.673  0.972  0.673  0.673  0.704  1.015  0.704  0.704
Bus61  0.400  17.785  30.159  13.799  12.748  21.616  12.748  12.748  15.187  25.752  15.187  15.187  16.548  28.061  16.548  16.548
Bus63  0.400  20.188  37.539  14.747  14.658  27.255  14.658  14.658  17.247  32.069  17.247  17.247  18.584  34.555  18.584  18.584
Bus64  0.400  14.060  21.325  11.743  9.479  14.377  9.479  9.479  12.106  18.360  12.106  12.106  13.173  19.980  13.173  13.173
Bus65  0.400  16.480  26.851  13.112  11.624  18.939  11.624  11.624  14.141  23.039  14.141  14.141  15.426  25.134  15.426  15.426
Bus66  0.400  5.756  8.410  4.940  3.302  4.824  3.302  3.302  4.845  7.079  4.845  4.845  5.188  7.580  5.188  5.188
Bus67  0.400  8.359  12.625  6.763  4.949  7.475  4.949  4.949  7.001  10.573  7.001  7.001  7.566  11.428  7.566  7.566
Bus68  0.400  12.957  19.274  11.043  8.545  12.711  8.545  8.545  11.171  16.618  11.171  11.171  12.117  18.025  12.117  12.117
Bus69  0.400  0.233  0.336  0.232  0.135  0.195  0.135  0.135  0.201  0.291  0.201  0.201  0.208  0.299  0.208  0.208
Bus70  0.400  12.476  18.934  11.272  8.612  13.070  8.612  8.612  10.750  16.315  10.750  10.750  11.892  18.049  11.892  11.892
Bus72  0.400  13.003  19.694  11.728  9.016  13.656  9.016  9.016  11.202  16.967  11.202  11.202  12.422  18.814  12.422  12.422
Bus73  0.400  14.725  24.063  12.959  10.841  17.716  10.841  10.841  12.644  20.662  12.644  12.644  14.089  23.023  14.089  14.089
Bus74  0.400  5.937  8.696  5.211  3.471  5.085  3.471  3.471  5.001  7.326  5.001  5.001  5.397  7.905  5.397  5.397
Bus75  0.400  8.414  12.801  7.077  5.134  7.810  5.134  5.134  7.049  10.725  7.049  7.049  7.702  11.717  7.702  7.702
Bus76  0.400  0.251  0.362  0.244  0.144  0.208  0.144  0.144  0.217  0.313  0.217  0.217  0.226  0.325  0.226  0.226
Bus77  0.400  16.978  29.834  14.653  13.149  23.107  13.149  13.149  14.519  25.514  14.519  14.519  16.187  28.444  16.187  16.187
Bus78  0.400  17.072  31.761  14.809  13.481  25.080  13.481  13.481  14.597  27.155  14.597  14.597  16.112  29.974  16.112  16.112
Main Bus A1  0.400  22.786  44.640  16.658  17.420  34.129  17.420  17.420  19.398  38.003  19.398  19.398  20.796  40.741  20.796  20.796
Main Bus A2  0.400  20.432  40.706  17.218  16.904  33.677  16.904  16.904  17.408  34.681  17.408  17.408  19.118  38.088  19.118  19.118
Main Bus B1  0.400  17.785  30.159  13.799  12.748  21.616  12.748  12.748  15.187  25.752  15.187  15.187  16.548  28.061  16.548  16.548
Main Bus B2  0.400  16.978  29.834  14.653  13.149  23.107  13.149  13.149  14.519  25.514  14.519  14.519  16.187  28.444  16.187  16.187
Main Bus C  0.400  20.188  37.539  14.747  14.658  27.255  14.658  14.658  17.247  32.069  17.247  17.247  18.584  34.555  18.584  18.584

All fault currents are in rms kA. Current ip is calculated using Method C.

* LLG fault current is the larger of the two faulted line currents.
Project: ETAP Page: 89
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Sequence Impedance Summary Report

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

Bus1  13.800  0.01982  0.36123  0.36177  0.01759  0.36124  0.36166  0.01269  0.38067  0.38088  0.00000  0.00000  0.00000

Bus2  13.800  0.04656  0.40722  0.40987  0.04366  0.40758  0.40991  0.05660  0.51499  0.51810  0.00000  0.00000  0.00000

Bus3  13.800  0.01916  0.36175  0.36226  0.01688  0.36266  0.36306  0.01269  0.38067  0.38088  0.00000  0.00000  0.00000

Bus4  13.800  0.04746  0.41094  0.41367  0.04461  0.41252  0.41492  0.05942  0.52360  0.52697  0.00000  0.00000  0.00000

Bus5  13.800  0.07044  0.42731  0.43307  0.06747  0.42756  0.43285  0.09669  0.56880  0.57696  0.00000  0.00000  0.00000

Bus6  13.800  0.07283  0.42927  0.43541  0.07000  0.42970  0.43536  0.09939  0.57242  0.58099  0.00000  0.00000  0.00000

Bus7  13.800  0.06686  0.42337  0.42862  0.06382  0.42393  0.42871  0.08903  0.55852  0.56557  0.00000  0.00000  0.00000

Bus8  13.800  0.07278  0.42893  0.43506  0.06979  0.42939  0.43502  0.09827  0.57091  0.57931  0.00000  0.00000  0.00000

Bus9  13.800  0.05245  0.41212  0.41544  0.04955  0.41249  0.41546  0.06606  0.52769  0.53181  0.00000  0.00000  0.00000

Bus10  0.400  0.00240  0.00734  0.00772  0.00233  0.00755  0.00790  0.00254  0.00890  0.00926  0.00000  0.00000  0.00000

Bus11  13.800  0.05197  0.41470  0.41794  0.04912  0.41629  0.41918  0.06663  0.53328  0.53742  0.00000  0.00000  0.00000

Bus12  0.400  0.00251  0.00809  0.00847  0.00242  0.00833  0.00868  0.00254  0.00890  0.00926  0.00000  0.00000  0.00000

Bus13  13.800  0.07270  0.43183  0.43791  0.06976  0.43351  0.43908  0.09951  0.57741  0.58592  0.00000  0.00000  0.00000

Bus14  13.800  0.06509  0.42503  0.42999  0.06213  0.42678  0.43127  0.08757  0.56139  0.56818  0.00000  0.00000  0.00000

Bus15  13.800  0.07318  0.43252  0.43867  0.07043  0.43421  0.43988  0.10131  0.57982  0.58861  0.00000  0.00000  0.00000

Bus16  13.800  0.06855  0.42867  0.43412  0.06571  0.43025  0.43524  0.09500  0.57136  0.57921  0.00000  0.00000  0.00000

Bus21  0.400  0.02176  0.01911  0.02896  0.02160  0.01938  0.02903  0.08299  0.04399  0.09392  0.00000  0.00000  0.00000

Bus22  0.400  0.02075  0.02042  0.02912  0.02061  0.02069  0.02920  0.08083  0.04920  0.09463  0.00000  0.00000  0.00000

Bus24  0.400  0.03548  0.01212  0.03749  0.03535  0.01248  0.03749  0.11067  0.02457  0.11336  0.00000  0.00000  0.00000

Bus25  0.400  0.00875  0.01143  0.01439  0.00863  0.01179  0.01461  0.02468  0.02415  0.03453  0.00000  0.00000  0.00000

Bus26  0.400  0.00875  0.01143  0.01439  0.00863  0.01179  0.01461  0.02468  0.02415  0.03453  0.00000  0.00000  0.00000

Bus27  0.400  0.88812  0.10659  0.89449  0.92922  0.08270  0.93289  3.00289  0.05526  3.00340  0.00000  0.00000  0.00000

Bus29  0.400  0.91610  0.08384  0.91993  0.94447  0.06560  0.94674  3.02438  0.05550  3.02489  0.00000  0.00000  0.00000

Bus30  0.400  0.96079  0.03541  0.96144  0.96544  0.03210  0.96598  3.04587  0.05575  3.04638  0.00000  0.00000  0.00000

Bus31  0.400  0.89398  0.10780  0.90046  0.93567  0.08362  0.93940  3.02438  0.05550  3.02489  0.00000  0.00000  0.00000

Bus32  0.400  0.94077  0.08752  0.94484  0.97077  0.06830  0.97317  3.11034  0.05648  3.11085  0.00000  0.00000  0.00000

Bus33  0.400  0.92319  0.11392  0.93019  0.96787  0.08825  0.97188  3.13183  0.05672  3.13234  0.00000  0.00000  0.00000

Bus34  0.400  0.97150  0.09222  0.97587  1.00361  0.07177  1.00618  3.21778  0.05770  3.21830  0.00000  0.00000  0.00000

Bus35  0.400  0.97628  0.04278  0.97721  0.98412  0.03708  0.98481  3.11034  0.05648  3.11085  0.00000  0.00000  0.00000

Bus36  0.400  0.98766  0.03643  0.98833  0.99258  0.03290  0.99313  3.13183  0.05672  3.13234  0.00000  0.00000  0.00000

Bus37  0.400  0.99623  0.04382  0.99719  1.00440  0.03787  1.00511  3.17480  0.05721  3.17532  0.00000  0.00000  0.00000

Bus38  0.400  1.00781  0.03720  1.00849  1.01294  0.03351  1.01349  3.19629  0.05745  3.19681  0.00000  0.00000  0.00000

Bus39  0.400  0.65124  0.05992  0.65399  0.67019  0.04791  0.67190  2.14334  0.04552  2.14383  0.00000  0.00000  0.00000

Bus40  0.400  0.30452  0.03782  0.30686  0.30441  0.03825  0.30680  0.98127  0.05902  0.98304  0.00000  0.00000  0.00000

Bus41  0.400  0.03299  0.01314  0.03551  0.03290  0.01358  0.03559  0.10237  0.02652  0.10575  0.00000  0.00000  0.00000
Project: ETAP Page: 90
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

Bus42  0.400  0.08164  0.03041  0.08712  0.08719  0.03044  0.09234  0.29008  0.05683  0.29559  0.00000  0.00000  0.00000

Bus43  0.400  0.91687  0.11338  0.92385  0.96090  0.08808  0.96493  3.10817  0.05474  3.10865  0.00000  0.00000  0.00000

Bus45  0.400  0.95261  0.09014  0.95686  0.98341  0.07048  0.98593  3.15115  0.05523  3.15163  0.00000  0.00000  0.00000

Bus46  0.400  0.99396  0.03755  0.99467  0.99891  0.03396  0.99948  3.15115  0.05523  3.15163  0.00000  0.00000  0.00000

Bus47  0.400  0.92269  0.11462  0.92979  0.96733  0.08902  0.97142  3.12966  0.05499  3.13014  0.00000  0.00000  0.00000

Bus48  0.400  0.95876  0.09108  0.96307  0.98997  0.07117  0.99253  3.17264  0.05547  3.17312  0.00000  0.00000  0.00000

Bus49  0.400  0.94593  0.11962  0.95346  0.99303  0.09282  0.99736  3.21561  0.05596  3.21610  0.00000  0.00000  0.00000

Bus50  0.400  0.98941  0.09585  0.99405  1.02278  0.07470  1.02550  3.28008  0.05669  3.28057  0.00000  0.00000  0.00000

Bus51  0.400  1.00246  0.04503  1.00347  1.01069  0.03898  1.01144  3.19412  0.05572  3.19461  0.00000  0.00000  0.00000

Bus53  0.400  1.01411  0.03832  1.01483  1.01926  0.03457  1.01984  3.21561  0.05596  3.21610  0.00000  0.00000  0.00000

Bus54  0.400  1.02240  0.04609  1.02344  1.03097  0.03978  1.03174  3.25859  0.05645  3.25908  0.00000  0.00000  0.00000

Bus55  0.400  1.03424  0.03911  1.03499  1.03961  0.03518  1.04020  3.28008  0.05669  3.28057  0.00000  0.00000  0.00000

Bus56  0.400  0.66939  0.06330  0.67237  0.68945  0.05064  0.69131  2.20564  0.04451  2.20609  0.00000  0.00000  0.00000

Bus57  0.400  0.30886  0.03927  0.31135  0.30870  0.03968  0.31124  0.99501  0.05790  0.99670  0.00000  0.00000  0.00000

Bus58  0.400  0.03562  0.01434  0.03840  0.03547  0.01476  0.03842  0.11017  0.02538  0.11306  0.00000  0.00000  0.00000

Bus59  0.400  0.12409  0.03178  0.12809  0.12392  0.03218  0.12803  0.40418  0.05699  0.40818  0.00000  0.00000  0.00000

Bus60  0.400  0.27876  0.04373  0.28217  0.27858  0.04412  0.28205  0.91545  0.05480  0.91709  0.00000  0.00000  0.00000

Bus61  0.400  0.00627  0.01063  0.01234  0.00618  0.01108  0.01269  0.01596  0.02141  0.02670  0.00000  0.00000  0.00000

Bus63  0.400  0.00420  0.01002  0.01087  0.00408  0.01039  0.01117  0.00989  0.02064  0.02289  0.00000  0.00000  0.00000

Bus64  0.400  0.01117  0.01090  0.01560  0.01104  0.01129  0.01579  0.03156  0.02175  0.03833  0.00000  0.00000  0.00000

Bus65  0.400  0.00763  0.01091  0.01331  0.00750  0.01130  0.01356  0.02032  0.02195  0.02991  0.00000  0.00000  0.00000

Bus66  0.400  0.03257  0.01980  0.03812  0.03454  0.02079  0.04031  0.11391  0.04292  0.12173  0.00000  0.00000  0.00000

Bus67  0.400  0.01915  0.01795  0.02625  0.02031  0.01932  0.02804  0.06727  0.04206  0.07933  0.00000  0.00000  0.00000

Bus68  0.400  0.01304  0.01080  0.01693  0.01292  0.01118  0.01708  0.03768  0.02141  0.04334  0.00000  0.00000  0.00000

Bus69  0.400  0.94273  0.02932  0.94319  0.94261  0.02971  0.94308  2.97114  0.05761  2.97170  0.00000  0.00000  0.00000

Bus70  0.400  0.01253  0.01234  0.01759  0.01237  0.01275  0.01777  0.03568  0.02151  0.04166  0.00000  0.00000  0.00000

Bus72  0.400  0.01211  0.01175  0.01687  0.01195  0.01216  0.01705  0.03425  0.02000  0.03966  0.00000  0.00000  0.00000

Bus73  0.400  0.00839  0.01231  0.01490  0.00824  0.01272  0.01516  0.02218  0.02165  0.03100  0.00000  0.00000  0.00000

Bus74  0.400  0.03101  0.02011  0.03696  0.03279  0.02116  0.03903  0.10730  0.04043  0.11466  0.00000  0.00000  0.00000

Bus75  0.400  0.01842  0.01845  0.02607  0.01948  0.01988  0.02783  0.06376  0.03979  0.07516  0.00000  0.00000  0.00000

Bus76  0.400  0.87215  0.06842  0.87483  0.87197  0.06880  0.87468  2.82034  0.04817  2.82075  0.00000  0.00000  0.00000

Bus77  0.400  0.00587  0.01151  0.01292  0.00573  0.01195  0.01325  0.01379  0.01967  0.02403  0.00000  0.00000  0.00000

Bus78  0.400  0.00493  0.01187  0.01285  0.00478  0.01229  0.01318  0.01039  0.02034  0.02284  0.00000  0.00000  0.00000

Main Bus A1  0.400  0.00320  0.00908  0.00963  0.00308  0.00947  0.00996  0.00570  0.01728  0.01819  0.00000  0.00000  0.00000

Main Bus A2  0.400  0.00331  0.01021  0.01074  0.00317  0.01063  0.01109  0.00532  0.01626  0.01711  0.00000  0.00000  0.00000

Main Bus B1  0.400  0.00627  0.01063  0.01234  0.00618  0.01108  0.01269  0.01596  0.02141  0.02670  0.00000  0.00000  0.00000

Main Bus B2  0.400  0.00587  0.01151  0.01292  0.00573  0.01195  0.01325  0.01379  0.01967  0.02403  0.00000  0.00000  0.00000
Project: ETAP Page: 91
12.6.5C
Location: Date: 10-25-2018
Contract: SN: SCHNEDR-EL
Engineer: Revision: Base
Study Case: SC
Filename: EP17009 IMPEDANCE Config.: Normal

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

Main Bus C  0.400  0.00420  0.01002  0.01087  0.00408  0.01039  0.01117  0.00989  0.02064  0.02289  0.00000  0.00000  0.00000