7.0 RESULTS
LAPORAN KEJURUTERAAN
The scope of work for this project includes the diversion of sewerage flow from existing
MH-B to existing MH-A. The main sewer pipe is proposed to be 900mm diameter RCP.
Refer Minute Meeting “Pegawai Pengawal bagi Perbelanjaan Darurat Arahan
Perbendaharaan 55/ Perolehan Darurat Arahan Perbendaharaan 173.2: Kerja-Kerja
Pembaikan Struktur Kawalan Banjir Dan Tembok Penahan di Outlet Kolam Takungan
Banjir Sri Rampai, Kuala Lumpur” as attached under Appendix B which is self explanatory.
Based on the existing sewerage system around the area, new sewer line of 900mm
diameter RCP pipe is proposed to be connecting two existing manholes (MH-B and MH-A)
as shown in drawing.
The total length of sewer pipe is approximately 123 m. The sewer pipe shall be 900mm
diameter RCP which will be able to cater for PE of 92,500.
Based on the pipe gradient between MH-A and MH-B, and the pipe size of 900mm
diameter, the maximum PE capacity is 92,500.
c) Hydraulic System
For calculating the capacity of the sewer pipes, the Manning’s Formula is adopted
as follows :-
Q = (1/n) AR2/3S1/2
Where Q = capacity in m3/sec
n = Manning’s Coefficient of Roughness
(for this new VCP Pipe, adopt n = 0.013)
A = Cross sectional area of pipe in m2
R = Hydraulic radius in meter, m
S = Gradient of pipe in meter per meter (m/m)
a) All sewer pipes are approved vitrified clay and conform to the requirements of MS1061.
Table 1 – Typical Manning Coefficient, n
Manning Coefficient, n
Good Condition Bad Condition
Uncoated cast-iron 0.012 0.015
Coated cast iron 0.011 0.013
Ductile iron 0.012 0.015
Vitrified clay pipe 0.010 0.017
Concrete 0.012 0.016
4.4 Manhole
General:-
Precast concrete manholes shall conform to MS 881 and BS 5911. Walls shall have
either PVC lining, high alumina cement, epoxy coating or equivalent. The benching shall
be protected with epoxy coating, high alumina cement mortar or equivalent.
Minimum diameter of manhole chambers constructed from precast concrete rings shall
be as follows:-
An induct vent shall be provided for manhole receiving pumping discharge. Spacing
between manholes shall not be more than 100m for sewer less than 1.0m in diameter. For
sewer greater than 1.0m, the spacing between manholes shall not be more than 150m.
4.5 PROPOSED LENGTH OF SEWER PIPES
900 RCP
DESCRIPTION 900
MATERIAL OF SEWER PIPE RCP
a. Refer Hydraulic calculation under Appendix ‘A’ showing the following details;
(i) Tabulation of manhole Flow Computation for PE, Cumulative PE, Average flow,
Peak Flow Factor, Peak Flow & Cumulative Peak Flow.
(ii) Tabulation of Pipe Computation showing diameter, length, gradient, full pipe
velocity & full pipe flow.
(iii) Tabulation of Manhole and level computation showing fall, ground level, Invert Level
& Depth.
6.0 EXAMPLE OF FLOW COMPUTATION USING MANNING EQUATION
A. Flow Computation
1. Population Equivalent
2. Average Flow
The average daily design flow shall be based on 225 litre per person.
4. Peak Flow
V = (1/n) R2/3S1/2
Q = VxA
Q = (1/n) AR2/3S1/2
L = 123.00 m
R = 0.225 / 4 = 0.225;
Q=VxA
Based on the computation of sewer flow, the results of the analysis are attached under
Appendix ‘A’ using Coefficient of Manning, n = 0.013. With the available gradient and
internal pipe size, the velocity is found to be within the acceptable limits of minimum