Professional Documents
Culture Documents
SM 03
SM 03
45000
800
3500 3900 5400 7100 8000 6500 6900 2000 900
Q
11°
1500
1500
01 01
2400
2400
Store
02 02
WATER TANK WATER TANK
SPACES FOR CAR / VAN BELOW BELOW
3500
3500
POOLING 5% = 19 cars
B1-23 B1-22 B1-21 B1-20 B1-19 B1-18
PUMP ROOM
03 03
B1-24
TOWER LINE
FHC
ST-01
ABOVE
RMU ABOVE
SPF
UP
7800
7800
B1-25
DN
STAIR-01
REVISED
B1-17
B1-26
04 04
B1-16
-46
= 19 carsB1-27
LIFT
B1
SPACES FOR CAR / VAN
POOLING 5% = 19 cars
SPACES FOR CAR / VAN
LOBBY
B1-15
8500
8500
B1-28
-45
LIFT PIT
B1
POOLING 5%
B1-14
B1-29
4 -4
B1
4400
4400
STORE
SUBSTATION
B1-12
B1-31
-43
ABOVE RAMP
06 06
B1
B1-11
B1-32
STAIR-02
61000
61000
SER. LIFT
5100
5100
UP DN LOBBY
PRES. SHAFT
LIFT LOBBY
B1-33
B1-42
TYPE OF APPLICATION
B1-10
SER. LIFT
07 07
DD Detailed Design Application
4100
4100
B1-09
ELEC.RM.
DN DEVELOPMENT NAME
STAIR-03 UP
08 08
FHC
B1-08
JUMEIRAH VILLAGE
B1-07
PLOT ID
7900
7900
RAMP
6 M DRIVE WAY
JVC14PHRA005
B1-06
D
BASE N TO
MENT RAM
2 P
BAS UP FR
EME OM
NT 2
09 B1-36 B1-37 B1-38 B1-39 B1-40 B1-41
09 PROJECT NAME
B1-05
PROPOSED 3B+G+4P+33+M+ROOF
2800
2800
B1-35
6 M DRIVE WAY
B1-34
Length=12.54 @ Slope 2%
COMMERCIAL / RESIDENTIAL
10 10 BUILDING
B1-04
OWNER
5000
%
8 .0
B1-03
pe o
CONTRACTOR
Sl
11 11
,
RAMP UP TO
0M
B1-02
GROUND
.9
15
=
th
ng
Le 6.6M Wide Ramp 6.545M Wide Ramp
7000
7000
p
R am
B1-01
Ramp Length=20.40 Slope 10% Ramp Length=20.40 Slope 10%
RAMP DN FROM CONSULTANT
RAMP - 1 GROUND
1000
ational ngineering ureau
1000
CONSULTANT
45000
7100
3500 3900 5400 8000 6500 6900 2000 900
800
45000
A B C D E F G H J Sheet Title
1ST BASEMENT
SMOKE MANAGEMENT LAYOUT