BILL OF QUANTITY (BQ)

PEKERJAAN PENGADAAN UNIT PERTASHOP 3 KL GENERASI 3


PT PERTAMINA RETAIL
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN SAT. VOL MATERIAL JASA MATERIAL JASA
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
I II III IV V VI VII VIII
A PEKERJAAN TANGKI
Tangki Double Wall Kapasitas 3 KL Follow Standar UL 142 + Thermal Insulation
Dimensi TangkI Outer: 1400 x 1880 x 1800 mm = 3,5 Kl
1 MildSteel A36 atau SS400 tebal 6 mm double wall tank Kg 1.518,17
Include :
* Loading Port Dia 2" Set 1,00
* Suction Port Dia 1-1/2" Set 1,00
* Emergency Vent Port Dia 6" Set 2,00
* Dipping Port Dia 2" Set 1,00
* PV Vent Port Dia 2" with extention pipe and cap drat tinggi 4 m Set 1,00
* Manual Tank Gauge Port 2" Set 1,00
* Leakage For Insulation Concrate Port Dia.1" Set 3,00
* Leakage Detection Dia 1" Set 1,00
* Emboss Serial No. Per Tangki Set 1,00
* Foot Tank with Nut and Bolt Set 1,00
2 Perlite Insulating Concrete Fire Protection tebal 75 mm (Heat Insulation) Kg 1.050
3 Sublasting & Finishing Outer Tank Cat Epoxy warna Putih m3 18,25
4 Internal Tank Fluid Level - Volume Table / Tabel Tangki Set 1,00
5 Emergency Vent, Diameter 6", 260000 scfh, Primary and secondary tank Set 2,00

SUB TOTAL - I - -
B PEKERJAAN MECHANICAL (PERPIPAAN)
1 a. Inlet Pipe to Tank with accessories terpasang
* Pipa Black Steel Sch.40 Dia. 2" Set 1,00
* Incl. Camlock Type A Dia 2" w/ cover Set 2,00
* Incl. Tee Connection with dropline/extension pipe perforated Set 1,00
* Termasuk Equipment Support Pipa Lengkap (Isolation Oil Resistant, Bracket, dll) Ls 1,00
b. Outlet Pipe to Dispenser with accessories terpasang
* Pipa Black Steel Sch.40 Dia. 2" Set 1,00
* Termasuk Equipment Support Pipa Lengkap (Isolation Oil Resistant, Bracket, dll) Ls 1,00
2 Flange, Gasket Oil Resistant (*setara klingrit), bounding cable for flange, Elbow, Socket, Plug (Steel Oil Resistant) Ls 1,00
3 Overfill Prevention Valve Dia 2" Pcs 1,00
4 Foot Valve Dia 1-1/2" (Steel Oil Resistant) Pcs 1,00
5 Ball Valve Dia 2" (Steel Oil Resistant) Pcs 1,00
6 Check Valve Dia. 2" Threded Pcs 1,00
7 Ball Valve Dia 1-1/2" (Steel Oil Resistant) Pcs 1,00
8 Ball Valve Dia 1-1/2" (Steel Oil Resistant) tipe Three Piece Pcs 1,00
9 PV Vent Flame Arrester Dia 2" with extension pipe blacksteel sch.40 Set 1,00
10 Anti Siphon Valve Dia. 1-1/2" Outlet Pipe Pcs 1,00
11 Emergency Shut off valve (Inlet : Female dan Outlet : Male) Set 1,00

SUB TOTAL - II - -

Hal 1 / 2
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN SAT. VOL MATERIAL JASA MATERIAL JASA
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
I II III IV V VI VII VIII
C PEKERJAAN COMPARTMENT
Compartment Dimensi Luar 1900 x 2200 x 2200 mm dan Accessories Terpasang
1 Rangka Utama Container (Frame dan Based)
* IWF 150 x 75 x 7mm Kg 140,35
* Hollow 100 x 100 x 2,3mm Kg 83,94
* Hollow 50 x 50 x 2,3mm Kg 125,91
* CNP 200 x 75mm Kg 22,37
* UNP 50 x 38 x 6 x 8mm Kg 7,17
2 Dinding, Alas & Atap Container
* Plat Dinding tebal 2 mm Incl. ventilasi pada sisi container with nut and bolt (Khusus area Tangki) Kg 363,19
* Plat Bordes tebal 3,2 mm (alas bandwall kemiringan 1 Derajat) Kg 15,23
* Dudukan Dispenser, incl. dinding dan dop drain bandwall Ls 1,00
* Name Plate Unit (Fabrikator, Serial No. dan Tahun Produksi) Pcs 1,00
3 Rolling Door Aluminium berkisi partial perforated with box plat metal m2 3,06
4 Lifting Lug 4 titik corner Titik 4,00
5 Sandblasting Finishing Interior dan Exterior warna Putih & Hitam standar dan Merah Pantone Pertamina 186 C unit 1,00
Acrilic (Sign Produk) dan sticker unit (setara 3M), Pertashop, produk, dilarang merokok & zona berbahaya (kanan, kiri dan belakang)
6 Ls 1,00
serta ketentuan rambu lainnya
7 Tangga Knockdown Unit 1,00
8 Wadah Tumpahan Detachable with Ball Valve (wadah tumpahan) loading Set 1,00
9 Pekerjaan Listplang Kanopi Keliling m' 12,10
* Hollow 30x30x1,5
* Siku 60x60
* ACP Warna Merah Pantone Pertamina 186 C
* Aluminium Plat Warna Putih bagian bawah canopy
* Cutting sticker scotlite list keliling dan background logo Pertamina Putih
* Stickering logo Pertamina
* Sealant dan finishing cat duco
* Plat Aluminium penutup bagian dalam listplang

SUB TOTAL - III - -


D PEKERJAAN ELECTRICAL
1 Kabel NYFGBY 4 x 2,5mm Incl. Accessories terpasang m 10,00
* Untuk Koneksi lampu dan Dispenser
2 Kabel Conduit (Flexible & Pipe) metal & Gland Cable metal terpasang Ls 1,00
3 Pemasangan Bonding Dispenser dan Tangki ke Body Container, Copper Rod 5/8” @1 batang dan kabel grounding BC 35mm Ls 1,00
4 Lampu Explotion Proof dan aksesoris terpasang Unit 1,00

SUB TOTAL - IV - -
JUMLAH TOTAL - -
JUMLAH MATERIAL + JASA -
KEUNTUNGAN & RESIKO 10% -
JUMLAH -
DIBULATKAN -
TERBILANG :
* Harga belum termasuk ppn 10%
Jakarta, Agustus 2020
Dibuat :
Technical Manager

Sugeng Riadi

Hal 2 / 2