Professional Documents
Culture Documents
Gambar Pondasi Sludge Centrifuges
Gambar Pondasi Sludge Centrifuges
Gambar Pondasi Sludge Centrifuges
280
,
50
PARIT SLUDGE
130 130 130 120
o
Is-
T—
PARIT SLUDGE
POT. A
DENAH
SKALA1: 85
^ fe. SAW IT
SUM BERM AS
SAWIT SUMBERMAS SARANA
HEAD OFFICE : JL. H. UDAN SAID No. 47
Telp. (0532) 23095, 25235 Fax (0532) 21396
GAMBAR EXTENSION
Pangkalan Bun 74113 - Kalimantan Tengah
SARANA KORI ANGGRAINI r BAMBANfe IRAWAN NISSI SIAHAAN GENGA RAJ <#HIMMATTH|RI PONDASI SLUDGE CENTRIFUGES SCALA : NTSC
ESTIMATOR CJPl KA Q vf. ENGINEERING PROJECT CONTROLLER CNIEP ENGINEER
Korytt Nyata Untuk KSvgeri DATE : DATE DATE : DATE :
Drg. No : Sheet Of Rev
0
0.45 mm ZINC ALUM
POTONGAN
SKALA 1: 50
“0 -
PREPARED BY CHECKED BY APPROVED BY APPROVED BY Title:
S AW IT SU M BER M AS SARANA
•5 ^ J S i SAWIT HEAD OFFICE : JL. H. UDAN SAID No. 47 z f jz r r t v i
GAM BAR POTONGAN
SUMBERMAS
SARANA
Telp. (0532) 23095, 25235 Fax (0532) 21396
Pangkalan Bun 74113 - Kalimantan Tengah
KORI ANGGRAINI L BAMBAwi IRAWAN NISSI SIAHAAN
l Mn>hk
GENGA RAJ CJHIMMATHIRI
PONDASI SLUDGE CENTRIFUGES SCALA : NTSC
ESTIMATOR OR. ka PROJECTCONTROLLER CHEF ENOINHR
Kiirya Nyjtu Untim ISej^'i DATE : DATE V DATE DATE : Sheet Of Rev
Drg. No: 0