Analysis Report: Customer Name SST in Date SST Out Date
Analysis Report: Customer Name SST in Date SST Out Date
No : FRM-ALL-09NC-02-00
PT. BUMIPUTRA MANUFAKTUR TEKNOLOGI Rev. No : 00
ANALYSIS REPORT
Customer Name : Report Date:
SST In Date : PT. BUMIPUTRA MANUFAKTUR TEKNOLOGI
SST Out Date :
Attn :
A. Purpose
SST Report : Check condition part with Salt Spray Test System about 96 hours. (After Treatment with Palcoat)
Target Check : While Rust Percentage (%)
C. SST Result
- 96 Hours
D. Summary
Based on the data:
SST 96 hours all parts was good.
Data White rust < 5%.
No Item
1 Concentration of NaCl (W/V%)
2 Tempt. Chamber (°C)
3 Tempt. Of Air Tank (°C)
4 Press air Compressor (kg/m₂)
5 Time process (hr)
Standard Actual Remark
5 5 OK
33 ~ 37 35 OK
49 ~ 51 50 OK
0.8 ~ 1.0 1.0 OK
96 96 OK
Approved Checked Checked Prepared