Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

JOB SAFETY ANALYSIS (JSA)

Country / Location: Date:


Description of Job CHECK PUMPS WHILE LOGGING Rig:
or Work Activity:
IS A PERMIT TO WORK REQUIRED YES NO
JSA # 26
PREJOB SAFETY MEETING HELD YES NO

Work Sequence (Job Steps) Hazards or Potential Incidents Recommendations to Eliminate or


Reduce Hazards
ACCIDENTAL OPERATION OF PUMPS
1 LOCK OUT PUMPS IN SCR RESULTING IN CRUSHED BODY PARTS MAKE SURE PUMPS ARE LOCKED OUT

WRONG TOOLS RESULT IN PINCHED


2 GET THE PROPER TOOLS FOR THE JOB FINGERS WATCH PINCH POINTS
OPEN PUMP AND CHECK VALVES, SEATS , PISTONS , WORN PARTS COULD RESULT IN RIG
3 LINERS. REPLACE WORN PARTS DOWN TIME. PREVENTIVE MAITANENCE
CLEAN UP SPILLED MUD & BE
4 CLEAN UP MESS AND PUT AWAY TOOLS SLIPPERY SURFACE CAREFULL MOVEING AROUND
CLEAR EVERYONE AWAY FROM PUMP
5 UNLOCK PUMP AND TEST THROUGH BLEEDER LINE WHEN START UP

List Below the Personal Protective Equipment, Special Tools and Other Safety Equipment Required to do this Job

HARD HAT , SAFETY GLASSES , GLOVES , WRENCHES


SIGN-OFF
F0782 (2) Original – Rig Files Copy-Area Office Copy-Houston Office Page 1 of 2
JOB SAFETY ANALYSIS (JSA)

Country / Location: Date:


Description of Job CHECK PUMPS WHILE LOGGING Rig:
or Work Activity:
IS A PERMIT TO WORK REQUIRED YES NO
JSA # 26
PREJOB SAFETY MEETING HELD YES NO

JSA Written By: JSA Approved By:

F0782 (2) Original – Rig Files Copy-Area Office Copy-Houston Office Page 2 of 2

You might also like