Professional Documents
Culture Documents
#21 Wireline Logging
#21 Wireline Logging
Date:
2 TIDY DRILLING TOOLS FROM RIG FLOOR BODILY INJURY STAY IN SAFE AREA
HANG SHEAVE IN ELEVATORS AND CHAIN OFF FLOOR FALLING OBJECTS FROM DERRICK, WORKING AT WEAR HARNESS AND SECURE ALL
3
SHEAVE HEIGHT IN SUB EQUIP
4 RUN BLOCKS UP THE DERRICK TANGLED IN WIRE LINE STAY CLEAR OF MOVING LINE
6 READ AND RECORD HOLE FILL MONITOR WELL LOSS OF FLUID OR GAIN OF FLUID MONITOR WELL AT ALL TIMES
10
List Below the Personal Protective Equipment,Special Tools and Other Safety Equipment Required to do this Job