YEMEN DRILLING JOB SAFETY ANALYSIS

PROJECT DESCRIPTION: MAINTANANCE ON MUD PUMPS,PULSATION DAMPER,LOW AND HIGH PRESSURE PIPE SYSTEM.

IS A PERMIT TO WORK REQUIRED YES NO


PRE JOB SAFETY MEETING HELD YES NO

TASK POTENTIAL ACCIDENT HOW WILL YOU CONTROL


DESCRIPTION OR HAZARD THE HAZARD

LOCK OUT MUD PUMPS. ELEC.SHOCK. TRAPPED PRESSURE, ASSURE PROPER LOCK OUT PROCEDURES ARE MAINTAINED.
SMASHED OR CRUSHED. OPEN ALL BLEED OFF VALVES.

PERFORM MANUAL AND VISUAL IMPROPER TOOLS, TRIPPING OR FALLING. CHECK TOOLS FOR PROPER FIT,ANDSAFE CONDITION.
MAINTANANCE. AS POLLUTION. KEEP WORK AREA CLEAR. USE P.P.E.
PER EACH WORK ORDER. COVER AREA WITH POLL. PADS WHERE NEEDED.
USE ROPE ON ANY HAMMER WRENCH.
WHEN MANUAL AND VISUAL CHECKS ARE COMPLETE
CLEAR AREA OF TOOLS AND MATERIAL LEFT.

UNLOCK MUD PUMPS AND POLLUTION, CHEMICAL BURNS, EXPOSURE ASSURE EQUIP.IS READY TO BE UNLOCKED. CHECK
PERFORM MAINTANCE CHECK TOHIGH PRESSURE.EQUIP.DAMAGE. VALVE ALIGNMENT.NOTIFY ALL PERSONNELL.
AS PER WORK ORDER. BARRACADE AREA WHERE NEEDED.

NORMAL PPE, WATER HOSE