Professional Documents
Culture Documents
Final Quantification
Final Quantification
R/F
FOR FOR TOP SLAB
No of bar No of member
Main Bar 10dia 15 2
9 2
2 10.26
2 6
10 31.7736
1 Earthwork in Excavation
a.) For column foundation m3 6 2.100 1.900
b.) For Brick wall Foundation m3 2 1.330 0.850
3 2.300 0.850
2 3.330 0.850
2 PCC
a.) For column foundation m3 6 2.000 1.800
b.) For Brick wall Foundation m3 2 1.430 0.750
3 2.400 0.750
2 3.430 0.750
1.350 32.319
1.350 3.052
1.350 7.918
1.350 7.642
0.150 3.240
0.150 0.322
0.150 0.810
0.150 0.772
0.300 4.590
2.018
0.300 0.467
0.300 0.431
0.300 1.094
0.300 0.947 3.73
0.300 1.007 4.445
0.300 0.846 8.175
4.0875
0.230 0.580
0.230 0.836
0.230 1.956
0.23 1.80
4.175
2.0875
6.115
3.0575
BBS of Portal Frame
Total cut
Sl.No. Description of Items dia of bar No. of member No. of Bar Length of bar Unit Weight Total Weight
length
1 Footing Main Bar 25 2 23 1.865 3.858024691358 326.1831276
2 Footing Distribution bar 25 2 19 2.165 3.858024691358 322.968107
Beam
for steel g 25 1 1 7.315 3.86 28.22145062
for steel h 25 1 1 7.315 3.86 28.22145062
for f 25 1 3 3.355 3.86 38.83101852
25 1 3 3.355 3.86 38.83101852
for d 25 1 2 3.635 3.86 28.04783951
for i 25 1 3 6.66 3.86 77.08333333
stirrups @ 120c/c 10 2 12 1.34 0.62 20.54115226
10 1 10 1.34 0.62 8.304691358
total #VALUE! in kg
Sl.No. Description Unit No. Length
earth work
for column foundation
c1 cum 6 2.1
c2 cum 4 2.3
c3 cum 2 2.5
footing concrete
P.C.C (1:3:6)
column c1 6 2
column c2 4 2.2
column c3 2 2.4
total pcc
cement concrete
for column footing
rectangular portion
for c1 6 2
for c2 4 2.2
for c3 2 2.4
trapezoidal section 6 4
4 4.84
2 5.76
for column
c1 6 0.25
c2 4 0.3
2 0.35
plinth beam
long wall 2 14.1
short wall 2 7.7
internal beam
4-5 and 5-6 2 7.5
2-5 abd b 2 5.15
beam a 1 3.25
beam c 1 3.85
beam d 1 2.75
beam 8-11 1 4.45
lintles
w1 8 1.5
w1&D 1 2.8
w2 4 1.2
w3 1 0.9
d 4 1.3
d1 4 1.2
collapsable gate 1 1.65
d1 1 1.3
d2 1 1.1
width Depth/Height Quantity REMARKS
0
0.6 0.6 10.296
0.6 0.6 5.256
0
0.6 -0.6 -4.536
0.6 -0.6 -3.312
124.938
2 0.075 1.8
2 0.075 1.32
2.4 0.075 0.864
0
0
0.6 0.15 2.574
0.6 0.15 1.314
0
0
0.2 -0.15 -0.045
0.2 -0.15 -0.036
0.6 0.1 0.168
0.6 0.1 0.135
8.094
2 0.15 3.6
2.2 0.2 3.872
2.4 0.2 2.304
0.105 0.3 2.852
0.12 0.3 2.289
0.135 0.3 1.355
0.2 4.925 1.4775
0.2 4.875 1.17
0.2 4.875 0.6825
19.602048645517
0.2 0.1
0.2 1
0.2 0.1
0.2 1
0.1 0.1
0.1 1
0.1 0.1
0.1 0.1
0.1 0.01
BBS of Portal Frame
1 slab1
main bar 10 1 22 0.617284
straight 10 1 11 3.05 33.55 0.617284 20.70988
crank 10 1 11 3.755 41.305 0.617284 25.49691
0 0 0
Distribution bar 1 13.5 0 0 0
straight 6 1 8 3.05 24.4 0.222222 5.422222
crank with anathor slab 6 1 5 3.93 19.65 0.222222 4.366667
crank within slab 6 1 1 3.055 3.055 0.222222 0.678889
0 0 0
extra cross bar 10 1 11 0.825 9.075 0.617284 5.601852
10 1 8 3.15 25.2 0.617284 15.55556
2 slab2 0 0 0
main bar 10 1 34 0 0.617284 0
straight 10 1 17 3.55 60.35 0.617284 37.25309
crank 10 1 17 4.13 70.21 0.617284 43.33951
Distribution bar 1 16 0 0 0
straight 10 1 8 4.55 36.4 0.617284 22.46914
crank with anathor slab 10 1 8 5.255 42.04 0.617284 25.95062
3 slab3 0 0 0
main bar 10 1 33 0 0.617284 0
straight 10 1 17 3.55 60.35 0.617284 37.25309
crank 10 1 15 4.505 67.575 0.617284 41.71296
crank within slab 10 1 1 3.43 3.43 0.617284 2.117284
Distribution bar 1 16 0 0 0
straight 10 1 8 4.35 34.8 0.617284 21.48148
crank with anathor slab 10 1 7 5.03 35.21 0.617284 21.73457
crank within slab 10 1 1 4.38 4.38 0.617284 2.703704
0 0 0
extra cross bar 10 1 17 0.95 16.15 0.617284 9.969136
10 1 10 1.15 11.5 0.617284 7.098765
493.4456
STANCHION
S.NO TIMSING DIMENSION SQUARING ROUGH WASTE REMARKS
1 25mm bolts
1/1/4. 0.00049063 0.0019625
Washer
plates(125*12
2 5*12)mm Unit wt=7850kg/m3)
1/1/4. 0.125
0.125
0.012 5.8875
Base
plate(580*580
3 *12) Unit wt=7850kg/m3)
1/1/1. 0.58
0.58
0.012 31.68888
ISA
4 (200*200*12) Unit wt=27.2kg/m3)
1/1/2. 0.58 31.552
ISA
5 (150*115*12) Unit wt=23.8kg/m3)
1/1/2. 0.225 10.71
Plates on
flange of ISMB
7 300 (240*12) Unit wt=7850kg/m3)
1/1/2. 4.5
0.24
0.012 203.472
8 ISMB 250*125 Unit wt=27.9kg/m3)
1/1/2. 3 167.4
Bracket ISA
9 150*150*12 Unit wt=27.2kg/m3)
1/1/2. 0.16 8.704
Cleat ISA
10 150*150*12 Unit wt=27.2kg/m3)
1/1/2. 0.16 8.704
11 ISLB 275*140 Unit wt=33kg/m3)
1/1/1. 3 99
Bracket ISA
12 150*150*12 Unit wt=27.20kg/m3)
1/1/2. 0.14 7.616
13 PCC Base
1/1/1. 0.75
0.75
0.6 0.3375
STEEL GRILLAGE FOUNDATION
S.NO TIMSING DIMENSION SQUARING ROUGH WASTE REMARKS
Bottom rows of RSJ
1 200*100@25.5\RM Unit wt=25.5kg/m3
1/2/8. 2.4 979.2
12 Angle Stiffner(75*75*10)
1/1/16/2. 0.686 241.472
13 Plata at top of column
1/2/1.
14 Base plate
1/2. 0.9
0.78
0.01 110.214
15 Angle (150*115*12)
1/2/2. 0.9 42.84
16 Gusset plate-12mm
1/2/2. 0.45
0.9
0.012 152.604
17 Channel -400*100*10
1/2/2. 5.5 543.4