Professional Documents
Culture Documents
TCM Commissioning Checklist
TCM Commissioning Checklist
Serial Number:
Operator:
Date:
Laptop to TCM
Connection Established Yes No
Connection
Current version:
Is TCM FW at Latest Release Yes No
TOTUS Firmware Check Following Steps are applicable if FW not on latest release
New version:
Update FW to Latest Release Yes No
37-0000-00 Totus Control Module – Commissioning Report
Asset ID
Transformer Manufacturer
Three Phase
Number of Phases
Single Phase
Transmission Auto Transformer
Transmission Transformer
GSU
Unit Transformer
Station Transformer
Transformer Type Distribution
Rectifier
Furnace
Reactor
Special
Others
No
Tertiary (Y/N)
Yes
Page 2 of 4
37-0000-00 Totus Control Module – Commissioning Report
Value
Test Description Results OK? (if applicable)
Following Steps are applicable when MODBUS Communication is in use
RS232
Unit polling over MODBUS
Yes No RS485
e.g. UTC Time updates every second
Ethernet
MODBUS
IP:Port
Unit polling MODBUS (Camlin Third
Yes No
Party Interface Only)
DNP3
RS232
Unit polling over DNP3
Yes No RS485
e.g. UTC Time updates every second
Ethernet
Following Steps are applicable when SMS alerts are in use
SMS
Transformer Analytics Following Steps are applicable when Transformer Analytics is uploaded
Page 3 of 4
37-0000-00 Totus Control Module – Commissioning Report
Value
Test Description Results OK? (if applicable)
Temperature Inputs
General Settings
Latitude:
_______________
Location GPS coordinates manually entered Yes No Longitude:
_______________
LAN
Unit Connected to Network Yes No
GSM
Domain:
Page 4 of 4