Likupang 1.

PLTG/MG Minahasa Peaker 150 MW – 2018


12
2. PLTG Sulbagut-1 150 MW – 2024
Pandu

Paniki Bitung
Teling Ranomut 3. PLTA Sawangan 12 MW – 2020
Sario/Manado Kota 3 Sawangan 4. PLTU Sulut-3 100 MW – 2020
Kema
Tasik Ria
SULAWESI 5 Tomohon U4
62 6 U Tonsealama
Kawangkoan 5. PLTU Sulbagut-2 200 MW – 2025/26
Leok UTARA Ratahan
Tolitoli
16
Bolontio
12
Lopana
78P
6. PLTU Sewa Amurang 50 MW – 2018/19
KALIMANTAN 13 Buroko
TIMUR
Lolak
A
11 Belang 7. PLTP Lahendong 7 20 MW – 2020
GORONTALO U

8. PLTP Lahendong 8 20 MW – 2021


Bangkir Isimu Bintauna P
Gobar
Marisa Botupingge Otam 9
10
Tutuyan 9. PLTU Sulut-1 2x50 MW – 2019
Limboto
Moutong G Tilamuta U
59
Suwawa
10. PLTP Kotamobagu - 80 MW – 2025
14
Tambu 15 Molibagu 11. PLTA Poigar-2 30 MW – 2021
12. PLTU Sulbagut-1 100 MW – 2019
13. PLTU Gorontalo (FTP1) 50 MW – 2017/18
14. PLTU Sulbagut-3 100 MW – 2021
MPP 60 MW 15. PLTG Gorontalo 100 MW – 2016
Likupang
SULTENG
12
16. PLTU Tolitoli 50 MW – 2023
17 17. PLTU Palu-3 100 MW – 2019
Sindue 18
U Pandu 18. PLTU Tawaeli Ekspansi 30 MW – 2016
Parigi
Donggala
Talise Ampana
Bunta Luwuk 19. PLTP Masaingi (FTP2) 20 MW – 2025
Silae Paniki
Petobo 49 Sario/Manado Bitung
20. PLTP Borapulu 40 MW – 2025
61 P 1920 Ranomut
Palu Mauro
Kota 21. PLTG/MG/GU/MGU Makassar 450 MW–2019/20
Teling
Baru 3
Sawangan
Kema 22. PLTGU Sulsel 450 MW–2022
Poso Toili Tasik Ria
U4
23. PLTA Poso-1 70 MW – 2019
Sigi
24. PLTA Seko-1 480 MW – 2023/24
G
SULAWESI TENGAH 63 Tomohon
Pasangkayu 44 Tonsealama
Kawangkoan
56 25. PLTA Salu Uro 95 MW – 2022
SULAWESI Tentena U
Ratahan 26. PLTU Kendari (Ekspansi) 10 MW – 2017
23 Lopana P7
BARAT 8 27. PLTU Kendari-3 100 MW – 2019
Kolonedale
ke ke 28. PLTA Pongkeru 50 MW - 2023
Topoyo 38 A
25 24 GI Otam GI Belang 29. PLTU Mamuju (FTP2) 50 MW – 2017
A 30. PLTA Kalaena-1 54 MW – 2022
Wotu
A 30 31. PLTA Malea 90 MW – 2020
Mamuju Baru
Masamba 28
Malili
ke ke 32. PLTA Bakaru III 146 MW- 2023
29 GI Barru GI/GITET Sidrap
Mamuju Rantepao
Bungku
Pangkep 33. PLTA Tabulahan 20 MW – 2023
33 34 31 Tonasa 34. PLTA Masupu 36 MW – 2023
A SULAWESI MPP 120 MW
Mamasa 32 Palopo SULSELBAR 35. PLTA Poko 130 MW – 2021
35 TENGGARA
A36 37 Makale 36. PLTA Bakaru II 140 MW – 2021
A 51 Andowia
21 37. PLTA Bonto Batu 100 MW – 2025
Luwu
Majene Polman 45 A 22 G
Bakaru Enrekang Lasusua A Maros 38. PLTA Tumbuan 300 MW – 2024/25
Siwa
57 Mandai
Bosowa 39. PLTU Sulsel Barru-2 100 MW – 2019
Pinrang
Sidrap
50 54 Daya Kima
40. PLTMG Wajo 20 MW – 2018
Pare A 26 Tallo Lama
Keera
27 Bontoala
Daya Baru 41. PLTU Sulsel-2 400 MW – 2020
Kendari Tello
53 Sengkang Kolaka Unaaha Panakukang
Tanjung
42. PLTU Punagaya 200 MW – 2017/18
40
39 Soppeng
Bunga Sungguminasa 43. PLTU Jeneponto-2 250 MW – 2018/19
Barru 58
SULAWESI
Andolo
44. PLTMG Luwuk 40 MW – 2018
SELATAN ke ke 45. PLTA Wotunohu 15 MW – 2024
Pangkep Tonasa
Bone GI Tallasa GITET Bantaeng
46. PLTU Bau-Bau 2 50 MW – 2022/23
60
Maros Buranga
58
Mandai
Bosowa Kajuara Kasipute 56 Raha 47. PLTU Bau-Bau 50 MW – 2019
53 Pure
Tello Daya
Daya Baru
48. PLTMG Bau-Bau 30 MW – 2016
Tallolama Sinjai
Panakkukang 49. PLTA Bongka 280 MW-2024/25
Sungguminasa 55
Bantaeng
Bulukumba
Malaompana 50. PLTA Konawe 21 MW – 2024
Tallasa
Ujungloe Bau-Bau 51. PLTA Lasolo 145 MW – 2023
Punagaya
JNP
Bantaeng Smelter
46 48 Pasarwajo 52. PLTMG Bau-Bau 30 MW – 2025
41 42
43 4752 Butauga 53. PLTA Buttu Batu 200 MW – 2025
54. MPP Sultra (Kendari) 50 MW- 2018
PERENCANAAN SISTEM
PT PLN (Persero) 55. MPP Wangi-Wangi 5 MW- 2018
PETA JARINGAN SULAWESI
56. MPP Bombana 10 MW- 2018
64 / GI 500 kV Existing / Rencana
GI 275 kV Existing / Rencana
P
U / U PLTU Existing / Rencana
G / G PLTG Existing / Rencana
57. MPP Kolaka Utara 5 MW- 2018
/
/ GI 150 kV Existing / Rencana
P
P / P PLTP Existing / Rencana 58. PLTP Lainea 20 MW – 2026
GI 70 kV Existing / Rencana A / A PLTA Existing / Rencana
59. PLTP Suwawa 20 MW – 2026
/
/ GI 500/275 kV Existing / Rencana GU / GU PLTGU Existing / Rencana
/
/
GI 500/275/150 kV Existing / Rencana MG / MG PLTMG Existing / Rencana
GI 275/150 kV Existing / Rencana M / M PLTM Existing / Rencana
60. MPP Sulselbar 120 MW – 2018
/ GI 150/70 kV Existing / Rencana D / D PLTD Existing / Rencana 61. MPP Sulteng 60 MW – 2018
/
/
T/L 70 kV Existing / Rencana
T/L 150 kV Existing / Rencana
Kit Existing
Kit Rencana
62. PLTGU Luwuk 150 MW – 2020
/
/
T/L 275 kV Existing / Rencana
T/L 500 kV Existing / Rencana Edit Januari 2017
63. PLTMG Selayar 10 MW - 2018
Likupang 1. PLTG/MG Minahasa Peaker 150 MW – 2018
12
2. PLTG Sulbagut-1 150 MW – 2024
Pandu

Paniki Bitung
Teling Ranomut 3. PLTA Sawangan 12 MW – 2020
Sario/Manado Kota 3 Sawangan 4. PLTU Sulut-3 100 MW – 2020
Kema
Tasik Ria
SULAWESI 5 Tomohon U4
62 6 U Tonsealama
Kawangkoan 5. PLTU Sulbagut-2 200 MW – 2025/26
Leok UTARA Ratahan
Tolitoli
16
Bolontio
12
Lopana
78P
6. PLTU Sewa Amurang 50 MW – 2018/19
KALIMANTAN 13 Buroko
TIMUR
Lolak
A
11 Belang 7. PLTP Lahendong 7 20 MW – 2020
GORONTALO U

8. PLTP Lahendong 8 20 MW – 2021


Bangkir Isimu Bintauna P
Gobar
Marisa Botupingge Otam 9
10
Tutuyan 9. PLTU Sulut-1 2x50 MW – 2019
Limboto
Moutong G Tilamuta U
59
Suwawa
10. PLTP Kotamobagu - 80 MW – 2025
14
Tambu 15 Molibagu 11. PLTA Poigar-2 30 MW – 2021
12. PLTU Sulbagut-1 100 MW – 2019
13. PLTU Gorontalo (FTP1) 50 MW – 2017/18
14. PLTU Sulbagut-3 100 MW – 2021
MPP 60 MW 15. PLTG Gorontalo 100 MW – 2016
Likupang
SULTENG
12
16. PLTU Tolitoli 50 MW – 2023
17 17. PLTU Palu-3 100 MW – 2019
Sindue 18
U Pandu 18. PLTU Tawaeli Ekspansi 30 MW – 2016
Parigi
Donggala
Talise Ampana
Bunta Luwuk 19. PLTP Masaingi (FTP2) 20 MW – 2025
Silae Paniki
Petobo 49 Sario/Manado Bitung
20. PLTP Borapulu 40 MW – 2025
61 P 1920 Ranomut
Palu Mauro
Kota 21. PLTG/MG/GU/MGU Makassar 450 MW–2019/20
Teling
Baru 3
Sawangan
Kema 22. PLTGU Sulsel 450 MW–2022
Poso Toili Tasik Ria
U4
23. PLTA Poso-1 70 MW – 2019
Sigi
24. PLTA Seko-1 480 MW – 2023/24
G
SULAWESI TENGAH 63 Tomohon
Pasangkayu 44 Tonsealama
Kawangkoan
56 25. PLTA Salu Uro 95 MW – 2022
SULAWESI Tentena U
Ratahan 26. PLTU Kendari (Ekspansi) 10 MW – 2017
BARAT 23 Lopana P 7
Kolonedale
8 27. PLTU Kendari-3 100 MW – 2019
ke ke 28. PLTA Pongkeru 50 MW - 2023
Topoyo 38 A
25 24 GI Otam GI Belang 29. PLTU Mamuju (FTP2) 50 MW – 2017
A 30. PLTA Kalaena-1 54 MW – 2022
Wotu
A 30 31. PLTA Malea 90 MW – 2020
Mamuju Baru
Masamba 28
Malili
ke ke 32. PLTA Bakaru III 146 MW- 2023
29 GI Barru GI/GITET Sidrap
Mamuju Rantepao
Bungku
Pangkep 33. PLTA Tabulahan 20 MW – 2023
3334 31 Tonasa 34. PLTA Masupu 36 MW – 2023
A SULAWESI MPP 120 MW
Mamasa 32 Palopo SULSELBAR 35. PLTA Poko 130 MW – 2021
35 TENGGARA
A36 37 Makale 36. PLTA Bakaru II 140 MW – 2021
A 51 Andowia
21 37. PLTA Bonto Batu 100 MW – 2025
Luwu
Majene Polman 45 A 22 G
Bakaru Enrekang Lasusua A Maros 38. PLTA Tumbuan 300 MW – 2024/25
Siwa
57 Mandai
Bosowa 39. PLTU Sulsel Barru-2 100 MW – 2019
Pinrang
Sidrap
50 54 Daya Kima
40. PLTMG Wajo 20 MW – 2018
Pare A 26 Tallo Lama
Keera
27 Bontoala
Daya Baru 41. PLTU Sulsel-2 400 MW – 2020
Kendari Tello
53 Sengkang Kolaka Unaaha Panakukang
Tanjung
42. PLTU Punagaya 200 MW – 2017/18
40
39 Soppeng
Bunga Sungguminasa 43. PLTU Jeneponto-2 250 MW – 2018/19
Barru 58
SULAWESI
Andolo
44. PLTMG Luwuk 40 MW – 2018
SELATAN ke ke 45. PLTA Wotunohu 15 MW – 2024
Pangkep Tonasa
Bone GI Tallasa GITET Bantaeng
46. PLTU Bau-Bau 2 50 MW – 2022/23
60
Maros Buranga
58
Mandai
Bosowa Kajuara Kasipute 56 Raha 47. PLTU Bau-Bau 50 MW – 2019
53 Pure
Tello Daya
Daya Baru
48. PLTMG Bau-Bau 30 MW – 2016
Tallolama Sinjai
Panakkukang 49. PLTA Bongka 280 MW-2024/25
Sungguminasa 55
Bantaeng
Bulukumba
Malaompana 50. PLTA Konawe 21 MW – 2024
Tallasa
Ujungloe Bau-Bau 51. PLTA Lasolo 145 MW – 2023
Punagaya
JNP
Bantaeng Smelter
46 48 Pasarwajo 52. PLTMG Bau-Bau 30 MW – 2025
41 42
43 4752 Butauga 53. PLTA Buttu Batu 200 MW – 2025
54. MPP Sultra (Kendari) 50 MW- 2018
PERENCANAAN SISTEM
PT PLN (Persero) 55. MPP Wangi-Wangi 5 MW- 2018
PETA JARINGAN SULAWESI
56. MPP Bombana 10 MW- 2018
64 / GI 500 kV Existing / Rencana
GI 275 kV Existing / Rencana
P
U / U PLTU Existing / Rencana
G / G PLTG Existing / Rencana
57. MPP Kolaka Utara 5 MW- 2018
/
/ GI 150 kV Existing / Rencana
P
P / P PLTP Existing / Rencana 58. PLTP Lainea 20 MW – 2026
GI 70 kV Existing / Rencana
59. PLTP Suwawa 20 MW – 2026
/ A / A PLTA Existing / Rencana
/ GI 500/275 kV Existing / Rencana GU / GU PLTGU Existing / Rencana
/
/
GI 500/275/150 kV Existing / Rencana MG / MG PLTMG Existing / Rencana
GI 275/150 kV Existing / Rencana M / M PLTM Existing / Rencana
60. MPP Sulselbar 120 MW – 2018
/ GI 150/70 kV Existing / Rencana D / D PLTD Existing / Rencana 61. MPP Sulteng 60 MW – 2018
/
/
T/L 70 kV Existing / Rencana
T/L 150 kV Existing / Rencana
Kit Existing
Kit Rencana
62. PLTGU Luwuk 150 MW – 2020
/
/
T/L 275 kV Existing / Rencana
T/L 500 kV Existing / Rencana Edit Januari 2017
63. PLTMG Selayar 10 MW - 2018
PLTG/MG Minahasa
PERENCANAAN SISTEM 150 MW – 2018
PT PLN (Persero)
PETA JARINGAN PROPINSI SULAWESI UTARA
PLTGU Sulbagut 1
GI 500 kV Existing / Rencana U U PLTU Existing / Rencana 150 MW – 2023
/ /
/ GI 275 kV Existing / Rencana G / G PLTG Existing / Rencana
/ GI 150 kV Existing / Rencana / PLTP Existing / Rencana ACSR 1x240 mm2
P P
/ GI 70 kV Existing / Rencana A / A PLTA Existing / Rencana G
/
12 km - 2017 Likupang
GI 500/275 kV Existing / Rencana GU
/ GU PLTGU Existing / Rencana
/ GI 500/275/150 kV Existing / Rencana GB
MG / MG PLTMG Existing/ Rencana Pandu
/
/
GI 275/150 kV Existing / Rencana M / M
PLTM Existing / Rencana 2xHAWK
GI 150/70 kV Existing / Rencana D / D
PLTD Existing / Rencana 21 km - 2017
T/L 70 kV Existing / Rencana Kit Existing Paniki Bitung
/
/ T/L 150 kV Existing / Rencana Kit Rencana PLTD Bitung
Ranomut D
/ T/L 275 kV Existing / Rencana Manado Kota/ 57 MW
PLTA Sawangan
/ T/L 500 kV Existing / Rencana Edit Januari 2017 Sario 2xHAWK
12 MW – 2020 Teling
20 km - 2020
Tasik Ria A
PLTD Lopana Sawangan Kema
10 MW PLTU Sulut 3
U
2x50 MW – 2020
PLTU Amurang Tomohon
2x25 MW Tonsealama
P
PLTP Lahendong I&II
PLTU Sewa Amurang P
2x20 MW
2x25 MW – 2018/19 U
U D

PLTU Sulbagut 2 Lopana PLTP Lahendong III&IV


Kawangkoan
2x100 MW – 2025/26 Ratahan 2x20 MW
ACSR 1x240 mm2 P
5 km - 2017
PLTU Sulbagut 3 2xHAWK
100 MW – 2021 12 km - 2022 PLTP Lahendong V & VI (FTP 2)
2x20 MW – 2016
PLTU Sulut 1
2xHAWK
Buroko 2x50 MW – 2019 PLTP Lahendong VII & VIII
65 km - 2022
U Lolak 1xHAWK 2x20 MW – 2020/21
ke Bintauna U 15 km - 2020
GI Isimu Belang
A
PLTP Lahendong Small Scale
(Gorontalo) 2x5 MW – 2019/21
Otam
D
PLTA Poigar 2
P 30 MW – 2021

ACSR 2x240 mm2


Tutuyan PLTD Kotamobagu
60 km - 2019
8 MW

GORONTALO
ACSR 2x240 mm2
66 km - 2017
PLTP Kotamobagu (FTP2)
80 MW – 2025
ke 2xHAWK
PLTU TLG ACSR 2x240 mm2 120 km - 2022
(Gorontalo) 103 km - 2020
Molibagu

z
PLTU Sulbagut 1
2x50 MW – 2019
ke
GI Leok PLTU Gorontalo (FTP1)
2xHAWK mm2
2x25 MW – 2017/18
SULAWESI (Sulteng) 90 km - 2018

TENGAH Bolontio Buroko

U
U ke
GI Buroko
(Sulut)

Isimu PLTP Suwawa


20 MW – 2024
ke ACSR 2x240 mm2
GI Moutong 90 km - 2018 Botupingge
Marisa D
(Sulteng)
Gobar
P SULAWESI
PLTD Talaga
Moutong
Tilamuta
24 MW
U UTARA
G

PLTU Molotabu
ACSR 2x240 mm2
2x10 MW
103 km - 2020
PLTG Gorontalo Peaker
100 MW – 2016

PERENCANAAN SISTEM
PT PLN (Persero)
PETA JARINGAN PROPINSI GORONTALO
GI 500 kV Existing / Rencana U
/ U PLTU Existing / Rencana
/
/ GI 275 kV Existing / Rencana G / G PLTG Existing / Rencana
/ GI 150 kV Existing / Rencana P / P PLTP Existing / Rencana
/ GI 70 kV Existing / Rencana A / A PLTA Existing / Rencana
/ GI 500/275 kV Existing / Rencana GU GU PLTGU Existing / Rencana
/
/ GI 500/275/150 kV Existing / Rencana MG / MG PLTMG Existing/ Rencana
/
/
GI 275/150 kV Existing / Rencana M / M
PLTM Existing / Rencana
GI 150/70 kV Existing / Rencana D / D
PLTD Existing / Rencana
/ T/L 70 kV Existing / Rencana Kit Existing
/ T/L 150 kV Existing / Rencana Kit Rencana
/ T/L 275 kV Existing / Rencana
/ T/L 500 kV Existing / Rencana Edit Januari 2017
PLTU Tolitoli
2x25 MW – 2022
KALIMANTAN Leok ACSR 2x240 mm2
U 110 km - 2018 ke
TIMUR Tolitoli
ACSR 2x240 mm2 GI Bolontio
ACSR 2x240 mm2
90 km – 2018 108 km - 2018 (Gorontalo)

Bangkir GORONTALO
ACSR 2x240 mm2 Moutong ke SULAWESI
45 km – 2022 GI Marisa UTARA
ACSR 2x240 mm2 (Gorontalo)
110 km - 2022

Tambu
2 PLTA Bongka
ACSR 2x240 mm
50 km – 2018 4x70 MW–2024/25
PLTU Tawaeli Ekspansi
2x15 MW – 2016
PLTU Palu 3
2x50 MW – 2019 PLTP Marana (FTP2) PLTU Ampana
20 MW - 2025 2x3 MW–2018
MPP Sulteng 60
U
MW (2018) ACSR 2x240 mm2
Tawaeli U P PLTP Bora Pulu (FTP 2)
Parigi Bunta 95 km – 2020
Donggala Silae 40 MW – 2025
PLTD Silae
Talise
45 MW D Petobo Ampana U
G
ACSR 1x240 mm 2 Luwuk
45 km - 2017 Palu P
Baru Mauro/Parigi Baru A ACSR 2x240 mm 2
ACSR 2x240 mm2
ke 124 km – 2018 85 km – 2018
GI Pasangkayu ACSR 2x240 mm2
ACSR 2x240 mm
(Sulbar) Poso ACSR 2x240 mm2 90 km - 2018
Sigi 15 km - 2020 114 km – 2019
G Toili
PLTMG Luwuk
40 MW–2018
PLTA Poso 2 Tentena
A
3x65 MW PLTGU Luwuk
150 MW–2020
PLTA Poso 1
2x35 MW – 2018 Kolonedale
ACSR 2x240 mm2 PERENCANAAN SISTEM
65 km - 2018 PT PLN (Persero)
ACSR 2x240 mm2 PETA JARINGAN PROPINSI SULAWESI TENGAH
90 km - 2018
ke GI 500 kV Existing / Rencana U
/ U PLTU Existing / Rencana
/
GI 275 kV Existing / Rencana G / G PLTG Existing / Rencana
GITET Wotu /
ke / GI 150 kV Existing / Rencana P / P PLTP Existing / Rencana
SULAWESI SULAWESI (Sulsel)
GITET Wotu
Bungku / GI 70 kV Existing / Rencana A / A PLTA Existing / Rencana
/ GI 500/275 kV Existing / Rencana PLTGU Existing / Rencana
BARAT SELATAN (Sulsel) / GI 500/275/150 kV Existing / Rencana
GU

MG
/
/
GU

MG PLTMG Existing/ Rencana


ke /
/
GI 275/150 kV Existing / Rencana M / M
PLTM Existing / Rencana
GITET Kendari GI 150/70 kV Existing / Rencana D / D
PLTD Existing / Rencana
(Sultra) / T/L 70 kV Existing / Rencana Kit Existing
SULAWESI /
/
T/L 150 kV Existing / Rencana
T/L 275 kV Existing / Rencana
Kit Rencana

TENGGARA / T/L 500 kV Existing / Rencana Edit Desember 2016


PLTA Seko 1 SULAWESI ke
ke 3x160 MW – 2023/24 PLTA Kalaena 1 GI Tentena/
ke
GI Barru GI Sidrap PLTA Salu Uro BARAT 2x37.5 MW – 2022 PLTA Poso
Pangkep 2x47.5 MW – 2022 (Sulteng)
Tonasa PLTA Tumbuan-1 SULAWESI
ACSR 2x430 mm2 2x150 MW – 2024/25
PLTG Tello
160 km - 2021 PLTA Malea (FTP 2)
A A
A TENGAH
123 MW ke ACSR 2x240 mm2
2x45 MW – 2020 41 km - 2016
MPP Sulselbar PLTA Karama Masamba ke
G PLTA Poko
120 MW-2017 (Sulbar) 2 GI Bungku
Maros 2x65 MW – 2021 ACSR 2x240 mm A
55 km – 2017
(Sulteng)
Bosowa Wotu Malili
Mandai PLTA Bonto Batu
2x50 MW – 2025 PLTA Pongkeru
G
Tallo
G Daya Kima ACSR 2x240 mm2 50 MW – 2023
Lama PLTA Bakaru 2 Rantepao 145 km - 2016
Bontoala Daya Baru 2x70 MW – 2021
Tello
Panakukang PLTA Bakaru 3 A ke
2x73 MW – 2022 ACSR 1x430 mm2 Palopo GI Lasusua
Tanjung Sungguminasa
Bunga 15 km - 2019 (Sultra)
PLTG/MG/GU/MGU PLTA Bakaru 1 Makale
Makassar 2x63 MW
ke A
450 MW-2019/20 ke ACSR 4x430 mm2
PLTU PLTGU Sulsel GI Polman 80 km - 2022
A A
Punagaya 450 MW-2022 (Sulbar) Bakaru Belopa
PLTA Buttu Batu Enrekang ACSR 2x240 mm2
2x100 MW – 2025 90 km – 2017
ACSR 4x430 mm2
PLTU Sulsel Barru 2 40 km - 2022 Siwa SULAWESI
1x100 MW - 2019 Pinrang ACSR 2x240 mm2
Sidrap
66 km - 2017 TENGGARA
Pare
D Keera
Sengkang PLTG Sengkang (GT 22)
G 60 MW
GU
G PLTGU Sengkang (ST 28)
60 MW
Soppeng
U PLTMG Wajo
20 MW – 2018

Barru ACSR 4x430 mm2


175 km - 2022
Bone
Pangkep Tonasa
PERENCANAAN SISTEM
G PT PLN (Persero) PETA JARINGAN PROPINSI SULAWESI
Maros
Bosowa SELATAN
Tello D Libureng GI 500 kV Existing / Rencana U / U PLTU Existing / Rencana
G /
/ GI 275 kV Existing / Rencana G / G PLTG Existing / Rencana
Daya baru
Tanjung Bunga Sinjai / GI 150 kV Existing / Rencana P / P PLTP Existing / Rencana
Sungguminasa / GI 70 kV Existing / Rencana A / A PLTA Existing / Rencana
A / GI 500/275 kV Existing / Rencana GU
/ GU PLTGU Existing/Rencana
/ GI 500/275/150 kV Existing / RencanaMG / MG PLTMG Existing/Rencana
PLTU Sulsel 2 ACSR 2x430 mm2 ACSR 4x430 mm2 /
GI 275/150 kV Existing / Rencana M / M
PLTM Existing / Rencana
2x200 MW – 2020 45 km - 2018 Tallasa 70 km - 2024
Bantaeng
Bulukumba / D / D
Jeneponto ACSR 1x240 mm2 GI 150/70 kV Existing / Rencana PLTD Existing / Rencana
PLTU Punagaya (FTP 2) 40 km - 2019 / T/L 70 kV Existing / Rencana Kit Existing
2x100 MW – 2017/18 Bantaeng Smelter / T/L 150 kV Existing / Rencana Kit Rencana
Punagaya Ujungloe / T/L 275 kV Existing / Rencana
PLTU Jeneponto 2 U ACSR 4x430 mm2 / Edit Desember 2016
U T/L 500 kV Existing / Rencana
2x125 MW – 2018/19 30 km - 2018
SULAWESI
ke TENGAH
GI Malili ke
(Sulsel) GITET Bungku
(Sulteng)

ACSR 2x240 mm2 ACSR 2x430 mm2


145 km - 2017 130 km - 2024
PLTA Lasolo
Andowia 145 MW – 2023
Lasusua PLTA Konawe
A
2 A
21 MW – 2023
ACSR 2x240 mm
G
40 km - 2023 ACSR 2x430 mm2 PLTU Nii Tanasa (Ekspansi)
SULAWESI ACSR 2x240 mm2 68 km - 2024 1x10 MW - 2017
2 50 km - 2022
SELATAN ACSR 2x240 mm
116 km - 2017 PLTU Kendari/Nii Tanasa
MPP Kolaka Utara A 2x10 MW
5 MW – 2018
MPP Sultra (Kendari)
PLTA Wotunohu ACSR 2x240 mm2 U 50 MW – 2018
U
15 MW – 2023 40 km - 2023 G
PLTU Kendari 3
Kendari
2x50 MW – 2019
Kolaka Unaaha ACSR 2x240 mm2 U
ACSR 2x240 mm2 55 km - 2017
75 km - 2017

ACSR 1x240 mm2


90 km - 2018 P
Andolo PLTP Lainea
20 MW – 2025
ACSR 1x240 mm2
42 km - 2018

MPP Bombana G
10 MW – 2018

Buranga
Kasipute
Raha MPP Wangi-Wangi
Pure 5 MW – 2017
PERENCANAAN SISTEM
PT PLN (Persero) PETA JARINGAN
PROPINSI SULAWESI TENGGARA PLTMG Bau-Bau ACSR 1x240 mm2
GI 500 kV Existing / Rencana U
/ U PLTU Existing / Rencana 30 MW – 2017 85 km - 2018
/
/ GI 275 kV Existing / Rencana G / G PLTG Existing / Rencana
GI 150 kV Existing / Rencana PLTMG Bau-Bau
/ P / P PLTP Existing / Rencana
GI 70 kV Existing / Rencana /
30 MW – 2022 Malaompana
/ A A PLTA Existing / Rencana
/ PLTU Bau-Bau Labungkari G
GI 500/275 kV Existing / Rencana GU
/ GU PLTGU Existing / Rencana
/ GI 500/275/150 kV Existing / Rencana MG / MG PLTMG Existing/ Rencana 2x25 MW – 2019/20
/ G
GI 275/150 kV Existing / Rencana M / M
PLTM Existing / Rencana
/
/ PLTU Bau-Bau 2 U
GI 150/70 kV Existing / Rencana D D
PLTD Existing / Rencana 2x25 MW – 2025/26 Bau-Bau
/ T/L 70 kV Existing / Rencana Kit Existing
/ T/L 150 kV Existing / Rencana Kit Rencana PLTU Bau-Bau
/ T/L 275 kV Existing / Rencana 2x7 MW Pasarwajo
Butauga
/ T/L 500 kV Existing / Rencana Edit Desember 2016
ke
GI Silae
(Sulteng)

ACSR 2x240 mm2


45 km - 2017

Pasangkayu

SULAWESI
TENGAH
ACSR 2x240 mm2
128 km – 2017

Topoyo

ke
ACSR 2x240 mm2 PLTA Salu Uro
PLTU Mamuju
54 km - 2017 (Sulsel)
2x25 MW - 2017

ACSR 2x240 mm2


U
ACSR 2x430 mm2
SULAWESI
37 km - 2017 55 km - 2022 SELATAN
Mamuju
Mamuju Baru

PERENCANAAN SISTEM
PT PLN (Persero)
PETA JARINGAN PROPINSI SULAWESI BARAT
GI 500 kV Existing / Rencana U
/ U PLTU Existing / Rencana
/
/ GI 275 kV Existing / Rencana G / G PLTG Existing / Rencana
/ GI 150 kV Existing / Rencana P / P PLTP Existing / Rencana
A
A Mamasa / GI 70 kV Existing / Rencana A / A PLTA Existing / Rencana
PLTA Tabulahan
20 MW – 2023 ke / GI 500/275 kV Existing / Rencana GU
/ GU PLTGU Existing / Rencana
ACSR 2x240 mm2 /
PLTA Bakaru II GI 500/275/150 kV Existing / Rencana MG / MG PLTMG Existing/ Rencana
PLTA Masupu 40 km - 2019 /
(Sulsel) /
GI 275/150 kV Existing / Rencana M / M
PLTM Existing / Rencana
35 MW – 2023 GI 150/70 kV Existing / Rencana D / D
PLTD Existing / Rencana
Polman
/ T/L 70 kV Existing / Rencana Kit Existing
ke
/ T/L 150 kV Existing / Rencana Kit Rencana
Majene GI Pinrang / T/L 275 kV Existing / Rencana
(Sulsel) / T/L 500 kV Existing / Rencana Edit Desember 2016