Download as pdf
Download as pdf
You are on page 1of 29
-ALMUNTASSER coxmans es moo EGECY 1 ‘SUBMITTAL FOR APPROVAL OF DOCUMENT ‘Design and Bld fr Constucton of Document tore | | roneename: | and medication of warehouse & workshop at Asset | exbmiat no: | C023 -FM-CON- ‘crs Salve ffco. Project ID-BA 2019 C023 ‘008 nea al —T parca. a]; Emmet’ | eorex or EnginwingConutaton ‘ori 2 Hard copies and 1 —— ‘scopy | [Fes | Atmentasser Contacing and Treaira = eae ‘ee Apeion —FCONSTRUCTION rng oa Ra We: ‘ooo ane ANC TIO ee a Ge athale Seth ee, oe Mee ea AREER AME PT OES. ) Be eine BRencae wee tien aera: oro SCR as ea erriae Ses Reset eR ee BES reste 03} suinnd Sue: (C]A-Anrovt Sine [> B-Aypomdar Na”) -C-Reden Rent i gr0 CO voswpovestentmt Cl Ee enone hm mit scp hi ot Cha i eel ery an ce maa we car WE ane ———— S bse Teaving by Ooacer EGECR RECEIVED rerconcson Vote yw 22 on 00 EGECS _d) Sentimse METHOD STATEMENT For Production & Erection of Pre-cast Boundary Wall Construction at Zone 10. Najma Complex. SOMTRACTONS VERINCAMON STAMP WE, Marten Comatg & dr) VERIFY THAT TH CONTRACTORS Design and Build for Construction of Documant store and: dt narosoe workshop at Asset Afars Salva office | EGECS dj suns ‘TABLE OF CONTENTS, Design and Bulld for Construction of Document store and moditiation of warehouse & workshop at Asset Affairs Sabra office. Qt ecece duce ee cere meer eter ‘The Pupote of bis meth Statement to provide detaied mathadaloay adopted forthe proditon, supply & instalston of precsetRoundary wall Spesely for Zone 10 Naa amex and to ensure hal ts works are complomentedin accordance wh the santas, ‘ojct spectcations and QCS. 2014 2, scope ‘Te Scope of wakincudes producto, supply instalation of pre-cast boundary wall relat {0 Zone 10 ef is project:Dasgn and Bul er Construction of Document se ang ‘modieaon of warehouse & workshop at Asst Mars at Sava off. Project DBA 2019 coat 2. REFERENCE DOCUMENT ‘Allin wos ato be cae out as per sproved shop drmiogs MS TP and ‘relents: project scipe of wok and spectator 1h 20796223 | 6S 2014 Sacton 8 1 Approved Shop Drawing. {HSE Management Pian + Aoproved 44. DEFINTION AND ABBREVIATIONS pwn Puble Wark Autor (ASHGHAL) orc ‘General Engnesing Consultant (EGEC) Puc Prjoet Managing Constant contractor ‘A Muntassor Contracting & Trad, om Construction Manager ms. Matto Statement 1 Inspection and Tes Plan tor oot Boe Talk ine Inepocton Request neue Mii of muricpatiy na Urban sos Neil ae eata shot acs, (ar Censtucton Stand Design and Bull for Construction of Document store and modification of warehouse workshop at Asset Affairs Sabra office. ALMUNTASSER. 5. RESOURCES Iie ensure tat alcansbucon egdpment usd ase fr execution of works has val ‘ost conicstos fom auhoriod bodies and operators have valid ences Foslowing equ wil bo usd drng producto, tanspraten& installation of pre-cast semen: Coscte Baling Pant Cuting Yard ‘Cencrte Niner Trek Tal Truck Tobie Grane ia Ton or eating and worng crate TH ‘Orrin Bucket ganty aning ear) Vibe bar Ear Generator ‘Dunper Wrating Tale ‘Shovel Een Conpacor {6 ORGANZATIONAL, RESPONSIBILITY AND COMMUNICATION CHART + Project Manager “The pojact manages responlble fo delivering be overal wrk in a safe an iney mann “nating eonfomancs wiht approved design, Leading and guing te team Inthe deer the orks. Venting the watkdoneisinaccoaanes wath arent of contrac. Graig the aly ‘Sundar el for the weet re acioved ands war acre othe GNC and HSE. ‘requrement of ho entast ‘The constution manager wl be espns for enasng th wake ae cared oun compliance vith he submited and seroved method teen and aserdance with QCS 2014 ender or ie Darbouaraceiy, He wi ensue that eth and aft k= wal projet speiatone are ‘ered across th werk, He willbe the ke prs in coornaing wih supevislon const an {oinefac wih repreceiatva tam sskehlderwhesver neoasary a he neediest ing the lnplemontaton sto of is acy ‘Tho sto enginor shal response for diet supervision and imolomeniaon of es actity ae etal in he approved tod stemert J TP, Shop dawings and cama the wat accord ‘o ctv schadUle, He wf be in contol wth agus fo manpower an tol nade in exon the sc, and ensare that ll heath ae safety ick as val 3s project specications ae coniered serocs te wor Design and Build for Construction of Document store and modification of warehouse ‘& workshop at Assot Affairs Saba office EGECS dy SeMUNTASSER + Site Foreman ‘The ste feroman under the guidance of he ste engineer cal be respon for croc exocuton of works secrdg oth pan anda deat cat and pve insructon othe working peor ‘rt operators: He sal lo nse thal aces were pafomned wih prope ols nd equipment {nal ba responsible for maintain goos housekeeping around the working aes, + Charge Hand ‘The ain esponabiy of the Charge Hands ocoordnato and unr Instruction of th Ste Engineer nd Foreman nexectng te request, He wb fly exponite rte workers unde hn hd encire gale work cndion iro commoncomert ad ter completing the work requirement + ANC Engineer ‘GNC Enineris response forinspetion and documentation of evils check and cai the ‘skein contanoe th the iepecton end Test Pan (TP), Drawing and Qlty Standard ‘que nhs Project + HSE Manager The Heath Safty Erironmena (HSE) Manager general plan, coornato and implement issues and crectives win te organization, Aside rm safes, The HSE Manage wil ene sale Stormer working conion as pr the approved HSE plano the projet oral st petiuay howe workors directs nob ste + HSE Enginoor ‘The HSE Engineer sal ensue enorcamant that safety precede n accordance with he approved HE pla, He wil doen monitor the werk exeotan ax per he approved Mod latent ae Rsk sasesoment, as wal as proper tls and capers, The HSE Enpnoer shal be opoing rect to the HSE Manager and conauton Manager of any urea wok ‘The HSE Offer shal ensure enforcoent hat sfely procedure in acerdance wi he approved HSE plan, He wil dosaly monitor th work exciton x per he approved Method aterm a Risk zseseriot at wel proper ons and equipment, The HSE Oflee shall be reporting dete tho HSE Engineer and consracton Manager of any ine wor, nsec! al he ste sce a alt ‘he workers to proven acsent and i proper reporting oe HSE Enghnao/SE Manoge, ond chall ‘naire hat the work ity ae deaned er oy The Surveyor mus present als lo ensue hata ha works re bing conducted alows tho seting, lovl ard messurerent, maintaining documents aie o alge a high coir of relevant Design and Build for Construction of Document store and modification of warehouse 4 workshop at Asset Affairs Sabra office. oe et occece d) asus ‘Tho tafe alaftagran responsi to guide and give sina tthe moving equipment of curent ‘etl in the working eas ‘TYPICAL LINE OF COMMUNICATION AND WORK MATRIX ‘cnaenctin see ‘vac = Se ‘se Sore ayaa Note: Al aisigned ta invtredin the cammunicaon matic be dented and sbi 6 Engine Porto star of work. 71. PERMITS AND UISENCES, “The main conracor hal ensure tal he apeited sb contact fr peat ken shal hav all the necessary peri end eens to poducs pre-cast lements and abot operate in ata. Werk shat be dobvecadin ee sages accor oto requirement 1. Approval ef Design 2 Corton (ate work) 3. Precast wok (sto work) 9. PRE-PRODUCTION REQUIREMENTS: Prjectmenager and factory manager wil sir that ha following documents re approved by ‘proved Shop Drawings Matra (concrete mix design, rung & sei mats: ‘oproel fhe erecta spec of the roca lee, ‘Quay Pa: Design and Bulld for Construction of Document store and modification of warehouse workshop at Asset Affairs Sahva office Mere ccece |) wun See ieeroemreraracliomanere aston Sequence of ste wars willbe as fofow. 1141 FIXING OF FoRIRWORK. Form il be fb loving hop kavings. The chanfers wl be provided aecorsng “raving, lt connecors of side fomwork oon ster, here is any opening required, ack ‘ut abicatd spate n the sare manner as hao he man fomwor Upon compton of fever assonbly, emer wil be checked for dimensional equtemans and provisions (uppers, brace, ald, ecerses, el) Eos und at he ime of checking are orate arate 1 sal equrement Fomork components ae connected fo one anche by both. Gust cowl pacar chock the frm assembly work in rlaion to =hop Aron 1713 FORMWORK CLEANING AND APPLICATION OF FORM OIL. ‘lean he frmak fan dust and other at. Apply for al elesce agent every on tenn ‘kines of he sd offer, Avo spon in excess uaity, Apply frm release ‘gent on the ternal sue fliers, Bock oto eperng. ‘114 FABRICATION OF STEEL REINFORCEMENT CAGES. Ccuting an bering ef he sol reorcement wl be cared out in accordance to aprove bar bonding schedule ané as per requroment. Dowel ar wl be proved as pe the remroment of ‘ho hop dravings abwall as enercmentdawings. Ct stl renfercoment bre though he sof se war eater and ot by fame cuting, Bend soo renfereamant as one ume ay. Re bending and etragtning lente bas tat are toi once fn pert, Aspmble Ue steal cape in cnfomanco th abeaton eating to encurethal he abeaton daveng Bat ‘a baing usod ar fhe test even. Upon cern of i ta reifesanent cage "ssembly, instal plas paces noth asarby. The space be sor enough 1 old he Weight ofthe reirorcamentand conzete spacer can be sd aan sitet opton. 118 PLACEWENT OF STEEL REINFORCEMENT ‘exemblod sta oye vl be ited a te designed point lo provent it dstorton ath eof ‘ander Upon ying sil cane ure fora nal requ cstaoing ans, ie. anchor elt one pate, angle pla Hock xt, sackets MEP provigons, es spe hap drawings requed il be ena that iis propre and supported Yo prevent locaton at he ne {26 inspecton: por» easing he QC inspector wil ensure ta th aba age and maui a per sraning and ensue tat mods rn any ews scr ler dei ale ono tat tllthe eatin tame in hiright loeabon and scared propel to revert movement ing Design and Build for Construction of Document store and modification of warehouse ‘workshop at Assot Affairs Salva office. EGece dj seus Approve concrete mix design wil be wed Po to pouting of const QAQC ongnse ill heck ans, emer, rnforcomont & cover based on draving, The samp willbe checked ‘and wires by assigned approved th party lboratony. 11.7 MANNEROF CASTING Seppe / source of conte sau be aperoved. Castings plannain sucha way hat oneeiating wos done none compete operation wihout beak. Canela wl be divored irom th ating plat hough th tans mer slong computed batch Soke Conte Pouring wil be though bucket. Te teva is obseves o ava he concurence of not {0c inspect wl naive tha batting wth approved max dsign its bathing record at he ‘heck pint of abratry. Mato engner vl eonauc al rest cone fests accorang to Inepecon and est lan. QC engner wil naire the concrete rpeature at hee of aneot plang shoud not exceed te standard si Ming apd pouring of cotta not pormited wine the shade empeatuteexcoas 406. Sump saloon of rech conrete a Der regiments. Cline sal be cated to check the compressive strength of corsa ay the once infomwarkin sch a anar hat the ent omwork is onvered evenly. Concrete ‘compaction willbe cried outing poker vibrates, meron Woo, rans applod ‘ontuautly fo pradlemsned ime ding the aceon ol esc conerete bach Spek ‘tenons given tel sear where heey rtorcament occurs o prover the reson of ‘oid of honey nh corte. Lavl he top srfce ar omoved excess concealer, ‘conorting. Mer thal sling of conte to sufoco, apy the equred surface fish as por ‘equement fhe speciation. 4118 COVERING AND CURING OF CONCRETE Aer pouring of concrete, cone struct be covered wi hessin dat 1 vad speody lots of moisture, wate cng wat be done conn fr 7 day, 11.9. REMOVING OF FORMWORK Sides of omuor wl be removed ater one day as described in QCS, 2014. Mtr removing of Fomor vil inspection wil be cared ou fer any delet o daage In such zee, intr We esponable abort on ts account Marke untor prope ienfeation dug ropa ¥ reps required wil be repre by wing approved none vink cameiious mata = por manufac recommendation and procedure Aer oven days; hoc caste il tested by approved labertay an witrassd by ‘relevant pry and endorsed the sae proces il be gone flr 28 da Design and Build for Construction of Document store and modiieation of warehouse & workshop at Asset Affairs Salva offic. EGECS dy AUMUNTASSER 11 TOLERANCE IN PRODUCTION “Tolerances for srustral Precast Coerte ‘Denonsons ang Thess Staighiness Endequrorest 12, HANDLINGISTORAGE & STACKING OF PRE CAST ELEMENT Precast conte are ganecaly stackodin tar erecton positon to avo over handing of the un ‘efor ial stacking QC inspector wil eure that al eloments ae property cred ith wat. or the ‘abd alert reset laments and lowed them eno te wooden plank eat onto ground and hon siocing at ite doomed advisable, he labs are dlvered and stacked tothe erection positon ‘where thay can be rested dec by mabe care Wooden lanks(stacksrasers) ae used 0 ‘ovate thso precast ns om the ground [Al nshedprcas elements le inspactod by the main contacororsutant before dev on te Permissiadevaton of fared faces Dimensions ‘enath ae a ‘lana Flange za Siaghiness nn fo st0Gr Endauronoss ni Cunt planning i require bore naw produto processes ave iplenented The quly panning !may take placa as 2 design poet or exarng tthe planing of produ ratzaon procedure During his planing, margaret or asigned persone! ent ‘The quail otjecves and vequement fr the prod, Processes documentation and rosowrces reqs Design and Build for Construction of Document stor and mediation of warehouse 4 workshop at Asset Affairs Salwa office. EGECS _d) ‘ALMUNITASSER .Vedtieaton, algae, montorng, inspection ad est requremens 44 Ciera for produ xcapance “The output uty planing and caros documented quay pans, procesee,pocedues an

You might also like