-ALMUNTASSER
coxmans es
moo EGECY
1 ‘SUBMITTAL FOR APPROVAL OF DOCUMENT
‘Design and Bld fr Constucton of Document tore
| | roneename: | and medication of warehouse & workshop at Asset | exbmiat no: | C023 -FM-CON-
‘crs Salve ffco. Project ID-BA 2019 C023 ‘008
nea al —T parca. a];
Emmet’ | eorex or EnginwingConutaton ‘ori 2 Hard copies and 1
—— ‘scopy
| [Fes | Atmentasser Contacing and Treaira = eae
‘ee Apeion —FCONSTRUCTION
rng oa Ra We:
‘ooo ane ANC TIO
ee a Ge athale
Seth ee, oe Mee ea AREER AME PT OES. )
Be eine BRencae wee tien aera: oro
SCR as ea erriae
Ses Reset eR ee BES reste 03}
suinnd Sue: (C]A-Anrovt Sine [> B-Aypomdar Na”) -C-Reden Rent
i gr0
CO voswpovestentmt Cl Ee enone
hm mit scp hi ot Cha i eel ery an ce maa we car WE
ane ———— S bse
Teaving by Ooacer
EGECR
RECEIVED
rerconcson Vote yw 22 on 00EGECS _d) Sentimse
METHOD STATEMENT
For Production & Erection of Pre-cast
Boundary Wall Construction at Zone 10.
Najma Complex.
SOMTRACTONS VERINCAMON STAMP
WE, Marten Comatg & dr) VERIFY THAT TH CONTRACTORS
Design and Build for Construction of Documant store and: dt narosoe
workshop at Asset Afars Salva office |EGECS dj suns
‘TABLE OF CONTENTS,
Design and Bulld for Construction of Document store and moditiation of warehouse
& workshop at Asset Affairs Sabra office.Qt ecece duce
ee cere meer eter
‘The Pupote of bis meth Statement to provide detaied mathadaloay adopted forthe
proditon, supply & instalston of precsetRoundary wall Spesely for Zone 10 Naa
amex and to ensure hal ts works are complomentedin accordance wh the santas,
‘ojct spectcations and QCS. 2014
2, scope
‘Te Scope of wakincudes producto, supply instalation of pre-cast boundary wall relat
{0 Zone 10 ef is project:Dasgn and Bul er Construction of Document se ang
‘modieaon of warehouse & workshop at Asst Mars at Sava off. Project DBA 2019
coat
2. REFERENCE DOCUMENT
‘Allin wos ato be cae out as per sproved shop drmiogs MS TP and
‘relents: project scipe of wok and spectator 1h 20796223 |
6S 2014 Sacton 8
1 Approved Shop Drawing.
{HSE Management Pian
+ Aoproved
44. DEFINTION AND ABBREVIATIONS
pwn Puble Wark Autor (ASHGHAL)
orc ‘General Engnesing Consultant (EGEC)
Puc Prjoet Managing Constant
contractor ‘A Muntassor Contracting & Trad,
om Construction Manager
ms. Matto Statement
1 Inspection and Tes Plan
tor oot Boe Talk
ine Inepocton Request
neue Mii of muricpatiy na Urban
sos Neil ae eata shot
acs, (ar Censtucton Stand
Design and Bull for Construction of Document store and modification of warehouse
workshop at Asset Affairs Sabra office.ALMUNTASSER.
5. RESOURCES
Iie ensure tat alcansbucon egdpment usd ase fr execution of works has val
‘ost conicstos fom auhoriod bodies and operators have valid ences
Foslowing equ wil bo usd drng producto, tanspraten& installation of pre-cast
semen:
Coscte Baling Pant Cuting Yard
‘Cencrte Niner Trek Tal Truck
Tobie Grane ia Ton or eating and worng
crate TH
‘Orrin Bucket ganty aning
ear)
Vibe bar Ear
Generator ‘Dunper
Wrating Tale ‘Shovel
Een Conpacor
{6 ORGANZATIONAL, RESPONSIBILITY AND COMMUNICATION CHART
+ Project Manager
“The pojact manages responlble fo delivering be overal wrk in a safe an iney mann
“nating eonfomancs wiht approved design, Leading and guing te team Inthe deer the
orks. Venting the watkdoneisinaccoaanes wath arent of contrac. Graig the aly
‘Sundar el for the weet re acioved ands war acre othe GNC and HSE.
‘requrement of ho entast
‘The constution manager wl be espns for enasng th wake ae cared oun compliance
vith he submited and seroved method teen and aserdance with QCS 2014 ender or ie
Darbouaraceiy, He wi ensue that eth and aft k= wal projet speiatone are
‘ered across th werk, He willbe the ke prs in coornaing wih supevislon const an
{oinefac wih repreceiatva tam sskehlderwhesver neoasary a he neediest ing the
lnplemontaton sto of is acy
‘Tho sto enginor shal response for diet supervision and imolomeniaon of es actity ae
etal in he approved tod stemert J TP, Shop dawings and cama the wat accord
‘o ctv schadUle, He wf be in contol wth agus fo manpower an tol nade in exon the
sc, and ensare that ll heath ae safety ick as val 3s project specications ae coniered
serocs te wor
Design and Build for Construction of Document store and modification of warehouse
‘& workshop at Assot Affairs Saba officeEGECS dy SeMUNTASSER
+ Site Foreman
‘The ste feroman under the guidance of he ste engineer cal be respon for croc exocuton of
works secrdg oth pan anda deat cat and pve insructon othe working peor
‘rt operators: He sal lo nse thal aces were pafomned wih prope ols nd equipment
{nal ba responsible for maintain goos housekeeping around the working aes,
+ Charge Hand
‘The ain esponabiy of the Charge Hands ocoordnato and unr Instruction of th Ste Engineer
nd Foreman nexectng te request, He wb fly exponite rte workers unde hn
hd encire gale work cndion iro commoncomert ad ter completing the work requirement
+ ANC Engineer
‘GNC Enineris response forinspetion and documentation of evils check and cai the
‘skein contanoe th the iepecton end Test Pan (TP), Drawing and Qlty Standard
‘que nhs Project
+ HSE Manager
The Heath Safty Erironmena (HSE) Manager general plan, coornato and implement issues
and crectives win te organization, Aside rm safes, The HSE Manage wil ene sale
Stormer working conion as pr the approved HSE plano the projet oral st petiuay
howe workors directs nob ste
+ HSE Enginoor
‘The HSE Engineer sal ensue enorcamant that safety precede n accordance with he approved
HE pla, He wil doen monitor the werk exeotan ax per he approved Mod latent ae Rsk
sasesoment, as wal as proper tls and capers, The HSE Enpnoer shal be opoing rect to the
HSE Manager and conauton Manager of any urea wok
‘The HSE Offer shal ensure enforcoent hat sfely procedure in acerdance wi he approved
HSE plan, He wil dosaly monitor th work exciton x per he approved Method aterm a Risk
zseseriot at wel proper ons and equipment, The HSE Oflee shall be reporting dete tho
HSE Engineer and consracton Manager of any ine wor, nsec! al he ste sce a alt
‘he workers to proven acsent and i proper reporting oe HSE Enghnao/SE Manoge, ond chall
‘naire hat the work ity ae deaned er oy
The Surveyor mus present als lo ensue hata ha works re bing conducted alows tho seting,
lovl ard messurerent, maintaining documents aie o alge a high coir of relevant
Design and Build for Construction of Document store and modification of warehouse
4 workshop at Asset Affairs Sabra office.oe
et occece d) asus
‘Tho tafe alaftagran responsi to guide and give sina tthe moving equipment of curent
‘etl in the working eas
‘TYPICAL LINE OF COMMUNICATION AND WORK MATRIX
‘cnaenctin see
‘vac
= Se
‘se Sore ayaa
Note: Al aisigned ta invtredin the cammunicaon matic be dented and sbi 6
Engine Porto star of work.
71. PERMITS AND UISENCES,
“The main conracor hal ensure tal he apeited sb contact fr peat ken shal
hav all the necessary peri end eens to poducs pre-cast lements and abot operate in
ata.
Werk shat be dobvecadin ee sages accor oto requirement
1. Approval ef Design
2 Corton (ate work)
3. Precast wok (sto work)
9. PRE-PRODUCTION REQUIREMENTS:
Prjectmenager and factory manager wil sir that ha following documents re approved by
‘proved Shop Drawings
Matra (concrete mix design, rung & sei mats:
‘oproel fhe erecta spec of the roca lee,
‘Quay Pa:
Design and Bulld for Construction of Document store and modification of warehouse
workshop at Asset Affairs Sahva officeMere ccece |) wun
See ieeroemreraracliomanere aston
Sequence of ste wars willbe as fofow.
1141 FIXING OF FoRIRWORK.
Form il be fb loving hop kavings. The chanfers wl be provided aecorsng
“raving, lt connecors of side fomwork oon ster, here is any opening required, ack
‘ut abicatd spate n the sare manner as hao he man fomwor
Upon compton of fever assonbly, emer wil be checked for dimensional equtemans
and provisions (uppers, brace, ald, ecerses, el) Eos und at he ime of checking are
orate arate 1 sal equrement Fomork components ae connected fo one anche
by both. Gust cowl pacar chock the frm assembly work in rlaion to =hop
Aron
1713 FORMWORK CLEANING AND APPLICATION OF FORM OIL.
‘lean he frmak fan dust and other at. Apply for al elesce agent every on tenn
‘kines of he sd offer, Avo spon in excess uaity, Apply frm release
‘gent on the ternal sue fliers, Bock oto eperng.
‘114 FABRICATION OF STEEL REINFORCEMENT CAGES.
Ccuting an bering ef he sol reorcement wl be cared out in accordance to aprove bar
bonding schedule ané as per requroment. Dowel ar wl be proved as pe the remroment of
‘ho hop dravings abwall as enercmentdawings. Ct stl renfercoment bre though he
sof se war eater and ot by fame cuting, Bend soo renfereamant as one ume ay. Re
bending and etragtning lente bas tat are toi once fn pert, Aspmble Ue
steal cape in cnfomanco th abeaton eating to encurethal he abeaton daveng Bat
‘a baing usod ar fhe test even. Upon cern of i ta reifesanent cage
"ssembly, instal plas paces noth asarby. The space be sor enough 1 old he
Weight ofthe reirorcamentand conzete spacer can be sd aan sitet opton.
118 PLACEWENT OF STEEL REINFORCEMENT
‘exemblod sta oye vl be ited a te designed point lo provent it dstorton ath eof
‘ander Upon ying sil cane ure fora nal requ cstaoing ans, ie. anchor
elt one pate, angle pla Hock xt, sackets MEP provigons, es spe hap drawings
requed il be ena that iis propre and supported Yo prevent locaton at he ne
{26 inspecton: por» easing he QC inspector wil ensure ta th aba age and maui a per
sraning and ensue tat mods rn any ews scr ler dei ale ono tat
tllthe eatin tame in hiright loeabon and scared propel to revert movement ing
Design and Build for Construction of Document store and modification of warehouse
‘workshop at Assot Affairs Salva office.EGece dj seus
Approve concrete mix design wil be wed Po to pouting of const QAQC ongnse ill
heck ans, emer, rnforcomont & cover based on draving, The samp willbe checked
‘and wires by assigned approved th party lboratony.
11.7 MANNEROF CASTING
Seppe / source of conte sau be aperoved. Castings plannain sucha way hat
oneeiating wos done none compete operation wihout beak. Canela wl be divored
irom th ating plat hough th tans mer slong computed batch Soke Conte
Pouring wil be though bucket. Te teva is obseves o ava he concurence of not
{0c inspect wl naive tha batting wth approved max dsign its bathing record at he
‘heck pint of abratry. Mato engner vl eonauc al rest cone fests accorang to
Inepecon and est lan. QC engner wil naire the concrete rpeature at hee of
aneot plang shoud not exceed te standard si Ming apd pouring of cotta not
pormited wine the shade empeatuteexcoas 406. Sump saloon of rech conrete a
Der regiments. Cline sal be cated to check the compressive strength of corsa ay the
once infomwarkin sch a anar hat the ent omwork is onvered evenly. Concrete
‘compaction willbe cried outing poker vibrates, meron Woo, rans applod
‘ontuautly fo pradlemsned ime ding the aceon ol esc conerete bach Spek
‘tenons given tel sear where heey rtorcament occurs o prover the reson of
‘oid of honey nh corte. Lavl he top srfce ar omoved excess concealer,
‘conorting. Mer thal sling of conte to sufoco, apy the equred surface fish as por
‘equement fhe speciation.
4118 COVERING AND CURING OF CONCRETE
Aer pouring of concrete, cone struct be covered wi hessin dat 1 vad speody
lots of moisture, wate cng wat be done conn fr 7 day,
11.9. REMOVING OF FORMWORK
Sides of omuor wl be removed ater one day as described in QCS, 2014. Mtr removing of
Fomor vil inspection wil be cared ou fer any delet o daage In such zee,
intr We esponable abort on ts account Marke untor prope ienfeation dug
ropa ¥ reps required wil be repre by wing approved none vink cameiious mata =
por manufac recommendation and procedure
Aer oven days; hoc caste il tested by approved labertay an witrassd by
‘relevant pry and endorsed the sae proces il be gone flr 28 da
Design and Build for Construction of Document store and modiieation of warehouse
& workshop at Asset Affairs Salva offic.EGECS dy AUMUNTASSER
11 TOLERANCE IN PRODUCTION
“Tolerances for srustral Precast Coerte
‘Denonsons
ang
Thess
Staighiness
Endequrorest
12, HANDLINGISTORAGE & STACKING OF PRE CAST ELEMENT
Precast conte are ganecaly stackodin tar erecton positon to avo over handing of the un
‘efor ial stacking QC inspector wil eure that al eloments ae property cred ith wat. or the
‘abd alert reset laments and lowed them eno te wooden plank eat onto ground and
hon siocing at ite doomed advisable, he labs are dlvered and stacked tothe erection positon
‘where thay can be rested dec by mabe care Wooden lanks(stacksrasers) ae used 0
‘ovate thso precast ns om the ground
[Al nshedprcas elements le inspactod by the main contacororsutant before dev on
te
Permissiadevaton of fared faces
Dimensions
‘enath ae
a ‘lana Flange za
Siaghiness nn fo st0Gr
Endauronoss ni
Cunt planning i require bore naw produto processes ave iplenented The quly panning
!may take placa as 2 design poet or exarng tthe planing of produ ratzaon procedure
During his planing, margaret or asigned persone! ent
‘The quail otjecves and vequement fr the prod,
Processes documentation and rosowrces reqs
Design and Build for Construction of Document stor and mediation of warehouse
4 workshop at Asset Affairs Salwa office.EGECS _d) ‘ALMUNITASSER
.Vedtieaton, algae, montorng, inspection ad est requremens
44 Ciera for produ xcapance
“The output uty planing and caros documented quay pans, procesee,pocedues an