Download as pdf
Download as pdf
You are on page 1of 27
ALMUNTASSER com EGECH ‘SUBMITTAL FOR APPROVAL OF DOCUMENT. Design and Bul or Cnsiucton of Document store Propetntine: | ard modiicaionct warehouse & workshop at Asset. submitalne: | cars yaucrasr cod ‘Alfsirs Sata ofc. Project ID-BA 2019 C029 Coweeret | pwaroisiz0te Sel « ‘oneal “ps dua Tove: 7 rd copies 1 Sot orem | EOC attr Engng Cos ie ase ve Fen [awe ‘error [ab emuntasser Gortrating and Trading S eee ‘We oun yu ans on eon Dane etodsalament for Cont lok Woks Sande cs ate wine SMALE DID sym mm 05-04. 2020 Cl kavpomd tases] B-Agpowedashns CC Rowe Rant Db eappenttenien CI Rect ston “oat spd os oleh Contact pry eae ma eh Sarg he ‘Nacenbone nt Conte tie ison by Conair EGECE i oy Gt EGECE () ys METHOD STATEMENT For Concrete Block works. comRAcrons wRcAnONSTAME ening Tra) VERIFY THAT TAS CONTRACTOR fp Cmsse Ove 25.04.2980 SS, Set EGECD 4) yu ‘TABLE OF CONTENTS. 1.0 PURPOSE: 20 SCOPE OF WORK SOREFERENCE DOCUMENT 40 ABREMATIONS 140 1.0 ORGANIZATIONAL, RESPONSIBILITIES AND SUPERVISION oTOOLS AND EQUIPMENT ‘LOMATERIALS USED ‘.0WORK SEQUENCES 8.1 Layout Setting out/ Preparation 8.2 quality asuranca! quay conto! {8.3 dalivery, storage and handing ‘.ACompressive Strength ‘8.8 Mortar Rai & Mixing ‘BSINSTALLATION OF BLOCKS 12.6: Prvison of THos onthe extemal walls 17 CONSTRUCTION OF STIFFENER BEANS AND COLUMNS, INTEL {2.9 FILLING OF THE HOLLOW BLOCK WALLS 8.40 CONTROL JOINTS: 8.41 JOINTS. 8.12 FAR FACED BLOCK WALLS ‘8.18 TOLERANCES 1:16 DAMP PROOFING APPLICATION IN ACCORDANCE TO MANUFACTURER'S, RECOMMENDATION 12.5 TEMPORARY SCAFFOLDS AND WORKING PLATFORMS (AS REQUIRED) 12.46 CURING OF BLOCK WALL ‘9.0 HEALTH & SAFETY PROCEDURES. 40.0 ANNEXES + SAFETY AND ENVIRONMENTAL RISK ASSESSMENT & HAZZARO ANALYSIS + EMERGENCY PROCEDURE + SITELAY-OUT DRAWINGS EGECD () sa / Super-tctira extra lckwerk (oll fname lack blt neem mortar, hoow block Inter an se Bocke with conree ll backs In oataln 20966 Fig 1 Block work on External Wall imm = EGECH duns Sin oC nd atPreO GHC ‘Theme Blok tow Book Sold Book a @ we “Toble . Sempe of Typical Types of Corte Blk or Prec 1-BA 2019 6023 | “The diferent cimendon and pes ol he concrete tocks as menonad above wb wed forthe ‘recon of boc wal fr Bs prec. I thr say change in he design and materi request or [pproval ibe set of Conan. The design snenarent and mater cubital wl be ‘resed sxorangly Belo she dotted pros for the execution fhe bacon See EGECD | wis 21 LAYOUT /SETTINGOUT / PREPARATION ‘Suet wore fore, Saba ferent ive shal be completed pio he staf blockwork, {survey an inspection cn te succes eamgleton af ha stuchral eck wl be flowed by Bocwor 1+ Ghean th ae under wal course of dt ung brush, Remove any sry, ntenc, lesing of found cone. ‘+ Survey and sting cto ust masony wos or ech butting in respec to coordinates om approved seunge shalt carted out pirate sao the Boke. ‘+ Mortar ticoasa lb rained at fn (veri! & frien pe bikes) 1 Prortolayng of tot couse fe Boss the tl span Srl long he ay vl be Idorfed Theis o deeming ct poe end bode) a avd bocuence of end ct place of loss than 200mm ent The height flack wa wil be cls in ro: + ithe couse height ect pee lock woul atoss han Yoon replace he computed eat ‘tear anoter ful ossae han equivalent? cut locas having ie same ght The Ente let courses shoud be ul ees ogee. The Zen paces can hon be aided elon ‘hotopmest and owaat cere of fe wal. + Incase the height of fe poce lok woe more than Odum instal cut pec at second hue om ho opin eco forthe opmos ayer be a sgt tock couse. 1.2 QUALITY ASSURANCE AND QUALITY CONTROL + Theinapecton and west pan (IP) and choc fortis Math Statoment sunmarizs various, haralrstos tbe cite. Tho concord ate engin genea foreman wi be responsible te ersue camplancs for those operat ad he ste OC engecr il carry cut quay conra heck an epee nsec rests. Tho nepecton antes plan (TP) apliabet this wos Shall be submited as a separate document. £23 DELIVERY, STORAGE AND HANDLING + Conette locks, ready ky marta, sand eament, waar, Hckwork accessories and oar relevant mats il be ansported by the suppers oe ranch slack othe so and stored leprae dsigstoa storage reas ‘+The dley of the mates sat be dane such @ manner that damage can be reverted 1 Almateals shal be ingected a tne very andl be subjected the ate ‘representa’ acceptnes, + tel ound natn aecadance wt the purchase oder shal ot be aap and ete back tothe supp. + Thomas at se shal be handled and stored a8 recomended by he suppl, opravert + Any mate found nt accordance wth the purchase deel abe sccapad and retuned back othe spi, + Rady ry mora sea ssa be store prope covered stood areas (Concines termporay add re, st). ich wl minnize adverse wenterrg impacto he Imari, The shaded eras lb abl o make sf rm sun ar a. Ens, no wale tomes in conta! wi th mat This sal be done othe blockwork accessuis to. EGECE ) guys “The materiale at ste alle handed and store a8 recommended by he suppl, 0 prevent damages deterioration ‘Sting tem grounder above oor wl be dane earful to voi any mage fe materi iting of he mse toe done ctl 184 COMPRESSIVE STRENGHT REQUIREMENT “The assodated mort rqurmentter use vth ferent ppc for blocks wl be done ortho tbl bolo: Ta Carprassve Seenaih | Uses forwhich | — Gas of Worl Glassen (wr) locks ar Sutabe Classes gd | Lowest bods | indivi Bloke 7 70 38 | Bitamal nortan 18 bering was 2 oo 33 Teed bearing wal te 3 Ta ae ang wae wiz belowground _| a a nz ‘Soak away and we z 7 38 ‘Weil rowan co bearing wa = 7 35 ot bock wa 5 a 38 Prise sn oo undone “able 2 Compressive SrengthRequernant 8.5 MORTAR RATIO AND MING ‘option by teady mix nota + Ay readyenicmoartrom an sppraved source can be wed forthe bockwoks {The mata etnital lo sibmited for an approval 1 Theblock mortar be mized and ved a per te manufac recommendations. {The qunty ofthe wate ll be edd a per the manufacturer's oammendaon. The ‘ay mis ponders thn add slowly othe ae le ming conunuousty wth ow speed wih he pal, + sig tre construed fr mine, 2 mines sn nom consistency ebsned {Normal temperate tape wate iba used forming, {To enaire proper mbna, mechaniealy powered mixer or il od wth suitable paxae EGECE (guy 4+ Thesuplus mori at be used or remote wheter or with new mer 1 Themotarshal nt be used aor? hours of ii ming + Appeaton by vaonsmortar mis: + tora, ordnary Portland coment and washed sand can bo used forthe lock ‘consrucon w0vmsas as ndeatedin aie 2 below, + Constete mxermachie wil be used fal preparation of mats wen bing at he {+The consiuentnsteras wi be aceuratly geuged alomance beng mace fr bung send + Armotre be conayed tes othe work a equred for us, Matar wich has agun tr vich hasbeen steemized fora ped of mae han ane hain the ase f M2 andME, and two hows te cage of lasses Md and M2 shal note Used. + Ingen wl fet mised dry unl thas been thoroughly mbes to a ufo cleur before waters soto the mic using caren mer machine. Nonna Mixby Mass and tir Compreave Sxengh el Ccamant(), Line) & Sand (6) we | Sand (8) witoe | Srongth a raha erent Ga) thou mB days classes cnainment (ig) | Nive c v 5 cys | 6 w | 8 z en wz] 1] |W 7 Table 3 Nominal Mix by Mass —S, See EGECD | ww {6 INSTALLATION OF BLOCKS ‘+ Before eying the fist ayer mora, the sifener colar anchor aba il be mark il and [Baced wit an spprovedepony grax mateo approved ep mae wich are sh Ted on fhe conarete calms. + Layout wel for accurate pacing of surface bond plies an for accuse leaton of openings rmavement pears rat and feat. ‘+ Thoconetesrlace whore the mortar il be placed, wl be provided roughen sure a recess + Thetataje of he Hoo wad wb provided so block, Wet bike tee ying alow unis te absorb waters they aro dump but rat eta he tne of laying the couse, Wat Ba for ur the als ‘+ ay te comer and ends wl be aid eat care. Steve wl be used to ens the favre sgrment and vray ‘+ Bul the comers andar ofthe wl up to foro fhe course hghor han tho caurso boing ld “Todo comarfends are checked fr agrntlovl sn pun, Each Bock oe crtully checked with a spit lode staght edge omake cetaln ha ho fcos of a he beck rein tho same plano. rth comer teach end ofa wl hve bean i, ing Bee tech Sy rr ore {ocame for ach esura andthe lp cutie ee leach ck ado tise, He ie Ie oved wp as each our ‘+ ‘Aausmens otha petion must be made we tha meta sot 1 Forstring course on fontings spend oil mortar bed, nln areas Unde al folowing the pyroved setig of wall ‘+ Before taying the second course and spreading of mor, ls esata to wat ho top {+ Surac of tea leks by use of br. Socone course of hallow Hock to be ld wih mort. 1 Metiods witte da win staggered vere jars agonal i vate abso he prev ad Curae and ha ma wl ba Toomey Ne verical js are showed wo be ihe same ine + Corner ibe iin sagged manner wth the intersecting wall roving a ssa jon or otal + Mr fet couse, ple he cies and pd ho mat eels canine he ‘+ Coltmesh be appeto evr ti ayer in adaton or as por the approved shop drawings 1 Ensire ne mash sfcedat eer the yer nado otal ange betwen lo cect wil 1+ Tismandstaey torte ato courses ah ihe freed mesh une the soit fhe Afabibear. Lap ol mesh by Tsomm sends af mesh + Also provide eal mesh above Ina and teow ils extending Gm beyond jamb opeings {loot wal ebuting of conerat sue wi be led wt approved wal ee vey second ayer fours of he los nok + Bood and to syst wll placod annealed in acordanc wth tho approved shop drains. (Cefate nals wich ibe operat wth to pom actuated gun wal sod frag of he co + Any MEP penotaton and opening wal bo coordinated ih MEP tan {Provision ef epening fr MEP eribedmant ature alr approvedSuccssl instalation, camo the masa lomath the eacent wall + Relea gop wil be minis ny etwran the oft of he slab and hockwok. and vera ‘nnectonbetaeen covers sacra blocork The gp bawen he Bosker he + Thetna ayer ofthe beclovork alow the eo of he slabeam lb stale so ack EGECD () sn» 1+ Panton op anchor rods i be stalin telecon as mentcnodin the approve shop ‘range ace val nd sabia sf) Fao fhe anchor fod ll be dene 3 por ‘manutscurers recommendation 4+ Ensure, fit pacing te eka, atthe veil face are fuly covered wth mot {The teks wt be placeapostonod and pressd info the marta bed ard séeways agains he vous ald locks cot moraronzen cut th had an be ots on both side fhe face shall breathe ants a Hd prove + Cary out ocosve ayers ote ine andy. The maximum Night of Hock wok per day Sorerusten sll no exceed ag coursosiayrs. + Acca wl be const up othe soto the ala unin the camo proeduredosrb ‘erin tore hsb ape fora and extra wal spot cae, separa ‘evan wl beled, «_Atstopsing and resuming workin each course, rack back one-haraning bond or ane it long for ane bird running bone, can exposed sufecs of st mas od remnovelooee masonry ont nd morer bore lying fresh masonry. + Clean usmasoy a2 work progres By dy britng to remove mda ns and soars before teaing ts “+ Remove and replace masony wns it re oe, pad and token eal ew us a atch ‘ning unt wt ross mona 1+ fay tending agents are tobe use, willbe aproved proto the apcaon at st The bong lb wad for bonding fresh wot somenious raters to easing comerttous Siac be utd on the Rotana srfoa or on vores sie, rue 2nd 25 por {he approval Hom te Constant + Ine oil, where wal mounts bain counter ei miu 7 layers of soli bocks wi be toa! 861 PROVISION OF TIES ON THE EXTERNAL WALLS + Conus / cota wal tii a wal fe wb fed bee the paral yor to ‘Soskson the extema walls + Thedetal or the xn willbe done a per the manufacturers recommendation {any cas, sind onion exe or te tra wal hen same wi be apd fr hace Irera was el 167 CONSTRUCTION OF STIFFENER BEAMS AND COLUMNS + To.ensure ovr tatty of conerot Hock wails, RC cas inst sifonerboans and columns Wb cnsrcted in aoordanos wih the hop awings na concat ade of C2. + Agi connection of tens bears and olan he conte wal uns ara hoor abs (ibe pronded wing post sald fang rebar ‘+The work sequence or stifnor beams wil allows: + Diling forth oles to set the ei + Chemical anchor wl be led in the les ater lening of thas + Fin of postinsated starter bars on RC clunn RC wal EGECE ¢)) suse aim NU) eotmenci non: Instalason of reltorcemont Figo shter (2Cinepecton of eifrcanent shut, dimensions snd lgnment ing of eoneoto Tae wer sequence fe sifenar clus wil be as flim Dating forthe les te incr era. ‘chemical anchor wil te filadin the holes ter earn ofthe aos Fang of postin starter bars on slab Inslalan of elnorcament Fixing of shutar aC inspection of evreement, she, dimensions and agrment Corer cating (af up to bot love fener bear, 2nd it vp to 10mm estes to ab sett) + Gung of conte +The execution of ten vl be dae as or the deals inthe approved sap drwdogs. {inl ibe provided above te opening of doors, windows and aves. Te mim cover 0 fenercarant il be Zonal ound. The sang a eonereto vd fr nl lb miimrn {o. Th up fr he it il be kp in pace or mn & ys, 4+ Theil bets con be eas ins fong usual eontation norm whee a farmer ae “poo bs checked ports pouring Wii yng of cours on op fe Dea, sorng ‘he na a ot be amaved url acheved its supposed eng, + Atoravey, ltl canbe se 9 pe he manufac’ reeormendalons fo openings 5 ‘oreo wth ihe Engoor + rhe lowing situation th caves of block wal ae fo be filo sad wth ter concrete grade or grat equine grace: + Jambof at oping no, angle and jinetons of walle an partons {atin of walls aed partons wth columns to Atte partons ao speed 1 Topwide aso hing frase cllg prmotors Si Ser EGECD |) we + Tae ttng causes iso be supported a 8 sip of expanded metal lthing embedded in theo + Walls which aot be led so ae to be but pin ts not exceeding 12mm and be led ‘ler lloning amininum paiod of 2t har a saps to enable the ora t harden. The ns, ‘onpacon ete corte ia fo be cemod a by hand ving 825% srw wooded tel or by “fio Tho fia conipacson shal ake placa 10'S mires terial compochon, 4g CONTROL JOWTS “+ atl canta and expansion intuit mason wher required Bul in rate iems a ‘Mason progresses Done fry a eontauaus span feaugh movement jonts unless provisions [remade to prevetin plane resin a wal or paren movamant + tovoment jefe {2mm wide ar fomes whee neste or where continuous uns of Hock ‘sling exceeds Gin length, an somnrs: + orto baring walls nd patina willbe bit te eave th it dfn he deta tet the op ate wal or paion and te silt othe dab. +e the wal has horoughy ed out an tata expected deetionin the ab dus to dead ‘ba hr tae lace, Be at tbe lila sad witha cass M7 mort. + Where cnet slabs are sported on tock wor, a ayer of pote sects tobe Movie bats he tap fe al an tesa forthe al wh tho wa + Mlovemast into be Tn nde and famed where inated or where continuous rans of Hock ‘ang exceed arn + Themovement jas wi be sealed witha mast sealant or thar equtvalent mati ter he ‘naucton tock alla have been foroughl ied cut andjelis surfaces cles + Thesadlrt wl be ape! on fam backing stip rsa th cored dep of wala {Alito oming mavererton ilo appa in accordance wah manufacturers ‘scrmmendatn 4+ Then reo be sagt and vertzally formed with uncut faces fhe blocks o each ide and ied wy an approved compressible masa marulaced spect bul i ‘novement ont, + Fairacd lok was and wal bul of facing Wocks av tobe conshuctod gory ith Parco eave bag lakon to ance ‘The sptcedbonlng or nto scons The pepends are rly mb or sl eigh Tho blocks used are oth sre oxi and appearance a ald a patchy fe The eau of be moar consistent (When a lek has bean placa inthe wa the extruded aria i tobe sek ff sh, ra cre (Sha itor ted snteing the mortar on fe fon fh lok + oi re aa tt tan sight (mb pent har) and hen be aly comps with 3 intuing tooo the raged prees. The tango wet maar a ot be pai. + Inert optings have stuck othe lacks must be alles ody andthe surplus removed byte Tho emai residual be eeannd ty wating ah 2 ama ploce flock and sbeaquor bring dwn Ei tm = EGECK 4 MS a. + Troe cing ls i nb pried vars is can sete wout vie 819 TOLERANCES. “+ Faicfacad block wats and walls but lacing blocks aot be constructed general wth afb care bang aon ensure: rm | arom ean ‘mat Den “aeons + | ee ‘trate 2 2 | same itp 000 « ot ety 28m & senate | ent efo 00e ‘ 2 | wae | "tehcesmtnaeeaseetecr 1s Fear a TT © P| tet st tc sno & vies a cam & ‘dia ‘Tobie Tolerance 8.14 DAMP PROOFING APPLICATION IN ACCORDANCE TO MANUFACTURER'S RECONNENDATION + Watpracfing deal vt be provided the shop dawings athe werk wl flowed apr The eas proviedin te caving, Gow ae deta tho wark exer he dren system of watrproaig wor. + Pras fr water ax mate be erected each calon. Each safling parm lt bre eyectad and alee cried workers oa an il bo tay fr af ys y te competent ‘Cafllingpeconn ts lation wt be used uneos ay aerate Each enprsypae wil te geo for loraneaor safe use [Nt wrksimelved il bein asordanes wth OCS 2014 and Project Spectiatons fer locks “The surface wile dears thoroughly of al conainans ke dst lease, ee The sae rs be elooned, sounds ree fom any contaninant= Se EGECD | gm 2 Ughimechanical ging maybe ood to oan te surface ofa the contaninants depending on {he dag of contamination on the surface to bo cate. 1 eroceimpatfestins, promos wil be removed andreas. orion of pie coat +The primar wb propared in he ste by dain damp coarse mati wih war in accordance {eimimutscurersocammendton “+ For vty dy are porous subsraes, apply two coats of primer. The to cats be a ght [ges to ech cer aionng tea cont ry completly before spying We second cst + Incase of dlaynappation of heap cost moro than 24 rs, a esh ena of primer shale re spied + Aopleation of waterproofing memteane “Th primase it be prepared propery pe the manufacturer's recommendation, ‘The waterproofing membrana lb aid pre proved dawigs. ‘Aurion flashing oil be neal onthe comer parton othe wa and wibe led be Sealant ont top opening parton, 8.15 TEMPORARY SCAFFOLD AND WORKING PLATFORMS (AS NECESSARY) + Woting scafi end pens be ected a nocassary, i when he hgh oth wall, ‘achat 150m toons safe acess otha Wer aed ‘+ Piro loading wit materi a our, te scat wl be nepoced an taged with green “+The scoff wl be sited ftouing the constuction soquencs fhe boc walls + Sole wring practons wl be fafowed 16 CURNGOF BLOCK WALL + Block hal be war ced or amitimun ee days. +The bleckvork shal be kept wa inthe caring poco 9. HEALTH, SAFETY AMD ENVIRONMENT “+The HSE Plan wi be stiety aero atl nos. SS meee §=EGECH 4 wwesigs “+ Ab orks wl coi ste inuon end lt be provided wth PPE ncliing athe with 9 DMT indicted eka + Regular Tool Box Tas aa held and attendance logged Site mse vl be aval ote te + Al ccs shall amply wth th sally procedure or asttion a st ut in prjct sft plan ad ‘murispalty ues aed rogaine. + Persona Protctve Eqdement (PPE) is mandatory and wile wom byl ding the exetn ot the work anda a + operates sal be induced bor entering ese + Safty hamess wl be wom ware rau, wile wring on height 10, APPENDIX + SAFETY AND ENVIRONMENTAL RISK ASSESSMENT & HAZZARD ANALYSIS + EMERGENCY PROCEDURE + + cheek ust + SITELAY-OUT DRAWINGS EGECB ) ws acer EMERGENCY RESPONSE STREAM FOR OCCURANCE ‘OF OCCUPATIONAL ACCIDENTS AT 408 SITE V ‘Se Foreman working at Jobsite mustcal the AMCT HSE Manager torpor any occurrence of serious accident and diel efor the Fst Aide Team fer medical assistance SES HSE Oifcor wil cal for ANBULANCE (#999) informing the ‘exact location and the nature of accident ofthe porson. Ho ‘must also report both vrbel and in wing the Incident © the Project Manager Vv ‘The Vici must be transported immediatly to HAMAD Hospital or te nearest avaiable medical faclity upon the ‘artva of AMBULANCE and Medical Asskiance Team _ V ‘All oseurence of major and fatal accidents must be report {o Suponision Consultant by means of proper ‘communication By AMCT Project Manager tamsnnb tar = bon Anse Mer CoS Manager [Reuss EGECE (| Checklist for Masonry Block works. AUMUNTASSER omnes THONG om Tavera ik [wera Li [ero oss 1 [erred gain et 13: vewwnd as APPROVED BY: Se EGECA (ww =n oe 4s Asn See EGECA |) ane Demolition and Renovation Works at Najma Complex ay i yt TSM Ls LEGEND ZONE 10 evant WE cooone beans ue a (revi Set EGECD () yaw Meo STATEMENT FR CONCRETE BLOCK WOR. ZONE 11 AT STATIC LAB LEGEND ZONE 11 nerve orn somonse ma HB vevvewcuun cate Wh vcorivesmmnene Wh sev stoner sumeus

You might also like