Lifting Plan for lifts less than 5 Tons

Ayoki Fabrication Yard


Date:

Timing:

Type of lift: Check all that apply:

1. Unload trolley
2. Load trolley
3. Pick & carry less than 3 meters
4. Pick & carry more than 3 meters, but within fabrication yard
5. Erection
6. Others describe:

Object to be lifted:

1. Bundle of steel plates


2. Single steel plate
3. Bundle of structural shapes
4. Single structural shape
5. Equipment
6. Other describe:

Tackles required:

1. Slings & SWL:


2. Shackles & SWL:

Weight of lift including shackles:

Type of Hydra or Crane using During lifting/ Shifting:

Status of Lifting : Completed safely / Under progress

Signature of Engineer/ Supervisor: