KA022 Installation Manual - 1
KA022 Installation Manual - 1
KA022 Installation Manual - 1
27. THE INSTALLATION OF SLIDING DOOR’S RADAR AND DECORATIVE LIGHTS ...................... 60
1
29. THE INSTALLATION OF DECORATIVE PLATE ................................................................................... 83
FIGURE ONE...................................................................................................................................................... 89
2
Introduction
KBB Automated Entrances Inc. is the biggest specialized company dealing with automatic door
design, production, sales and after sales service nationally. Located in Beijing Changping
high-tech industrial park, with a production base of over 50000 square meters. KBB uses exquisite
specialized technology, advanced management methods and specialized workers hand in hand to
create first class automatic doors.
KBB Automated Entrances Inc. abbreviated as “KBB Corporation” and further abbreviated to
“KBB" and "KBB Automatic Door" are all legal names and symbols. KBB is legally acknowledged
in accordance with laws stipulating legal liability of un-permitted use of company trademarks.
The information in this manual has been compiled in accordance with the Peoples Republic of
China's information regulations. This manual includes information from cut-off to time of print. KBB
Corporation is fully responsible for the revisions and explanations of this manual. KBB reserves
the right to change products after the print date of the manual without notification. Pictures,
schematic diagrams and effect charts are in place for reference only. in comparison of a diagram
and the object, the object shall be taken as standard.
The copyright for this manual is owned by KBB Automated Entrances Inc.
Copyright protected.
3
1. The basic structure of the door
图 1-1
2.1
Ground
2.1.1
The requirements of ground
Finished floor with hard and smooth surface is required and the thickness of the floor must be greater than
150mm
2.1.2
Measure ground
Confirm the central point according to installation requirement. Draw a circle regarding R as radius, the
radius of this circle is the same as the ground rail outer curve, please refer to the figure 2-1. Mark 21 points
on the ground as shown in figure 2-1, No.11 is central point.
4
Table 2-1 R data ㎜
Figure 2-1
Place the gradienter on the position (indoor or outdoor),5-7 m far from the center point of revolving door.
First , measure the height of point 11, regard its height as the standard , then measure the height of other 20
points, and fill the measure data in the Table 1 (to file this table with installation and maintenance parts).
According to the ground requirements, check the ground.
2.2
Opening dimension
2.2.1
The requirements of opening dimension
H1≥H+5,H2≤H+10,T≤5。
According to the products specification and the deflection requirements, opening dimension should accord
with table 2-2.
Figure 2-2
H 5
H1
body(D)
Notice:Above data accord with the revolving door of surface anodizing treatment,If need to be decorated,
please add double thickness of metal board on the dimension of width direction.
2.2.2
Measure the dimension of opening
Measure the opening dimension with Steel Tape-measure,and fill the data in the table2.
Please go to the next step after the above items are qualified.
3.1
Draw a beeline which is vertical with the door opening direction through the center point,the beeline
6
Figure 3-1
3.2
Measure with Steel Tape-measure,Find out one center point on each outer curve of the ground rail.
3.3
Place the ground rail,and put the mark lines that you made at the symmetry center exactly at the points A
and B, and the outer round of ground rail must be symmetrical with the finished round on the ground.
Figure 3-2
7
Figure 3-3
3.4
3.5
Drill twelve holes which depth is about 170mm by using an aiguilles of ¢15 according to the holes of two
pieces of ground rails on the ground.. Clean earth in the holes after drilling , clean floor and insert plastic
pipe of floor fixed screws into the these holes , and put the ground rail on the original place, then insert
twelve pieces of floor fixed screws(ST7×160)into two pieces of ground rail.(Figure 3-4)。
8
Figure 3-4
3.6
Place the gradienter on the position (indoor or outdoor), 5-7 m far from the center point, measure the
flatness of ground rails, to measure 5 points of each piece, then mark 10 points number as the Figure 3-5
shows.
Figure 3-5
3.7
Adjust the flatness of the ground rail by using spacers; the tolerance must be less than 1mm.
Figure3-6
9
3.8
After fixing the twelve pieces of screws, please measure the flatness of the ground rails again and make
sure that the tolerance is ≤ 1mm. And please fill the data in the table 3. (File this table in the maintenance
part)
If the assembly of sidewall segments has finished before leaving factory, please skip this part.
4.1
The sidewall segments have 4 pieces. The product has been pre-assembly before leaving factory, every
piece of segments is the “semi-manufactured goods “, every spare part couldn’t be mixed. Therefore, the
same spare part will have the same group number, the group number of sidewall segments is 1----4 group,
that is: all the spare parts with the same number “1” are used to assembly the sidewall segments of the first
group.
The position of the group number is: in the glass groove close to the ends of the upper and lower curve
frame, in the glass groove close to the lower end of the left mullion and the right mullion and the central
mullion. (Attention: The central mullion couldn’t be assembled upside down).
Find out the spare parts with the same group number, and place them group by group.
4.2
There should be the protection layer to prevent scathe on the process of assembly.
4.3
Insert the central mullion into the mid-groove of the upper curve frame, adjust the assembly gaps≤0.3 mm,
the radial deflection of upper curve frame and central mullion≤0.3 mm, then fix the central mullion and
upper curve frame with two pieces of inner hexagon self-tapping screw with anaerobic glue.(Figure 4-1)
10
Upper curve frame
Central mullion
Figure 4-1
Central mullion
Figure 4-2
4.4
Connect the lower curve frame to central mullion with the same way.(Figure 4-2)。
4.5
Insert the left and right mullion of sidewall segments into the groove of the upper and lower curve frame,
11
adjust the assembly gaps≤0.3 mm, the radial error of curved frame and mullion≤0.3 mm, then fix all the
curve frame and the mullion with ST6.3×38 inner hexagon self-tapping screw. Figure 4-4 shows the
Figure 4-3
Central mullion
Right mullion
Left mullion
Figure 4-4
4.6
Check:Check the diagonal dimension of sidewall segments with tape-measure, the tolerance≤2 mm; check
12
the assembly gaps with stopple ruler, the assembly gap≤0.3 mm, check the radial error of the curve frame
5.1
Place sidewall segments of the same side on the ground rail, please keep more than 200mm distance in the
middle.
Attention: The mullion with a few operation buttons should be placed indoor, the position can't be
exchanged.
5.2
Install the rubber strip. Insert the two connection surfaces of sidewall segments with dual tape and rubber
Figure 5-1
5.3
Insert and fix the two sidewall segments with 3 or 4 pieces of inner hexagon self-tapping screw (model of
ceiling height 2300mm has 4 pieces) , and ensure the joint gap≤0.3mm, radial error≤0.3mm, adjust the
central gap to overlap with the midline of revolving door, deflection ±1mm(Figure 5-2)。
13
Figure 5-2
5.4
Repeat steps 5.1~5.3.Install the other side sidewall segment(Figure 5-3)。Measure and adjust the
Requirements: the upper and lower opening dimension difference in the same side≤3mm, the same height
Figure 5-3
14
Lower curved frame
Ground rail
Figure 5-4
5.5
Fixing the sidewall segments into the ground rail with 8 pieces of ST5.5×12 inner hexagon self-tapping
screw(Figure 5-4)。
6.1
Place the two canopy rings (without Radar holes) on the two sidewall frames, To fix the ends of canopy
ring on the sidewall frame with 4 sets of inner hexagon self-tapping screws and 8x24 thickness spacers
( thickness 5mm).(Figure 6-1).
Figure 6-2 is layout of position I.
15
Figure 6-1
Figure 6-2
6.2
。
Install the other two canopy rings with the same way.(Figure 6-3)
16
Figure 6-3
6.3
Measure the distance between the edge of the canopy ring and the outer curve of sidewall segments with
Depth—measure Ruler, measure 6 points on the circle, adjust the canopy ring, and the data is : surface
paint or anodized 4±0.5mm、cladding 5~6 mm ( Figure 6 ). Measuring with stopple ruler, adjust the
Figure 6-4
17
7. The installation of “Z”- shape supporting rack
To fix 10 pieces of “Z”- shape supporting racks on the canopy ring, (located on the top of 10 mullions of
the sidewall frame separately). Refer to figure 7-1. To fix 4 pieces of “Z”- shape supporting racks on the
sidewall, located on the top of middle mullions of the sidewall with 2 sets of ST6.3 x 38 inner hexagon
screws and 8 x 24 (thickness 5mm) spacers for each piece. The rest 6 pieces fixed with 2 sets of M8 x 40
inner hexagon screws and 8 x 16 (thickness 1mm) spacers for each piece. Figure 7-2 is the enlarged
drawing of “Z”- shape supporting racks ins
Figure 7-1
Figure 7-2
18
8. The installation of “C”- shape rail
8.1
The installation of long “C”- shape rail. Total are four pieces, two long, two short. Before leaves the factory,
2 brackets has installed on every long “C”- shape rail. And place these two long ones on the installation
location. (figure 8-1), each bracket fixed on the “Z”- shape supporting racks with 2 sets of M8×40 inner
hexagon screws, 8×24 (thickness 5mm) spacers ,nuts, 8×24 (thickness 1mm) spacers and spring spacers.
Please tighten screws properly to ensure the brackets slid on the “Z”- shape supporting racks.
Figure 8—1
8.2
Please install two brackets separately on the middle of two short “C”- shape rails (figure 8-2), each bracket
is fixed on the “C”- shape rail with 8 sets of M8x 25 inner hexagon screws and 8×16 (thickness 1mm)
spacers Please tighten the screws of “C”- shape rails’ undersurface firmly first, to make sure it’s no gap
between “C”- shape rails’ undersurface and the bracket, then tighten the screws of “C”- shape rails’ upper
surface firmly.
Notice: Upward the face marked “UP " of “C”- shape rail, do not put upside down.
19
Figure 8-2
8.3
To place these two short “C”- shape rails on the installation location. (Figure 8-3). Please fix the bracket on the
“Z”- shape supporting rack. with the same way.
Figure 8-3
8.4
To connect the long “C”- shape rail and short one with the rest 4 brackets ( Figure 8-4), each bracket is
fixed on “C”- shape rail with 16 sets of M8×25 inner hexagon screws, 8×16 (thickness 1mm) spacers, do
not tighten them firmly first. To adjust both sides of “C”- shape rails’ joint,and to make sure the level
flatness tolerance≤0.3mm. To measure with the stopple ruler, and to adjust the gap:1.5~2mm(Figure
20
8-5). Please tighten the screws which located on the side of “C”- shape rails’ undersurface firmly first, to
make sure it’s no gap between “C”- shape rails’ undersurface and the bracket, then tighten the screws of
“C”- shape rails’ upper surface firmly. At last to fixed four brackets on the “Z”- shape supporting brackets
with 8 sets of M8×40 inner hexagon screws, 8×24 (thickness 5mm) spacers ,nuts, 8×24 (thickness 1mm)
spacers and spring spacers. Please tighten screws properly to ensure the brackets slid on the “Z”- shape
supporting rack.
Figure 8-4
21
Figure 8-5
8.5
To adjust “C”- shape rail to be concentric with canopy ring. Measure 10 points along the circle. To adjust
the gap on the measure points between “C”- shape rail and canopy ring is 45mm utilizing oval-shaped holes
of “Z”- shape supporting racks and bracket by removing “C”- shape rails(Figure8-6),to ensure it to be
concentric with canopy ring. After adjustment, tighten connected screws of brackets and “Z”- shape
supporting rack.
Working face
Figure 8-6
8.6
To adjust the working face flatness of “C”- shape rails (see figure8-6). Please place the gradienter on the
position ,5~7 meters far from the central of the door, measure the height value of “C”- shape rail’s working
face located on these 10 brackets. Increase/ decrease spacers of “Z”- shape supporting rack. to ensure the
height deflection of these 10 points is less than 1mm.
Please fix two pieces of hanging spokes on the top of door entrance‘s bracket with 4 sets of M8x30 inner
22
Figure 9-1
10.1
Please check if the composing parts of the beam are completed according to the following figure.
③ drive unit assembly 2 pieces ( including one reducer, one motor, two belt wheels, one belt, one
Figure 10-1
23
10.2
To check the flexibility of each wheel. Drive unit and brake unit should push back to the retractile position
along the arrow direction.(Figure 10-2). To loosen properly 8 pieces of M12x35 screws to ensure the fixed
board to slid on the main beam.
Figure 10-2
10.3
To take down the 8 pieces of M12 x 3 screws which are fixed on the connected board beforehand for later
use(Figure 10-3)。
Figure 10-3
10.4
Please remove the main beam assembly from the door opening into the installed sidewall segments.
10.5
Please hang the hoisting pothook of hoist tackle on the hanging spokes.
10.6
Please hang the sling hook on the bottom of the main beam.(Figure 10-4)。
24
Notice:Please tie the hook on the bottom of the main beam reliably. Do not appear safety problem.
Figure 10-4
10.7
Please hang the beam with hoist tackle, and push the driver and brake to the rail direction along the arrow
shows, the wheels put inside of “C”- shape rail’s face, and make the directional screw on the fixed board to
fit with the screw eye on the main beam. And install 8 pieces of M12 x 35 bolts that just took down, and
25
Figure 10-5
10.8
To loosen hoist tackle, let the beam down, to observe whether the 4 wheels are jointed with the rail
completely, if any wheel doesn’t, we should tighten up the other wheels, then loosen the fixed screw of this
wheel. To adjust the wheel to joint with the “C”- shape rail by the gap between screw and screw eye.
Meanwhile adjust each wheel to make its axes cross the beam center. Tighten it firmly after adjustment.
Figure 10-6
To connect the bearing base and bracket with 6 pieces of the spokes, one end of every spoke is fixed on the
bracket with 1 set of M8 x 30 inner hexagon screw, two pieces of flat spacers, spring spacer and nut,
another end is connected to the bearing base with 1 set of M8 x 50 inner hexagon screw (adjustment screw),
spacer and two pieces of nuts.(Figure 11-1). Figure 11-2 is the layout figure of the six spokes. While
installation, do not tighten the spoke’s locked screw on the bearing base firmly.
26
Figure 11-1
Figure 11-2
There are four connection boards on the end of the main beam, to mark one point on the undersurface of
any connection board. Push the main beam to rotate, measure the distance from the marked counterpoints
of the six spokes to canopy ring, then make the comparison between the measured values of each point. If
the difference between Max. and Min <2mm, please tighten the adjustment locked nut on the bearing base
( Refer Figure 11-1);If the difference>2mm,please tighten the bolt of Max. Value, loosen the bolt of
Min. value until the difference<2mm, then tight the nut. Repeat the steps above. Please tighten all the
27
locked nuts if confirm the difference<2mm.
Please push the main beam to make trial –rotation, require for flexibility and noiseless.
The whole circle is filled with sealed nylon short brush of canopy ring. Please plug the brush into the gap of
Figure 13-1
14.1
Totally is four pieces, two are with oblong hole. Please fix these two on the bottom of main beam
connection board with 6 sets of M8x25 inner hexagon screws, spacer and spring spacer, (Figure 14-1). Do
not tighten the screws firmly first.
28
Figure 14-1
14.2
Please fix 6 accessorial wheels, 6 spacers on another two ceiling support ring with M8×25 screws, spacer
Figure 14-2
14.3
Please install the two above ceiling support ring. Connect to the two pre-installed ceiling support ring
through connection board of accessorial wheels. The gap between them should be≤0.3mm.
14.4
Measure 10 points along the circle, and adjust the radial gap between ceiling support ring and canopy ring
11±2mm. To adjust the radial gap by using one black plastic spacer ( thickness 3mm)、one yellow plastic
spacer ( thickness 4mm)and one red plastic spacer ( thickness 2mm)to fill into it. To adjust undersurface of
ceiling support ring and canopy ring to a same level by increasing/ decreasing spacers between
accessorial wheels’ connection board and ceiling support ring,(Figure 14-3).Tighten all screws firmly
after adjustment.
29
Figure 14-3
The revolving-wing totally have two segments with the same construction. If the assembly has finished
before leaving the factory, please skip part. The installation process of one piece is described below:
15.1
Same as the sidewall segments, the assembly of the revolving-wing has finished before leaving the factory,
group numbers are 5 and 6 , the mark position of group number is as the same as the sidewall segments.
Find out the spare parts of same group number, place them by groups.
15.2
To fix upper/ lower curved frame and middle mullion of the revolving-wing together with 8 pieces of ST6.3
Notice: two middle mullions are different, one is with 4 small holes (for the installation of lock frame),
another one is without hole, and the position can’t be exchanged. Also, the four holes should be
located on one side of the mullion’s middle line.(Figure 15-2 is the magnifying drawing of A)。
30
Figure 15—1
Figure 15-2
15.3
To fix the front mullion of the revolving-wing on the upper/ lower curved frame with 4 pieces of ST6.3×38
31
Figure 15—3
15.4
The installation of the revolving wings’ back mullion. Please firstly lead 3 wires through the gap of the
revolving wings’ back mullion and lower curved frame out of the three holes separately ,These 3 wires are
the connection for safety beam, and then fix the back mullion of the revolving wings on the upper/ lower
curved frame with 4 pieces of ST6.3×38 inner hexagon screws. Figure 15-4 shows the condition after
installation completion.
Figure 15-4
32
15.5
15.6
The installation of locked frame. To fix locked frame on the middle mullion with 4 holes of the revolving
。
wings with 4 pieces of ST5.5×12 self-tapping screws(Figure 15-5)
Figure 15-5
15.7
The installation of the revolving wings’ connection sheet. To fix it on the back mullion of the revolving
wings with 3 sets of M6×20 inner hexagon screws, flat spacer and spring spacer.(Figure 15-6)
33
Figure 15-6
15.8
The installation of lower brush. To bend the lower brush (width 50mm) of revolving wing to arc refer to the
revolving wing’s radian. To fix it on the lower curved frame with 7 pieces of ST5.5×22 inner hexagon
Notice: Lower brush (width 50mm) of revolving wing is installed close to the revolving wing’ outer
arc.
Figure 15-7
34
15.9
The installation of revolving wing’s front brush. Please plug a piece of brush (width 63mm) into the groove
Figure 15-8
15.10
The installation of revolving wing’s back brush. Please plug a piece of brush (width 63mm) into the groove
of revolving wing’s pinch plate, plug corner brush into the bottom of groove, and fasten the pinch plate
with the back mullion of revolving wing.(Figure 15-9). When install the pinch plate, it should install one
side first, then beat lightly another side with rubber hammer.
35
Figure 15-9
16.1
To fix the revolving wing on the main beam connection board and an accessorial wheel connection board
with 7 sets of M8×80 inner hexagon screws, 8×24 ( thickness 5mm) spacers and spring spacers. Please
tighten the screws properly. To tighten the bolt of revolving wing on the connection sheet(the position of
connection sheet see figure15-6). To fix the bolt of revolving wing on the accessorial wheel connection
board with one set of M8 nuts(2 pieces), flat spacer and spring spacer(Figure 16-1). Do not tighten the
nut first. To adjust the distance between revolving wing and sidewall segment about 50mm±2mm by the
long hole of connection board, and then tighten all the bolts and nuts firmly.
Figure 16-1
16.2
The installation of the safety switch of revolving wing. Refer to Figure16-2, to install one side of the safety
switch first, and then beat the other side lightly by rubber hummer. After the installation completed, check
the tightness of safety switch, if any looseness is found, remove the safety switch, and maintain the bayonet.
Choose 4 points along the direction of length, maintain the bayonet to the outer side with plier, and then
reinstall the safety switch.
Notice: The “NO Knocking” signs will be sticking on the two ends of the safety switch. Please read
carefully, and install the safety switch according to the requirements. Take off the signs when the
installation is finished.
36
Figure 16-2
16.3
To check the distance between the lower curved frame and ground. 28mm±3mm
16.4
To repeat steps 16.1-16.3, install the other revolving wing.
There are two sets of showcase, showing door and sliding evacuation door, the structure and the installation
process for both sets are completed the same. The installation process of one piece is described below:
17.1
The installation of brush. Put one end of the brush (width: 50mm) into the groove of brush, and pull until
the other end in the same line with the groove of brush. (Figure 17-1)
Notice: Brush is installed on the side which closes to the outer side of showcase.
Brush groove
Brush
37
Figure 17-1
17.2
To remove the pinch plate that installed on the showcase before leaving the factory (Figure 17-2). Method:
knock one side lightly with rubber hummer.
Figure 17-2
17.3
To hang the showcase to the connection board under the main beam with 2 sets of inner hexagon screws, 8
Figure 17-3
17.4
To connect the lower frame of showcase and the lower curved frame of revolving wing with the connection
board of showcase and revolving wing, and fix showcase connection sheet on the lower frame with 2 sets
of M8×22 inner hexagon screws and spacers. The installation method refers to Figure 17-4.
38
Figure 17-4
18.1
The installation of the brush. To fix the brush (Width: 50mm) on the buckle of the brush of the showing
door with 6 pieces of ST5.5×12 inner hexagon self-tapping screws and 6 brush thick spacers of swing
door.(Figure 18-1)
brush
Figure 18-1
Notice: The brush should be installed on the side which closes to the outer side of showing door.
18.2
To fix the showing door on the showcase through the upper / lower connection pedestal of showing door
39
Figure 18-2
18.3
To install 2 showcase connection sheet and 1 revolving wing connection sheet on the showcase or curved
sidewall with 4 sets of M8×22 inner hexagon screws and spacers. Refer to Figure 18-3.
Figure 18-3
18.4
To install the ground frame of showing door. Refer to Figure 18-4, to fix ground frame units with 2 sets of
40
Figure 18-4
18.5
To fix showcase triangle frame to showcase with 5 pieces of ST5.5×12 inner hexagon screws. (Figure
18-5)
Figure 18-5
41
18.6
To fix two sets of showcase locks on the lock frame. (If is already installed before leaving the factory, skip
this part)
Figure 18-6
18.7
To adjust the gap of showing door
To close the showing door and insert the leading cone into the hole, observe whether the door gap is even.
Please adjust the position of installing screw and leading cone of the ground frame to make door gap even,
about 4mm width. The lock of showing door can be easily operated. (Figure 18-7)
Figure18-7
42
19. The installation of sliding door
19.1
The installation of brush
To fix 2 pieces of brushes (width 50mm) into the buckle of brush with 8 pieces of ST5.5×12 inner hexagon
self-topping screws and 8 brush thick spacers of swing door .(The method is similar as the showing door’s
brush installation).
Notice: For the two sliding doors, the brush is installed in different sides to make the brush in the
same line after the installation of the sliding door.
19.2
To remove the pinch plate. (Figure 17-2).
19.3
Screw out 3 pieces of M8 screws to remove central-axis cover of the sliding door. (Figure 19-1)
Figure 19-1
19.4
To check the tightness of toothed belt, if find any looseness, release the fixed screws of the stretching pulley.
Move the stretching pulley to the outer side to make the proper tightness of toothed belt, and then tighten
the screws firmly.
19.5
To connect the pulley and sliding door body with 4 sets of M8×30 hexagon screws and spacers. To adjust
the gap between door body and showcase to be 10mm.Tighten the bolts firmly. To re-install the central-axis
cover that was just removed (Figure 19-2)
43
Pulley
Showcase
Figure 19-2
19.6
To release 2 pieces of hexagon bolts and locked nut of adjusting screw. Please adjust the screws to ensure
the gap between sliding door body and the ground to be 36mm. Then twist the bolts and nuts. (Figure
19-3).
Locked nuts
Adjusted screw
Hexagon screw
Figure 19-3
19.7
To insert the bearing of the sliding door’s stop piece into brush groove from one end of showcase and fix it
on the thick spacer of the sliding door’s stop piece with 2 pieces of M5×10 inner hexagon screws.(Figure
44
19-4) To adjust the position of stop piece by adding/decreasing flat spacers between stop piece and the
thick spacers; To adjust the angle of stop piece according to the arrow direction to adjust the gap between
stop piece and sliding groove by the gap between screw and screw hole.
Thick spacers
Figure 19-4
19.8
To install the other door leaf with the same steps above.
19.9
To adjust the sliding door. Refer to Figure 19-5 and Table 19-1, adjust sliding door by following steps.
When the door is closed, the gap between the both sliding door body is 6 mm.
45
Figure 19-5
19.9.1
Please close the sliding leaves, to aim the door gap at the revolving center.
19.9.2
Please move inner-side moving stopper to make it closed to pulley units, and twist the inner hexagon
screws of moving stopper.
19.9.3
To push the sliding leaves to the opening width to ensure the equal sliding distance of both leaves.
19.9.4
To move outer-side moving stopper to make it closed to pulley units, and tighten the inner hexagon screws
of moving stopper firmly.
46
20. The installation of electric control system
20.1
The installation of main control box.
20.1.1
To fix connection board of main control box to the upper surface of “C shape” rail with M8×35 inner
hexagon screws, and the distance between connection board and the side of outer arc will be 15-50mm.
(Figure 20-1)
Figure 20-1
20.1.2
To hang the main control box to the connection board with M8×22 inner hexagon screws.
20.1.3
To connect input power wire of main control box to power box , and to connect output power wire to slip
ring.
Notice: To ensure good connection between ground wire of main control box and door body.
20.2
The installation of power box
To fix power box to the side of outer arc of “C shape” rail with M4 inner hexagon screws (Figure 20-2).
According to the sign, connect the standard power (AC220V±10%) to the connecting bar (brown line L,
47
Figure 20-2
20.3
The installation of connection wires of spoke
Refer to the number, connect one end of spoke wire to the stretched wire of slip ring of revolving door
center, and connect the other end to the adaptor of main control box through the spoke.
Notice: Spoke wires after connection should be lay in the spoke groove and fixed with bonding wire
and sticking piece.
20.4
The installation of revolving door’s radar
1. To fix radar on the bracket with M4×16 inner hexagon screws, and ensure the radar detector to be
2. To fix bracket on the canopy ring with M6×20 outer hexagon screws
3. According to the number (J06), connect one end of extension wire to radar and the other end to side
socket of main control box.
4. To install the other three radars in the same way mentioned above.
Figure 20-3
20.5
The installation of anti-squeezing sensor
1. To fix anti-squeezing sensor on the bracket with M4×16 inner hexagon screws.
48
Figure 20-4
20.6
The installation of anti-strike sensor
1. To fix the anti-strike sensor to the bigger ceiling supporting ring in front of revolving wing.
2. Connect four-core wires, white, brown, green and yellow with 1,2,3,5 separately.
Figure 20-5
20.7
The installation of operation panel
1. To fix panel tray on the right side column of the inner opening with 4 pieces of M4×16 inner hexagon
2. To fix panel on the panel tray with M4×16 inner hexagon screw.
3. To fix one end of panel wire to main control box and the other end to the installation place of panel from
the top of inner-side column and through the hole. the wiring diagram refer to Figure 20.
Figure 20-6
49
20.8
The installation of handicap button
1. To fix handicap button panel tray on the right side column of the inner opening and outer opening with 4
2. To fix handicap button panel to the panel tray with M4×16 inner hexagon screw.
3. To fix one end of panel wire to main control box and the other end to the installation place of panel from
the top of inner-side column and through the hole. the wiring diagram refer to Figure 20.
Figure 20-7
20.9
The installation of UPS
1. To fix UPS bracket on “H ” beam with 4 pieces of M8×40 inner hexagon screws.
2. To place UPS flatly on the bracket, and to fix the fixing strip on the bracket with M6×20 inner hexagon
Figure 20-8
20.10 The installation of safety beam
To plug safety beam adapters into
the adapters from the hole of safety beam, and then put
50
the safety beam into installing hole properly.
Figure 20-10 shows the position of one side’s safety beam after installation.
(Single numbers indicate transmitting, and double numbers indicate receiving). Figure 20-9
G1, G6, G7 are the installed positions of anther side revolving wing. G10, G13, G16 are the positions
of showcase.
Figure 20-10
To lead wires of 6 sets of safety beam to safety beam control box along the wire groove located on “H”
beam inner side.
The order from left to right is: G2, G1, G10, G9, G6, G5,
G14, G13, G8, G7, G16, G15. (Figure 20-14)
Figure 20-14
Figure 20-14
21.1
To check electro-mechanical lock, and confirm the normal condition and wiring of electric-mechanical
lock.
21.2
To fix electro-mechanical lock to the lock board. (Figure 21-1)
51
Figure 21-1
21.3
Install electro-mechanical lock on the bracket which located on the top of left mullion in the inner opening
(Figure 21-2). Screw out two fixing screws of bracket and “Z shape” supporting rack first, and install the
lock on the bracket, re-twist the screws. (Don’t screw too tightly.)
Figure 21-2
21.4
To fix lock bank on connection board of accessorial wheel that locates on the top of revolving wing’s back
mullion. (Figure 21-3) To screw out two connection screws of two ends of the accessorial wheel, and to
place the lock bank on the connection board of accessorial wheel, and to re-twist screws.
52
Figure 21-3
21.5
To push the revolving wing to the door-locked position, stretch the dead bolt by switch. Adjust the placing
angle of lock installation board to ensure the radial position of electric-mechanical lock by oval-shaped
hole of the bracket and board, to make dead bolt in the lock bank. Then twist the two fixing screws tightly.
Figure 21-4
53
22. The installation of glass
22.1
The installation of curved glass of sidewall segment
22.1.1
To place 2 pieces of glass gaskets (4mm) into glass groove of lower curved frame of the sidewall segment
that locates 100mm from two mullions. To place 3 pieces of glass gaskets in the both outer mullion groove
(not for middle mullion with pinch plate), fixed with two-side glue. (Figure 22-1)
Figure 22-1
22.1.2
To place stow-wood on the floor inside entrance as support. Please install the glass to the specified position
by glass suck disc and check the equal space of two sides of glass.
22.1.3
To put pinch plate into the middle mullion and beat the other side with the rubber hammer from one end to
the other end slightly. While beating, someone else push the back of the middle mullion to prevent
shape-changing.
22.1.4
The installation of glass rubber strip. It should be 30-50mm longer than the length of the frame. To install
the level strip first, then the upright one. The upright strip presses on the level one. To place the upright
strip to 45°and spurt glass with soap liquid, insert the two ends first, then the middle. Notice: Don’t stretch
the glass rubber strip. (Figure 22-2),the same method to install others glass rubber strip.
54
Figure 22-2
22.1.5
To check the appearance of stripe: no sinking, no scrolling.
22.2
The installation of curved glass of revolving wing
The same way with installation of sidewall glass
To insert 4 pieces of safety rubber into 4 mullions located in the doorway separately (Figure 23-1). Refer to
the installation method of safety switch.(see the section 16.2).
Figure 23-1
To place 4 pieces of top ring on the brackets along the midline of the entrance symmetrically, and the 4
pieces are the same(Figure 24-1). To fix the top ring on the bracket with 10 pieces of fixing board(Figure
24-2). Connect each fixing board to top ring with two sets of M8 x 22 inner hexagon screws and spacers.
Connect to the bracket with a set of M8X30 inner hexagon screws, 2 spacers, spring spacers and nuts.
Don’t tighten the all screws firmly.
55
Layout of position of A
Figure 24-1
24.2
In the middle of entrance , to connect the 2 pieces of top ring with 2 pieces of fixing board on the side, and
each fixing board is fixed with 2 sets of M8x22 inner hexagon screws and spacers. Don’t screw them
tightly. To connect 2 pieces of top ring with 2 pieces of fixing board on the bottom, and each fixing board is
fixed with 4 sets of M8x22 inner hexagon screws and spacers. Don’t screw them tightly (figure 24-3).
24.3
To connect the top ring and canopy ring with 2 sets of canopy ring’s connection board 、adjustable screw 、
56
24.4
To adjust the joint of top ring≤0.3mm,the distance between the top ring’s
Upper level and ceiling supporting ring’s lower level is 340 mm, and then tighten them firmly.
Layout of position B
Figure 24-2
There are two kinds of ceilings: nonmetal and metal. Please select the installation methods according to the
material:
25.1
Install the nonmetal ceiling
25.1.1
Check the ceiling and decorative strip , to confirm the appearance is completed.
25.1.2
The ceilings of KA022 have 14 sections. Positions as shown in figure 25-1.
To place the ceiling and decorative strip of ceiling on the position, there are 3 kinds of decorative strip,
located at the ①、②marks of figure25-1, the section drawing of decorative strip as shown as figure 25-2,
each decorative strip is connected to ceiling with 2 pieces of ceiling’s sealed strips. The installation
numbers of the ceiling are from No.1 to No.7 to place the ceilings on the two ceiling support ring (bigger
57
and smaller) and support strip of ceiling on the upper of sliding door and showcase. After finishing the
No.2 ceiling, install the short support strip of ceiling on the upper of showing door, Refers to the figure
25-3, to fix the short support strip of ceiling on the 2 pieces of connection board which located on the
bottom of main beam (for door diameter 42 and 48, fix one end to the connection board, the other end is
fixed to the main beam with 10mm thickness spacer) , and then, install the ceilings from No.3 to No.7 .
After finishing one ceiling, thread out the line from the hole of decorative lamp. The other installation
method is the same with above steps.
Figure 25-1
Figure 25-2
58
Figure 25-3
25.1.3
To check the ceiling. The appearance of ceiling is without white stubble and double-face tape , and the gap
between the two ends of decorative strip and ceiling support ring( bigger/smaller) <0.5mm。
25.1.4
Installation of fixing plate
There are two kinds of ceiling fixing plate, refer to figure 25-1 , the sectional plane of A point as shown in
figure25-4 , totally are 28 points; the sectional plane of B point like figure 25-5 , totally are 18 points.
25.2
25.2.1
The overall position of ceiling refers to the figure 25-1. The installation order is the same with this figure.
After finishing one ceiling, thread out the line from the hole of decorative lamp.
25.2.2
25.2.3
Installation of fixing plate
It is similar with the nonmetal ceiling fixing plate, the only difference is adding the spacer under the fixing
59
plate.
Figure 26-1
27.1
The installation of sliding door’s radar
Get the sliding door’s Rader, connect the 4-core wire from longitudinal direction of “H” beam with
radar’s terminal , white wire with terminal 1, brown wire with terminal 2, green wire with terminal 3,
yellow wire with terminal 4 (Figure 27-1).
Notice: 1. To ensure 4-core wire and terminals well-connected.
2. This is applied only for metal ceiling.
Figure 27-1
To lead the wire through the installing hole, and place the radar upward in the hole of the ceiling (terminals
facing doorway). To make the hole of radar’s black bracket meet the fixing hole of ceiling. To fix radar on
60
the ceiling with 2 pieces of M4×12 (Figure 27-2).
Figure 27-2
27.2
The installation of the decorative lights
Draw the 12 pieces of light transformer wires on the main beam from the ceiling holes. Take the spotlight
and plug into the two connectors. Press the clasp and put the light into the hole vertically.
The illustration introduces the debugging method and attention items. To ensure the normal operation,
please debug the products according to the following steps. Otherwise may cause product can’t work
properly, even occur serious accident.
Notice: the 28(Ⅰ) is the debugging method of SIEMENS system ,and the 28(Ⅱ) is the debugging
method of PANISONIC system, the no mark (Ⅰ) and (Ⅱ) is all-purpose ,when debugging please
28.1
(Ⅰ) Connect all the components to the relevant wires. After checking again, tidy up and fix them.
28.2
(Ⅰ)Check the insulating resistance between the input power supply (AC220V) and door body should be
61
more than 1 M Ω, ensure it’s no short circuit of live line & null line. Check and ensure there’s no short
circuit between the DC 24V power supply module and door body. DC 0V power supply module should be
well-connected to door body. Grounding protection is required for door body. Please check all the
connections if found any abnormalities.
28.3
(Ⅰ)Check and ensure power supply is AC 220V±10%, 50Hz, 10A, and no heavy inductance in loop.
28.4
(Ⅰ) Turn on the power and check the validity of each input signal according the following Form.
62
29 Q0.4 Electronic lock
30 Q0.5 Malfunction display signal L3
31 Q0.6 Malfunction display signal L0
32 Q0.7 L1 Malfunction display signal L1
33 Q1.0 Operation signal
34 Q1.1 Reverse signal
35 Q1.2
36 Q1.3 Electronic signal
37 Q1.4 Malfunction display signal L2
38 Q1.5 high speed/ low speed
39 Q1.6 sliding door full open
40 Q1.7 Decelerator
28.5
Replace the SDP display plate by BOP control plate. Press “P” to go into parameter setting mode and
then the LED displays the present parameter. Use the button “△”and “▽” to increase or decrease the data.
1、 P0010=30,P0970=1
2、 P0010=1
3、 P0100=0
4、 P0300=1
63
5、 P0304=240
6、 P0305=1.8 * 2
7、 P0307=0.37 * 2
8、 P0308=0.8
9、 P0309=0.8
10、 P0310=50
11、 P0311=1400
12、 P0640=300
13、 P0700=2
14、 P701=1
15、 P702=12
16、 P703=4
17、 P731=53.3
18、 P1000=2
19、 P1080=12
20、 P1082=50
21、 P1120=2.0-4.0
22、 P1121=1.0-2.0
23、 P1135=0.3-1.0
24、 P1300=0
25、 P1310=50
26、 P1311=50
64
27、 P1312=150-200
28、 P3900=3
29、 P1910=1
28.6
Refer to the following Figure of TD200 profile: 9 buttons and 1 LED display
LCD
SIEMENS TD200
F5 F6 F7 F8
F1 F2 F3 F4
TD200 panel
There are two operating mode: operating mode and parameter editing mode. The system runs under
operating mode automatically when power on. Observe every stop position by adjusting program selector
and record the distance (unit: mm) between actual stop position and standard one. Press the button “F5/F1”
and read the message on LCD display “amend parameter”. Press “ENTER” and input the password
according to register message. Input the parameter number and amend the parameter.
Parameter sequence refers to the following form:
No Variable name Remarks
1 Activation position of maintaining message 1. Revolving door adjustment: Adjust the deflection on
2 Stop on the lock position stop position.
3 Stop on the Opening position 2. Sliding door adjustment: Adjust the stop position error.
4 Revolving door adjustment 3. PDR brake reference point: PDR position.
5 Sliding door adjustment 4. PDR braked scope: PDR effective scope
6 Malfunction diagnosis time: from sending 5. Safety beam (photocell) reverse scope: safety beam
normal operation signal to cannot start-up effective scope.
7 Alternation time of revolving and opposite 6. Malfunction diagnosis time: time between sending
revolving: from the stop of revolving to the normal operation signal and cannot start-up
beginning of opposite revolving. 7. Alternation time between revolving and opposite
8 Safety beam (photocell) reverse scope revolving: time from the stop of revolving to the beginning
9 Reorientation and emendation of opposite revolving.
10 Malfunction diagnosis time 8. Opposite revolving time: operation time of opposite
11 Restart time revolving
9. Restart time: from the end of opposite revolving to the
12 Opposite revolving time
beginning of revolving
13 Restart times
65
14 Alternation time between revolving and 10. Restart times: times of system trial-start
opposite revolving
The LCD display shows one amendable parameter every time. The parameter information is shining until
enter into editing mode. Press “Enter” to enter into editing mode. Let the cursor stop on the parameter.
When the parameter is not shining, amend it by pressing the button “ ” or “ ”. Press the button “ ” or
“ ” one time to change the parameter 1 pulse. For different diameters of doors the distance and the
relevant pulse is as following:
Diameter pulse distance
3.6m 1 8mm
4.2m 1 9mm
4.8m 1 10.5mm
(For example: The parameter “POSITION_1” for the doorФ3.6M is 435, and the distance to the standard
stop position is 40MM. Then there is 40/8=5 pulse needed to add to the parameter. So adjust it to 440.)
Adjust each parameter to reasonable value based on the relevant report of distance. Press “ENTER” to exit
editing mode.
For example:
1. Set the door to stop in the lock position
Press F1/F5 to activate parameters.
Press “ENTER” and input the password “1111” if needed, then amend the second parameter.
Press “ENTER”, amend the parameter to the required stop pulse value.
Press “ENTER” to exit editing mode.
1. Reset and amend parameter:
(1) Put the selector to position “2” (For KA023: Put the switch to the position “ON”.), press the
emergency button when the door runs to the panic break-out position (For KA023: the lock position). Push
the door wings to the required stop position manually. Press the button F1/F5 to activate the information
and amend the ninth parameter.
(2) Set the parameter to be “1”.
(3) After 15 seconds, release the emergency stop button. This position would be the “0” position and to
reset all the other stop positions.
(4) The automatic adjustment is over when the door stops near the opening position.
(5) Check each stop position and adjust the relevant parameters if needed.
(6) Check up the effective scope of the PDR and the safety beam (photocell) respectively. Adjust the
relevant parameters if scope changes are needed.
(7) Adjustment is over.
Notice: The door would amend some parameters and adjust the stop position automatically after the
first power on or reset parameters. It is normal that the stop position is random in the preliminary
revolving. The door would stop in the opening position when the adjustment is over.
28.7
Relevant meanings
code Q0.3 Q0.5 Q0.7 Q0.4 Q0.6
66
01 ○ Position_1 in Lock position
07 ○ ○ ○ sliding door
10 ○ decelerated sensor
11 ○ ○ brake sensor
12 ○ ○ anti-squeezing PDR
14 ○ ○ Emergency button
16 ○ ○ ○ Handicap pressed
20 ○ radar
28
The control unit is consist of a PLC, a inverter drive and a tri-phase DC motor, and combine with the
67
Mode switch inverter
变频器
1
2
3
KBB 4
凯必盛 5
6
7
8
Fi 28( Ⅱ ) 1
When the installation is completed, inspect the wire and the adaptor; connect the communication wire of
touch-screen and PLC after confirmation. Turn on the mode switch on the PLC to “RUN”; refer to
28.1
(II) Adjust the parameter of the transducer
Notice: Please press the emergency stop button, and then switch on UPS power
68
Please follow the steps shown below to adjust the parameters; the rest parameters are default value.
1. Make sure the transducer is in inactive position, the screen shows “000”.
2. Press “MODE” button (3 time), the transducer in on set position, the screen shows “P01”’
3. Press or button, the screen will show one of the functional numbers, which could
find out from the table shows below;
4. Press “SET” button to show the parameter “Pxx”;
5. Press or button to increase or decrease the data same as the enactment data’
6. Press “ SET” to save the data;
7. The screen will show next data. Follow steps “3,4,5,6” to set other data. Press “ MODE”
button, the transducer turns to “ Output frequency-Output electric current,” and then the
transducer start to work.
Data Function Extension Parameter
P66 Initialization 0.1 1
(Ⅱ)The adjustment of motor turning direction and the setting of low speed and high speed.
69
28.2.1
First, press the emergency stop button, and then remove motor belt.
Turn the functional switch to revolving position and program selection switch to position 4, remove
emergency stop button to make motor operate. Observe turning direction of the two motors, and adjust the
wiring to make the motors revolves anti-clockwise.
Notice: The adjustment of wiring should be done after cutting UPS for at least 5 minutes,
otherwise may cause electric shock and death.
28.2.2
Cut the UPS and mount the motor belt. Connect UPS and turn program selection switch to position 4.
Activate repeat to make door revolves at a high speed. Observe the high speed is qualified or not. If
qualified, do none adjustment and skip to B item to continue. If is not qualified, press emergency stop
button to adjust the second speed frequency P32 of the transducer. To repeat the process “ release
emergency stop button and observe high speed—press emergency stop button and adjust high speed
frequency until high speed is qualified.
Release emergency stop button, the revolving door should be rotate continuous ,If it is qualified, do none
adjustment. Skip to the third item to continue. If doesn’t meet the requirements, adjust the first speed
frequency Fr of transducer after pressing the emergency stop button. To repeat the process “release
emergency stop button, press handicap button and observe low speed---press emergency stop button and
adjust low speed frequency, until the low speed meets the requirements.
28.3
(II) The adjustment of the connection wire of coder A and B and settings of system offset.
KA021
凯必盛 KA022
Figure-1 Figure-2
KBB
Lock position 0
Model
Opening position 1 锁门位 0
状态
Closing position 1
Up page
关门位 2 0
锁门优先 下页
Next page
Lock is priority
Figure -4
Braking delay
Up page
制动延时 0
Current position 上页
Figure -5
疏散位 2 0 状态 Model
Anti-squeezing position
Figure -6
Fire alarm
Emergency stop
急停 火警 设定
Set
Braked safety beam
制动电子眼 下页
Next page
Figure -7
Up page
Overload of transducer 71
变频器过载 上页
There are 8 interfaces on the touch screen. The relations between them are shown below:
Up page Figure -3
Up page Figure -4
Figure -4
Figure -5
Next page Figure -5
Next page Figure -6
Up page Figure -4
Figure -6
Model Figure -7
and reaches at the max balance door position (the “current position” of interface in Figure-5 should be<
72
512, otherwise revolve at least 180°and seek for max balance position one more time), release reset button
and then input the numbers that “current position” corresponds into the numbers that “offset” corresponds.
The details: take down the numbers that “current position” corresponds firstly, and then touch the number
that “offset” corresponds. Figure 9 shows the keyboard on the surface. Press the numbers that “current
position” corresponds one by one, and then press ENTER.
Figure -9
28.4
(II) The adjustment of lock position, opening position, closing position, max balance position and
anti-squeezing distance, see figure-10.
73
Figure -10
1. The adjustment of lock position: Turn program selection switch to 1 (Notice: the personnel in charge
of adjustment should not be in the revolving door to prevent to be locked in). The automatic door should
stop at the lock position. The adjustment personnel will observe outside the door. If the deflection is in the
allowed scope, do none adjustment and skip to item 2 to continue. If the deflection is not qualified, turn the
program selection switch to 2. When the door revolves to opening position, press the emergency stop
button, the personnel will go into the door to do adjustment. Input the deflection value to the numbers that
“lock position” corresponds. The adjustment scope: -15 pulse to +15 pulse. Repeat the above steps until the
lock position is qualified.
2. The adjustment of opening position 1 and 2: After adjusting lock position, turn the program
selection switch from 1 to 2. The door should stop at opening position (opening position 1 or2), and now
activate radar time for time to make the stop position exchange at opening position 1 (The “current
position” shown on Figure 5 <512) and opening position 2 (The “current position”>512). Observe the
opening position 1 and 2 respectively to see whether the closing position is qualified. If it is qualified, skip
to item 3. If it is not qualified, press the emergency stop button and then touch the numbers that opening
position 1 and 2 corresponds on the touch screen to do adjustment work. The adjustment range: -15 pulse to
+15 pulses. After the adjustment, release emergency stop button and activate the radar to see whether the
stop position is qualified. Repeat the above steps until the deflection meets the demands.
3. The adjustment of closing position 1 and 2: Turn the program selection switch to 3 (Notice: the
adjustment personnel cannot be in the door to prevent to be locked in). Activate the radar to make the door
revolve and stop the door at closing position (closing position 1or 2). Activate the radar time by time to
exchange the stop position at position 1 (The “current position”<512) and position 2 (The “current
position”>512). The adjustment personnel will observe outside the door. If the deflection is in the allowed
scope, do none adjustment and skip to item 4 to continue. If the deflection is not qualified, turn the program
selection switch to 2. After the door stop at opening position, press the emergency stop button to do
adjustment work. Touch the number that closing position 1 and 2 corresponds on the screen (screen
figure-4) and input adjustment value. The adjustment scope: -15 pulse to +15 pulse. Repeat the above steps
until the deflection of closing position 1 and closing position 2 meets the demands.
4. The adjustment of max balance position 1 and 2: When at closing position 1 and 2, turn the program
selection switch to sliding door position, the door will stop at max balance position (balance position 1 or
2).The “current value” of balance position 1<512, and the “current value” of balance position 2<
512.Observe the deflection and see it whether in the allowed scope. If the deflection is in the allowed scope,
do none adjustment and skip to item 5 to continue. If it is not qualified, touch the number that balance
position 1 and 2 corresponds on the screen (screen figure-6) and input adjustment value. The adjustment
scope: -15 pulse to +15 pulse. Turn the functional switch to the revolving position and program selection
switch to 3. Turn the functional switch to the sliding position when at stop position, closing position 1 and
closing position 2. Observe the whether the deflection of balance position 1 and balance position 2 is in the
allowed scope. Repeat the above steps until the deflection of balance position meets the demands.
5. The adjustment of anti-squeezing distance: Turn the operation way to revolving position and
74
program selection switch to 4, and activate anti-squeezing PDR. Observe the anti-squeezing distance is
qualified or not when the door stops. If is qualified, do none adjustment and skip to item 6 to continue. If it
is not qualified, touch the number that anti-squeezing corresponds on the screen (screen figure-6) and input
adjustment value. The adjustment scope: -15 pulse to +15 pulse.
Leave the anti-squeezing sensor in the state of no activation and active the anti-squeezing sensor again
when the door revolves through the anti-squeezing area. Observe the anti-squeezing distance again when
the door stops. Repeat the above steps until the deflection of anti-squeezing PDR meets the demands.
28.5
(II) Condition display
You can observe the condition of emergency stop button, fire alarm signal, braked safety beam and
safety switch and the overload of transducer. Exam the wiring is right or not.
Appendix-A the meanings shown on LCD
01 “1” –locking
07 Sliding door
10 speed reduction safety beam
11 Braked safety beam
12 Anti-squeezing PDR
13 Safety switch
14 Emergency stop button
15 Fire alarm or power cut
16 handicap button pressed
17 Overload protection
20 radar
00 Be adjusting
21 sliding door radar
22 sensor
3X remote control mode
31 “1” –locking
75
32 “2” –start at opening position
28.6
As customers’ request, we set the PRI relations of lock and fire alarm in the surface shown as Figure-4.
If the PRI of locking: no matter how the fire alarm is, the door stops at the lock position when functional
switch is turned to revolving position and PSA is turned to 1. The door will not revolve when radar is
activated. If the PRI of fire alarm: no matter the condition of functional switch and PSA (including lock
condition), the door will stop when revolves to sliding door position and the sliding door will half open
automatically.
28.7
1 X0 N
PIC-RDY
2 X1 N
PIC-DATA
3 X2 N
PLC-RDY feedback signal
4 X3 A pulse N
5 X4 B pulse N
6 X5 Z pulse N
7 X6 speeding reduction safety beam Y
8 X7 braked safety beam Y
9 COM Ground wire N
10 COM Ground wire N
11 X8 Safety switch Y
12 X9 Inner/outer PDR signal N
13 XA Inner/outer radar N
14 XB currency limit Y
15 XC fire alarm signal Y
16 XD Manual button N
17 XE handicap button N
76
18 XF emergency stop button N
19 COM Ground wire N
20 COM Ground wire N
FPO-E8X input signal terminal
21 X0 N
Program selector“1”
22 X1 N
Program selector “2”
23 X2 N
Program selector “3”
24 X3 N
Program selector “5”
25 X4 N
Program selector “6”
32 Y1 N
PIC-DATA
41 Y8 Y
transformer signal—5
42 Y9 Y
transformer signal—6
43 YA Y
transformer signal—7
44 YB Y
transformer signal—8
77
47 YE sliding door half-opening Y
48 YF Brake unit Y
49 COM(+) 24V power supply Y
50 0V Y
COM(-)
28.1
Adjustment of radar detecting scope
28.1.1
Adjustment of radar
Adjust the radar detecting scope to be 2.5m. There are two adjustment methods:
(1) Adjust radar bracket to make radar outward gradient to be about 15° (eyeballing).
(2) Set DIP switch as following:
DIPSwitch ON OFF Set in factory
1 High sensitive Low sensitive ON
2 Passive way Initiative way OFF
3 OFF
Keep time:2s Keep time:0.5s
OFF 1 2 3
Figure 28-1-1
28.1.2
To adjust the reaction height of anti-striking sensor through rotating the potentiometer(Figure 17-4)
anticlockwise. To adjust the reaction height of the anti-striking sensor to make the distance to lower
ceiling support rings of revolving wing should be ≥1500mm.
Figure28-1-2
Take off the panel, and adjust the position and ensure the radar’s sensitive height (between sensor and
ground) should be less than 100mm. Meanwhile, cover the anti-squeezing sensor, the revolving wing
should stop revolving, the distance between stop position and outer mullion should be more than 700mm.
78
Figure 28-1-3
Adjust potentiometer
Terminal
25 26
1
2
3
4
Wiring layout of back PSA
Figure 28-2-1
28.2.2
Functions setting (the second class)
The functions are displayed by abbreviation words on the right side of the PSA control unit. Press the
button “+” or “-” to choose the required function. The function comes into effect when press the button “+”
and “-” at the same time. The setting of functions is indicated by splashing of LED. (High frequency = high
speed / short opening keep time) The buttons of “+” and “-” are used to amend the value of setting. (“+”:
faster and longer; “-”: slower and shorter)
There are two ways for returning to the first class: 1.Press the two buttons at the same time; 2. No
operation will be done within 1 minute on the PSA control plate.
1. Reset: LED 32
Resetting is to restart equipment. If operate “reset” in the condition of UPS battery power supply,
drive unit stops and control unit turns off.
2. Door opening speed: LED16
Adjustable opening speed: 40~100%; Standard: 100%
3. Closing speed: LED 8
Adjustable closing speed: 25~66%; Standard: 65%.
4. Opening width (winter): LED 4
Adjustable opening width: 25~90%; Standard: 65%.
5. Opening keep time (Standard): LED 2
Adjustable opening keep time: 0~10s; Standard: 2s.
6. Adjust keep opening time (night) (0~30 seconds) LED 1
Standard setting is based on the first operation of the door.
If execute order “reset” in the second class function, the setting such as opening speed, closing speed
79
and partial open will reset to standard setting.
Select the “remote control” position on the Working mode selector, the automatic door will cancel the
former working mode automatically (At this moment, the working mode will base on the display of remote
control), automatic door should be operated through the remote control.
The operation steps are as following:
1 --------position1,when the digital tube is flashing, please press this key, loosen it after one second,
the data of this key will be sent. If the left digits of the digital tube are not 07 or 14, well then, the former
data will become 01.
2 --------position2, when the digital tube is flashing, please press this key, loosen it after one second,
the data of this key will be sent. If the left digits of the digital tube are not 07 or 14, well then, the former
data will become 02.
3 --------- position3, when the digital tube is flashing, please press this key, loosen it after one second,
the data of this key will be sent. If the left digits of the digital tube are not 07 or 14, well then, the former
data will become 03.
4 --------- position4, when the digital tube is flashing, please press this key, loosen it after one second,
the data of this key will be sent. If the left digits of the digital tube are not 07 or 14, well then, the former
data will become 04.
5 --------- position5, when the digital tube is flashing, please press this key, loosen it after one second,
the data of this key will be sent. If the left digits of the digital tube are not 07 or 14, well then, the former
data will become 05. Subsequently, press the RESET, the door will revolve anti-clockwise, loosen RESET,
the door will stop.
6 ------- position6, when the digital tube is flashing, please press this key, loosen it after one second,
the data of this key will be sent. If the left digits of the digital tube are not 07 or 14, well then , the former
data will become 06. Subsequently, press the RESET, the door will revolve clockwise, loosen RESET, the
door will stop.
7 -------handicap, when the digital tube is flash, please press this key, the door will revolve slowly,
loosen this key, the door speed will be order after one circle of low-speed.
8 -------sliding door/the change of revolving door, when the digital tube is flashing, please press this
key, the data of this key will be sent. If the left digits of the digital tube are not 14, well then, the former
data will become 07. The door will go to the position of sliding door. Alternate 30 seconds at least, the
digital tube is flash, press this key again, if the left digits of the digital tube are not 14, well then , and the
digital tube will display the new position, if the left digits of the digital tube are 14, the sliding states still be
canceled, but there is no display change. If the emergency stop is canceled, the digital tube will display the
80
new position.
9 --------light 1, when the digital tube is flashing, please press this key, loosen it after one second, the
data of this key will be sent. Before now, the lights of both groups will be not flashing (the right digits of
the digital tube are 90), at this time, the right digits of the digital tube will display 91, the frist group of
ceiling lights will be flashing; Before now, the lights of the second group have been flashing (the right
digits of the digital tube will display 92), at this time, the right digits of the digital tube will display 93. The
first group of ceiling lights will be flashing. Alternate 30 seconds at least, the digital tube is flashing, press
this key again, before it, if the second group of lights is not flashing, the right digits of the digital tube will
display 90; if the second group of lights is flashing, and the right digits of the digital tube will display 92. In
addition, under the state of non-controlled, we can also control the lights. The non-controlled state is that
select the revolving or sliding door position on the working selector.
10 -------light 2, when the digital tube is flashing, please press this key, loosen it after one second,
the data of this key will be sent. Before that, if the lights of both groups will be not flashing (the right
digits of the digital tube are 90), at this time, the right digits of the digital tube will display 92, the second
groups of ceiling lights will be flashing; Erenow, the lights of the first group have been flashing (the right
digits of the digital tube will display 91), at this time, the right digits of the digital tube will display 93.
The second group of ceiling lights will be flashing. Alternate30 seconds at least, the digital tube is flashing,
press this key again, Erenow, if the first group of lights are not flashing, the right digits of the digital tube
will display 90; Erenow, if the first group of lights have been flashing, at this time, the right digits of the
digital tube will display 91. In addition, under the state of non-controlled, we can also control the lights.
The non-controlled state is that select the revolving or sliding door position on the working selector.
11 -------emergency stop, when the digital tube is flashing, please press this key, loosen it after one
second, the data of this key will be sent. Alternate 30 seconds at least, when the digital tube is flashing,
please press this key again, the emergency stop will be canceled, at this time, if the door is not under the
state of sliding door, the digital tube will display the door are on the new position. Contrarily, the left digits
of the digital tube will display 07.
12 ------Reset, when the digital tube is flashing, and the left digits of the digital tube display 05 or
06, please press this key, the door will revolve clockwise, loosen RESET, and the door will stop.
13 ---------Display, before operating the door or check the operation state of controlling state, please
press this key , loosen it after about 1 second, the digital tube will display the latest results of operating the
controller, and the digital tube will be under the state of displaying. Contrarily, the digital tube will not be
under the state of displaying, please press the “displaying”.
81
B. The Min. switch time is 1 second, the Max. Controlling distance is 30 m.
28.3
The adjustment of monitor control (optional)
Check the connection of communication board、mobile phone、antenna、data line and so on, switch on the
mobile phone , operate the PLC program , observe the power supply connection of the communication
board.
28.3.1
According to the “remote control and states inquire” flow, check functions.
Remote control and states inquire flow chart
Pick up the phone
N
Please input password, press # key to end Because of mistake, please input the password again
Y Y
Romote operation, press 1 Check the state, please press 2, press # to end
Sliding door Revolving door Code operation, Status indication, Number of circles
operation, press 1 operation, press 2 press 3 press 1 press 2
Opening press 1
System normal Inquire sliding
Input
Closing press 2 Transducer trouble door press1
operation
Safety beam activation Inquire revolving
code, press
Lock door press 1 Safety switch activation door press2
# end
Emergency button press Press # end
Barrier trouble
Opening position startup press2 Inquire
System power off
product
Fire alarm
Closing position startup Input # *******times
The decorative plate should be installed after function adjustment. There are 6 or 7 pieces of decorative
plate based on different specifications (usually there are 6 pieces of decorative plates for metal decorative
automatic doors). The installation steps are similar. The difference is the locations of the decorative plates.
29.1
Check all the decorative plates and decorative plate strips. Make sure they are all in good condition.
Top ring
Decorative plate
Canopy ring
83
Figure 29-1
29.2
Put the decorative plates into the decorative plate grooves. Firstly, put the decorative plates into grooves of
the top ring decorative plate. Then, put them into grooves of the canopy ring decorative plate.
29.3
Manually push the decorative plates to the installation locations along the decorative plate grooves. There
are 2 pieces of short plates and 5 pieces of long ones for total the 7. Install the decorative plate strip to the
joint of each two decorative plates. Refer to Figure 29-2 that shows installation locations of the 7
decorative plates. There are 2 pieces of straight ones and 4 pieces of one-side-bend ones for total 6
decorative plates. Refer to Figure 29-3 that shows installation locations of the 6 decorative plates).
室内
Indoor
Decorative plate strip
Magnify
放大
Outdoor
室外
Figure 29-2
Magnify
放大
室内
Indoor
Outdoor
室外
There are 6 pieces of anti-dust plates for size 36, and 8 pieces for size 42 and size 48. Refer to Figure 30-1.
Place the anti-dust plates on the top ring, then insert the anti-dust plate strips into joint of each two pieces
of anti-dust plates.
Figure 30-1
Figure 30-2
85
31.1
Disperse the black glass glue evenly between sidewall panels, door shaft tray and the floor.
31.2
Plaster the showcase glass with yellow caution labels – “Caution: Automatic Door”.
31.3
Peel the protective film and clear the door body, wings and the construction location.
86
Attached Form 1: Floor horizon measuring result
Measuring point Measuring value benchmark value Difference between benchmark and measuring value
1
2
3
4
5
6
7
8
9
10
11. benchmark
12
13
14
15
16
17
18
19
20
21
Result: □ qualification □disqualification
87
Attached Form 2: Entrance measuring value
Model Min. net width of entrance (B1) Max. net width of entrance (B2)
Min. net height of entrance (H1) Max. net height of entrance (H2) Unilateral vertical allowance (T)
88
Only for SIEMENS system
Figure One
89
Only for PANISONIC system
Figure Two
90
Display 1: Main tools for installation process
91
Screw drivers Measuring tape
92
Open ended spanners Depth gauge
93
Scissors Glass cement gun
Files
94