1 2 3 4 5 6 7 Rencana Komulatif - 0.165 0.330 0.495 0.659 0.824 0.824 Rencana Mingguan 0 0.164845 0.164845 0.164845 0.164845 0.164845 0

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

1 2 3 4 5 6 7

rencana komulatif - 0.165 0.330 0.495 0.659 0.824 0.824

rencana mingguan 0 0.164845 0.164845 0.164845 0.164845 0.164845 0


8 9 10 11 12 13 14 15 16 17 18
0.989 1.154 2.042 4.330 9.191 14.029 18.857 23.127 28.219 33.549 39.376

0.164845 0.164845 0.888549 2.287851 4.861158 4.837105 4.828105 4.270712 5.092032 5.329436 5.827462
19 20 21 22 23 24 25 26 27 28 29
45.260 51.153 57.049 62.780 68.451 74.896 82.132 89.234 95.429 99.547 100.000

5.883875 5.892637 5.896353 5.731096 5.671143 6.444264 7.236301 7.102031 6.195015 4.118241 0.452719
JADWAL WAKTU PELAKSANAAN
PEMBANGUNAN RUMAH SAKIT UMUM DAERAH BANJARMASIN TAHAP I
TAHUN ANGGARAN 2015
PROYEK : PEMBANGUNAN RSUD BANJARMASIN TAHAP I
LOKASI : BANJARMASIN - KALIMANTAN SELATAN
TAHUN ANGGARAN : 2015

BOBOT
No. URAIAN PEKERJAAN JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER KETERANGAN
(%)
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 M28 M29

I PEKERJAAN PERSIAPAN 4.45% 0.00% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16% 0.16%

II STRUKTUR
1 Lantai I 13.99% 0.70% 2.10% 4.20% 4.20% 2.80%
2 Lantai II 4.63% 0.69% 2.08% 1.85%
3 Lantai III 4.60% 0.46% 1.84% 2.30%
4 Lantai IV 4.59% 0.23% 2.53% 1.84%
5 Lantai Atap 6.11% 1.22% 2.44% 2.44%

III ARSITEKTUR
1 Lantai I 7.82% 0.47% 0.47% 0.22% 0.74% 0.70% 0.42% 0.53% 0.53% 0.53% 0.54% 0.61% 0.81% 0.74% 0.25% 0.25%
2 Lantai II 6.48% 0.57% 0.57% 0.22% 0.76% 0.94% 0.40% 0.19% 0.44% 0.47% 0.47% 0.47% 0.72% 0.25%
3 Lantai III 2.33% 0.33% 0.33% 0.33% 0.24% 0.24% 0.06% 0.06% 0.06% 0.23% 0.23% 0.23%
4 Lantai IV 2.29% 0.39% 0.39% 0.39% 0.14% 0.14% 0.06% 0.06% 0.06% 0.32% 0.32%
5 Lantai Atap 2.17% 0.30% 0.30% 0.10% 0.29% 0.34% 0.34% 0.34% 0.08% 0.08%

IV BANGUNAN PENDUKUNG
PEKERJAAN STRUKTUR
1 PEKERJAAN POWER HOUSE (PROVISIONAL) 2.24% 0.22% 0.56% 0.78% 0.67%
2 POS JAGA (2 UNIT) 0.07% 0.02% 0.02% 0.02%
3 BANGUNAN IPAL 0.66% 0.22% 0.22% 0.22%
4 SAMPAH MEDIS 0.00%
5 GWT (PROVISIONAL) 0.57% 0.14% 0.14% 0.14% 0.14%
PEKERJAAN ARSITEKTUR
1 POWER HOUSE 0.75% 0.19% 0.19% 0.19% 0.19%
2 POS JAGA (2 UNIT) 0.09% 0.03% 0.03% 0.03%
3 SAMPAH MEDIS 0.00%
4 GWT 0.18% 0.06% 0.06% 0.06%

V INFRASTRUKTUR
PEKERJAAN PEMATANGAN LAHAN
1 PEKERJAAN PEMATANGAN LAHAN 0.00%
PEKERJAAN LUAR BANGUNAN
1 PEKERJAAN JALAN 3.88% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.78% 0.78% 0.78% 0.39%
2 PEKERJAAN PARKIR 1.11% 0.06% 0.06% 0.06% 0.06% 0.06% 0.06% 0.11% 0.28% 0.28% 0.11%
PEKERJAAN SALURAN PERMUKAAN
1 PEKERJAAN SALURAN (PROVISIONAL) 0.60% 0.06% 0.06% 0.09% 0.12% 0.12% 0.12% 0.03%
PEKERJAAN LANDSCAPING
1 PEKERJAAN PENANAMAN POHON 0.07% 0.04% 0.04%
2 PEKERJAAN PENANAMAN RUMPUT 0.42% 0.10% 0.10% 0.10% 0.10%
PEKERJAAN PAGAR DAN PINTU GERBANG
1 PEKERJAAN PAGAR DAN PINTU GERBANG 1.23% 0.15% 0.15% 0.15% 0.15% 0.15% 0.15% 0.15% 0.15%

VI MEKANIKAL & ELEKTRIKAL


1 PEKERJAAN LISTRIK ARUS KUAT 9.12% 0.09% 0.09% 0.09% 0.09% 0.09% 0.18% 0.18% 0.27% 0.27% 1.37% 1.37% 1.37% 1.37% 1.37% 0.91%
2 PEKERJAAN PENANGKAL PETIR 1.05% 0.26% 0.26% 0.26% 0.26%
3 PEKERJAAN GENSET 3.06% 0.76% 0.76% 0.76% 0.76%
4 PEKERJAAN FIRE ALARM 0.64% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.10% 0.10% 0.10% 0.03% 0.03% 0.03%
5 PEKERJAAN SOUND SYSTEM (PUBLIC ADDRESS) 0.76% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.11% 0.11% 0.11% 0.04% 0.04% 0.04%
6 PEKERJAAN TRIPLE PLAY 1.02% 0.09% 0.09% 0.09% 0.09% 0.09% 0.09% 0.09% 0.09% 0.09% 0.09% 0.09%
7 PEKERJAAN PLUMBING 1.86% 0.09% 0.09% 0.09% 0.09% 0.09% 0.09% 0.09% 0.09% 0.28% 0.28% 0.28% 0.19% 0.09%
8 PEKERJAAN FIRE HYDRANT & FIRE SPLINKER 1.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.16% 0.16% 0.16% 0.10% 0.05%
9 PEKERJAAN TATA UDARA 10.13% 0.20% 0.20% 0.20% 0.20% 0.20% 0.20% 0.51% 0.51% 0.81% 1.01% 2.03% 2.53% 1.52%

Rencana 100.00% 0.00% 0.16% 0.16% 0.16% 0.16% 0.16% 0.00% 0.16% 0.16% 0.89% 2.29% 4.86% 4.84% 4.83% 4.27% 5.09% 5.33% 5.83% 5.88% 5.89% 5.90% 5.73% 5.67% 6.44% 7.24% 7.10% 6.20% 4.12% 0.45%
Kumulatif rencana 0 0.00% 0.16% 0.33% 0.49% 0.66% 0.82% 0.82% 0.99% 1.15% 2.04% 4.33% 9.19% 14.03% 18.86% 23.13% 28.22% 33.55% 39.38% 45.26% 51.15% 57.05% 62.78% 68.45% 74.90% 82.13% 89.23% 95.43% 99.55% 100.00%
Realisasi
Kumulatif Realisasi

Diketahui oleh : Diperiksa, disetujui oleh : Diajukan oleh :


DINAS CIPTA KARYA DAN PERUMAHAN PT. PUSER BUMI MEKON PT. ADHI KARYA (Persero) Tbk

Hj. Lisda Maimanah, ST. MT Ir. Yudi Wahyono Ade Ivawan, ST


PPTK Team Leader Project Manager