Compilation of Minimum Design Requirements For: PD 957 BP 220 BP 344 RA 9514
Compilation of Minimum Design Requirements For: PD 957 BP 220 BP 344 RA 9514
Compilation of Minimum Design Requirements For: PD 957 BP 220 BP 344 RA 9514
1
1
3. Length of Block
Maximum length of block 400 meters with blocks exceeding
250 meters shall be provided with an alley approximately
at mid-length.
4. Roads Right of Way
7. Roads Specification
Planting Strip (PS)
Sidewalk (SW)
Open Market Housing Medium Cost Housing
Row Planting Strip (PS) Sidewalk (SW)
15 m. 1.3 1.2
12 m. 0.8 1.2
10 m. 0.8 1.2
8 m. 0.4 0.6
6 m. (service road) Optional Optional
Road Pavement
Major Concrete/Asphalt Concrete/Asphalt
Minor Concrete/Asphalt Concrete/Asphalt
Motor Court Concrete/Asphalt Concrete/Asphalt
Sidewalk Concrete/Asphalt Concrete/Asphalt
Alley Concrete/Asphalt Concrete/Asphalt
1
8. Water Supply
According to the mandatory of each subdivision shall have
at least an operational deep well and pump sets with
sufficient capacity to provide Average Daily Demand (ADD)
to all homeowners.
- Minimum Water Supply Requirement
Mandatory with the 150 liters per capita per day for
household connection.
- Fire Protection Demand
According to the provision for fire protection shall
comply with the requirements of the Fire Code of the
Philippines.
14. Setbacks/Easements
Front, Side and Rear shall conform to the provisions of the
National Building Code of the Philippines.
1
5. Length of Block
Maximum length of block is 400 meters. However, blocks
exceeding 250 meters shall be provided with a 2-meter alley
approximately at midlength.
1
8. Road Specifications
Planting Strip (PS)
Sidewalk (SW)
Economic Housing Socialized Housing
Row Planting Strip (PS) Sidewalk (SW)
15.0 m. 1.30 m. 1.20 m.
12.0 m. 0.80 m. 1.20 m.
1
9. Road Pavement
Economic and Socialized
Housing
Major Concrete /Asphalt
Minor Concrete / Asphalt
Motor Court Macadam
Side walk Macadam
Pathway/Alley Macadam
17. Setback/Yard
Economic and Socialized
Housing
Front Setback 1.5 m.
Side Yard 1.5 m. (from the building
Rear Yard line)
Abutments 2.0 m.
May be allowed per requirement
of the National Building Code
of the Philippines
The rules and regulations set forth herein provide for minimum
requirements and utilities for public use accessible to
disabled persons, pursuant to the objectives of the Batas
Pambansa Bilang 344 “ An Act to Enhance the Mobility of
Disabled Persons by Requiring Certain Buildings, Institutions,
Establishments and Public Utilities to Install Facilities and
Other Devices”.
4. Renovated Structure
5. Streets
Design Criteria
- Accessibility
- Reachability
- Usability
1
- Orientation
- Safety
- Work Ability and Efficiency
A- Stairs
B- Walkways
C- Corridors
D- Doors and Entrance
E- Washrooms and Toilets
F- Lifts/Elevator
G- Ramps
H- Parking Areas
I- Switches, Controls, buzzers
J- Handrails
K- Thresholds
L- Floor Finishes
M- Drinking Fountains
N- Public Telephones
O- Seating Accommodations
Hose Box - A case or bureau where fire hoses, valves and other
gear are put away and organized putting out fires.
The BFP may go into outer gathering arrangements for the lead
of preparing, instruction and assessment of fire volunteers,
professionals and fire volunteer associations, which will be
under the full control and management of the BFP: Provided,
notwithstanding, That during firefighting activities, fire
volunteer associations will be under the direct operational
control of the fire ground administrators of the BFP;
(7) A fire leave plan for each floor of the structure showing
the courses from one another space to suitable ways out,
showed noticeably on the entryway of such room;
(11) Properly checked and lit ways out with arrangement for
crisis lights to sufficiently enlighten leave courses in the
event of force disappointment.
FIRE HAZARD", which will stay posted until such time that the
proprietor, overseer, tenant or other individual liable for
the state of the structure, structure and their premises or
offices subside something similar, yet such period will not
surpass fifteen (15) days from the pass of the underlying time
frame given in the notification/request to agree.
(4) Two for every centum (2%) of all charges, barring re-
protection expenses for the offer of fire, seismic tremor and
blast peril protection gathered by organizations, people or
specialists authorized to sell such protections in the
Philippines;
(6) Two for every centum (2%) of the assistance expenses got
from fire, quake, and blast peril reinsurance reviews and post
misfortune administration of protection change organizations
working together in the Philippines straightforwardly through
specialists.
Section 16. On the off chance that any arrangement of this Act
or any segment thereof is pronounced illegal by a capable
court, different arrangements will not be influenced along
these lines.
Section 17. This Act will produce results fifteen (15) days
after its distribution in the Official Gazette or in two (2)
public papers of general course.