To

Nitin Sir
Ahura Builders
EXTERNAL PAINT SYSTEM

Pakeges ( Basic
Sr.No Description( Products) Ltr/Kg Prize
OPTION 1 :- APPLY AND SUPPLY OF JOTUN PROFILE DÉCOR 3MM AND JOTASHIEL
1 Cleaning/Surface prepration/ touch up putty - -
2 ACRYLIC EMULSION PRIMER 20 ltr 1,636.00
3 PROFILE DÉCOR 3 MM TEXTURE 25 KG 765.00
4 JOTASHIELD COLORLLAST SILK APPROVED SHADE 20 ltr 5,219.00
LABOUR COMPLIANCE
GANDOLA / METAL SCAFFOLDING

Pakeges ( Basic
Description( Products) Ltr/Kg Prize
OPTION 2:- APPLY AND SUPPLY OF JOTUN PROFILE DÉCOR 3MM AND EASY
1 Cleaning/Surface prepration / touch up putty - -
2 ACRYLIC EMULSION PRIMER 20 ltr 1,636.00
3 PROFILE DÉCOR 3 MM TEXTURE 25 KG 765.00
4 EASYCOAT MATT APPROVED SHADE 20 ltr 2,345.00
LABOUR COMPLIANCE
GANDOLA / METAL SCAFFOLDING

Pakeges ( Basic
Sr.No Description( Products) Ltr/Kg Prize
APPLY AND SUPPLY OF JOTUN EASYCOAT MATT - PLUMBING DUCT
1 Cleaning/Surface prepration - -
2 ACRYLIC EMULSION PRIMER 20Ltr 1,636.00
LABOUR COMPLIANCE

Note:-
GST @18% will be additional on above quoted rates
Mobilisation advance 25% of workorder value
Labour hutment to be provided by you.
water, electricity, storeage space to be provided by you
Materail will be supplied through our authorised dealer
DATE:- 14/08/2019

Covrage20Ltr/ Material Labour Performance


kg Coast Rate Total Warranty
MM AND JOTASHIELD COLORLAST SILK
- 0.50 1.10 1.60
1,800.00 0.91 1.10 2.01
60.00 12.75 4.40 17.15 7 Years
800.00 6.52 3.30 9.82
0.55 0.55
2.48 2.48
Total= 20.68 12.93 33.61

Covrage20Ltr/ Material Labour Performance


kg Coast Rate Total Warranty
COR 3MM AND EASYCOAT MATT
- 0.50 1.10 1.60
1,800.00 0.91 1.10 2.01
60.00 12.75 4.40 17.15 5 Years
800.00 2.93 3.30 6.23
0.55 0.55
2.48 2.48
Total= 17.09 12.93 30.02

Covrage20Ltr/ Material Labour


kg Coast Rate Total
- PLUMBING DUCT AREA
- - 0.55 0.55
900.00 1.82 2.20 4.02
0.55 0.55
Total= 1.82 3.30 5.12
To
Nitin Sir
Ahura Builders
EXTERNAL PAINT SYSTEM

Pakeges ( Basic
Sr.No Description( Products) Ltr/Kg Prize
OPTION 1 :- APPLY AND SUPPLY OF JOTASHIELD WATERXTREME BASECOAT + JOTUN PROF
JOTASHIELD COLORLAST SILK
1 Cleaning/Surface prepration / Touch putty - -
2 JOTASHIELD WATERXTREME BASE COAT 20 ltr 3,764.00
3 PROFILE DÉCOR 3 MM TEXTURE 25 KG 765.00
4 JOTASHIELD COLORLLAST SILK APPROVED SHADE 20 ltr 5,219.00
LABOUR COMPLIANCE
GANDOLA / METAL SCAFFOLDING

Note:-
GST @18% will be additional on above quoted rates
Mobilisation advance 25% of workorder value
Labour hutment to be provided by you.
water, electricity, storeage space to be provided by you
Materail will be supplied through our authorised dealer
DATE:- 13/08/2019

Covrage20Ltr/ Material Labour Performance


kg Coast Rate Total Warranty
OAT + JOTUN PROFILE DÉCOR 3MM +JOTASHIELD
ILK
- 0.50 1.10 1.60
950.00 3.96 1.10 5.06
60.00 12.75 4.40 17.15 7 YEARS
800.00 6.52 3.30 9.82
0.55 0.55
2.48 2.48
Total= 23.74 12.93 36.67
To
Nitin Sir
Ahura Builders

INTERNAL PAINT SYSTEM

Pakeges ( Basic
Sr.No Description( Products) Ltr/Kg Prize
APPLY AND SUPPLY OF JOTUN FENOMATIC PURE COLOR MATT - WAL
1 Cleaning/Surface prepration - -
2 PVA PRIMER 20Ltr 1,375.00
3 STUCCO PUTTY 35 kg 1,315.00
4 FENOMASTIC PURECOLOR MATT WHITE 20Ltr 3,613.00
LABOUR COMPLIANCE

Pakeges ( Basic
Sr.No Description( Products) Ltr/Kg Prize
APPLY AND SUPPLY OF JOTUN FENOMATIC PURE COLOR MATT - CEILING AR
1 Cleaning/Surface prepration - -
2 PVA PRIMER 20Ltr 1,375.00
3 STUCCO PUTTY 35 kg 1,315.00
4 DUROSAN ACTION WHITE 20Ltr 1,943.00
LABOUR COMPLIANCE

Pakeges ( Basic
Sr.No Description( Products) Ltr/Kg Prize
APPLY AND SUPPLY OF JOTUN FENOMATIC PURE COLOR MATT - CEILING AR
1 Cleaning/Surface prepration - -
2 PVA PRIMER 20Ltr 1,375.00
3 STUCCO PUTTY 35 kg 1,315.00
4 JOLLYFIX EMULSION WHITE 20Ltr 1,427.00
LABOUR COMPLIANCE

Note:-
GST @18% will be additional on above quoted rates
Mobilisation advance 25% of workorder value
Labour hutment to be provided by you.
water, electricity, storeage space to be provided by you
Materail will be supplied through our authorised dealer
DATE:- 13/08/2019

Covrage20Ltr/ Material Labour


kg Coast Rate Total
COLOR MATT - WALL AREA
- - -
2,800.00 0.49 1.10 1.59
650.00 2.02 3.30 5.32
1,300.00 2.78 3.85 6.63
0.55 0.55
Total= 5.29 8.80 14.09

Covrage20Ltr/ Material Labour


kg Coast Rate Total
R MATT - CEILING AREA OPTION 1
- - -
2,800.00 0.49 1.10 1.59
650.00 2.02 3.30 5.32
1,500.00 1.30 3.30 4.60
0.55 0.55
Total= 3.81 8.25 12.06

Covrage20Ltr/ Material Labour


kg Coast Rate Total
MATT - CEILING AREA - OPTION 2
- - -
2,800.00 0.49 1.10 1.59
650.00 2.02 3.30 5.32
1,100.00 1.30 3.30 4.60
0.55 0.55
Total= 3.81 8.25 12.06
To
Nitin Sir
Ahura Builders

INTERNAL PAINT SYSTEM

Pakeges ( Basic
Sr.No Description( Products) Ltr/Kg Prize
APPLY AND SUPPLY OF JOTUN FENOMATIC PURE COLOR MATT - WAL
1 Cleaning/Surface prepration - -
3 JOTUN CEMENT PUTTY FINE 40 KG 700.00
2 PVA PRIMER 20Ltr 1,375.00
4 FENOMASTIC PURECOLOR MATT WHITE 20Ltr 3,613.00
LABOUR COMPLIANCE

Pakeges ( Basic
Sr.No Description( Products) Ltr/Kg Prize
APPLY AND SUPPLY OF JOTUN FENOMATIC PURE COLOR MATT - CEILING AR
1 Cleaning/Surface prepration - -
2 JOTUN CEMENT PUTTY FINE 40 KG 700.00
3 PVA PRIMER 20Ltr 1,375.00
4 DUROSAN ACTION 20Ltr 1,943.00
LABOUR COMPLIANCE

Pakeges ( Basic
Sr.No Description( Products) Ltr/Kg Prize
APPLY AND SUPPLY OF JOTUN FENOMATIC PURE COLOR MATT - CEILING AR
1 Cleaning/Surface prepration - -
2 JOTUN CEMENT PUTTY FINE 40 KG 700.00
3 PVA PRIMER 20Ltr 1,375.00
4 JOLLYFIX EMULSION 20Ltr 1,427.00
LABOUR COMPLIANCE

Note:-
GST @18% will be additional on above quoted rates
Mobilisation advance 25% of workorder value
Labour hutment to be provided by you.
water, electricity, storeage space to be provided by you
Materail will be supplied through our authorised dealer
DATE:- 14/08/2019

Covrage20Ltr/ Material Labour


kg Coast Rate Total
COLOR MATT - WALL AREA
- - -
480.00 1.46 3.30 4.76
2,800.00 0.49 1.10 1.59
1,300.00 2.78 3.30 6.08
0.55 0.55
Total= 4.73 8.25 12.98

Covrage20Ltr/ Material Labour


kg Coast Rate Total
R MATT - CEILING AREA OPTION 1
- - -
480.00 1.46 3.30 4.76
2,800.00 0.49 1.10 1.59
1,500.00 1.30 3.30 4.60
0.55 0.55
Total= 3.24 8.25 11.49

Covrage20Ltr/ Material Labour


kg Coast Rate Total
R MATT - CEILING AREA OPTION 2
- - -
480.00 1.46 3.30 4.76
2,800.00 0.49 1.10 1.59
1,100.00 1.30 3.30 4.60
0.55 0.55
Total= 3.25 4.95 11.50