NAME OF WORK : CONSTRUCTION OF GRADE SEPERATOR AT KM 51/2 OF NH532

(CUDDALORE-VIRUDACHALAM-SALEM ROAD)

Detailed Estimate
Sl
No Description Quantity

1 Earthwork excavation in all classes of soils except rock requiring blasting and depositing on bank,
with all leads and lifts as per SS20B, including cost of all labour, equipments and all other incidental
charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring,
bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and
obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all
surplus materials etc., complete as per relevant standard specification, for Footing under Abutment
and Pier

For Footing under Abutment Length Breadth Depth

1x2 7.70 7.70 4.10 486.18

Pier

1x 5 8.20 8.20 4.10 1378.42


5

1864.60

or 1865 m3
Sl
No Description Quantity

3 Cement Concrete M10 ( mix 1:3:6 ) using 40 mm ISS HBGS Jelly including cost and conveyance of
all materials o site and cost of cement at site including soft water, labour charges for mixing,
transporting, laying and curing concrete, Tools and Plants and incidental charges such as baling out
water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant
standard specification, for LEVELLING COURSE BELOW FOOTING

Under Abutment pier footing

1x2 7.70 7.70 0.10 11.86

Under pier footing

1x 5 8.20 8.20 0.10 33.62

or 45.48 m3
4 Vibrated reinforced cement concrete M35 (Design mix) using ISS Graded HBGS Jelly including
cost and conveyance of all materials to site and cost of cement at site, but, excluding cost and
fabrication of steel, but, excluding cost and fabrication of steel, but, including labour charges for
mixing, transporting, laying and curing concrete, working at heights, soft water, hire charges for tools
and plants, including all other incidental charges, etc., complete, for FOOTING UNDER
ABUTMENT & PIER

For Footing under Abutment Type Length Breadth Depth

1x2 Rectangle 7.50 7.50 0.50 56.25

A=1/3*(a1^2+(a1*a2)^0.5+a2^2)

2 Trapezoidal 24.33 0.80 38.93

Pier

1x 5 Rectangle 8.00 8.00 0.50 160.00

A=1/3*(a1^2+(a1*a2)^0.5+a2^2)
5 Trapezoidal 27.21 1.00 136.07

or 391 m3
5 Vibrated reinforced cement concrete M35 (Design mix) using ISS Graded HBGS Jelly including
cost and conveyance of all materials to site and cost of cement at site, but, excluding cost and
fabrication of steel, but, excluding cost and fabrication of steel, but, including labour charges for
mixing, transporting, laying and curing concrete, working at heights, soft water, hire charges for tools
and plants, including all other incidental charges, etc., complete, for SUB STRUCTURE OF
ABUTMENTS , WINGS AND COLUMN PIER.( Above Sill )

Abutments PI/4
Sl
No Description Quantity

1x2 0.79 1.80 6.953 35.39

Piers PI/4 D

1x 5 0.79 1.80 6.553 83.38

or 118.76 m3
6 Vibrated reinforced cement concrete M35 (Design mix) using ISS Graded HBGS Jelly including
cost and conveyance of all materials to site and cost of cement at site, but, excluding cost and
fabrication of steel, but, excluding cost and fabrication of steel, but, including labour charges for
mixing, transporting, laying and curing concrete, working at heights, soft water, hire charges for tools
and plants, including all other incidental charges, etc., complete, for CAPPING BEAM ( Above
Sill )

ABUTMENT

1x 2 Rectangular 6.10 1.8 0.8 17.57

2 A=1/3*(a1^2+(a1*a2)^0.5+a2^2)

trapezoidal 6.27 0.8 10.03

PIER
1x 5 Rectangular 6.10 1.8 0.8 43.92

5 A=1/3*(a1^2+(a1*a2)^0.5+a2^2)

trapezoidal 6.27 1 31.35

or 103 m3
8 Vibrated reinforced cement concrete M 35 (Design mix) using 20 mm ISS Graded HBGS Jelly
including cost and conveyance of all materials to site and cost of cement at site but excluding cost
and fabrication of steel, including labour charges for steel, including labour charges for mixing,
transporting, laying, curing concrete, soft water, hire charges for tools and plants, including all other
incidental charges, etc., complete for BED BLOCK CUM DIRT WALL, PEDESTAL OVER
ABUTMENTS & PIERS.

Pedestal Abutment
2x2 1 0.8 0.3 0.96
4

Pedestal Pier
5x4 0.9 0.8 0.3 4.32
20
Dirt wall
1x2 2.35 12 0.300 16.89

2
Sl
No Description Quantity

or 22.17 m3
9 Supply and fixing Elastomeric bearing of size 500 x 400 x 80 at girder locations over abutment
including cost and conveyance to worksite, labour for fixing the same in correct
position and all other incidental charges etc, complete.

Over abutment

1x2x2 60 40 8 76800

Over Pier

5 x4 60 40 8 384000

20
460800

or 460800 cm3
10 Vibrated Reinforced Cement Concrete of grade M 30(Design mix) using 20mm ISS Graded HBGS
Jelly including cost and conveyance of all materials to site and cost and fabrication of steel, including
cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete,
working at depths, Tools and Plants and incidental chargaes such as balingout water, maintaining of
protective bunds, cofferdams, shoring, strutting etc., complete, as per relevant standard specification,
for DECK SLAB AND KERBS FOOT PATH (PROVIDED WITH INNER CRASH
BARRIER.)

Deck Uniform portion

1x1 8.250 27.40 0.2000 45.21

1 (0.35+0.2)/2
1 x2 1.875 27.40 0.275 28.26

End portion

1 x2 8.550 1.50 0.2000 5.13

2 (0.337+0.2)/2

2 x2 1.725 1.50 0.269 2.79

Varying portion

1 x2 8.400 1.50 0.2000 5.04

2 (1.875+1.725)/2 (0.275+0.269)/2

2 x2 1.800 1.50 0.272 2.94

Drip portion

1 x2 27.40 0.5 0.025 0.69

2
90.05
Sl
No Description Quantity

No of spans 6 x 90.05 = 540.27

540.27

or 541 m3

11 Vibrated Reinforced Cement Concrete of grade M 30 (Design mix) using 20mm ISS Graded HBGS
Jelly including cost and conveyance of all materials to site and cost and fabrication of steel, including
cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete,
working at depths, Tools and Plants and incidental chargaes such as balingout water, maintaining of
protective bunds, cofferdams, shoring, strutting etc., complete, as per relevant standard specification,
for T-BEAM AND CROSS BEAMS (WITH FOOT PATH).

Main Girder Uniform portion

1x4 19.560 0.300 1.5000 35.21

Haunches Bottom

2x4 19.560 0.150 0.150 3.52

8 top

1x6 19.560 0.300 0.1500 5.28

6
End Portion

2x 4 2.10 0.600 1.9000 19.15

Top

2x4 2.10 0.150 0.0750 0.19

Transition Portion (0.3+0.6)/2

2x 4 2.10 0.450 1.5000 11.34

Haunches Bottom

2x4 2.10 0.150 0.075 0.19

2.100 0.250 0.625 2.63

Top (0.3+0.15)/2 (0.15+0.075)/2


2x6 2.10 0.225 0.11 0.64

12
Sl
No Description Quantity

Cross Beam

at end (7.95+0.6)

1X2 8.550 0.300 2.200 11.29

at mid (7.95-1.8)

1x1 6.150 0.300 1.500 2.77

1
per span 92.20

No of spans 6 x 92.20 = 553.19

or 553 m3

12 Providing and fixing of Galvanized steel drainage spouts 100mm dia as per GOI drawing with
grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting at
least 300mm beyond the bottom of deck slab as shown in the drawing, including cost and conveyance
of Galvanised Steel Pipes and flats and fixing them in position, etc., complete.

1x 6 6 Per span 36

6 36 Nos
13 Supplying and installation of Copper Strip Expansion Joint System conforming to Section 2607
and in accordance with section 2602 of "Specification for Road Bridge Works - IV th Revision:
2001" published by Ministry of Surface Transport (Road wing) in the 40mm wide expansion gap
provided in between decks over piers and in between deck and dirt wall over abutment with fatigue
tested structural steel section at the nosing and anchorage assembly, including cost and conveyance
of all materials, cost of testing as per Section 2608 of the MOST specifications, including labour,
equipment and other incidental charges for fixing the joints complete in all respects, as per section
2609 and 2610 of the above said specifications

1x2 11 22

1x 5 11 55

5 77 RM
Sl
No Description Quantity

16 Vibrated Cement Concrete M15 (Nominal mix 1:2:4) using 40 mm ISS HBGS Jelly, including cost
and conveyance of all materials to site and cost of cement at site, including all labour charges for
mixing concrete, laying, hire charges for tools and plants, compacting, curing with all leads for soft
water, including all other incidental charges, form work etc., complete, for BASE COURSE
BELOW APPROACH SLABS

1x2 12.00 3.50 0.15 12.60

12.60
or 13 m3

17 Vibrated reinforced cement concrete M 30 (Design mix) using 20mm ISS Graded HBGS Jelly,
including cost and conveyance of all materials to site and cost of cement at site, but excluding cost
and fabrication of steel, but, including labour charges for mixing, laying, curing concrete, working at
heights, soft water, hire charges for tools and plants, including all other incidental charges, etc.,
complete, for APPROACH SLABS

1x2 12.00 3.50 0.3000 25.20


2 or 26 m3

18 Providing and laying bituminous concrete of varying thick (40mm-min) using aggregates of specified
grading, premixed with bituminous binder @ 5.4 to 5.6 percent of mix and filler, transporting the hot
mix to work site layiing with a hyrdrostatic paver finisher with sensor control to the required grade,
level and alignment rolling with smooth wheeled, vibratory and random rollers to achieve the desired
compaction as per MORTH specification clause 509 complete in all respect as per section 500 &
2700 of MORT&H Specifications (V Revision).

Over approach slab

1x2 3.50 11.00 0.4 30.80

Over deck slab

1x6 27.96 11.00 0.4 738.14

6 768.94

or 769 m3
*
Sl
No Description Quantity

19 Providing and laying 25mm thick Mastic Asphalt wearing course on top of deck slab excluding tack
coat with paving 10/20 grade bitument ast 15.5% meeting the requirement given in the table 500-29,
prepared by using mastic cooker and laid to required level and slope after cleaning the surface with
mechanical broom, air compressor including providing antiskid surface with bitumen 10sqm and at
an approximate spacing of 10cm c/c in both directions, pressed into surface when the temperature of
surface is notless than 100degc, protruding 1mm to 4mm over mastic surface, all complete as per cl.
515 including cost of all materials, labour, hire charges of machineries, transportation, loading,
unloading with all lead , lifts etc., complete as per the directions of Engineer in charge of work, as per
MORTH Technical specification Cl. 2702 and section 500 & 2700 of MORT&H Specifications (V
Revision).

Over approach slab

1x2 3.50 11.00 77.00

Over deck slab

1x6 27.96 11.00 1845.36

6 1922.36

or 1923 m2
*

20 Providing and applying tack coat using bituminous emulsion complying to IS 8887 over prepared
surface preheated to a temperature between 20 - 70 deg c and applying a uniform coat with the aid of
self propelled bitumen pressure sprayer self heating arrange and spraying bar with nozzle of constant
volume or pressure system @ 3 kg / 10 sqm on primed / black top surface curing etc. including all
material, labour, machinery with all leads and litfs etc., complete as per section 500 & 2700 of
MORT&H Specifications (V Revision).

Over approach slab

1x2 3.50 11.00 77.00

Over deck slab


1x6 27.96 11.00 1845.36

6 1922.36

or 1923 m2
*

21 Vibrated Reinforced Cement Concrete of grade design mix M 40 using ISS graded HBG metal
including cost and conveyance of all materials to site and cement at site including labour charges for
mixing, transporting, laying, curing concrete working at heights, hire charges for tools and plants,
including all other incidental charges etc., complete for CRASH BARRIER

For Spans 2x6 27.4 0.27 87.132


Sl
No Description Quantity

For Returns 2x2 3.50 0.27 3.710

or 91 m3
Sl
No Description Quantity

22 Supply and fabrication of Fe-500D steel required for all RCC items of works involved in the
schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods
straightening,cutting,bending,tying grills, including over laping to the required length wherever
necessary and providing to the reinforcement placing the reinforcement in position as specified in the
drawings including cost of binding wire, provision of spacer bars, cover blocks and all other
incidental charges , etc., complete as per section 1600 of MORT&H Specifications (V Revision).

1
Super structure

For deck slab

1x6 8.97 53.820

For Approach slab

1x2 0.95 1.900

2
For crash barrier

1x2 1.923 3.846

For Girders

1x6 19.202 115.212

Sub structure
Sl
No Description Quantity

For Pedestal over Abutment

2x4 0.03 1 0.240

For Pedestal over Pier

5 x4 0.05 1 1.000

20

For bed block over Abutment


1x2 0.94 1.880

For Abutment and wings

1x2 6.963 13.926

2x2 1.629 6.516

Pier & Cap Beam

5 3.407 17.035

Foundation

Abutment Pile cap

1x2 7.444 14.888

Pier Pile Cap


5 3.086 15.430

245.69

or 245.7 MT

23 Supply and fabrication of Fe-240 steel required in the schedule including cost of steel at site cost of
providing and cost of fabrication, labour charges for cleaning the rods, straightening, cutting,
bending, tying grills including over lapping to the required length wherever necessary and providing
to the reinforcement, placing the reinforcement in position as specified in the drawings including cost
of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc complete
as per section 1600 of MORT&H Specifications (V Revision).

For deck and bed block As per MOST Drg No. SD/256 Sheet - 1 and Sheet 2

1 0.303 0.303

1 0.30

or 0.4 MT
NAME OF WORK : CONSTRUCTION OF GRADE SEPERATOR AT KM 51/2 OF NH532 (CUDDALORE-
VIRUDACHALAM-SALEM ROAD)

Abstract Estimate
Estimate Amount Rs. #NAME?

No. Quantity Description Rate Per Amount


1 Earthwork excavation in all classes of soils except rock
requiring blasting and depositing on bank, with all leads and
lifts as per SS20B, including cost of all labour, equipments
and all other incidental charges such as baling out water,
providing and maintaining necessary cofferdams, sheeting,
shoring, bracing, and their subsequent removal, removal of all
logs, stumps and other deleterious matter and obstructions,
trimming bottom of excavation backfilling, and clearing the
site and disposal of all surplus materials etc., complete as per
relevant standard specification, for Footing under Abutment
and Pier

1865.00 89.39 cum 166,712


2 #NAME?

#NAME? 17595.90 #NAME?


3 Cement Concrete M10 ( mix 1:3:6 ) using 40 mm ISS HBGS
Jelly including cost and conveyance of all materials o site and
cost of cement at site including soft water, labour charges for
mixing, transporting, laying and curing concrete, Tools and
Plants and incidental charges such as baling out water,
maintaining of protective bunds, cofferdams, shoring, strutting
etc., complete as per relevant standard specification, for
LEVELLING COURSE BELOW FOOTING

45.48 6157.58 RM 280,047


4 Vibrated reinforced cement concrete M35 (Design mix) using
ISS Graded HBGS Jelly including cost and conveyance of all
materials to site and cost of cement at site, but, excluding cost
and fabrication of steel, but, excluding cost and fabrication of
steel, but, including labour charges for mixing, transporting,
laying and curing concrete, working at heights, soft water, hire
charges for tools and plants, including all other incidental
charges, etc., complete, for FOOTING UNDER ABUTMENT
& PIER

#NAME? 7839.66 cum #NAME?


5 Vibrated reinforced cement concrete M35 (Design mix) using
ISS Graded HBGS Jelly including cost and conveyance of all
materials to site and cost of cement at site, but, excluding cost
and fabrication of steel, but, excluding cost and fabrication of
steel, but, including labour charges for mixing, transporting,
laying and curing concrete, working at heights, soft water, hire
charges for tools and plants, including all other incidental
charges, etc., complete, for SUB STRUCTURE OF
ABUTMENTS , WINGS AND COLUMN PIER.( Above
Sill )

118.76 8247.22 cum 979,440


6 Vibrated reinforced cement concrete M35 (Design mix) using
ISS Graded HBGS Jelly including cost and conveyance of all
materials to site and cost of cement at site, but, excluding cost
and fabrication of steel, but, excluding cost and fabrication of
steel, but, including labour charges for mixing, transporting,
laying and curing concrete, working at heights, soft water, hire
charges for tools and plants, including all other incidental
charges, etc., complete, for CAPPING BEAM ( Above Sill )

102.87 8427.16 cum 866,902

ab Page 12 of 26
No. Quantity Description Rate Per Amount
7 #NAME?

#NAME? 235.74 cum #NAME?

ab Page 13 of 26
No. Quantity Description Rate Per Amount
8 Vibrated reinforced cement concrete M 35 (Design mix) using
20 mm ISS Graded HBGS Jelly including cost and
conveyance of all materials to site and cost of cement at site
but excluding cost and fabrication of steel, including labour
charges for steel, including labour charges for mixing,
transporting, laying, curing concrete, soft water, hire charges
for tools and plants, including all other incidental charges, etc.,
complete for BED BLOCK CUM DIRT WALL, PEDESTAL
OVER ABUTMENTS & PIERS.

0.00 8427.16 Nos 0


9 Supply and fixing Elastomeric bearing of size 500 x 400 x 80
at girder locations over abutment including cost and
conveyance to worksite, labour for fixing the same in
correct position and all other incidental charges etc,
complete.
460800 1.50 cucm 691,200
10 Vibrated Reinforced Cement Concrete of grade M 30(Design
mix) using 20mm ISS Graded HBGS Jelly including cost and
conveyance of all materials to site and cost and fabrication of
steel, including cost of formwork, soft water, labour charges
for mixing, transporting, laying and curing concrete, working
at depths, Tools and Plants and incidental chargaes such as
balingout water, maintaining of protective bunds, cofferdams,
shoring, strutting etc., complete, as per relevant standard
specification, for DECK SLAB AND KERBS FOOT PATH
(PROVIDED WITH INNER CRASH BARRIER.)

cub
541 9271.91 cm 5,016,103
11 Vibrated Reinforced Cement Concrete of grade M 30 (Design
mix) using 20mm ISS Graded HBGS Jelly including cost and
conveyance of all materials to site and cost and fabrication of
steel, including cost of formwork, soft water, labour charges
for mixing, transporting, laying and curing concrete, working
at depths, Tools and Plants and incidental chargaes such as
balingout water, maintaining of protective bunds, cofferdams,
shoring, strutting etc., complete, as per relevant standard
specification, for T-BEAM AND CROSS BEAMS (WITH
FOOT PATH).

553.19 9648.82 cum 5,337,611


12 Providing and fixing of Galvanized steel drainage spouts
100mm dia as per GOI drawing with grating arrangements at
top as shown in the drawing and 100mm dia drainage spout
projecting at least 300mm beyond the bottom of deck slab as
shown in the drawing, including cost and conveyance of
Galvanised Steel Pipes and flats and fixing them in position,
etc., complete.

36.00 425.01 cum 15,300


13 Supplying and installation of Copper Strip Expansion Joint
System conforming to Section 2607 and in accordance with
section 2602 of "Specification for Road Bridge Works - IV th
Revision: 2001" published by Ministry of Surface Transport
(Road wing) in the 40mm wide expansion gap provided in
between decks over piers and in between deck and dirt wall
over abutment with fatigue tested structural steel section at the
nosing and anchorage assembly, including cost and
conveyance of all materials, cost of testing as per Section 2608
of the MOST specifications, including labour, equipment and
other incidental charges for fixing the joints complete in all
respects, as per section 2609 and 2610 of the above said
specifications

77.00 11800.00 Nos 908,600


14 #NAME?

#NAME? 2819.28 RM #NAME?


15 #NAME?

#NAME? 832.12 cum #NAME?


16 Vibrated Cement Concrete M15 (Nominal mix 1:2:4) using 40
mm ISS HBGS Jelly, including cost and conveyance of all
materials to site and cost of cement at site, including all labour
charges for mixing concrete, laying, hire charges for tools and
plants, compacting, curing with all leads for soft water,
including all other incidental charges, form work etc.,
complete, for BASE COURSE BELOW APPROACH SLABS

13.00 6403.89 cum 83,251

ab Page 14 of 26
No. Quantity Description Rate Per Amount
17 Vibrated reinforced cement concrete M 30 (Design mix) using
20mm ISS Graded HBGS Jelly, including cost and
conveyance of all materials to site and cost of cement at site,
but excluding cost and fabrication of steel, but, including
labour charges for mixing, laying, curing concrete, working at
heights, soft water, hire charges for tools and plants, including
all other incidental charges, etc., complete, for APPROACH
SLABS

26.00 11342.97 cum 294,917


18 Providing and laying bituminous concrete of varying thick
(40mm-min) using aggregates of specified grading, premixed
with bituminous binder @ 5.4 to 5.6 percent of mix and filler,
transporting the hot mix to work site layiing with a
hyrdrostatic paver finisher with sensor control to the required
grade, level and alignment rolling with smooth wheeled,
vibratory and random rollers to achieve the desired
compaction as per MORTH specification clause 509 complete
in all respect as per section 500 & 2700 of MORT&H
Specifications (V Revision).

768.94 8700.91 cum 6,690,513


19 Providing and laying 25mm thick Mastic Asphalt wearing
course on top of deck slab excluding tack coat with paving
10/20 grade bitument ast 15.5% meeting the requirement given
in the table 500-29, prepared by using mastic cooker and laid
to required level and slope after cleaning the surface with
mechanical broom, air compressor including providing
antiskid surface with bitumen 10sqm and at an approximate
spacing of 10cm c/c in both directions, pressed into surface
when the temperature of surface is notless than 100degc,
protruding 1mm to 4mm over mastic surface, all complete as
per cl. 515 including cost of all materials, labour, hire charges
of machineries, transportation, loading, unloading with all lead
, lifts etc., complete as per the directions of Engineer in charge
of work, as per MORTH Technical specification Cl. 2702 and
section 500 & 2700 of MORT&H Specifications (V Revision).

1922.36 514.22 Sq m 988,516


20 Providing and applying tack coat using bituminous emulsion
complying to IS 8887 over prepared surface preheated to a
temperature between 20 - 70 deg c and applying a uniform
coat with the aid of self propelled bitumen pressure sprayer
self heating arrange and spraying bar with nozzle of constant
volume or pressure system @ 3 kg / 10 sqm on primed / black
top surface curing etc. including all material, labour,
machinery with all leads and litfs etc., complete as per section
500 & 2700 of MORT&H Specifications (V Revision).

1923.00 12.48 Sq m 23,999


21 Vibrated Reinforced Cement Concrete of grade design mix M
40 using ISS graded HBG metal including cost and
conveyance of all materials to site and cement at site including
labour charges for mixing, transporting, laying, curing
concrete working at heights, hire charges for tools and plants,
including all other incidental charges etc., complete for
CRASH BARRIER

0.00 9271.91 Sq m 0
22 Supply and fabrication of Fe-500D steel required for all RCC
items of works involved in the schedule, including cost of steel
at site and cost of fabrication labour charges for cleaning the
rods straightening,cutting,bending,tying grills, including over
laping to the required length wherever necessary and
providing to the reinforcement placing the reinforcement in
position as specified in the drawings including cost of binding
wire, provision of spacer bars, cover blocks and all other
incidental charges , etc., complete as per section 1600 of
MORT&H Specifications (V Revision).

Piles
#NAME? 5974.00 cum #NAME?
Substructure
40.60 5974.00 cum 242,526
Super structure
174.78 5974.00 cum 1,044,124
23 Supply and fabrication of Fe-240 steel required in the schedule
including cost of steel at site cost of providing and cost of
fabrication, labour charges for cleaning the rods, straightening,
cutting, bending, tying grills including over lapping to the
required length wherever necessary and providing to the
reinforcement, placing the reinforcement in position as
specified in the drawings including cost of binding wire,
provision of spacer bars, cover blocks and all other incidental
charges etc complete as per section 1600 of MORT&H
Specifications (V Revision).

Above 16 mm dia
0.40 53146.00 MT 21,258
#NAME?
Construction of Reinforced Earth Wall and
24 135178659
Approach road
ab Page 15 of 26
No. Quantity Description Rate Per Amount

25 Providing Service road 37688367


26 Providing Retaining Wall at Service road 18476983

27 Providing road furniture 5272329

28 Providing pier protection 814849

sub Total #NAME?

29 Maintenance charges Road work 5% 9871559

30 Maintenance charges bridge structure work 2.5% #NAME?

sub Total #NAME?


31 Add 12% GST #NAME?
Sub Total (A) #NAME?
32 Contingencies @ 2.8% #NAME?
Sub Total(B) #NAME?
33 Supervision charges @ 3% #NAME?
34 Agency charges @ 3% #NAME?
35 Shifting Utilities LS 2000000
Price Escalation @5% #NAME?
TOTAL #NAME?
or Lakhs #NAME?

ab Page 16 of 26
Shuttering area calculation

1 Crash barrier

Shuttering area per m run of crash barrier


Sl. Description Nos Length Breadth Depth m Quantity
No m m
1 Outter face 1 x 1 24.96 - 0.900 22.46

2 Inner face 1 x 1 24.96 - 0.500 12.48


1 x 1 24.96 - 0.305 7.61
1 x 1 24.96 - 0.150 3.74
3 Side face 1 x 2 - 0.261 0.52
Area = 0.261 m2

Total = 46.82 m2
Concrete quantity for approach slab = #NAME? m /m 3

Shuttering area per m3 of concrete = 1.88 m2/m #NAME? m2/m3 of conc

2 Approach slab

Shuttering area
Sl. Description Nos Length Breadth Depth m Quantity
No m m
(0.395 + 0.3) / 2
1 2 x 2 - 7.500 0.348 10.44

2 2 x 2 - 3.500 0.300 4.20

Total = 14.64 m2

Concrete quantity for approach slab = 25.20 m3

Shuttering area per m3 of concrete = 14.64 / 25.20 = 0.581 m2/m3 of conc

3 Base course below Approach slab and Foot path

Shuttering area
Sl. Description Nos Length Breath Depth m Quantity
No m m
1 1 x 2 - 7.700 0.150 2.31
2 X 2 3.30 0.150 1.98
2 Foot Path 2 X 2 1.50 0.300 1.80

Total = 6.09 m2

Concrete quantity for approach slab = 12.60 m3

524961248.xlsx 17
Shuttering area per m3 of concrete = 6.09 / 12.60 = 0.483 m2/m3 of conc

524961248.xlsx 18
4 Pile cap

Shuttering area
Sl. Description Nos Length Breath Depth m Quantity
No m m
1 Abutment & returns 2 x 2 - 5.100 1.800 36.72
2 x 2 - 12.300 1.800 88.56

2 Pier 6 x 2 - 5.100 1.800 110.16


6 x 2 - 5.100 1.800 110.16

Total = 345.60 m2

Concrete quantity = #NAME? m3

Shuttering area per m3 of concrete = #NAME? #NAME? m2/m3 of conc

5 Abutment Returns and Pier


Sl. Description Nos Length Breath Depth m Quantity
No m m
1 Abutment 2 x 2 - 12.000 6.953 333.74
2 x 2 - 1.000 6.953 27.81

2 Return wall Outer 2 x 2 - 2.100 #NAME? #NAME?


Inner 2 x 2 - 2.100 #NAME? #NAME?
2 x 2 - 2.100 #NAME? #NAME?
End St portion 2 x 2 - 0.550 #NAME? #NAME?
End - Slope portion 2x 2- ( 0.5+1.0)/2 #NAME? #NAME?
3 Piers
Circular Portion
6 x 1 3.770 6.553 148.23
(pd)
Total = #NAME? m2

Concrete quantity = 0.00 m3

Shuttering area per m3 of concrete = #NAME? #NAME? m2/m3 of conc

6 Caping Beam
Sl. Description Nos Length Breath Depth m Quantity
No m m
1 Piers 6 x 2 - 8.750 0.800 84.00
6 x 2 2.100 0.800 20.16
Soffit 6 x 4 0.50 3.325 0.800 31.92
bottom 6 x 2 2.100 1.800 45.36
6 x 2 3.420 1.800 73.87
Sides 6 x 2 - 1.800 0.800 17.28
Detuct pier area 6 x -1 3.14 0.900 0.900 -15.27

Total = 257.32 m2

Concrete quantity = 0.00 m3

524961248.xlsx 19
Shuttering area per m3 of concrete = 257.32 / 0.00 = #DIV/0! m2/m3 of conc

524961248.xlsx 20
7 Bed Block cum dirt wall & Pedestal
Sl. Description Nos Length Breath Depth m Quantity
No m m
1
Front 2 x 2 11.00 0.300 13.20
Front bottom 2 x 1 11.00 0.050 1.10
Sides 2 x 2 - #NAME? 0.300 #NAME?
2 x 2 - 0.300 0.300 0.36
2 Pedestal Abutment 2 x 4 - 1.600 0.300 3.84
2 x 4 - 2.000 0.300 4.80
Pier 6 x 4 - 1.800 0.3 12.96
6 x 4 - 1.600 0.300 11.52

#NAME?
Total #NAME? m2

Concrete quantity = 0.00 m3

Shuttering area per m3 of concrete = #NAME? #NAME? m2/m3 of conc

8 T- Beam & Cross Beam


Sl. Description Nos Length Breath Depth 0
No m m m
1 T-Beam

End portion 2 x 4 1.50 4.449 53.39 m2


sides of end portion 2 x 4 1.149 9.19 m2
Mid portion 1 x 4 18.96 4.759 360.92 m2

Taper portion 2 x 4 1.50 4.604 55.25 m2

2 Cross Girder

End Bottom 2 x 3 2.025 0.300 3.65


Middle Bottom ends 1 x 3 2.325 0.300 2.09
End Sides 2 x 6 2.025 1.270 30.86
Deduct 2 x 12 0.075 0.075 -0.14
Middle Sides 1 x 6 2.325 1.270 17.72
Deduct 1 x 12 0.150 0.150 -0.27

Total = 532.93 m2

Concrete quantity = 92.20 m3

Shuttering area per m3 of concrete = 532.93 / 92.20 = 5.780 m2/m3 of conc

524961248.xlsx 21
9 Deck Slab
Sl. Description Nos Length Breath Depth m Quantity
No m m
1 Deck Slab
End portion mid 1 x 2 1.50 5.175 15.53
End portion Cantilever 2 x 2 1.50 1.220 7.32
Kerb bottom 2 x 2 1.50 0.500 3.00
Sides 2 x 2 1.50 0.900 5.40

Mid portion mid 1 x 1 18.96 5.175 98.12


Mid portion Cantilever 2 x 1 1.50 1.371 4.11
Kerb bottom 2 x 1 1.50 0.500 1.50
Sides 2 x 1 1.50 0.900 2.70

Taper portion mid 1 x 2 1.50 5.175 15.53


Taper portion Cantilever 2 x 2 1.50 1.295 7.77
Kerb bottom 2 x 2 1.50 0.500 3.00
Sides 2 x 2 1.50 0.900 5.40

Total = 169.37 m2

Concrete quantity = 90.05 m3

Shuttering area per m3 of concrete = 169.37 / 90.05 = 1.881 m2/m3 of conc

10 Hand Rails MOST Drg No:202


Sl. Description Nos Length Breath Depth m Quantity
No m m
For 24.56 m Length Single sides
1 Posts
Sides 2 x 14 1.10 1.050 32.34
Railings Sides 6 x 13 1.62 0.175 22.11
Bottom 12 x 13 1.62 0.170 42.96
Total = 97.42 m2
Concrete Quantity
For 24.56 m Length Single sides
1 Posts 2 x 14 0.25 0.275 1.100 2.12
Railings 6 x 13 1.62 0.175 0.170 3.76

24.56Rm Total = 5.88 m3


For 1 Rm 0.239
Concrete quantity = 5.88 m3 per span
Steel Quantity MOST Drg No:202 = 880.00 Kg per span
Shuttering area per m3 of concrete = 97.42 / 5.88 = 16.577 m2/m3 of conc
Shuttering area per RM = 97.42 / 24.56 = 3.966 m2/RM of HR
Conc quantity Per RM = 5.88 / 24.56 = 0.239 m2/RM of HR
Steel Quantity Per RM = 880.00 / 24.56 = 35.831 Kg/RM of HR

524961248.xlsx 22
for 14 m spanSD/ 257
slab lg cg
above16 up to16 above16 up to16 above16 up to16
a 941.54 a1 400.43 a3 116.1
b 235.7 a2 182.94 b2 63.71
c 332.11 b1 278.64 e2 90.19 slab
d 143.64 c1 89.3 f2 59.54 lg
e 118.29 d1 201.22 i2 82.42 cg
f 672.61 e1 187.39 j3 257.69
g 1183.8 f1 172.45 k2 174.29
h 429.41 g1 1179.99 l1 162.34
i 332.11 g2 1170.29 n4 128.64
j 142.93 g3 1175.71 p1 127.01
k 161.22 g4 1166.07 r1 32.01
l 129.6 g5 392.24 s1 167.22
m 42.84 g6 165.82 t1 23.96
n 173.52 g7 140.62 t2 7.58
n1 185.09 h1 331.63
p 294.35 i1 484.91
q 114.78 j1 232.88
r j2 325.39
s 138.82 k1 399.42
t 122.64 n2 22.39
n3 33.25
592.28 900.42
1183.8 4711.2 5722.37 3010.61
Above up to
16+ 16- total
1183.8 4711.2 5895
5722.37 3010.61 8732.98
592.28 900.42 1492.7
7498.45 8622.23 16120.68
806.034
16926.71
slab lg cg
16+ 16- 16+ 16- 16+ 16-
1234.8 301.02 116.14
369.62 178.13 35.82 16+
443.66 715.3 35.82 slab 1814.69
182.02 68.94 90.19 lg 9995.31
86.02 252.42 33.55 cg 744.89
867.89 405.5 33.22 12554.89
1578.4 179.44 144.4
572.54 1482.39 326.68
443.66 1472.69 139.13
181.33 1478.11 128.69
193.63 1468.47 84.67
162 765.95 83.57
42.84 407.23 51.25
44.3 356.83 51.25
236.29 319.28 180.42
328.55 394.96 131.57
151.92 184.03 33.7
1814.69 5304.78 768.54 744.89 955.18
457.63
407.23
29.38
74.82
9995.31 2172.98
16- total
5304.78 7119.47
2172.98 12168.29
955.18 1700.07
8432.94 20987.83