Professional Documents
Culture Documents
Detailed Estimate: Description Quantity SL No
Detailed Estimate: Description Quantity SL No
Detailed Estimate: Description Quantity SL No
(CUDDALORE-VIRUDACHALAM-SALEM ROAD)
Detailed Estimate
Sl
No Description Quantity
1 Earthwork excavation in all classes of soils except rock requiring blasting and depositing on bank,
with all leads and lifts as per SS20B, including cost of all labour, equipments and all other incidental
charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring,
bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and
obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all
surplus materials etc., complete as per relevant standard specification, for Footing under Abutment
and Pier
Pier
1864.60
or 1865 m3
Sl
No Description Quantity
3 Cement Concrete M10 ( mix 1:3:6 ) using 40 mm ISS HBGS Jelly including cost and conveyance of
all materials o site and cost of cement at site including soft water, labour charges for mixing,
transporting, laying and curing concrete, Tools and Plants and incidental charges such as baling out
water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant
standard specification, for LEVELLING COURSE BELOW FOOTING
or 45.48 m3
4 Vibrated reinforced cement concrete M35 (Design mix) using ISS Graded HBGS Jelly including
cost and conveyance of all materials to site and cost of cement at site, but, excluding cost and
fabrication of steel, but, excluding cost and fabrication of steel, but, including labour charges for
mixing, transporting, laying and curing concrete, working at heights, soft water, hire charges for tools
and plants, including all other incidental charges, etc., complete, for FOOTING UNDER
ABUTMENT & PIER
A=1/3*(a1^2+(a1*a2)^0.5+a2^2)
Pier
A=1/3*(a1^2+(a1*a2)^0.5+a2^2)
5 Trapezoidal 27.21 1.00 136.07
or 391 m3
5 Vibrated reinforced cement concrete M35 (Design mix) using ISS Graded HBGS Jelly including
cost and conveyance of all materials to site and cost of cement at site, but, excluding cost and
fabrication of steel, but, excluding cost and fabrication of steel, but, including labour charges for
mixing, transporting, laying and curing concrete, working at heights, soft water, hire charges for tools
and plants, including all other incidental charges, etc., complete, for SUB STRUCTURE OF
ABUTMENTS , WINGS AND COLUMN PIER.( Above Sill )
Abutments PI/4
Sl
No Description Quantity
Piers PI/4 D
or 118.76 m3
6 Vibrated reinforced cement concrete M35 (Design mix) using ISS Graded HBGS Jelly including
cost and conveyance of all materials to site and cost of cement at site, but, excluding cost and
fabrication of steel, but, excluding cost and fabrication of steel, but, including labour charges for
mixing, transporting, laying and curing concrete, working at heights, soft water, hire charges for tools
and plants, including all other incidental charges, etc., complete, for CAPPING BEAM ( Above
Sill )
ABUTMENT
2 A=1/3*(a1^2+(a1*a2)^0.5+a2^2)
PIER
1x 5 Rectangular 6.10 1.8 0.8 43.92
5 A=1/3*(a1^2+(a1*a2)^0.5+a2^2)
or 103 m3
8 Vibrated reinforced cement concrete M 35 (Design mix) using 20 mm ISS Graded HBGS Jelly
including cost and conveyance of all materials to site and cost of cement at site but excluding cost
and fabrication of steel, including labour charges for steel, including labour charges for mixing,
transporting, laying, curing concrete, soft water, hire charges for tools and plants, including all other
incidental charges, etc., complete for BED BLOCK CUM DIRT WALL, PEDESTAL OVER
ABUTMENTS & PIERS.
Pedestal Abutment
2x2 1 0.8 0.3 0.96
4
Pedestal Pier
5x4 0.9 0.8 0.3 4.32
20
Dirt wall
1x2 2.35 12 0.300 16.89
2
Sl
No Description Quantity
or 22.17 m3
9 Supply and fixing Elastomeric bearing of size 500 x 400 x 80 at girder locations over abutment
including cost and conveyance to worksite, labour for fixing the same in correct
position and all other incidental charges etc, complete.
Over abutment
1x2x2 60 40 8 76800
Over Pier
5 x4 60 40 8 384000
20
460800
or 460800 cm3
10 Vibrated Reinforced Cement Concrete of grade M 30(Design mix) using 20mm ISS Graded HBGS
Jelly including cost and conveyance of all materials to site and cost and fabrication of steel, including
cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete,
working at depths, Tools and Plants and incidental chargaes such as balingout water, maintaining of
protective bunds, cofferdams, shoring, strutting etc., complete, as per relevant standard specification,
for DECK SLAB AND KERBS FOOT PATH (PROVIDED WITH INNER CRASH
BARRIER.)
1 (0.35+0.2)/2
1 x2 1.875 27.40 0.275 28.26
End portion
2 (0.337+0.2)/2
Varying portion
2 (1.875+1.725)/2 (0.275+0.269)/2
Drip portion
2
90.05
Sl
No Description Quantity
540.27
or 541 m3
11 Vibrated Reinforced Cement Concrete of grade M 30 (Design mix) using 20mm ISS Graded HBGS
Jelly including cost and conveyance of all materials to site and cost and fabrication of steel, including
cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete,
working at depths, Tools and Plants and incidental chargaes such as balingout water, maintaining of
protective bunds, cofferdams, shoring, strutting etc., complete, as per relevant standard specification,
for T-BEAM AND CROSS BEAMS (WITH FOOT PATH).
Haunches Bottom
8 top
6
End Portion
Top
Haunches Bottom
12
Sl
No Description Quantity
Cross Beam
at end (7.95+0.6)
at mid (7.95-1.8)
1
per span 92.20
or 553 m3
12 Providing and fixing of Galvanized steel drainage spouts 100mm dia as per GOI drawing with
grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting at
least 300mm beyond the bottom of deck slab as shown in the drawing, including cost and conveyance
of Galvanised Steel Pipes and flats and fixing them in position, etc., complete.
1x 6 6 Per span 36
6 36 Nos
13 Supplying and installation of Copper Strip Expansion Joint System conforming to Section 2607
and in accordance with section 2602 of "Specification for Road Bridge Works - IV th Revision:
2001" published by Ministry of Surface Transport (Road wing) in the 40mm wide expansion gap
provided in between decks over piers and in between deck and dirt wall over abutment with fatigue
tested structural steel section at the nosing and anchorage assembly, including cost and conveyance
of all materials, cost of testing as per Section 2608 of the MOST specifications, including labour,
equipment and other incidental charges for fixing the joints complete in all respects, as per section
2609 and 2610 of the above said specifications
1x2 11 22
1x 5 11 55
5 77 RM
Sl
No Description Quantity
16 Vibrated Cement Concrete M15 (Nominal mix 1:2:4) using 40 mm ISS HBGS Jelly, including cost
and conveyance of all materials to site and cost of cement at site, including all labour charges for
mixing concrete, laying, hire charges for tools and plants, compacting, curing with all leads for soft
water, including all other incidental charges, form work etc., complete, for BASE COURSE
BELOW APPROACH SLABS
12.60
or 13 m3
17 Vibrated reinforced cement concrete M 30 (Design mix) using 20mm ISS Graded HBGS Jelly,
including cost and conveyance of all materials to site and cost of cement at site, but excluding cost
and fabrication of steel, but, including labour charges for mixing, laying, curing concrete, working at
heights, soft water, hire charges for tools and plants, including all other incidental charges, etc.,
complete, for APPROACH SLABS
18 Providing and laying bituminous concrete of varying thick (40mm-min) using aggregates of specified
grading, premixed with bituminous binder @ 5.4 to 5.6 percent of mix and filler, transporting the hot
mix to work site layiing with a hyrdrostatic paver finisher with sensor control to the required grade,
level and alignment rolling with smooth wheeled, vibratory and random rollers to achieve the desired
compaction as per MORTH specification clause 509 complete in all respect as per section 500 &
2700 of MORT&H Specifications (V Revision).
6 768.94
or 769 m3
*
Sl
No Description Quantity
19 Providing and laying 25mm thick Mastic Asphalt wearing course on top of deck slab excluding tack
coat with paving 10/20 grade bitument ast 15.5% meeting the requirement given in the table 500-29,
prepared by using mastic cooker and laid to required level and slope after cleaning the surface with
mechanical broom, air compressor including providing antiskid surface with bitumen 10sqm and at
an approximate spacing of 10cm c/c in both directions, pressed into surface when the temperature of
surface is notless than 100degc, protruding 1mm to 4mm over mastic surface, all complete as per cl.
515 including cost of all materials, labour, hire charges of machineries, transportation, loading,
unloading with all lead , lifts etc., complete as per the directions of Engineer in charge of work, as per
MORTH Technical specification Cl. 2702 and section 500 & 2700 of MORT&H Specifications (V
Revision).
6 1922.36
or 1923 m2
*
20 Providing and applying tack coat using bituminous emulsion complying to IS 8887 over prepared
surface preheated to a temperature between 20 - 70 deg c and applying a uniform coat with the aid of
self propelled bitumen pressure sprayer self heating arrange and spraying bar with nozzle of constant
volume or pressure system @ 3 kg / 10 sqm on primed / black top surface curing etc. including all
material, labour, machinery with all leads and litfs etc., complete as per section 500 & 2700 of
MORT&H Specifications (V Revision).
6 1922.36
or 1923 m2
*
21 Vibrated Reinforced Cement Concrete of grade design mix M 40 using ISS graded HBG metal
including cost and conveyance of all materials to site and cement at site including labour charges for
mixing, transporting, laying, curing concrete working at heights, hire charges for tools and plants,
including all other incidental charges etc., complete for CRASH BARRIER
or 91 m3
Sl
No Description Quantity
22 Supply and fabrication of Fe-500D steel required for all RCC items of works involved in the
schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods
straightening,cutting,bending,tying grills, including over laping to the required length wherever
necessary and providing to the reinforcement placing the reinforcement in position as specified in the
drawings including cost of binding wire, provision of spacer bars, cover blocks and all other
incidental charges , etc., complete as per section 1600 of MORT&H Specifications (V Revision).
1
Super structure
2
For crash barrier
For Girders
Sub structure
Sl
No Description Quantity
5 x4 0.05 1 1.000
20
5 3.407 17.035
Foundation
245.69
or 245.7 MT
23 Supply and fabrication of Fe-240 steel required in the schedule including cost of steel at site cost of
providing and cost of fabrication, labour charges for cleaning the rods, straightening, cutting,
bending, tying grills including over lapping to the required length wherever necessary and providing
to the reinforcement, placing the reinforcement in position as specified in the drawings including cost
of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc complete
as per section 1600 of MORT&H Specifications (V Revision).
For deck and bed block As per MOST Drg No. SD/256 Sheet - 1 and Sheet 2
1 0.303 0.303
1 0.30
or 0.4 MT
NAME OF WORK : CONSTRUCTION OF GRADE SEPERATOR AT KM 51/2 OF NH532 (CUDDALORE-
VIRUDACHALAM-SALEM ROAD)
Abstract Estimate
Estimate Amount Rs. #NAME?
ab Page 12 of 26
No. Quantity Description Rate Per Amount
7 #NAME?
ab Page 13 of 26
No. Quantity Description Rate Per Amount
8 Vibrated reinforced cement concrete M 35 (Design mix) using
20 mm ISS Graded HBGS Jelly including cost and
conveyance of all materials to site and cost of cement at site
but excluding cost and fabrication of steel, including labour
charges for steel, including labour charges for mixing,
transporting, laying, curing concrete, soft water, hire charges
for tools and plants, including all other incidental charges, etc.,
complete for BED BLOCK CUM DIRT WALL, PEDESTAL
OVER ABUTMENTS & PIERS.
cub
541 9271.91 cm 5,016,103
11 Vibrated Reinforced Cement Concrete of grade M 30 (Design
mix) using 20mm ISS Graded HBGS Jelly including cost and
conveyance of all materials to site and cost and fabrication of
steel, including cost of formwork, soft water, labour charges
for mixing, transporting, laying and curing concrete, working
at depths, Tools and Plants and incidental chargaes such as
balingout water, maintaining of protective bunds, cofferdams,
shoring, strutting etc., complete, as per relevant standard
specification, for T-BEAM AND CROSS BEAMS (WITH
FOOT PATH).
ab Page 14 of 26
No. Quantity Description Rate Per Amount
17 Vibrated reinforced cement concrete M 30 (Design mix) using
20mm ISS Graded HBGS Jelly, including cost and
conveyance of all materials to site and cost of cement at site,
but excluding cost and fabrication of steel, but, including
labour charges for mixing, laying, curing concrete, working at
heights, soft water, hire charges for tools and plants, including
all other incidental charges, etc., complete, for APPROACH
SLABS
0.00 9271.91 Sq m 0
22 Supply and fabrication of Fe-500D steel required for all RCC
items of works involved in the schedule, including cost of steel
at site and cost of fabrication labour charges for cleaning the
rods straightening,cutting,bending,tying grills, including over
laping to the required length wherever necessary and
providing to the reinforcement placing the reinforcement in
position as specified in the drawings including cost of binding
wire, provision of spacer bars, cover blocks and all other
incidental charges , etc., complete as per section 1600 of
MORT&H Specifications (V Revision).
Piles
#NAME? 5974.00 cum #NAME?
Substructure
40.60 5974.00 cum 242,526
Super structure
174.78 5974.00 cum 1,044,124
23 Supply and fabrication of Fe-240 steel required in the schedule
including cost of steel at site cost of providing and cost of
fabrication, labour charges for cleaning the rods, straightening,
cutting, bending, tying grills including over lapping to the
required length wherever necessary and providing to the
reinforcement, placing the reinforcement in position as
specified in the drawings including cost of binding wire,
provision of spacer bars, cover blocks and all other incidental
charges etc complete as per section 1600 of MORT&H
Specifications (V Revision).
Above 16 mm dia
0.40 53146.00 MT 21,258
#NAME?
Construction of Reinforced Earth Wall and
24 135178659
Approach road
ab Page 15 of 26
No. Quantity Description Rate Per Amount
ab Page 16 of 26
Shuttering area calculation
1 Crash barrier
Total = 46.82 m2
Concrete quantity for approach slab = #NAME? m /m 3
2 Approach slab
Shuttering area
Sl. Description Nos Length Breadth Depth m Quantity
No m m
(0.395 + 0.3) / 2
1 2 x 2 - 7.500 0.348 10.44
Total = 14.64 m2
Shuttering area
Sl. Description Nos Length Breath Depth m Quantity
No m m
1 1 x 2 - 7.700 0.150 2.31
2 X 2 3.30 0.150 1.98
2 Foot Path 2 X 2 1.50 0.300 1.80
Total = 6.09 m2
524961248.xlsx 17
Shuttering area per m3 of concrete = 6.09 / 12.60 = 0.483 m2/m3 of conc
524961248.xlsx 18
4 Pile cap
Shuttering area
Sl. Description Nos Length Breath Depth m Quantity
No m m
1 Abutment & returns 2 x 2 - 5.100 1.800 36.72
2 x 2 - 12.300 1.800 88.56
Total = 345.60 m2
6 Caping Beam
Sl. Description Nos Length Breath Depth m Quantity
No m m
1 Piers 6 x 2 - 8.750 0.800 84.00
6 x 2 2.100 0.800 20.16
Soffit 6 x 4 0.50 3.325 0.800 31.92
bottom 6 x 2 2.100 1.800 45.36
6 x 2 3.420 1.800 73.87
Sides 6 x 2 - 1.800 0.800 17.28
Detuct pier area 6 x -1 3.14 0.900 0.900 -15.27
Total = 257.32 m2
524961248.xlsx 19
Shuttering area per m3 of concrete = 257.32 / 0.00 = #DIV/0! m2/m3 of conc
524961248.xlsx 20
7 Bed Block cum dirt wall & Pedestal
Sl. Description Nos Length Breath Depth m Quantity
No m m
1
Front 2 x 2 11.00 0.300 13.20
Front bottom 2 x 1 11.00 0.050 1.10
Sides 2 x 2 - #NAME? 0.300 #NAME?
2 x 2 - 0.300 0.300 0.36
2 Pedestal Abutment 2 x 4 - 1.600 0.300 3.84
2 x 4 - 2.000 0.300 4.80
Pier 6 x 4 - 1.800 0.3 12.96
6 x 4 - 1.600 0.300 11.52
#NAME?
Total #NAME? m2
2 Cross Girder
Total = 532.93 m2
524961248.xlsx 21
9 Deck Slab
Sl. Description Nos Length Breath Depth m Quantity
No m m
1 Deck Slab
End portion mid 1 x 2 1.50 5.175 15.53
End portion Cantilever 2 x 2 1.50 1.220 7.32
Kerb bottom 2 x 2 1.50 0.500 3.00
Sides 2 x 2 1.50 0.900 5.40
Total = 169.37 m2
524961248.xlsx 22
for 14 m spanSD/ 257
slab lg cg
above16 up to16 above16 up to16 above16 up to16
a 941.54 a1 400.43 a3 116.1
b 235.7 a2 182.94 b2 63.71
c 332.11 b1 278.64 e2 90.19 slab
d 143.64 c1 89.3 f2 59.54 lg
e 118.29 d1 201.22 i2 82.42 cg
f 672.61 e1 187.39 j3 257.69
g 1183.8 f1 172.45 k2 174.29
h 429.41 g1 1179.99 l1 162.34
i 332.11 g2 1170.29 n4 128.64
j 142.93 g3 1175.71 p1 127.01
k 161.22 g4 1166.07 r1 32.01
l 129.6 g5 392.24 s1 167.22
m 42.84 g6 165.82 t1 23.96
n 173.52 g7 140.62 t2 7.58
n1 185.09 h1 331.63
p 294.35 i1 484.91
q 114.78 j1 232.88
r j2 325.39
s 138.82 k1 399.42
t 122.64 n2 22.39
n3 33.25
592.28 900.42
1183.8 4711.2 5722.37 3010.61
Above up to
16+ 16- total
1183.8 4711.2 5895
5722.37 3010.61 8732.98
592.28 900.42 1492.7
7498.45 8622.23 16120.68
806.034
16926.71
slab lg cg
16+ 16- 16+ 16- 16+ 16-
1234.8 301.02 116.14
369.62 178.13 35.82 16+
443.66 715.3 35.82 slab 1814.69
182.02 68.94 90.19 lg 9995.31
86.02 252.42 33.55 cg 744.89
867.89 405.5 33.22 12554.89
1578.4 179.44 144.4
572.54 1482.39 326.68
443.66 1472.69 139.13
181.33 1478.11 128.69
193.63 1468.47 84.67
162 765.95 83.57
42.84 407.23 51.25
44.3 356.83 51.25
236.29 319.28 180.42
328.55 394.96 131.57
151.92 184.03 33.7
1814.69 5304.78 768.54 744.89 955.18
457.63
407.23
29.38
74.82
9995.31 2172.98
16- total
5304.78 7119.47
2172.98 12168.29
955.18 1700.07
8432.94 20987.83