Approved: Code 1 Code 2 Code 3 Code 4

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

As per title of this package (Security Defense), the design in this package should

covered the previous package (outside fencing) in term of security. Assuming the
intruder has successfully passed the outside fence, the design in this Security
Defense work package must be able to block the intruder or at least make it more
difficult to infiltrate further or make the smuggling effort easy to monitor by Plant
security.

Add No.6: Elevation


+0.00 correspond to
MSL of Al-Faw station,
formerly known As
FAO 1979 height

Approval Code
 Remarks
Here

Code 1 Approved

With Minor Comments: Revise and


Code 2 Resubmit, Works may proceed

√ With Major Comments: Revise and


Code 3 Resubmit, Works may NOT Proceed

Code 4 Reference and information only.

Christian Berry/ Senior 2021/05/15


Civil/Structural Engineer

Approval Authority Signature Date

These comments do not relieve the Contractor/ Vendor and/ or their


Sub‐contractors of their responsibilities to meet the requirements of
the Contract.