Site Memorandum

Design and Build of Document Store and


Project Modification of Warehouse & Workshop at Asset Project ID BA 2019 C 023 I
Affairs’ Salwa Road
Contractor Al Muntasser Contracting and Trading Site Location Zone 09
Date 8-May-21 S.M. No. R000007.83-SM-06
Subject External Grading Level at Zone 9

With reference to the aforesaid subject, the grade level was


stablished/staked on ground without reference or shop drawings approval and
no FDT taken during backifilling.

Please find the attached pictures for your refence and further actions ASAP.

Attachment: Photos

Staking level

Backfilling commenced without proper compaction and testing.

26-Nov-17
EGEC-QA-CS-D-01 1/1 Rev. 00
QC Civil Inspector Alvin Badecao
Received by
Contractor:
Project Manager Eng. Emad Atya

26-Nov-17
EGEC-QA-CS-D-01 1/1 Rev. 00