Professional Documents
Culture Documents
All India Council For Technical Education: INSTITUTION DETAILS (Information Uploaded by Institute For Approval 2020-21)
All India Council For Technical Education: INSTITUTION DETAILS (Information Uploaded by Institute For Approval 2020-21)
Overall Deficiency No
Organization Website
PRINCIPAL / DIRECTOR
PERSONAL DETAILS
Surname/Family name C.J First Name Unny
Father's Name Ouseph C I Mother's Name
EDUCATIONAL DETAILS
Doctorate Degree Yes Master's Degree MA ECONOMICS
Bachelor's Degree BA Other Qualifications NA
HISTRY,ECONOMICS,POLITIC
S
International Certification (If NA Field of Specialization
Any)
1-7005166132 Page 1 of 20
DETAILS RELATED TO PROFFESSION
Date of joining the Institution 15/04/2013 Appointment Type Regular
Exact Designation Director
WORK EXPERIENCE DETAILS
Teaching Experience (Years) 33 Research Experience (Years) 2
Industry Experience (Years)
OTHER DETAILS
Research Projects Guided - UG Research Projects Guided -
PG
Research Projects Guided - Number of Books Published 3
PhD
Papers Published - National 6 Papers Published -
International
INFRASTRUCTURE DETAILS
LAND DETAILS
Location: Urban Land in Hilly Area: No
Total Area in Acres: 1.75 FSI: NA
Built Up Area (Sqm): NA Number of Pieces: 1
Land Piece Area 1 in 1.75 Land Piece Area 2 in NA
Acres: Acres:
Land Piece Area 3 in NA Max distance in farthest NA
Acres: land pieces (Km):
Land registered with: 3238/2001, Sub Re Date of Registration: 12/09/2001
Land use certificate Village Office, Angamaly Land use certificate 17/01/2011
issued by: issued Date:
Ownership Details: Gift Deed Is the Land Mortgaged: No
Mortgaged Purpose: N
Land (North/South): North Latitude Degree: 10
Latitude Minute: 10 Latitude Second: 35
Longitude (East/West) East Longitude Degree: 76
Longitude Minute: 22 Longitude Second: 30
BUILDING DETAILS
Building Status: Available Total built up Area 3815
(ready) Sqm:
Activities in the building NO Whether Access Yes
other than courses &Circulation Area and
approved by AICTE: Toilet Area are
maintained as per
National Building Code
(NBC) Norms?
Total Carpet Instructional 1701 Total Carpet 828
Area (ready) -Sqm: Administrative Area
(ready) -Sqm:
Access and Circulation 487 Total built up Area -Sqm 0
1-7005166132 Page 2 of 20
Area (Sqm): Planned:
Total Carpet Amenities 799
Area (ready) -Sqm:
LABORATORY DETAILS
1-7005166132 Page 3 of 20
Modem
Building Number NA
ADMINISTRATIVE AREA
1-7005166132 Page 4 of 20
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: G3 Room Type: Principal Directors Office
No.
8 Area in Sqm: 49.14 Building Name: Dist Main Block
Building Number: 529 A,B,C,G Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: G4 Room Type: Central Store
No.
9 Area in Sqm: 10 Building Name: Dist Main Block
Building Number: 529 A,B,F,G Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: G5 Room Type: Office All Inclusive
No.
10 Area in Sqm: 42.3 Building Name: Dist Main Block
Building Number: 529-A,B,F,G Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: G6 Room Type: Exam Control Office
No.
11 Area in Sqm: 30 Building Name: Dist Main Block
Building Number: 529-A,B,F,G Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: G7 Room Type: Housekeeping
No.
12 Area in Sqm: 10.81 Building Name: Dist Main Block
Building Number: 529A,BF,G Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: G8 Room Type: Office All Inclusive
No.
13 Area in Sqm: 76.8 Building Name: Dist Main Block
Building Number: 529-A,B,F,G Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: GATE Room Type: Security
No.
14 Area in Sqm: 10 Building Name: Security Room
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
1-7005166132 Page 5 of 20
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: HG2 Room Type: Office All Inclusive
No.
15 Area in Sqm: 14.23 Building Name: Dist Main Block
Building Number: 529-A,B,F,G Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: HG4 Room Type: Office All Inclusive
No.
16 Area in Sqm: 14.23 Building Name: Hostel Block
Building Number: 529-C,D Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: HG5 Room Type: Office All Inclusive
No.
17 Area in Sqm: 14.23 Building Name: Hostel Block
Building Number: 529-C,D Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: HG7 Room Type: Pantry for Staff
No.
18 Area in Sqm: 14.23 Building Name: Hostel Block
Building Number: 529-C,D Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: HGI Room Type: Office All Inclusive
No.
19 Area in Sqm: 14.23 Building Name: Hostelblock
Building Number: 529-C,D Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: S1 Room Type: Central Store
No.
20 Area in Sqm: 6 Building Name: Dist Main Block
Building Number: 529-A,B,F,G Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: S5 Room Type: Office All Inclusive
No.
21 Area in Sqm: 49.95 Building Name: Dist Main Block
Building Number: 529-A,B,F,G Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
1-7005166132 Page 6 of 20
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: S6 Room Type: Cabin for Head of Dept
No.
22 Area in Sqm: 14 Building Name: Dist Main Block
Building Number: 529-A,B,F,G Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: T1 Room Type: Central Store
No.
23 Area in Sqm: 6 Building Name: Dist Main Block
Building Number: 529A,B,F,G Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: T6 Room Type: Placement Office
No.
24 Area in Sqm: 37.87 Building Name: Dist Main Block
Building Number: 529A,B,F,G Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
AMENITIES AREA
1-7005166132 Page 7 of 20
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: G12 Room Type: Toilet
No.
5 Area in Sqm: 10 Building Name: DIST MAIN BLOCK
Building Number: 529-A,B,F,G Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: G7-1 Room Type: Cafeteria
No.
6 Area in Sqm: 120 Building Name: DIST MAIN BLOCK
Building Number: 529-A,B,F,G Readiness of Flooring Not Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Not Ready
furniture/fixtures
Sr. Room ID/ Name: HF1 Room Type: Boys Common Room
No.
7 Area in Sqm: 31.82 Building Name: HOSTEL BLOCK
Building Number: 529-C,D Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: HF2 Room Type: Boys Common Room
No.
8 Area in Sqm: 14.23 Building Name: HOSTEL BLOCK
Building Number: 529-C,D Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: HF5 Room Type: Boys Common Room
No.
9 Area in Sqm: 21.02 Building Name: HOSTEL BLOCK
Building Number: 529-C,D Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: HF6 Room Type: Boys Common Room
No.
10 Area in Sqm: 21.02 Building Name: HOSTEL BLOCK
Building Number: 529-C,D Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: HF7 Room Type: Boys Common Room
No.
11 Area in Sqm: 14.23 Building Name: HOTEL BLOCK
Building Number: 529.C-D Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: HF8 Room Type: First aid cum Sick Room
No.
1-7005166132 Page 8 of 20
12 Area in Sqm: 14.23 Building Name: HOSTEL BLOCK
Building Number: 529-C,D Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: HG10 Room Type: Cafeteria
No.
13 Area in Sqm: 35.5 Building Name: HOSTEL BLOCK
Building Number: 529-C Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: HG11 Room Type: Girls Common Room
No.
14 Area in Sqm: 24.23 Building Name: HOSTEL BLOCK
Building Number: 529-C,D Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: HG12 Room Type: Girls Common Room
No.
15 Area in Sqm: 22.23 Building Name: HOSTEL BLOCK
Building Number: 529-C,D Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: HG13 Room Type: Others
No.
16 Area in Sqm: 37.83 Building Name: HOSTEL BLOCK
Building Number: 529-A,B,F,G Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: HG8 Room Type: Girls Common Room
No.
17 Area in Sqm: 64.27 Building Name: HOSTEL BLOCK
Building Number: 529-C,D Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: HG9 Room Type: Cafeteria
No.
18 Area in Sqm: 35.5 Building Name: HOTEL BLOCK
Building Number: 529-C,D Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: HOANN Room Type: Boys' Hostel
No.
19 Area in Sqm: 620.01 Building Name: HOSTEL ANNEX BLOCK
Building Number: 542-A Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
1-7005166132 Page 9 of 20
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: HOGIR Room Type: Girls' Hostel
No.
20 Area in Sqm: 3480.01 Building Name: GIRLS HOSTEL
Building Number: 323 H Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: HOSTEL Room Type: Boys' Hostel
No.
21 Area in Sqm: 1182.09 Building Name: HOSTEL BLOCK
Building Number: 529-E,E1 Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: S11 Room Type: Toilet
No.
22 Area in Sqm: 10 Building Name: DIST MAIN BLOCK
Building Number: 529-A,B,F,G Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: S12 Room Type: Toilet
No.
23 Area in Sqm: 10 Building Name: DIST MAIN BLOCK
Building Number: 529-A,B,F,G Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
CIRCULATION AREA
INSTRUCTIONAL AREA
1-7005166132 Page 10 of 20
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Not Available
furniture/fixtures
Sr. Programme MCA Level POST GRADUATE
No.
2 Room Type Computer Laboratory Room ID/ Name F5
Area of Room in 48.6 Building Name DIST MAIN BLOCK
Sqm
Building Number 529-A,B,F,G Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Not Available
furniture/fixtures
Sr. Programme MCA Level POST GRADUATE
No.
3 Room Type Computer Laboratory Room ID/ Name F6
Area of Room in 23.5 Building Name DIST MAIN BLOCK
Sqm
Building Number 529-A,B,F,G Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Not Available
furniture/fixtures
Sr. Programme MCA Level POST GRADUATE
No.
4 Room Type Classroom Room ID/ Name F7
Area of Room in 73.9 Building Name DIST MAIN BLOCK
Sqm
Building Number 529-A,FB,F,G Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Not Available
furniture/fixtures
Sr. Programme MCA Level POST GRADUATE
No.
5 Room Type Seminar Hall Room ID/ Name F8
Area of Room in 155.36 Building Name DIST MAIN BLOCK
Sqm
Building Number 529-A,B,F,G Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Not Available
furniture/fixtures
Sr. Programme MCA Level POST GRADUATE
No.
6 Room Type Classroom Room ID/ Name FI
Area of Room in 150.4 Building Name DIST MAIN BLOCK
Sqm
Building Number 529-A,B,F,G Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Not Available
furniture/fixtures
Sr. Programme MANAGEMENT Level POST GRADUATE
No.
7 Room Type Seminar Hall Room ID/ Name G9
Area of Room in 51.2 Building Name DIST MAIN BLOCK
Sqm
Building Number 529-A,B,F,G Readiness of Flooring Ready
1-7005166132 Page 11 of 20
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Available
furniture/fixtures
Sr. Programme MANAGEMENT Level POST GRADUATE
No.
8 Room Type Seminar Hall Room ID/ Name S2
Area of Room in 77.9 Building Name DIST MAIN BLOCK
Sqm
Building Number 529-A,B,F,G Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Available
furniture/fixtures
Sr. Programme MCA Level POST GRADUATE
No.
9 Room Type Computer Laboratory Room ID/ Name S2/1
Area of Room in 71.9 Building Name DIST MAIN BLOCK
Sqm
Building Number 529-A,B,F,G Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Not Available
furniture/fixtures
Sr. Programme MCA Level POST GRADUATE
No.
10 Room Type Tutorial Room Room ID/ Name S3
Area of Room in 46.71 Building Name DIST MAIN BLOCK
Sqm
Building Number 529-A,B,F,G Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Not Available
furniture/fixtures
Sr. Programme MANAGEMENT Level POST GRADUATE
No.
11 Room Type Seminar Hall Room ID/ Name S4
Area of Room in 62.96 Building Name DIST MAIN BLOCK
Sqm
Building Number 529-A,B,F,G Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Not Available
furniture/fixtures
Sr. Programme MANAGEMENT Level POST GRADUATE
No.
12 Room Type Classroom Room ID/ Name S7
Area of Room in 73.67 Building Name DIST MAIN BLOCK
Sqm
Building Number 529-A,B,F,G Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Not Available
furniture/fixtures
Sr. Programme MANAGEMENT Level POST GRADUATE
No.
13 Room Type Seminar Hall Room ID/ Name S8
Area of Room in 76.84 Building Name DIST MAIN BLOCK
Sqm
1-7005166132 Page 12 of 20
Building Number 529-A,B,,F,G Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Not Available
furniture/fixtures
Sr. Programme MANAGEMENT Level POST GRADUATE
No.
14 Room Type Seminar Hall Room ID/ Name S9
Area of Room in 76.84 Building Name DIST MAIN BLOCK
Sqm
Building Number 529-A,B,F,G Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Not Available
furniture/fixtures
Sr. Programme MCA Level POST GRADUATE
No.
15 Room Type Computer Laboratory Room ID/ Name T 10
Area of Room in 77 Building Name dist main block
Sqm
Building Number 529 a,b,f,g Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Not Available
furniture/fixtures
Sr. Programme MANAGEMENT Level POST GRADUATE
No.
16 Room Type Classroom Room ID/ Name T2
Area of Room in 78 Building Name DIST MAIN BLOCK
Sqm
Building Number 529-A,B,F,G Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Not Available
furniture/fixtures
Sr. Programme MCA Level POST GRADUATE
No.
17 Room Type Classroom Room ID/ Name T4
Area of Room in 57.4 Building Name DIST MAIN BLOCK
Sqm
Building Number 529-A,B,F,G Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Not Available
furniture/fixtures
Sr. Programme MANAGEMENT Level POST GRADUATE
No.
18 Room Type Tutorial Room Room ID/ Name T5
Area of Room in 46.9 Building Name DIST MAIN BLOCK
Sqm
Building Number 529-A,B,F,G Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Not Available
furniture/fixtures
Sr. Programme MCA Level POST GRADUATE
No.
19 Room Type Computer Laboratory Room ID/ Name T7
Area of Room in 37.61 Building Name DIST MAIN BLOCK
1-7005166132 Page 13 of 20
Sqm
Building Number 529A,B,F,G Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Not Available
furniture/fixtures
Sr. Programme MCA Level POST GRADUATE
No.
20 Room Type Tutorial Room Room ID/ Name T8
Area of Room in 48.6 Building Name DIST MAIN BLOCK
Sqm
Building Number 529-A,B,F,G Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Not Available
furniture/fixtures
Sr. Programme MCA Level POST GRADUATE
No.
21 Room Type Classroom Room ID/ Name T9
Area of Room in 77 Building Name DIST MAIN BLOCK
Sqm
Building Number 529-A,B,F,G Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Not Available
furniture/fixtures
HOSTEL FACILITIES
1-7005166132 Page 14 of 20
Sr. Whether Hostel Yes Girl's Hostel (Y/N): Yes
No. facility
Available(Y/N) ?
1 No. of Rooms: 67 Hostel Capacity: 260
Boy's Hostel: Y No. of Rooms for Boys? 75
Total Capacity: 200 Apply for Site Change No
Location Within the Campus Hostel Facility Y
COMPUTATIONAL FACILITIES
1-7005166132 Page 15 of 20
No. Reference Number:
3 Date of Appointment: 25/01/2019 Name of the Muhammed Riaz
Committee Member:
Profession: CI OF POLICE Associated With: Police
Sr. Committee Type: Anti-Ragging Squad Appointment Order DIST/CIR/09/19
No. Reference Number:
4 Date of Appointment: 25/01/2019 Name of the DR.VINAY RAJ R
Committee Member:
Profession: ASSOCIATE PROFESSOR Associated With: Managment
Sr. Committee Type: Anti-Ragging Committee Appointment Order DIST/CIR/10/19
No. Reference Number:
5 Date of Appointment: 25/01/2019 Name of the REENA JOSE
Committee Member:
Profession: Representative of Faculty Associated With: Depaul Institute Of Science& Technology
Sr. Committee Type: Anti-Ragging Committee Appointment Order DIST/CIR/10/19
No. Reference Number:
6 Date of Appointment: 25/01/2019 Name of the Dr. K.P Mani
Committee Member:
Profession: HOD,MBA Associated With: De Paul Institute Of Science& Technology
Sr. Committee Type: Anti-Ragging Committee Appointment Order DIST/CIR/10/19
No. Reference Number:
7 Date of Appointment: 25/01/2019 Name of the Mr. Denny P Francis
Committee Member:
Profession: Representative of Faculty Associated With: De Apul Institute Of Science& Technology
Sr. Committee Type: Anti-Ragging Committee Appointment Order DIST/CIR/10/19
No. Reference Number:
8 Date of Appointment: 25/01/2019 Name of the Fr. Varghese Srambickal VC
Committee Member:
Profession: HOSTEL DIRECTOR Associated With: De Paul Institute Of Science&Technology
Sr. Committee Type: Anti-Ragging Committee Appointment Order DIST/CIR/10/19
No. Reference Number:
9 Date of Appointment: 25/01/2019 Name of the Mr. Tinu Thomas
Committee Member:
Profession: Student Representative Associated With: De Paul Institute Of Science &
Technology
Sr. Committee Type: Anti-Ragging Committee Appointment Order DIST/CIR/10/19
No. Reference Number:
10 Date of Appointment: 25/01/2019 Name of the Ms. Jasna K A
Committee Member:
Profession: Student Representative Associated With: De Paul Institute Of Science&Technology
Sr. Committee Type: Anti-Ragging Committee Appointment Order DIST/CIR/07/18
No. Reference Number:
11 Date of Appointment: 02/01/2019 Name of the Mr. Stalin A
Committee Member:
Profession: Representative of Faculty Associated With: De Paul Institute Of Sciene & Technolgy
Sr. Committee Type: Anti-Ragging Squad Appointment Order DIST/CIR/09/19
No. Reference Number:
12 Date of Appointment: 25/01/2019 Name of the Ambily Pramitha P
Committee Member:
Profession: Representative of Faculty Associated With: De Paul Institute Of Science& Technology
Sr. Committee Type: Anti-Ragging Squad Appointment Order DIST/CIR/09/19
No. Reference Number:
13 Date of Appointment: 25/01/2019 Name of the Ms. Chinju C.J.
Committee Member:
Profession: Asst. Professor, School of Associated With: De Paul Institute Of Science &
Management Technology
Sr. Committee Type: Anti-Ragging Squad Appointment Order DIST/CIR/09/19
No. Reference Number:
14 Date of Appointment: 25/01/2019 Name of the SONA MARY LOUIS
Committee Member:
Profession: Asst. Professor, School of Associated With: De Paul Institute Of Science &
Computer Science Technology
Sr. Committee Type: Anti-Ragging Squad Appointment Order DIST/CIR/09/19
No. Reference Number:
1-7005166132 Page 16 of 20
15 Date of Appointment: 25/01/2019 Name of the Mr. Joseph Paul
Committee Member:
Profession: Asso. Professor School of Associated With: De Paul Institute Of Science &
Computer Science Technology
Sr. Committee Type: Anti-Ragging Committee Appointment Order DIST/CIR/10/19
No. Reference Number:
16 Date of Appointment: 25/01/2019 Name of the Mathew Sebastian
Committee Member:
Profession: Representative of Parent Associated With: Depaul Institute Of Science& Technology
Sr. Committee Type: Anti-Ragging Committee Appointment Order DIST/CIR/10/19
No. Reference Number:
17 Date of Appointment: 25/01/2019 Name of the Fr. George Pottayil VC
Committee Member:
Profession: Director Associated With: De Paul Institute Of Science &
Technology
Sr. Committee Type: Anti-Ragging Committee Appointment Order DIST/CIR/10/19
No. Reference Number:
18 Date of Appointment: 25/01/2019 Name of the Ms. Sherin Paul
Committee Member:
Profession: ASSOCIATE PROFESSOR Associated With: De Paul Institute Of Science &
Technology (Dist)
Sr. Committee Type: Anti-Ragging Committee Appointment Order DIST/CIR/10/19
No. Reference Number:
19 Date of Appointment: 25/01/2019 Name of the Anosh Paul
Committee Member:
Profession: ASSOC. PROFESSOR & Associated With: De Paul Institute Of Science &
HOD Technology (Dist)
Sr. Committee Type: Anti-Ragging Committee Appointment Order DIST/CIR/10/19
No. Reference Number:
20 Date of Appointment: 25/01/2019 Name of the Fr. Lindo Puthuparambil VC
Committee Member:
Profession: FINANCE OFFICER Associated With: De Paul Institute Of Science &
Technology (Dist)
Sr. Committee Type: Anti-Ragging Squad Appointment Order DIST/CIR/09/19
No. Reference Number:
21 Date of Appointment: 25/01/2019 Name of the Anosh Paul
Committee Member:
Profession: Associated With: Assoc. Professor & Hod
Sr. Committee Type: Anti-Ragging Squad Appointment Order dist/cir/09/19
No. Reference Number:
22 Date of Appointment: 25/01/2019 Name of the Mr. Jijo Joy
Committee Member:
Profession: ASSOC. PROFESSOR & Associated With: De Paul Institute Of Science &
HOD Technology (Dist)
Sr. Committee Type: Anti-Ragging Squad Appointment Order dist/cir/09/19
No. Reference Number:
23 Date of Appointment: 25/01/2019 Name of the Mr. Sanil Kumar P.S.
Committee Member:
Profession: ASST. PROFESSOR Associated With: De Paul Institute Of Science &
Technology (Dist)
Sr. Committee Type: Anti-Ragging Squad Appointment Order DIST/CIR/09/19
No. Reference Number:
24 Date of Appointment: 25/01/2019 Name of the 9.Ms. Francina Davis
Committee Member:
Profession: ASST. PROFESSOR Associated With: De Paul Institute Of Science &
Technology (Dist)
Sr. Committee Type: Anti-Ragging Squad Appointment Order DIST/CIR/09/19
No. Reference Number:
25 Date of Appointment: 25/01/2019 Name of the JACOB THALIYAN
Committee Member:
Profession: ASSOCIATE PROFESSOR Associated With: De Paul Institute Of Science And
Technology
Sr. Committee Type: Anti-Ragging Committee Appointment Order DIST/CIR/10/19
No. Reference Number:
26 Date of Appointment: 25/01/2019 Name of the SAJI VARGHESE
Committee Member:
1-7005166132 Page 17 of 20
Profession: WARD COUNCILLOR Associated With: Parents Teachers Association
Sr. Committee Type: Anti-Ragging Committee Appointment Order DIST/CIR/10/19
No. Reference Number:
27 Date of Appointment: 25/01/2019 Name of the JANCY JOHNY
Committee Member:
Profession: OFFICE SUPERINTENDENT Associated With: De Paul Institute Of Science And
Technology
Sr. Committee Type: Anti-Ragging Committee Appointment Order DIST/CIR/10/19
No. Reference Number:
28 Date of Appointment: 25/01/2019 Name of the SHINE PAUL
Committee Member:
Profession: REPORTER, MEDIA Associated With: Media
LIBRARY BOOKS
LIBRARY FACILITIES
General Insurance Yes All Weather Approach Yes Fire and Safety Yes
(Motorized Road) Certificate
1-7005166132 Page 18 of 20
Post & Yes Projectors in Classrooms Yes Medical & Yes
Banking/ATM Counselling
Staff Quarters Yes Public Announcement System Yes Group Insurance Yes
for Employees
Electrical Grid Yes Telecom & FAX Yes Safety Provisions Yes
Power Supply
Connection
Rain Water Yes ERP Software Yes Transport Facility Yes
Harvesting
1-7005166132 Page 19 of 20
attendance for
regular faculty
members?
OTHER FACILITIES II
Sr. No. Particulars Status
Copies of AICTE Approvals (LOA and EOA of subsequent years) obtained since Inception Yes
1.
of Institution till date shall be placed in the Website of the Institution
Display Board within the premises as well as in the Website of the Institution Indicating the Yes
2.
Feedback Facility of Students and Faculty Members Available in the AICTE Web Portal
Establishment of Grievance Redressal Committee in the Institution and Appointment of Yes
3.
OMBUDSMAN by the University
Display of Course(s) and "Approved Intake" in the Institution at the entrance of the Yes
4. Institution. Course(s) taken through duly recognized MOOCs shall be used as
Supplementary Course(s)
Availability of quality sanitary napkins through sanitary napkin vending machines and Yes
5.
ensuring safe and environment friendly disposal of used sanitary napkin
Display of information submitted to AICTE (including the accreditation status and Board of Yes
6.
Governors) along with mandatory disclosures in the Web site of the Institution
1-7005166132 Page 20 of 20