Professional Documents
Culture Documents
All India Council For Technical Education: INSTITUTION DETAILS (Information Uploaded by Institute For Approval 2020-21)
All India Council For Technical Education: INSTITUTION DETAILS (Information Uploaded by Institute For Approval 2020-21)
Overall Deficiency No
Organization Website
PRINCIPAL / DIRECTOR
PERSONAL DETAILS
Surname/Family name Dr First Name Violet Rajam
Father's Name H Rajayyan Mother's Name Helen Violet
EDUCATIONAL DETAILS
Doctorate Degree Yes Master's Degree commerce
Bachelor's Degree commerce Other Qualifications NA
International Certification (If NA Field of Specialization finance
Any)
1-7022182540 Page 1 of 11
DETAILS RELATED TO PROFFESSION
Date of joining the Institution 03/12/2014 Appointment Type Regular
Exact Designation Principal
WORK EXPERIENCE DETAILS
Teaching Experience (Years) 32 Research Experience (Years) 22
Industry Experience (Years) 1
OTHER DETAILS
Research Projects Guided - UG 240 Research Projects Guided - 80
PG
Research Projects Guided - Number of Books Published
PhD
Papers Published - National 2 Papers Published -
International
INFRASTRUCTURE DETAILS
LAND DETAILS
Location: Mega and Metro Land in Hilly Area: No
Total Area in Acres: .5 FSI: 73.6
Built Up Area (Sqm): 1550 Number of Pieces: 1
Land Piece Area 1 in .5 Land Piece Area 2 in NA
Acres: Acres:
Land Piece Area 3 in NA Max distance in farthest NA
Acres: land pieces (Km):
Land registered with: Sub Registrar, Nemom Date of Registration: 12/11/2002
Land use certificate VILLAGE OFFICER, NEMOM Land use certificate 13/10/2010
issued by: VILLAGE issued Date:
Ownership Details: Registered Sale Deed Is the Land Mortgaged: No
Mortgaged Purpose: N
Land (North/South): North Latitude Degree: 8
Latitude Minute: 28 Latitude Second: 9
Longitude (East/West) East Longitude Degree: 76
Longitude Minute: 59 Longitude Second: 58
BUILDING DETAILS
Building Status: Available Total built up Area 1550
(ready) Sqm:
Activities in the building NIL Whether Access Yes
other than courses &Circulation Area and
approved by AICTE: Toilet Area are
maintained as per
National Building Code
(NBC) Norms?
Total Carpet Instructional 568 Total Carpet 340
Area (ready) -Sqm: Administrative Area
(ready) -Sqm:
Access and Circulation 190 Total built up Area -Sqm 1800
1-7022182540 Page 2 of 11
Area (Sqm): Planned:
Total Carpet Amenities 470
Area (ready) -Sqm:
LABORATORY DETAILS
1-7022182540 Page 3 of 11
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: 12 Room Type: Department Office
No.
5 Area in Sqm: 20 Building Name: Cams Building
Building Number: TC/49/C/1936 Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: 13 Room Type: Pantry for Staff
No.
6 Area in Sqm: 10 Building Name: Cams Building
Building Number: TC/49/C/1936 Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: 2 Room Type: Office All Inclusive
No.
7 Area in Sqm: 150 Building Name: Cams Building
Building Number: TC/49/C/1936 Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: 3 Room Type: Cabin for Head of Dept
No.
8 Area in Sqm: 10 Building Name: Cams Building
Building Number: TC/49/C/1936 Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: 4 Room Type: Faculty Room
No.
9 Area in Sqm: 30 Building Name: Cams Building
Building Number: TC/49/C/1936 Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: 5 Room Type: Central Store
No.
10 Area in Sqm: 30 Building Name: Cams Building
Building Number: TC/49/C/1936 Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: 7 Room Type: Maintenance
No.
11 Area in Sqm: 10 Building Name: Cams Building
Building Number: TC/49/C/1936 Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
1-7022182540 Page 4 of 11
furniture/fixtures
Sr. Room ID/ Name: 8 Room Type: Security
No.
12 Area in Sqm: 10 Building Name: Cams Building
Building Number: TC/49/C/1936 Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: 9 Room Type: Housekeeping
No.
13 Area in Sqm: 10 Building Name: Cams Building
Building Number: TC/49/C/1936 Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Not Available Readiness of Ready
furniture/fixtures
AMENITIES AREA
1-7022182540 Page 5 of 11
furniture/fixtures
Sr. Room ID/ Name: 7 Room Type: Stationery Store
No.
6 Area in Sqm: 10 Building Name: CAMS BUILDING
Building Number: TC/49/C/1936 Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
CIRCULATION AREA
INSTRUCTIONAL AREA
1-7022182540 Page 6 of 11
4 Room Type Seminar Hall Room ID/ Name CLASS4
Area of Room in 50 Building Name CAMS BUILDING
Sqm
Building Number TC/49/C/1936 Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Available
furniture/fixtures
Sr. Programme MANAGEMENT Level POST GRADUATE
No.
5 Room Type Seminar Hall Room ID/ Name CLASS5
Area of Room in 50 Building Name CAMS BUILDING
Sqm
Building Number TC/49/C/1936 Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme MANAGEMENT Level POST GRADUATE
No.
6 Room Type Seminar Hall Room ID/ Name CLASS6
Area of Room in 50 Building Name CAMS BUILDING
Sqm
Building Number TC/49/C/1936 Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme MANAGEMENT Level POST GRADUATE
No.
7 Room Type Computer Laboratory Room ID/ Name CLASS7
Area of Room in 100 Building Name CAMS BUILDING
Sqm
Building Number TC/49/C/1936 Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
1-7022182540 Page 7 of 11
HOSTEL FACILITIES
COMPUTATIONAL FACILITIES
Sr. Committee Type: Anti-Ragging Committee Appointment Order OFFICE ORDER NO.1-1/2018
1-7022182540 Page 8 of 11
No. Reference Number:
1 Date of Appointment: 24/01/2018 Name of the DR.VIOLET RAJ,CHAIRMAN,
Committee Member: MANJU,FACULTY-IN-CHARGE,
PUSHPAKUMAR,FACULTY REP,
BINDU,STAFF REP, SASIKALA,
Profession: PRINCIPAL Associated With:
Sr. Committee Type: Anti-Ragging Squad Appointment Order OFFICE ORDER NO.2-1/2018
No. Reference Number:
2 Date of Appointment: 24/01/2018 Name of the DR.VIOLET RAJAM,CHAIRMAN,
Committee Member: MANJU,FACULTY-IN-
CHARGE,PUSHPAKUMAR,ANAND R
NAIR
Profession: PRINCIPAL Associated With:
LIBRARY BOOKS
LIBRARY FACILITIES
General Insurance Yes All Weather Approach Yes Fire and Safety Yes
(Motorized Road) Certificate
Staff Quarters Yes Public Announcement System Yes Group Insurance Yes
for Employees
Electrical Grid Yes Telecom & FAX Yes Safety Provisions Yes
Power Supply
Connection
Rain Water Yes ERP Software No Transport Facility Yes
Harvesting
1-7022182540 Page 9 of 11
Counselor
OTHER FACILITIES II
Sr. No. Particulars Status
Copies of AICTE Approvals (LOA and EOA of subsequent years) obtained since Inception Yes
1.
of Institution till date shall be placed in the Website of the Institution
Display Board within the premises as well as in the Website of the Institution Indicating the Yes
2.
Feedback Facility of Students and Faculty Members Available in the AICTE Web Portal
Establishment of Grievance Redressal Committee in the Institution and Appointment of Yes
3.
OMBUDSMAN by the University
4. Display of Course(s) and "Approved Intake" in the Institution at the entrance of the Yes
1-7022182540 Page 10 of 11
Institution. Course(s) taken through duly recognized MOOCs shall be used as
Supplementary Course(s)
Availability of quality sanitary napkins through sanitary napkin vending machines and Yes
5.
ensuring safe and environment friendly disposal of used sanitary napkin
Display of information submitted to AICTE (including the accreditation status and Board of Yes
6.
Governors) along with mandatory disclosures in the Web site of the Institution
1-7022182540 Page 11 of 11