MINISTRY OF TRANSPORT

TYPICAL INSPECTION PLAN


MOTTIP-C-05-02
Portland Cement Concrete Works Approved on
Revision
--/--/----
02

Project Name: Project No.:

Level of Inspection
Task/Activity MOTIC Contractor MOT-Consultant MOT Remark
1. Document Review
Concrete raw materials sampling and
testing standard test methods, source,
size and frequency shall be in
Portland Cement Concrete Raw Materials RH RH accordance with Highway Materials
Sampling, Testing and Concrete Mix Design MOTIC-C-05-02-01 RH Manual Volume 1 Part One General
Review and Approval Page 1-33 to 1-35

RH RH RH
1.2 Review and Approval of Design/Construction MOTIC-C-05-02-02
and Fabrication Shop Drawings

2. Receiving Inspection

2.1 Reinforcing Steel Bars and Embedded Items


MOTIC-C-05-02-03 H W S
Receiving Inspection

2.2 Handling, Storage & Preservation of Steel S


MOTIC- C-05-02-04 H W
Bars

2.3 Concrete Pump/Transit Mixer Inspection MOTIC-C-05-02-05 H W S

3.0 Installation

3.1 Formwork Inspection H S


MOTIC-C-05-02-06 H

3.2 Installation of Reinforcing Steel, Embedded


H S
Items and Form Pre-Closure Inspection MOTIC-C-05-02-07 H
Inspection
See GSRBC Sec 5.01.8-Quality Control
3.3 Concrete Sampling, Testing & Procedures for sampling and testing of
MOTIC-C-05-02-08 I H S
Placement Inspection concrete during mixing, production and
site delivery

3.4 Concrete Finishing and Curing H W


MOTIC-C-05-02-09 S
Inspection
3.5 Formwork Stripping Inspection MOTIC-C-05-02-10 H W S

3.6 Concrete Testing and Final


MOTIC-C-05-02-11 H W S
Acceptance Inspection

4. Pre-Commissioning: Not Applicable

GENERAL NOTES: LEGEND:


RH-Review Hold
H: Hold Point.
1. Contractor shall be totally responsible for the QUALITY of WORK as required by the Contract. W: Witness Point.
S: Surveillance.
2. Frequency, Test Method and Location of Sampling and Testing of Portland Cement Concrete Raw Materials (Cement, Water, Aggregates shall
I-100% Contractor
be in accordance with Highway Materials Manual Volume 1-Part 1 General, Page 1-33 to 1-35 Testing/Inspection
3. General Specifications for Road and Bridge Construction Part 1-General Sec 1.03.10: Contractor shall submit a written request for inspection
of any portion of the Work at least twenty-four (24) hours before such Work is to be performed. The request shall include the date, time, location
and type of Work to be performed. When approved by the Engineer, a method of communication other than a written request may be used.
4. In case of conflict with the level of inspection responsibility between MOTTIPs and MOTICs, the level of inspection responsibility as indicated
on MOTIPs shall govern.
5. Concern Contractor Representatives signing the MOTICs indicate that activities were supervised, verified and inspected all in accordance with
MOT approved project drawings, standards and specifications. Quality of WORK is the total responsibility of the Contractor.

Reviewed by: Approved by: