Api 570 294-42
Api 570 294-42
If the probable A
corrosion rate for a new
piping system or a
piping system for which
service conditions are
being changed cannot
be determined, when
shall initial non-
destructive thickness
measurement
determination be
made?
a) After no more than
three months of service.
b)After no more than six
months of service.
c)After no more than
nine months of service.
d) After no more than
twelve months of
service
During a SMAW C
Procedure qualification,
if the WPS lists a
minimum preheat of 250
F and the test coupon
was welded with a 149F
minimum preheat, what
would be the qualified
preheat temperature if
all other tests passed?
a) 149F minimum
b) 250F minimum
c) none, since preheat is
essential variable and
the PQR would not
support the WPS
d) 249F
API 570 Question wrong on Open and Closed Book
https://quizlet.com/154280452/api-570-question-wrong-on-open-and-closed-book-flash-cards/ 4/10
5/22/2021 API 570 Question wrong on Open and Closed Book Flashcards | Quizlet
What personnel C
qualification are
required for performing
the PMI testing?
a) as established by
SNT-TC-1A
b) as established by
ASME sec V
c) as approved by the
owner/user
d) as approved by the
inspector
Who is responsible to B
determine the extent of
PMI examination
required and to verify
that the implementation
and conduct if the
material verification
program is properly
performed in
accordance with API
578?
a) the owner/user
b) the owner/user or
designee
c) the piping engineer
d) the inspector in
consultation with the
piping engineer