Professional Documents
Culture Documents
Housing Standards Handbook - WEB - 1 - Br1315 2
Housing Standards Handbook - WEB - 1 - Br1315 2
Housing Standards Handbook - WEB - 1 - Br1315 2
David Orr
Chief Executive
National Housing Federation
2
Acknowledgements
The authors Special thanks also go to:
Levitt Bernstein is an architectural practice n Sarah Allan, Design Council CABE
with expertise in urban design, landscape
n Brian Quinn, Design Council CABE
architecture, sustainability and research. Housing
accounts for the majority of their projects, with n Julia Wallace, Design Council CABE
social housing particularly close to their hearts,
n Members of the London Technical Group
but they are also active in many other sectors,
including arts and education. n National Housing Federation members,
including:
Acknowledged experts in the field of housing
standards, Levitt Bernstein use their experience – Emma Hickling, Rooftop Housing Group
to test theories, advise government and other
– Susan May, Affinity Sutton
organisations, contribute to national debate and
help shape housing policy. Most importantly, – Dave Norris, Family Mosaic
they make sure that this accumulated knowledge
– Marie Riordan, Stonewater Ltd
shines through in the homes and places they
create. They know that good design enriches – Mike Watts, The Guinness Partnership
lives and adds value beyond its cost, with nothing
n Jane Briginshaw, Homes and
demonstrating this more powerfully than good
Communities Agency
housing. For this reason, we are delighted that
Levitt Bernstein have authored this handbook for n Amy Simmons, Homes and Communities
the National Housing Federation. Agency
The work has been led by Julia Park, Head n Joris Van der Starre, Homes and
of Housing Research. Other members of the Communities Agency
drafting team include Clare Murray, Head
n Nick Powell, Waltham Forest Council
of Sustainability, Glyn Tully, Head of Urban
Design, Andy Jobling, Technical Manager, n Dhruv Sookhoo, Newcastle University
and Kate Digney, Associate, who leads their
Cover illustration produced by Richard Hind for
landscape team.
Southwark Council. Other images supplied by
Levitt Bernstein.
3
4
Part I
Introduction
5
The purpose of this handbook
Why now? In July 2015, the Government reversed its
decision to require new housing to reach Zero
The issue of housing standards has never been Carbon (ZC) standards by 2016. The requirements
straightforward and has often been controversial. of Part L 2013 of the Building Regulations
The last five years has brought unprecedented will therefore remain the national targets for
change, not only to the standards themselves, but energy efficiency and CO2 reduction for the
also to the regimes that own, manage and assess foreseeable future.
them, and the tenures to which they apply.
The full impact of recent policy changes will not
Many of these recent changes result directly from be known for some time and further changes
the Housing Standards Review (HSR), conducted cannot be ruled out, so this handbook inevitably
by the coalition Government (2010-15) as part of represents a snapshot in time. But, in the
its wider, deregulatory agenda to cut red tape. It wake of significant reductions in grant and
concluded in March 2015 and the most significant welfare benefits, a redefinition of affordable
outcomes include: rent, and plans to extend Right to Buy to
n the abolition of national funding standards in housing association tenants, this is a pivotal
March 2014 (Homes and Communities Agency time for affordable housing. Everyone involved
(HCA) Design and Quality Standards assessed with housing today knows that the pressure
through the Housing Quality Indicators (HQIs)) for numbers is enormous. This is bound to
threaten quality and makes the role of housing
n the winding down of the Code for associations and local planning authorities
Sustainable Homes (LPAs) more important than ever. It is therefore
n the consolidation of all ‘technical’ housing a good moment to pull together the standards
standards into the Building Regulations and regulations that apply to new housing and
consider how to achieve more for less.
n the introduction of an optional, cross tenure
‘Nationally Described Space Standard’
What it covers
These changes came into force through planning
and Building Regulations on 1 October 2015. The The handbook considers the role that standards
next section and Appendix J give more detail on play in securing the quality of new build housing.
the HSR, including implementation and transition, It includes aspects of housing regulation,
and the standards themselves are covered in particularly in subject areas that have until
Part II. recently been included in funding standards or
6
Part I Introduction
local planning policy documents, or both. These LPA, or the Greater London Authority (GLA),
areas are primarily internal space, accessibility, including the new nationally described space
security, energy and water. Although the primary standard and ‘optional requirements’ for
focus is affordable housing, it is relevant to all accessibility and water efficiency.
other tenures too.
C. Locally defined and locally applied:
The standards in Part II are set out in typically referred to as local planning policy
three sections: requirements. As these vary across the
country, they cannot be included.
Section 1.0 Placemaking and the public realm
Section 2.0 Communal spaces D. Additional good practice standards: extra
Section 3.0 The home requirements that remain at the discretion
of the client and the project team. These
The sequence mirrors the design process. This
are bespoke (written specifically for this
generally starts with the site, in the context of the
document) but draw heavily on existing good
wider neighbourhood, and establishes the early
practice guidance, including GLA standards
landscape and urban design principles before
(from the London Housing SPG, 2012)
moving into block layouts, and on to the detail of
where relevant.
individual homes.
Because Group C standards vary across the
The process is never strictly linear and schemes
country, the handbook only covers standards
are often progressed at different levels
from groups A, B and D.
simultaneously. The handbook works in a similar
way. It reads logically from start to finish but Throughout the text, the term ‘standards’
each section, and subsection, aims to work as a has been used as convenient shorthand for
self-contained resource, cross-referencing other ‘principles’, ‘standards’, ‘regulations’ and
related parts. ‘requirements’ but the distinction has been made
where necessary. The balance of standards
Not all standards are mandatory, and not all are
varies across the three sections. Those for
equally important. In broad terms, they can be
Section 1.0 (Placemaking and the public realm)
categorised into four main groups, as follows:
are mostly from Group D and should be regarded
A. Nationally defined and universally applied: as design principles rather than standards.
requirements that apply everywhere and Section 2.0 (Communal spaces) and Section
are non-negotiable (essentially baseline 3.0 (The home) include the nationally defined
Building Regulations). standards and regulations from Groups A and
B, and the additional good practice standards
B. Nationally defined and locally applied:
(Group D) are more definitive and more
requirements that apply at the discretion of an
technical here.
7
The emphasis is on design in the pre-planning the discontinued Code for Sustainable Homes. In
stages. The handbook does not attempt to cover that sense, there is little here that is completely
specification, highly technical or ‘health and new, but existing standards have been critically
safety issues’. Topics such as structure, means examined and considered alongside new and
of escape, drainage, resistance to moisture and emerging research and evidence in areas such
electrical safety are therefore outside the scope as overheating, daylight and air quality, where
of this document, though they are mentioned. The knowledge continues to develop.
standards represent a ‘good practice,’ rather than
It has no official status in terms of securing
a ‘best practice’ approach, recognising that the
funding, or planning, or Building Regulations
most successful standards are not necessarily
approval, though it deals with many of the issues
always the highest.
that must be satisfied under the various stages of
Part III provides an overview of the design the development control process.
process from the client’s perspective with an
emphasis on the role of standards. It touches How to use it
on some aspects of procurement and considers
different types of ‘development scenarios’, The handbook is particularly aimed at housing
including Section 106 partnerships. associations, local authorities and other
affordable housing providers with some
A series of appendices provide checklists and
experience in the housing sector. However, it will
further detail on key topics.
also be useful to designers and other members
of the project team, suitable for students and
Its status and how it relates to others with little or no experience, and valuable
other documents to anyone with an interest in housing.
The handbook sets a comprehensive but realistic It can be adopted as a briefing tool, used to
benchmark for good design by pulling together support design reviews and compliance checking,
important information from other sources as employed as training resource or aide memoire,
well as providing new insights. Definitive in or referenced for advice on specific topics.
scope, it is also partly a directory, building on the Taken together, the standards provide a
best of what already exists and signposting to consistent starting point for a project brief. Group
other resources. A standards are non-negotiable, Groups B and C
Many of the Group D additional good practice address local planning requirements, (Group C
standards come directly, or indirectly, from standards need to be added on a project-by-
other documents such as Building for Life 12, project basis) and Group D are discretionary
London Housing SPG 2012, Secured by Design and standards which clients can adopt to address
8
Part I Introduction
gaps in the required standards and enhance the
quality of their schemes.
This will save time, allow the team to focus on the
opportunities and challenges that are specific to
the project and help to achieve consistent results
and approaches. It will also ensure that all issues
are given due consideration from the start. Many
schemes demonstrate exemplary practice in one
or more respects but relatively few do everything
well and, all too often, some issues are either left
too late or overlooked. To a degree, trade-offs
are inevitable but not in basic areas of amenity.
Good daylight, for example, does not compensate
for poor soundproofing. Having said that, it
is important that the handbook is not simply
referenced in briefs or Employer’s Requirements
(ERs) as something to be ‘complied with’ because
this could be committing the client to more
than the budget can afford, or run the risk of
not paying enough attention to the particular
circumstances.
Ultimately of course, the handbook is for
residents: the people who benefit most from
good quality housing. Affordable housing is
expected to be fully occupied, often by people
with higher needs but less housing choice. It is
imperative that it remains functional, manageable
and desirable over time and meets the needs of
successive households. Adopting these standards
as the minimum benchmark for all new housing
would be a hugely positive step.
9
The role of standards in promoting good design
Why design matters We know what makes a good home. It should offer enough
room to accommodate its occupants and their lifestyles
in comfort, in a peaceful, secure, private space, and use
Design is often perceived as being only about how
energy efficiently. Its surroundings or neighbourhood should
something looks, but it goes far beyond that. Over provide a balance between private, semi-private and public
2000 years ago, the Roman architect, Vitruvius, space, and offer all residents easy, unfettered access.1
defined three essential principles of architectural
design: Firmness, Commodity and Delight. The The report cites the growing body of evidence
message still resonates – buildings need to last, that backs up what most of us instinctively feel
to work and to make us feel well and happy. – that well designed spaces are good for our
When it comes to housing, good design can, health and general wellbeing. Research has
quite literally, transform the lives of individuals, shown that access to green space is beneficial
families and communities. to people’s health, regardless of their economic
circumstances, and that how well green space is
Good Design – it all adds up, a report produced by
used is directly related to its quality.2 Evidence
RIBA in 2011, sums up the value of well-designed
from deprived areas with higher levels of physical
housing as follows:
inactivity among residents has shown that:
Nowhere do we feel the benefit of good design more
investing in the quality of parks and green spaces is
than in our own homes and the spaces around them.
an important way to tackle inequalities in health and
We eat, sleep, work, rest and play here. In an increasingly
wellbeing’.3
complex and rapidly changing world, our homes represent
stability and security. As more of us now work from home,
the division between work and home becomes more blurred. Poor housing is also costly. In 2010, the Building
For thousands of years, people have designed and built their Research Establishment (BRE) reported that
own habitats, to fit their own needs. Today, when our homes almost a quarter (4.8 million) of homes in
and neighbourhoods are created independently of us, they
can often fail to provide the flexibility, functionality, comfort,
England contain defects that can give rise to
privacy or freedom that we need, and our quality of life can Category 1 hazards as measured by the Housing
suffer. And if a home fails to withstand the test of time – or Health and Safety Rating System. These are
the market changes – that negative impact on our lives can
hazards that can lead to serious health risks such
be prolonged.
as cardio-respiratory disease, stroke, asthma
and even death caused by falls, excess cold and
10
Part I Introduction
other events. Estimates put the cost to the NHS a safeguard against unacceptable outcomes.
of these hazards at £600m per year, and the cost Voluntary, good practice standards are for those
to individuals and society from loss of earnings who wish to go further but they often form the
alone, at £1.5bn per year.4 basis of future regulation too. The Lifetime
Homes standard (LTH) is a good example.
While residents often pay the highest price, poor
Conceived by a group of housing experts
design also impacts on the wider community,
in the early 1990s as a set of good practice
and the environment. Carbon emissions have
recommendations, it has since been gradually
no respect for development boundaries, and, as
adopted as local planning policy, become a
CABE points out:
funding standard in London and, most recently,
No building exists only for the people who paid for it taken into regulation.
or live in it. Streets and parks affect us all’.5
On the whole, and as one might expect, standards
and regulations improve (become more
How standards help demanding) as time goes on. Today’s new homes
are undoubtedly more energy-efficient than
The vast majority of new housing is designed for ever before. They are also considerably more
people who will not have had a direct say in the accessible, safer and more secure – but are they
process or been able to influence the outcome. actually better? It is a salutary fact that some of
Inevitably therefore, clients and designers have our oldest and coldest housing is also the most
to rely on generic, good practice principles rather sought after. Proof perhaps, that standards are
than produce individually tailored solutions. part of the answer but by no means all of it.
As a result, some design issues receive less
Those with means can choose what to prioritise
consideration than they deserve and corners
and where to compromise – trade space for
are cut. This is a particular risk when (as now)
location or energy efficiency for character. But
demand exceeds supply, margins are tight, or
not everyone has a choice and most would agree
profit the end goal. It is under conditions like
that new housing should achieve a relatively
these that standards are most needed, yet also
high level of design quality and all-round
most likely to be cut.
performance. This is more straightforward for
Housing standards fall into two main categories. houses than for high density flat blocks where
Mandatory baseline standards (including most the issues are considerably more complex and
regulations) are primarily intended to act as the consequences of sub-standard design more
4 Ormandy D and Ambrose P (2010), The Real Cost of Poor Housing, (BRE Trust Report FB23, BRE Press)
5 CABE, Good Design: the fundamentals
11
far-reaching – potentially affecting tens or even These are at various stages of development
hundreds of people. Flats are therefore subject to but all involve a system of rating against a
more standards and regulations than houses. range of criteria, such as energy performance,
space standards and elements of running cost.
A good set of standards will be comprehensive
As voluntary, client-invoked initiatives, they are
but not overly demanding or prescriptive. It will
unaffected by the HSR and can operate in parallel
prioritise value over cost and take a long-term
with standards and regulations.
view – a theme we return to later.
Voluntary consumer-focused
initiatives
As an alternative, or an adjunct to formal
standards, various organisations continue to put
forward voluntary ‘kitemarks’ and consumer-
focused ‘labelling initiatives’. Building for
Life was originally conceived in this way but
became a quasi-standard when taken up by
planning authorities. Until 2014, the Homes
and Communities Agency (HCA) also required
a minimum score to be achieved as a condition
of funding.
More recent initiatives include:
n Home Quality Mark:
www.homequalitymark.com/building-a-
home-quality-mark-home
published by the BRE
n PassivHaus Certification:
www.passivhaus.org.uk/standard.jsp?id=122
certified by the BRE
n Home Performance Labelling:
www.homeperformancelabelling.co.uk
published by the Housing Forum
12
Part I Introduction
Government policy in relation to housing standards
Background This unwieldy situation is represented in the
diagram on the next page.
Recent governments have confined their interest
in housing standards to the Code for Sustainable In 2010, with the housing market still in the
Homes (and its predecessor Eco-homes), and grip of the 2007-8 recession, the coalition
Design and Quality Standards (the national Government decided that the planning process,
funding standards managed by the HCA and including the housing standards applied
applied to the National Affordable Housing through local planning policy, had been acting
Programme (NAHP)). as a ‘brake on development’ and needed to be
radically simplified.
Responsibility for housing in London was
devolved to the Mayor in 2000 and ten years later Other significant changes have taken place in
the Greater London Authority (GLA) produced parallel. These include major reductions in grant
the London Housing Design Guide, setting out funding and welfare payments, the redefinition of
the standards required for new housing in ‘affordable rent’ (now defined as housing let at, or
London. The Mayor was also granted the power below, 80% of market rents), extensions to Right
to administer funding for affordable housing in to Buy and Permitted Development, and a general
the capital. emphasis on increasing housing supply, home
ownership in particular. Housing is once again at
Elsewhere, LPAs have been allowed virtually free the forefront of government thinking.
rein to set housing standards through planning
policy (often by adopting good practice guidance)
while government has retained responsibility for
funding outside London.
As a result of this laissez-faire approach,
housing-related planning policy standards
have proliferated. Although well meaning, and
generally helpful in terms of improving housing
quality, this has also created overlaps, led to
infinite local variations, and added cost and
complexity to development.
13
The need to rationalise housing standards
Diagram showing the confusing and overlapping standards applied through the planning system prior to the
Housing Standards Review
Building regulations
CSH
SBD
Planning HQI
LTH
LHDG
Funding
WHDG S&Q
HD AC
BFL MFS
Source: DCLG
14
Part I Introduction
The National Planning Policy make more effective use of the existing housing
stock) and the agreed approach contributes to
Framework (NPPF) the objective of creating mixed and balanced
communities. Such policies should be sufficiently
Published in March 2012, as part of these flexible to take account of changing market
reforming measures, the National Planning Policy conditions over time….’
Framework (NPPF) represents a new direction 7. Requiring good design
in planning policy. Its overarching message, the 56. The Government attaches great importance to the
‘presumption in favour of sustainable development’, design of the built environment. Good design is a
signalled an important shift in development key aspect of sustainable development, is indivisible
from good planning, and should contribute positively
control – less ‘can’t do’, and more ‘can do’. to making places better for people.
Nonetheless, the NPPF places considerable 57. It is important to plan positively for the
achievement of high quality and inclusive design
emphasis on the importance of good design and
for all development, including individual buildings,
the quality of the built environment. Housing public and private spaces and wider area
is given significant weight, and the following development schemes.
paragraphs from various sections of the 58. Local and neighbourhood plans should develop
document are particularly relevant to quality robust and comprehensive policies that set out
and standards: the quality of development that will be expected
for the area. Such policies should be based on
stated objectives for the future of the area and
6. Delivering a wide choice of high quality homes an understanding and evaluation of its defining
characteristics. Planning policies and decisions
50. To deliver a wide choice of high quality homes,
should aim to ensure that developments will:
widen opportunities for home ownership and create
sustainable, inclusive and mixed communities, local • function well and add to the overall quality of
planning authorities should: the area, not just for the short term but over the
lifetime of the development;
• plan for a mix of housing based on current and
future demographic trends, market trends and the • establish a strong sense of place, using
needs of different groups in the community (such streetscapes and buildings to create attractive and
as, but not limited to, families with children, older comfortable places to live, work and visit;
people, people with disabilities, service families
• optimise the potential of the site to accommodate
and people wishing to build their own homes);
development, create and sustain an appropriate
• identify the size, type, tenure and range of housing mix of uses (including incorporation of green and
that is required in particular locations, reflecting other public space as part of developments) and
local demand; and support local facilities and transport networks;
• where they have identified that affordable housing • respond to local character and history, and reflect
is needed, set policies for meeting this need the identity of local surroundings and materials,
on site, unless off-site provision or a financial while not preventing or discouraging appropriate
contribution of broadly equivalent value can be innovation;
robustly justified (for example to improve or
15
• create safe and accessible environments where
crime and disorder, and the fear of crime, do not
Housing Standards Review (2012-15)
undermine quality of life or community cohesion;
The Housing Standards Review (HSR) began
and
formally in 2012, building on the cross-sector
• be visually attractive as a result of good
architecture and appropriate landscaping….’
report of the Local Housing Delivery Group,
chaired by the National House Building Council
8. Promoting healthy communities
(NHBC) and overseen by Sir John Harman.
69. The planning system can play an important role in
facilitating social interaction and creating healthy, Its aim was to encourage more housing building
inclusive communities. Local planning authorities by restricting the ability of LPAs to set planning
should create a shared vision with communities of
the residential environment and facilities they wish policy requirements for new housing in areas
to see. To support this, local planning authorities considered to be ‘technical’. The cross tenure
should aim to involve all sections of the community remit was limited to five main topic areas with
in the development of Local Plans and in planning
decisions, and should facilitate neighbourhood some minor amendments to waste storage. The
planning. Planning policies and decisions, in turn, outcome was published in March 2015, following
should aim to achieve places which promote: two public consultations, and can be summarised
• opportunities for meetings between members of as follows:
the community who might not otherwise come into
contact with each other, including through mixed- n accessibility: requirements taken into Building
use developments, strong neighbourhood centres Regulations and defined at three distinct
and active street frontages which bring together
those who work, live and play in the vicinity;
levels (current Part M and two higher levels;
broadly equivalent to Lifetime Homes and the
• safe and accessible environments where crime
and disorder, and the fear of crime, do not Wheelchair Housing Design Guide, referred to
undermine quality of life or community cohesion; as ‘optional requirements’).
and
n space: a new optional ‘Nationally Described
• safe and accessible developments, containing
clear and legible pedestrian routes, and high Space Standard’ operating through planning.
quality public space, which encourage the active
and continual use of public areas.’ n security: a new, single-tier Building
Regulation (Part Q) for new housing only.
n water: current Part G of the Building
Regulations retained as the baseline
requirement for water efficiency and a higher
‘optional requirement’ introduced for water-
stressed areas.
16
Part I Introduction
n energy: to remain in Part L of the Building of having to take a temporary step back in
Regulations only (with the planned trajectory these areas, the Government has introduced a
to Zero Carbon by 2016 subsequently put on mechanism allowing pre-existing planning policy
indefinite hold). requirements to be automatically ‘passported’
to the nearest equivalent new standard or
n waste: minor changes to Part H to reduce
regulation.
bin blight.
Significantly, the HSR also prohibits LPAs from
With the exception of space, these topics are
setting any other additional technical standards,
now dealt with solely through regulation.
either in these topic areas or others. There is
However, the new optional requirements (two
however considerable uncertainty about the
levels for accessibility and one for water) have
definition of ‘technical’.
to be formally adopted in a Local Plan by LPAs
before they can apply. These and the optional Further detail on the HSR, including
space standard must also be subject to need and implementation and transitional arrangements
viability testing prior to adoption. and the future of existing standards is provided in
Appendix J.
Paragraph 50 of the NPPF (reproduced in the
previous subsection) requires LPAs to assess
the housing needs of local communities and
ensure that these needs are met. It is therefore
the trigger for adopting the space standard and/
or the optional requirements where these can
be justified.
The package of new measures arising from the
HSR is summarised in the diagram overleaf.
The new standards and Building Regulations
took effect on 1 October 2015 and effectively
replace the government-owned national funding
standards and the Code for Sustainable Homes.
It may be many months before some LPAs
update their Local Plans, and many years before
the full impact of the HSR can be assessed.
To ensure that LPAs are not put in a position
17
Diagram summarising the main changes arising from the
Housing Standards Review
Part G Water
Requirements now defined at two levels. The current limit of 125 litres/person/day
1 2 remains the mandatory baseline, and a more stringent limit of 110 litres/person/day
(equivalent to Code 3/4) is the new ‘optional requirement’. LPAs in water-stressed
areas are expected to adopt the more efficient optional requirement.
Part H Waste
Additional wording introduced to ensure that bin storage is well-designed and
well-integrated to reduce ‘bin blight’.
New regulation
Part Q Security
New single, baseline regulation for the physical security of new dwellings.
Requirements apply to easily accessible doors and windows and are equivalent to
PAS 24 (in line with Secured by Design, Part 2).
18
Part I Introduction
Taking a long-term view
Designing for low management Plant and equipment should be easy to reach
and maintenance and maintain, and combined heat and power
(CHP) engines only used where they can be
Affordable housing providers are in it for the properly managed.
long haul so reducing ongoing costs is crucial.
The quality and durability of the external fabric
Designing for low management and maintenance
is also crucial. Good bricks last for centuries and
should be an integral part of the design process
retain their integrity and appearance with little
but it is often overlooked or outweighed by
or no maintenance. In contrast, render, timber
other short-term pressures. It can be a difficult
and other lightweight cladding materials have a
principle to uphold, particularly when bidding for
shorter life and require more frequent attention.
land against private developers for whom these
They have their place but should be used with
issues tend to be less important. The rise of
care, and generally in moderation.
Design and Build has also meant that designers
are more removed from the build process, and Many otherwise good-looking buildings are ruined
have less first-hand experience of the sort of by money-saving shortcuts (often referred to as
practical problems that can arise. Section 106 ‘value engineering’). Typical examples include
situations are also difficult because housing cheap UPVC doors, windows, fascias and rainwater
association partners have less control over goods and poor quality bricks or paving. Sometimes
the design. the overriding priority is to bring a building in on
budget, but a higher price is often paid in the end.
The two key facets of this are:
High grade stainless steel ironmongery lasts
n reducing the need for intensive management indefinitely whereas chrome-plated brass lasts for
and maintenance through good design a maximum of ten years, for example.
n ensuring that key elements of the buildings and There are exceptions – timber veneered doors are
spaces can be more easily inspected, repaired smarter and more expensive than painted doors
and/or replaced when the time comes. but when they do get damaged, they are harder
to repair. On the other hand, painted railings will,
There is no single answer but many helpful
like the Forth Bridge, be a problem forever.
strategies. Part of the solution lies in keeping
things simple – easier said than done in a high Lifecycle costing is a complex topic and outside
rise, high density, highly serviced building but the scope of this handbook but it is based on the
a sound principle nonetheless. Services should principle that long-term value is more important
be routed efficiently, and controls, valves and than initial cost. This concept resonates strongly
stopcocks accessible from communal areas. with those who have a long-term interest in
19
the homes they construct, particularly when Service charges
these are for people on lower incomes. Ideally,
responsible sourcing, and reducing embodied This section draws heavily on Superdensity:
energy in particular, would also be part of taking the Sequel (www.superdensity.co.uk), a recent
a long-term view but despite the efforts of the report by a group of four leading architectural
BRE and its Green Guide, it remains very difficult practices, concerned by the physical and social
to trace provenance reliably. consequences of London’s spiralling density.
We do know that residents often share the It notes that service charges have historically not
eventual burden of poor specification through the been given the attention they deserve, despite the
higher maintenance costs that invariably make extent to which they impact on the cost of living.
up a large proportion of service charges – the The 2014 London Assembly Report notes that the
subject of the next subsection. It is therefore cost of service charges ranked highest among the
sensible to encourage residents to manage list of leaseholder complaints6. Annual charges at
their own living environment as far as possible. Nine Elms Point averaged £2,250 for a studio and
Simple measures such as ensuring that windows £4,600 for a three bedroom flat in 2014.7
can be safely cleaned from inside the home, Even for relatively well-off leaseholders or
and restricting the number of households that private renters, who might expect to pay more
share a core to encourage pride and ownership for high quality facilities and services, this is a
of the shared spaces can make a considerable large amount of money to find on top of mortgage
difference. Spending more on areas that are a repayments. For tenants of affordable housing, it
common source of complaint also makes sense. would be out of the question. While this is one of
Soundproofing is a good example. For a relatively the primary reasons for providing mono-tenure
small extra cost, soundproofing between flats cores in multi-tenure developments, a balance
can be increased by up to 5dB and this has needs to be struck – a very stark contrast in
been shown to reduce complaints and improve quality works against the principle of tenure-
relationships between neighbours. blind design and restricts the potential for tenure
Many of the standards in Part II encourage to change over time. The problem is by no means
low maintenance solutions as part of taking a confined to London, though it is primarily an
long-term view and looking after the interests urban issue and costs tend to rise with density, as
of residents. Part III adds to this by stressing discussed in subsection 1.4 of Part II.
the importance of involving the client’s asset
management team in the briefing process to
ensure that their knowledge and experience of
issues in use informs the design.
6 London Assembly Report, Highly charged – residential leasehold service charges in London (March 2014)
7 Barratt Homes 24/11/2014
20
Part I Introduction
Superdensity suggests a number of ways in which service charges could be mitigated by different
approaches to management, and includes a checklist of the design issues that have the highest impact
on service charges. These are summarised below:
21
Future-proofing Regulations and standards cannot guarantee
longevity or safeguard against obsolescence
Focusing on the present is difficult enough but but they play an important role in ensuring that
thinking ahead has never been more important. buildings are safe, reasonably fit for purpose,
Every home built today should be designed for an and to some extent, adaptable. Energy and
80-100 year life and it is instructive to consider accessibility standards are obvious examples of
why some houses, or types of housing, have sensible future-proofing measures and arguably,
already lasted very much longer than that while space standards are too. Very small homes, or
others have been demolished after less than homes with very small rooms, are inherently less
40 years. flexible than larger spaces.
The reasons are undoubtedly complex – social, Expectations generally increase as time goes
physical and/or economic – but in principle it on. Outside WCs used to be the norm and shared
makes sense to ensure that buildings are resilient bathrooms were relatively common until the
and sustainable. The structure and fabric should middle of the last century. Many pre-war blocks
be built to last, and the homes themselves fit for of flats have been ‘kept going’ by the addition of
purpose, and adaptable to suit people of ages and lifts and internal re-modelling to achieve ‘decent
levels of need, and respond to climate change. homes’ status, but others have proved to be too
The flexibility for homes to function well under difficult or costly to upgrade.
any tenure is an important consideration. Later parts of this handbook promote specific
New tenures are emerging all the time and measures that improve resilience, durability,
it is increasingly likely that homes will be inclusivity and flexibility, and discourage
occupied under different tenures. Communal approaches that cut corners for expediency
arrangements and/or internal layouts that or limit the potential for buildings and spaces
are specifically geared to a specific tenure to evolve over time. This encourages good
may therefore be less future-proof than more custodianship, helping residents to play an active
generic approaches. role in shaping and caring for their environment
Longevity also relies on enduring appeal – the and reducing the burden on landlords.
buildings and the spaces around them must
remain desirable. This hinges on the quality and
integrity of the initial design, the way in which
the materials have weathered and performed
over time and whether the building and its
surroundings have been well maintained.
22
Part II
The standards
23
How to use this part of the handbook The three groups of standards that feature in the
tables are described below:
Part II of the handbook summarises the issues
that should be considered as part of the Nationally defined and universally applied:
design process and includes, or references, fixed requirements that apply to all new-build
the standards and regulations that define housing and are essentially non-negotiable.
performance and promote good design. In They comprise baseline requirements of
doing so, it seeks to simplify what is still a very selected sections of the Building Regulations,
complex area. and will be formally assessed under building
Each of the three main sections is divided into control by building control officers (BCOs) or
topic-based subsections. These begin with a Approved Inspectors (AIs).
summary of design considerations, followed
by a short set of standards. The standards are Nationally defined and locally applied:
in tabular format to distinguish them from the fixed requirements that apply at the discretion
supporting text. Each has a unique, three-part of the local authority, or the Greater London
reference number. Each group of standards Authority (GLA). They include the ‘optional
aims to be as complete as possible, and includes requirements’ for accessibility and water,
the relevant standards from three of the four which will be assessed under building control,
groups identified in the introduction. These are and the nationally described space standard,
colour coded throughout Part II to ensure that which will be assessed under planning.
the status/origin of every standard is immediately
Additional good practice standards:
obvious. As explained in the previous section, the
extra requirements that are important to a
missing group is local planning policy standards
good outcome but remain at the discretion
that can only be added on a project-by-project
of the client and the project team. They are
basis.
unique to this handbook but draw heavily on
existing good practice guidance. They are not
subject to any outside assessment.
24
The nationally defined ‘standards’ are mainly
regulations and too lengthy to include in full in the
tables. Key points have been summarised outside
of the table to avoid confusion. Designers and
other members of the project team will need to
refer to the regulations and Approved Documents
to understand the detail. The new nationally
described space standard (referred to as the
‘space standard’) is outside of regulation and
succinct enough to be reproduced in full.
The additional good practice standards are
25
1.0 Placemaking and How we feel about where we live extends well
beyond our own front door. The quality of our
the public realm external environment is integral to our sense of
wellbeing and belonging. Places that are well
designed become well loved and well used.
The scope of this section
They provide a framework for building stable
1.1 Site appraisal and sustainable communities and a platform
1.2 Landscape and climate for individual fulfilment and mutual support.
1.3 Urban design Feeling valued and proud of where we live leads
1.4 Density and scale to responsibility and good stewardship. The best
1.5 Dwelling mix, tenure and typology places improve over time and are shaped by those
1.6 Streets and parking who live there.
1.7 Building form and composition
Every project starts with an understanding of
1.8 Open space and play
the site – its strengths and weaknesses, what
1.9 Ecology and biodiversity
lies immediately next to it, how it relates to the
1.10 SuDs and surface water run-off
wider neighbourhood, its history, landscape
and climate, how it is currently used and how it
This section looks at all aspects of the external might be better used. The term ‘urban design’
environment and the public realm. It deals with may sound as though it only applies to cities
the issues that need to be considered in order but the general principles of scale, movement,
to create a successful ‘place’ – somewhere that connectivity and character, etc. are relevant to
is attractive, distinctive and vital, has integrity, suburban and rural development too.
character and gravitas, and provides the core
We share a responsibility to make the most of
ingredients for a successful, mixed community
every site but the goal is not simply to build as
to develop.
many homes as possible. The scale and density of
It refers to other published good practice a development should reflect the local character,
guidance such as Building for Life 12, and the the availability of public transport and facilities,
Urban Design Compendium and represents appropriate housing typologies, the need for open
a summary overview of a well-researched space and many other factors. Density should be
and well-documented topic. It should be read optimised, rather than maximised, and buildings
alongside these, and other documents. and spaces designed to work together and endure
over time.
26
The standards in this section are principles for
good practice. They provide an overview of the
core issues and a starting point for successful
placemaking.
A reminder of the three groups of standards and
regulations:
27
1.1 Site appraisal
other stakeholders. It needs to be reviewed by the 1.1.4 Communicate the results of the site appraisal
through annotated diagrams and text and
team to ensure that it fully captures the strengths consider the impact that the new development
and weaknesses of the site and the opportunities may have on the site, its surroundings and
it presents. its ecology.
28
Evaluating the opportunities and constraints of a site
1. Good views across park and southerly aspect = high amenity and high value
2. Area for possible new urban square
3. New green route would link the park to the new square
4. Potential to open up views to attractive listed building on neighbouring site
5. Potential to extend/connect existing routes
6. Noisy road with high levels of pollution
7. Rear of shops – untidy and insecure
8. Need to anticipate future connections for next phase of masterplan
29
Checklist for site appraisal:
Typical features to observe/investigate through • evidence of existing habitats and/or eco-systems
site visits • the nature and condition of boundary walls fences
• the general physical and socio-economic character of and/or hedgerows
the local area • manholes, overhead cables and any other evidence of
• the underlying landscape – whether the site is existing services
on a hillside or in a valley, prone to flooding, its • the potential for the site (or its value) to be improved
topography, soil type etc. or enhanced, for example by land exchange or
• the ‘local climate’ – the direction of the prevailing further acquisition.
wind, whether the site is exposed or sheltered, damp
or dry etc. Typical issues to research through a
• the orientation of the site, the potential for views in desktop study
and out, and for passive solar design • local planning policy requirements including density,
• the availability of public transport and, for sites mix, affordable housing provision, parking, etc.
in London, the public transport accessibility level • the history of the site including its planning history
(PTAL rating)
• the legal situation in respect of restrictive covenants,
• its proximity to other local assets – open space, parks wayleaves, rights of way, boundary issues, etc.
and play areas, shops, schools, community, health
and leisure facilities etc. • archaeology
• existing buildings, other structures and services on • the location and capacity of any above and below
the site, noting those which are worthy of retention ground services; identifying which have potential to
connect into, which must remain in-situ and which
• existing trees and other landscape features, noting could be diverted cost effectively if necessary.
those which are worthy of retention
30
1.2 Landscape and climate
31
gardens (or add a balcony or roof terrace) to A respect for landscape and climate should
homes with a north facing garden. permeate all aspects of the design and
specification. Where it is impractical to locate
A good open view – whether to an open landscape
building entrances on the more sheltered
or across a city – is a prize asset. A layout which
facades, recessed entrances or porches
allows as many dwellings as possible to take
should be considered. Where taller buildings
advantage of a good view is usually a sound
are proposed, winter gardens may be more
strategy in terms of maximising value, as well
appropriate than balconies (more on this in
as spreading the amenity benefit. Rather than
subsection 3.13) and high performance windows
allowing relatively few dwellings to occupy a
may be needed. From the external cladding to the
prime edge and enjoy direct views out, it can
planting, components and detailing should take
be better to design fingers of development that
account of context.
run perpendicular to it and give many more
households an oblique view. Where the view is Notwithstanding the value and importance
to an open space, ‘greening the gaps’ between of these and other approaches, they will only
the fingers not only improves the quality of these be successful if they can be managed and
spaces but also draws the natural landscape into maintained over time. This is much easier when
the development. As density rises, and we face the design creates an environment that is as self-
climate change, the value of green, open spaces sustaining as possible.
increases too.
The edge or boundary treatment of a development Standards
has a big impact on its ability to mesh with its
surroundings. Abutting open land, hard, straight 1.2.1 Ensure that early design proposals
demonstrate a considered and sustainable
edges make a development appear stark and response to landscape, and climate.
alien, particularly when the boundaries are 1.2.2 Ensure that landscape design is not a reserved
nothing more than flimsy close-boarded fences. matter at the planning stage as this allows
developers to cut out, or water down, the
More organic lines, softened further by hedges or
proposals.
planting that bleed out into the wider landscape,
are much more successful. 1.2.3 On larger sites, devise a landscape strategy
that includes plans for implementation,
management and maintenance. Use Section
A strategic response to landscape can also turn 106 obligations to deliver these objectives.
problems into attributes. For example, in areas
1.2.4 Use the strategy to guide design development
prone to flooding, swales and balancing ponds and specification. Consider how it can be
can give developments a strong identity, provide reinforced and carried through into all aspects
of public realm design.
amenity and create new wildlife habitats.
32
Working with the underlying topography
traditional building
forms reinterpreted in
new trees interspersed a contemporary and informal grouping
among the buildings help sustainable way appropriate to the
to soften the hard lines natural setting
33
1.3 Urban design
34
a similar scale, form and proportion, continue Standards
established building lines and find a fit with local
character. Occasionally the context has little or 1.3.1 Meet the core aspirations of Building for Life 12
nothing to offer and it is then appropriate to make by ensuring that:
a ‘clean break’, establish a new set of rules and • the development is connected to, and
integrated with its surroundings
develop a distinctive new character. Done well, • the layout is legible, permeable and uses
this often acts as a catalyst for wider change. visual clues or markers to allow people
to navigate through the site and orientate
Character, continuity and enclosure are important themselves within it
to the creation of safe, successful streets and • streets are connected, well-used and well-
overlooked and dead-ends and blank walls
open spaces, especially in urban areas. Places avoided
also need to be easy to navigate with routes that • landscape and buildings are designed to work
35
Using urban design principles to enhance the setting of a local landmark
and add value
36
1.4 Density and scale
10 Superdensity: the Sequel, HTA LLP, Levitt Bernstein, Pollard Thomas and Edwards, PRP Architects
37
Diagram illustrating typical characteristics at a range of densities
density range up to 50dph 50-100dph 100-150 dph 150-250dph 250+ dph
typology houses
storey height 2 to 3
3 to 5
4 to 7
6 to 9
7 and over
on street + undercroft
undercroft or underground
management none
implications
light
moderate
heavy
38
Even when the same metric is used, the
methodology for calculating density often varies.
There are different rules about where to draw
the ‘red line’ (back of pavement or centre of road)
whether to include public open space and, in
some cases, how to factor in non-residential uses
and integral parking. The methodology required
by the GLA for calculating density takes account
of these factors. It is reproduced in Appendix K.
The definition of ‘habitable room’ also varies.
Some LPAs include all kitchen/dining rooms
Standards
1.4.1 Check local planning policy requirements for
density (and the method of calculation to be
used). Be guided by these targets or limits
but challenge them where there is a strong
justification for deviating from them and
consider appointing a planning consultant
where proposals are likely to be contentious.
1.4.2 Aim to optimise, rather than maximise, density
and consider it alongside a range of other
issues including scale, massing, typology, mix,
tenure, block layout, service charges, public
transport and local facilities, parking and open
space requirements.
39
1.5 Dwelling mix, tenure and typology
40
the top floor can work well too. Maisonettes and Standards
duplexes are a good option because, like a house,
they offer greater separation between living and 1.5.1 Development should be tenure blind and homes
sleeping areas. of different tenures integrated.
Most local authorities require some wheelchair 1.5.2 Aim to provide a good tenure mix and range
of dwelling sizes and types, in line with local
housing, and housing for older people planning policy requirements, and taking
(specialised and mainstream options) should also account of the site and its context.
be considered in all larger developments. Three 1.5.3 Aim to provide houses with gardens for
larger families even in urban locations, and
storey homes are impractical for these user consider alternatives such as double-stacked
groups because they need a special type of home- maisonettes where density targets make
lift and means of escape is compromised. houses impossible.
41
1.6 Streets and parking
42
soften the effect of parking, provide habitats for Most residential streets need to provide for car
birds and insects, absorb CO2 and improve air parking. The NPPF invites local authorities to
quality. To be sustainable over time (stay healthy set parking requirements for new development,
and require little maintenance) trees must be and in setting these targets, the following factors
carefully specified, located, and planted within should be considered:
tree pits that are designed to suit their purpose
n the proximity of the site to local services and
and location, taking account of their eventual size
the availability of public transport and cycle
and kept clear of underground services. Where
networks
new streets are proposed, good coordination
between the landscape architect and the services n the tenure, mix and type of development
consultant should ensure that combined services
n levels of local car ownership
trenches are positioned to allow for continuous
43
Creating successful residential streetscapes – getting the basic
elements right
44
New development should avoid exacerbating pavements to narrow the road and create safer
pressure on existing streets, as this can be crossing points. Perpendicular parking should
a major source of tension within the existing usually be confined to one side of the street
community. In lower density settings, all the except in a short stretch where the space can be
parking is usually at grade, either on-street, in treated almost as a public square.
curtilage or in parking courts. These options all
Providing access for refuse vehicles is equally
work well but where parking exceeds one space
challenging. Cul-de-sacs are best avoided for
per home it can be a challenge to incorporate
many reasons, not least to avoid the large turning
enough spaces without cars dominating the
heads that often destroy the scale and intimacy of
street scene. Allocated parking is popular
quiet residential enclaves – just for a short-lived
with residents (particularly homeowners) but
weekly ritual. Well-designed hard landscape can
unallocated parking is more flexible because
45
Standards
1.6.1 In all but the smallest developments, develop 1.6.9 Prioritise the needs and safety of pedestrians
a street hierarchy as part of the urban design and cyclists. Consider the need for dedicated
strategy. Represent this through a series of pedestrian routes and/or cycle lanes especially
typical street sections which show building where there is potential to connect into existing
heights, and identify zones for pedestrian cycle or planned local networks. Provide cycle
and car movement, car parking trees/planting parking for visitors in addition to, and separate
and services and front gardens/defensible from, provision for residents.
space.
1.6.10 Consider car-clubs and, on larger sites,
1.6.2 Comply with the principles of Manual for Streets. investigate the potential for bus routes to be
extended or new bus stops added to serve the
1.6.3 Carry out vehicle tracking as necessary to new development.
ensure that road widths and junction radii are
adequate for turning and manoeuvring, but 1.6.11 Where parking is in-curtilage, incorporate this
ensure that these do not dominate the design. at the side of dwellings rather than in front,
and where on street, use parallel, rather than
1.6.4 Ensure that streets are designed to adoptable perpendicular arrangements.
standards, and engage with the highways
department at an early stage. 1.6.12 Mitigate the visual impact of parking on the
streetscape through comprehensive landscape
1.6.5 Subject to local authority requirements, aim proposals. Include tree planting in all new
to confine tarmac to main feeder roads and streets; select appropriate species and space
use paving elsewhere. Select dark colours trees accordingly, ensure that pavements are
to disguise oil spills particularly in parking wide enough, tree pits large enough, and that
areas. Ensure that parking bays are delineated services are installed in dedicated zones, clear
from the carriageway by contrasting paving or of tree and planting areas.
edging, not by painted lines, and use permeable
paving.
1.6.6 Check local planning parking requirements
and reconcile this with local market research.
Ensure that appropriate provision is made
within the site boundary to avoid increasing the
pressure on surrounding streets. Include an
allowance for visitor parking and provide 10% of
this as disabled spaces (in addition to allocated
provision for wheelchair-using residents).
1.6.7 Create live frontages with frequent entrances,
windows, and habitable rooms at street level
while ensuring enough privacy.
1.6.8 Aim to meet the requirements of Secured
By Design: New Homes 2014 and achieve
certification for Section 3: Ancillary Security
Requirements, where appropriate.
46
1.7 Building form and composition
47
times of day. Every street corner is a landmark Standards
opportunity, however modest – often a chance to
step up in height – and always in terms of design. 1.7.1 Ensure that the design of every building
demonstrates awareness of its context and
Roof form is equally important. The ‘wrong’ place within the urban design strategy and
material or pitch looks uncomfortable, and cheap resolve the form and composition before
undertaking pre-application consultation.
fascias, barge-boards and rainwater goods
can let down an otherwise elegant building. 1.7.2 Pay attention to every element of the building
facade as the design develops and plan ahead to
Boiler flues, vents and satellite dishes can be avoid unsightly flues, vents and satellite dishes
equally unsightly so the location of kitchens and particularly on street-facing facades.
bathrooms needs early consideration – ideally 1.7.3 Aim to provide buildings that are ‘of their time’
but that also exhibit a timeless quality.
vertical duct space should be built into floor
plans to allow flues and vents to be grouped and See sub-section 1.10 SuDs and surface water
run vertically. run-off for green roofs and Appendix G for
Green roofs have a place, and technology considerations associated with window design.
continues to improve, but they should only be
contemplated where landlords are prepared to
commit to a long-term maintenance plan. Planted
walls should normally be avoided because of the
maintenance implications.
48
1.8 Open space and play
Design considerations animates the edges and helps the space to feel
part of the street scene. Well-placed, obvious
A well-designed public open space is often the entrance points aligned with pathways increase
heart of a new development and, if successful, footfall, create strong sightlines, and provide
will also become the heart of the community. subtle subdivision, allowing the space to be used
By definition, public open space is for everyone. in different ways at the same time. For some,
It needs to be enticing, safe, accessible and it will be a peaceful refuge, and for others, a
multi-functional – welcoming to people of all ages chance to run or work out after a sedentary day in
and abilities and designed to support relaxation, the office.
49
groups and cultures. Separate dog exercising Standards
areas can resolve conflict in use, and in urban
areas, public open space generally works best 1.8.1 Ensure that an open space strategy, including
with planted boundaries that can be locked at a play strategy, forms part of the overall
masterplan for all but the smallest sites,
night. Design should always consider future and is informed by existing and planned local
management and maintenance to ensure long- provision, and the views of local people.
term prosperity. 1.8.2 Use public open space to give a scheme its
identity; ensure that it is designed for everyone
The provision of public open spaces is a key factor and is multi-functional.
in promoting active living and providing important 1.8.3 Ensure that space is overlooked and designed
physical, psychological and social health benefits for year-round use, a large proportion of the
space is green, and, where appropriate, it is
for individuals and the community. The Active by
enclosed.
Design agenda outlined in the Design Council’s
Designing places for healthy lives is designed to 1.8.4 Ensure that a long-term management plan is in
place.
increase activity within buildings and the external
1.8.5 Provide for an appropriate range of play spaces,
environment.11 based on the guidelines in the tables on pages
52 and 53.
National Housing Federation guidance on
managing green space is available within their
publication Greener Neighbourhoods: A Good
Practice Guide to Managing Green Space (2011);
further advice is also available within the Design
Council CABE publication Managing Green
Space (2010).
The GLA SPG Shaping neighbourhoods: play and
informal recreation (2012), provides excellent
guidance about designing for play which has
general relevance beyond London. The tables on
page 52 are adapted from this publication.
Further guidance is available from Play England;
Design for Play: A guide to Creating Successful
Play Spaces and Managing Risk in Play Provision:
Implementation Guide.
11 Design Council, Active by Design: Designing places for healthy lives www.designcouncil.org.uk/projects/active-design
50
Putting public open space at the heart of the community
well-designed
buildings animate
the edges of the
space and make
it feel part of the
street scene
landscape
integrated
with play
opportunities for
shared surface streets act open space responds to Active
informal meetings
as an extension to the public by Design agenda
with friends and
space
neighbours
51
Table summarising a range of playable space typologies
Doorstep playable Local playable space Neighbourhood Youth space
space playable space
Description • landscaped space • flexible, landscaped • varied, natural • social space for young
with features that space with space, with open people to meet, hang out,
engage young equipment that and secluded areas, take part in informal sport
children and allow allows children up landscape and or physical, recreational
parents/carers to 11 to be physically equipment that activities
to sit and talk active, and parents/ allows children up • no formal supervision
while providing carers to sit and to 11 to be physically
supervision talk while providing active, and parents/
casual supervision carers to sit and talk
Min size 100m2 300m2 500m2 200m2
Age group 0–5 0–11 all ages 12+
Location • residential area • residential areas • larger residential • larger residential areas
including housing including housing areas including including housing estates
estates estates housing estates • adjacent to community
• pocket parks • local parks • local parks facilities
• public squares • district parks • local parks
• school playgrounds • district parks
• town centres
Examples • landscape • natural landscape • as local playable • facilities for informal
of suitable • climbable objects with mounding and space and with: sport/recreation
facilities • fixed equipment equipment that • bike, skate and (e.g. table tennis)
• seating allows children to skateboard facilities • multi-use sports area
• sand/water etc. swing, slide and • shelter (MUSA)
where possible climb • climbing walls or • multi-use games area
• kick about area boulders where (MUGA)
• walled/fenced ball possible • climbing walls or boulders
games area with • BMX track, traversing wall,
basket ball nets fitness trails etc.
• seating (away from • kickabout area
equipment) • outdoor stage
• youth shelter
Adapted from Table 4.6 of Shaping neighbourhoods: play and informal recreation.
52
Table summarising a range of play provision in new developments
No. of children 10–29 30–49 50–79 80+
Size of space 100–300m 2
300–500 m 2
500–800m 2
800m2+
required
Facilities for on-site doorstep on-site local playable on-site local playable on-site local or
under-5s playable space space space neighbourhood playable
space
Facilities for on-site playable on-site local playable on-site local playable on-site local or
5–11s space unless already space space neighbourhood playable
available within 400m space
For 12+ off-site facilities off-site facilities off-site facilities off-site facilities within 800m
within 800m within 800m within 800m (or on- (or on-site where no existing
Adapted from Table 4.7 of Shaping neighbourhoods: play and informal recreation.
53
1.9 Ecology and biodiversity
54
Taking every opportunity to contributing to ecological value and biodiversity on a
small infill site
(Sketch based on a scheme designed by Peter Barber architects)
55
1.10 SuDs and surface water run-off
57
Table of typical SuDs interventions
(Ref CIRIA C697 – The SuDs manual, 2007)
58
About Pros Cons Suitability
Rainwater tanks collecting • Diverts water from the • Overflowing issues • Where there is
rainwater from roofs for sewer network reducing can arise if capacity is sufficient roof area
re-use in toilets, external flooding and resultant reached without enough to collect enough
irrigation and washing water quality problems consumption water for use and
machines. Downpipes fed • Reduces the demand • Where roofs are small and where there is
directly into tanks. on mains water for the developments large e.g. space for a tank.
fittings the rainwater blocks of flats, the supply
supplies i.e. toilets. will not meet demand
• Systems can be complex
and costly to install
landscaping typically along and ecological benefits of amounts of water in deal with more
roads or pathways. a scheme with planting extreme events frequent rainfall
that is naturally watered • Not suited to steeply events.
• Easily integrated into sloping sites.
landscaping with aesthetic
benefits
• Relatively low
maintenance
• Effective at removing
urban pollutants.
59
About Pros Cons Suitability
Broad, extensive, vegetated • Suited to reduce run-off • Potentially space hungry • Where space
drainage channels, designed rates and volumes to create an adequate allows, these create
to store or infiltrate surface • Easy to maintain as part of area for required water an interesting
water. normal landscaped areas collection and potentially
• Low cost to install • Is not suited to tree ecologically
Often sown with grass,
• Effective at removing planting biodiverse feature.
Swales
to infiltrate into the ground • Effective at removing sites as water is allowed to permit.
beneath. urban pollutants drain through
• No additional land areas • Cannot be used to cater
required as it is an for run-off containing high
integrated solution amounts of sediment due
• Low maintenance with no to clogging potential
pooling of water on roads • Sometimes difficult to get
and paths roads or paths adopted by
• Available in a variety of local authorities.
surface finishes.
Soakaways are excavations • Able to attenuate road/ • Not suitable for poor • Can be used on tight
in the ground typically filled pavement surface water draining soils urban sites where
with loose material (›30% run-off • Cannot be used to drain soil conditions
void space) such as rubble • Valuable in restricted polluted runoff permit.
which provide stormwater sites to allow shallower • Underground features
Soakaways
60
About Pros Cons Suitability
Gravel filled trenches • Collects water for • Cannot be used to cater • Where there is
with perforated pipe or infiltration or filtration of for run-off containing high sufficient linear
Trenches
geocellular units in the surface water run-off amounts of sediment due space alongside
bottom. Sometimes known • Significantly reduces run- to clogging potential hardstanding.
as French drains. off rates. • High maintenance to
prevent clogging and to
replace and clean stones.
Ponds designed to attenuate • Permanent pond serving • Large area of land • Suitable where land
and treat rainwater run-off to store significant required area is available.
and stormwater. amounts of water • Water can become
61
2.0 Communal spaces
The scope of this section social interaction and create conditions for allow
dual aspect, are also on the increase.
2.1 Approach routes and entrances
2.2 Circulation areas, lifts and stairs The Housing Standards Review has affected
2.3 Outdoor amenity spaces some aspects of the design and specification
2.4 Undercroft and underground parking of communal areas, particularly accessibility
2.5 Bike and bin storage and other and security. All housing-related accessibility
ancillary spaces requirements are now in regulation, and Approved
2.6 Utilities, meters and communications Document M (AD M) defines three categories of
technology dwelling. Each follows a similar structure and is
2.7 Special considerations in mixed- divided into two main sections. Section A of each
use buildings category deals with the approach to the dwelling
(all areas leading up to the private entrance) and
This section applies to flats or other dwelling Section B, with the dwelling itself, (beginning at
types that are served by communal areas. the private entrance). Section A is the part that is
As density rises, these areas become more relevant to communal areas.
complicated – often intensively used and heavily
serviced. They can easily feel institutional, Access to plant and services for maintenance,
particularly ‘double-loaded’ corridors (those that repair and renewal tends not to be covered by
serve flats on both sides). Undoubtedly efficient, any standard but can have a huge impact on the
they are often long and dark – at best boring, and smooth day-to-day functioning of a development
at worst, intimidating. They also give rise to a and its long-term sustainability, so some basic
high proportion of single aspect flats with limited principles are included here.
outlook and character, poor ventilation and more A reminder of the three groups of standards and
prone to overheating. regulations:
Flats now account for over 90% of new homes in
London and the GLA standards have done a great Nationally defined and universally applied
deal to stem the flow of double-loaded corridors
by encouraging dual aspect homes. They also limit Nationally defined and locally applied
the number of dwellings per floor, and per core,
Additional good practice standards
while being mindful of the need to keep service
charges manageable, especially for lower income
Local planning policy standards and bespoke
families. Smaller clusters and deck access are
client requirements, including tenure variations
now more common, and other, more ambitious
(see Appendix B) should be added for each project.
circulation solutions, such as atria, that encourage
62
2.1 Approach routes and entrances
64
Approach routes and entrances
robust internal
digital door entry system finishes cope with
with visual and audio heavy traffic and need
recognition little maintenance
level approach route
and accessible
threshold
65
2.2 Circulation areas, lifts and stairs
66
Making more of communal circulation areas
bay windows to
kitchens allow flats
to become dual
aspect and protect
privacy
‘double-loaded’
corridor rejected
in favour of linear
atrium with bridges
and light wells
results in a more
interesting and
convivial space
67
Standards
2.2.1 The communal circulation areas to every 2.2.7 As a general rule, each lift-served core should
Category 1 home must meet the accessibility serve a maximum of 25 dwellings or 100
requirements of AD M Section 1A Approach to bedspaces, with a maximum of eight dwellings
the dwelling, of Part M, regulation M4(1) Visitable per floor. Secondary security measures, such
dwellings. as fobbed doors to each at landing level that
restrict access to groups of eight flats, can
2.2.2 The communal circulation areas to every
allow overall numbers to be increased. This is
Category 2 home must meet the accessibility
particularly useful where two lifts are provided
requirements of AD M Section 2A Approach
as it spreads service charges.13
to the dwelling, of Part M, regulation M4(2)
Adaptable and accessible dwellings. 2.2.8 Aim to make Category 2 the minimum standard
for all circulation areas. As a minimum,
2.2.3 The communal circulation areas to every
and irrespective of lift provision, ensure the
Category 3 home must meet the accessibility
following:
requirements of AD M Section 3A Approach
to the dwelling, of Part M, regulation M4(3) • all corridors and decks are at least 1200mm
Wheelchair user dwellings. wide (preferably 1500mm to allow for
wheelchair turning)
2.2.4 Communal doors and windows must meet the
• all doors at entrance level have a clear
security requirements of Part Q, regulation Q1
Unauthorised Access. door opening width of at least 850mm and a
300mm nib to the leading edge.
2.2.5 The lift and stairs should be within sight of the
entrance area, or clearly signed. Stairs should 2.2.9 Provide at least one lift to every home on the
be attractive and prominent to encourage fourth floor or above, and two lifts to all homes
active, healthy lifestyle choices. on the seventh floor or above. Provide two lifts
to all Category 3 dwellings where possible.14
2.2.6 Avoid long doubled loaded corridors and ensure
that communal circulation areas receive 2.2.10 Where possible, provide two lifts to every
daylight where possible. Category 3 dwelling to give cover in the event of
breakdown.15
68
2.3 Outdoor amenity spaces
69
Incorporating communal amenity space in higher density developments
70
Standards
2.3.1 Aim to ensure that every flat has access to 2.3.5 Design for incidental play using natural
communal space that: elements, and discourage boisterous play
and ball games by breaking up the space with
• is overlooked by surrounding development
planting, seating, mounding and changes of
• is accessible to all residents of the block
material etc.
• is designed to take advantage of direct
sunlight 2.3.6 Consider the interface between any private
• has suitable management in place16. gardens, or terraces, and the communal space
carefully. Aim for privacy screening rather than
2.3.2 Provide fobbed access to the space from all
a solid barrier, and use railings and planting
cores. Aim to provide additional, secure access
rather than timber fencing. Avoid cheap timber
directly from the street for mowers and other
sheds and use neat storage ‘pods’ or integrate
large maintenance equipment. Where this is not
the external storage where possible. Consider
possible, ensure that one core has extra wide
71
2.4 Undercroft and underground parking
Undercroft parking is more viable and practical 2.4.2 Avoid underground parking for residents on
lower incomes.
for affordable rent and intermediate tenures but
still has far-reaching implications and should 2.4.3 Where undercroft parking is provided,
ensure that it is surrounded by dwellings or
not be undertaken lightly. The most common and other active uses that create a live frontage,
cost-effective solution is to provide parking in a and is only used by residents of that block.
Consider which dwelling typologies are most
covered, ground level courtyard, surrounded by appropriate, and consider the structural and
dwellings or other active uses. services implications where different dwelling
types are stacked.
Not unreasonably, planners will usually require
2.4.4 Install charging points for electric cars, or
the cars to be shielded from view – usually make future provision.
‘wrapped’ at street level by dwellings or other 2.4.5 Aim to meet the requirements of Secured
uses that create an active frontage and an By Design: New Homes 2014 and achieve
certification for Section 3: Ancillary Security
attractive streetscape. Dwellings will inevitably
Requirements, where considered appropriate.
72
2.5 Bike and bin storage and other ancillary spaces
73
Standards
2.5.1 Meet the bin storage/screening requirements 2.5.6 Ensure that stores are covered and well lit, and
of Part H (H6 of AD H) to reduce bin blight. provide individual, allocated stands or hangers
but avoid double stacking where possible. In
2.5.2 Ensure that bin stores meet the storage and
high risk areas, consider the need for individual
collection requirements of the local authority.
lockers within each store.
2.5.3 Locate bin stores close to cores or within
2.5.7 Where feasible, provide cycle storage in a form
courtyards where these are large enough.
that is suitable for storing other ‘outdoor’ items
Where integral with the building footprint,
including prams/buggies, sports/camping
ensure that bin stores are not sited directly
equipment etc.
next to, or below, a private front door, bedroom,
main living space or balcony. 2.5.8 Ensure that plant rooms are not located next to
entrances, or sound sensitive spaces such as
2.5.4 Design for waste and recycling to be deposited
bedrooms and main living spaces and that extra
and collected from outside, and avoid refuse
soundproofing is incorporated as required in
chutes. Ensure that stores are:
subsection 3.7.
• accessible to wheelchair users
• well lit and ventilated 2.5.9 Meet the requirements of Secured By Design:
New Homes 2014 and achieve certification for
• fitted with robust, scratch resistant, lockable,
Section 3: Ancillary Security Requirements,
metal doors
where considered appropriate.
• fitted with a tap and floor gulley (within a
concrete floor laid to falls) and suitable for
hosing down. See also subsection 3.7 for soundproofing.
74
2.6 Utilities, meters and communications technology
75
Standards
2.6.1 Locate all sub-stations, building services 2.6.8 Set aside space for service risers and main
running across or under the site, and locate service runs at an early stage, allowing for
the nearest data, power, water/sewerage, gas insulation where necessary. Consider how
connection points and heat networks. these can be discreetly integrated and tamper-
proof while allowing easy access for testing,
2.6.2 Contact UK Power Networks (UKPN) to
repair and renewal. Allow adequate ceiling
determine whether there is adequate capacity
void depth for recessed light fittings and
in the nearest electrical sub-station for the
service runs.
new development. Where capacity exists, apply
for connection early to ensure the capacity is 2.6.9 Plan for soil and vent pipes (SVPs) and
reserved. incoming services to be accessible from
communal areas, rather than within flats,
2.6.3 Make contact with all utilities companies in
wherever possible. As a minimum, provide
good time – they can be notoriously slow to
isolation valves in communal areas to mitigate
respond, provide information and/or carry out
damage in the event of a problem and avoid
works.
disturbing residents.
2.6.4 Check whether mobile telephone masts exist on
2.6.10 Ensure that risers containing gas can be
site and whether they can be moved/removed
adequately ventilated to prevent pressure
or reinstated. Where th ey are to be reinstated/
build-up in the event of a leak.
installed on roofs, consider the potential effect
on the sale value of adjacent dwellings. 2.6.11 Plan for either an adequate mains connection
or large water tanks where sprinkler systems
2.6.5 Determine the energy strategy at an early stage
are to be included.
to ensure space can be included in homes and
communal spaces for plant, service cupboards 2.6.12 Co-ordinate SVPs terminations at roof level (to
and horizontal and vertical ductwork runs. avoid clashes with other installations such as
solar panels) and boiler flues and other outlets
2.6.6 Where hot water is distributed through
on building facades.
communal spaces, especially corridors, ensure
pipework is adequately insulated, the network 2.6.13 Provide multiple data connections and TV
is planned efficiently and corridors are suitably signals from satellites to dwellings to allow for
ventilated. connection to all broadband and TV services
(such as Sky +). Use communal dishes where
2.6.7 Where gas connections exist on site, provide
possible and consider locations carefully.
space externally for meters allowing for
designed enclosures to reduce their visual
impact.
Building services and utilities have also been addressed in the following subsections:
2.2 Circulation areas, lifts and stairs
2.5 Bike and bin storage and other ancillary spaces
2.7 Special considerations in mixed-use buildings
3.5 Energy, together with Appendix F (which also covers district and communal heating).
76
2.7 Special considerations in mixed-use buildings
dynamic approach to
massing and elevations
allows a mixed-use
building (housing above
a community facility)
large winter gardens to become the focal
provide better privacy, point in a new, urban
soundproofing, and shelter development
for year-round enjoyment,
than balconies carefully chosen
dwelling mix – smaller
homes for younger
or older singles
and couples more
appropriate than family
homes, and private
rent more appropriate
than affordable rent
78
3.0 The home
The scope of this section planners. Where LPAs do not adopt the new
menu of optional standards and regulations, it
3.1 Space standards now falls to clients to require the higher level
3.2 Internal layout standards, fill gaps left by the withdrawal of
3.3 Accessibility (Category 1, 2 and 3 the Code and funding standards, and deal with
dwellings) issues such as overheating and air quality which
3.4 Security are becoming increasingly problematic and have
3.5 Thermal comfort not been satisfactorily addressed by standards
3.6 Water efficiency to date.
79
3.1 Space standards
Design considerations The GIAs allow for one bathroom in all homes,
and for a second WC and basin in all homes
The introduction of the first nationally described, with more than one storey, and in single storey
cross tenure space standard is one of the main homes for five or more people. There is nothing
outcomes of the HSR. The standard is not to prevent additional bathrooms, shower rooms
mandatory but applies at the discretion of LPAs and/or studies from being included within the
and the GLA, subject to evidence of need and minimum GIAs, provided that the minimum
viability. Under the terms of the HSR, planning bedroom and storage areas are met first.
authorities cannot change, reduce, or add to,
the space standard. It is very similar to the The floor areas are based on the provision
former GLA standards (which it now replaces) of winding stairs as this is the most compact
but is significantly above the minimum funding configuration and is permitted under Category 2.
requirements of the Housing Quality Indicators Straight flights are often considered preferable
(HQIs), particularly for dwellings on more than to winding or dogleg stairs because falls occur
one floor. less frequently, and stairlifts are cheaper where
there is no change of direction. Where straight
It is suitable for dwellings designed to flights and/or extra bathrooms are desired, it
accessibility Categories 1 and 2, but not Category will usually be necessary to add additional floor
3 (wheelchair user dwellings). The aim is to area in order to avoid ‘robbing space’ from the
ensure that every home can accommodate typical living/kitchen/dining areas (L/K/D), which are not
items of furniture and the associated activity, and protected under the space standard. The same
circulation space needed for daily living, when principle applies where the dwelling footprint
fully occupied. needs to be an unusual shape to suit the site, or
The standard provides minimum Gross Internal the location of the entrance door is constrained by
(Floor) Areas (GIAs) for a range of typical dwelling other factors.
types, described by the number of bedrooms and
bedspaces (or people) the dwelling provides. A
home with two double (or twin) bedrooms and
one single bedroom is therefore referred to as a
3 bedroom 5 person (3b5p). It also sets minimum
standards for ceiling height, bedroom areas and
widths, and general, built-in storage.
80
Standards
3.1.1 Where applied through local planning policy, Table 1
meet the nationally described space standard
Number of Number of 1 storey 2 storey 3 storey Built-in
which requires that: bedrooms bedspaces dwellings dwellings dwellings storage (m)
a. the dwelling provides at least the Gross 1p 39 (37)3 1.0
Internal (floor) Area1 (GIA) and built-in 1b 2p 50 58 1.5
storage area set out in Table 1 on the right.
2b 3p 61 70 2.0
b. a dwelling with two or more bedspaces has at
least one double (or twin) bedroom. 4p 70 79
c. in order to provide one bedspace, a single 3b 4p 74 84 90 2.5
bedroom has a floor area of at least 7.5m2 and 5p 86 93 99
is at least 2.15m wide. 6p 95 102 108
d. in order to provide two bedspaces, a double
4b 5p 90 97 103 3.0
(or twin bedroom) has a floor area of at least
81
3.2 Internal layout
82
3.2.6 A shower should be installed over the bath and
a second bathroom or shower room provided in
Information to include on each dwelling plan:
a home for 7 or more people. This may be the
entrance level WC in a house, provided that the • dwelling type i.e. the number of bedrooms and
shower is installed from the start. Where the bedspaces
shower is a floor gulley the floor should be laid
• accessibility category that the plan is designed to
to falls and the room designed as a wetroom
meet (Category 1, 2 or 3)
from the outset.
• function of each space (with the principal bedroom
3.2.7 Bathrooms should have natural light and
identified)
ventilation where possible but windows should
not be placed above the bath unless this is the • overall internal floor area (GIA)
3.2.11 Aim to ensure that all windows can be • written and drawn scale
safely cleaned from inside, in line with the • north point.
requirements of Part K for non-residential
buildings.
83
Building in flexibility to adapt the home over time
flexible
sleeping/
study/ 2
bathing
1
spaces
3
6
4
4
5
7 8
84
3.3 Accessibility (Category 1, 2 and 3 dwellings)
For planning purposes, LTH has been replaced LPAs need to decide which dwellings will be
by the optional requirement M4(2) Accessible subject to an allocations policy and should
and adaptable dwellings (Category 2), and all therefore be ‘wheelchair accessible’ (ready for a
wheelchair standards replaced by the optional wheelchair user to occupy from the outset) and
requirement M4(3) wheelchair user dwellings which can be ‘wheelchair adaptable’ (capable
(Category 3). Both are now included in Approved of being readily adapted to become ‘wheelchair
Document M (AD M) as alternatives to M4(1) accessible’).
Visitable dwellings (Category 1), which remains the
baseline regulation; applying by default where no
higher standard has been required.
85
The new regulations are too extensive to
reproduce here and must be studied in full. As
elsewhere, additional good practice standards are
also included. Examples of compliant Category 2
and Category 3 plans are included in Appendix E.
Standards
Category 3 dwellings (where required under local
Category 1 dwellings: planning policy):
3.3.1 Meet the requirements of AD M Section 1B 3.3.8 Where required by the LPA, meet the
Private entrances and spaces within the dwelling, requirements of AD M Section 3B Private
(Part M, regulation M4(1) Visitable dwellings). entrances and spaces within, and connected to the
dwelling (Part M, optional requirement M4(3)
3.3.2 Aim to increase the WC/cloakroom to at least
Wheelchair user dwellings).
1100mm wide and 1800mm long.
3.3.3 Ensure that stairs are at least 850mm wide and 3.3.9 Provide straight stair flights where possible
(M4(3) requires a power socket)
provide a power socket at the foot or head of the
stairs to facilitate the fitting of a stairlift. 3.3.10 In homes for 5 people and above, provide
the required bath and shower in separate
3.3.4 Include as many other Category 2 requirements
bathrooms where possible.
as possible particularly where the space
standard applies. Wider doors, nibs and the 3.3.11 Provide an accessible parking space close to
accessible bathroom are all easily incorporated all wheelchair homes and, where practical,
and benefit everyone. (The level access shower a covered carport linked to the entrance of
is more difficult to justify in homes without ‘wheelchair accessible’ dwellings.
step-free access).
3.3.12 Install sprinkler protection where possible,
particularly to ‘wheelchair accessible’
Category 2 dwellings (where required under local dwellings.
planning policy):
3.3.5 Where required by the LPA, meet the
requirements of AD M Section 2B Private
entrances and spaces within the dwelling, (Part
M, optional requirement M4(2) Accessible and
adaptable dwellings).
3.3.6 Provide straight stair flights where possible
and install a power socket at the foot or head of
the stairs to facilitate the fitting of a stairlift.
3.3.7 Form a soft pocket in the first floor to
accommodate a future through-floor lift in
homes designed for older people.
86
3.4 Security
87
Summary of key points of AD Q1
88
3.5 Thermal comfort
89
Environmental cross connections
Orientation
Building fabric
Heating, lighting
Low and zero and controls
carbon technologies
Aftercare/soft landings
Water
consumption
Energy performance
£ post-construction
90
and can be slow to respond which means that Standards
it only works where residents understand the
implications and it suits their lifestyle. 3.5.1 Meet the energy efficiency requirements of
Part L1A 2013.
District heat networks (DHNs), which supply heat
3.5.2 Take a fabric first approach on new
to a group of buildings, and communal heating, developments.
which serves a single building, are often specified 3.5.3 When selecting heating systems consider
in high density developments as efficient means future proofing them in terms of fuel choice
and system selection, while bearing in mind
of providing communal hot water and heating.
maintenance, ease of use for residents and the
While they have the potential to reduce carbon cost of energy bills.
emissions significantly, there are a number
3.5.4 Ensure adequate space for heating and
of issues to consider. A DHN should therefore domestic hot water systems together with their
91
3.6 Water efficiency
92
A good practice example of achieving 110 l/p/d for internal
water consumption
Unit of Measure Capacity/Flow rate
WC (dual flush) Full flush volume (litres) 6
Part flush volume (litres) 3
Taps (excluding kitchen/utility room taps) Flow rate (litres/min) 4
Bath (where shower also present) Capacity to overflow (litres) 180
Shower (where bath also present) Flow rate (litres /minute) 8
Kitchen/utility room sink taps Flow rate (litres/minute) 6
• Baths: lower water capacity baths can be found on the market between 130-150 litres
• Shower flow rates: 5 l/m is considered low flow, ›10 l/m is generally considered water intensive. As a general rule
of thumb 7-9 l/m is considered within the comfortable range of low flow, unless measures are taken to ensure good
water pressure under 7 l/m.
• Washing machine and dishwasher values: these have been set at the default level where their consumption is
unknown. Where the models are known, check their capacity with the manufacturer and enter these values into the
Water Efficiency Calculator for New Dwellings.
Standard
3.6.1 Meet the baseline requirement of Part G 3.6.4 Ensure that the specification of any rainwater
(125l/p/d) as a minimum. and greywater harvesting system takes account
of the needs of the end user and maintenance
3.6.2 Where required by the LPA, meet the optional
implications.
requirement of Part G (110 l/p/d) with reference
to the good practice example above. 3.6.5 Avoid combining green roofs with rainwater
harvesting as this can result in discoloured
3.6.3 Aim to meet the higher standard of 110 l/p/d in
water that is off-putting to residents.
all developments.
93
3.7 Soundproofing
94
3.8 Privacy from overlooking
Minimum privacy distances are often the subject n how frequently the overlooking occurs
of local planning policies which typically require n whether the sightline is direct or oblique –
18-22m between facing windows. This is a useful angled windows help to improve privacy
rule of thumb in lower density locations but
it can create streets and spaces that are out n the scale of the overlooking – we feel much
of character with surrounding development. more overlooked when large windows are
As a general rule, tighter distances are not involved.
95
3.9 Aspect and orientation
96
3.10 Daylight and sunlight
counterintuitive. The average daylight factor 3.10.4 Aim to ensure that at least 50% of the area of
a private outdoor space receives at least two
(ADF) calculated using this methodology can hours of sunlight in the shoulder seasons as
be useful to understand what can typically be defined by the BRE Guide to Site Layout Planning
achieved in similar types of developments. for Daylight and Sunlight.
97
See also Appendix F (energy) and Appendix G
(window design) and the following subsections:
3.5 Thermal comfort
3.9 Aspect and orientation
3.11 Ventilation and air quality
3.12 Overheating
The following ten principles outline a pragmatic, good practice approach to daylight:
1. Living areas and kitchen/dining rooms need more 7. The specification of the glass (particularly its g-value
daylight than bedrooms, but all parts of the home and light transmittance) will have an impact on the
should receive good levels of daylight. amount of daylight and solar gain the room receives.
2. When windows are confined to one wall, the window 8. The minimum targets for average daylight factors
width should be at least 35% of the wall length (BS (ADF) sought by British Standard (BS 8206:2008)
8206:2008). As a rule, the depth of rooms when and the BRE Guide to Site Layout Planning for Daylight
single aspect should not exceed 2 x height, allowing and Sunlight are 2% for kitchens, 1.5% for living
for good daylight and ventilation.18 The depth can be areas, and 1% for bedrooms. These values can be
doubled for dual aspect rooms. difficult to achieve in dense, city centre locations and
should not be rigorously applied, but can be used
3. Higher level glazing (above 0.8mm from the floor)
as a benchmark for understanding and addressing
admits more daylight than low level glazing. (The
variation across units on a site. Note that as ADFs
bottom portion of a full height window provides a
assume an overcast sky, the orientation of a window
very small share of the daylight, typically around
is irrelevant because sunlight is not factored in.
15%)19.
9. Taking account of height and orientation, blocks
4. Light coloured décor (wall, floor and kitchen finishes)
should be sensibly spaced to achieve good daylight
increases the amount of reflected light within the
and sunlight within homes and in external spaces.
space.
10. The measures above should be balanced with
5. Where windows face onto buildings or other large
appropriate shading to prevent overheating.
structures daylight will be reduced so where privacy
allows, larger windows should be considered.
6. Rooflights often cause or contribute to overheating
and undue heat loss and should be carefully sized
and located to avoid south-facing pitches.
98
3.11 Ventilation and air quality
99
because although MVHR will be capable of Where mechanical ventilation cannot be avoided
achieving the required air change rates, people some considerations include:
enjoy air movement. Residents also sometimes
n MVHR is more efficient at reducing heat loss in
find the level of background noise unacceptable
dwellings with an air permeability of less than
and switch it off.
3m3/h.m2 @50Pa.
External planting can be useful to improve local
n MVHR systems bring additional maintenance
air quality by converting CO2 to oxygen and
with filters that require changing by the
collecting airborne pollutants which are later
landlord or occupant. Where filters are not
washed away by rain.
maintained regularly studies have shown that
Some rules of thumb to achieve good levels of the indoor air quality can be very poor. Ensure
natural ventilation in the home adequate space for maintenance and access.
n Mechanical ventilation should be
Depth to floor/
Vent configuration
ceiling height (H)
commissioned and tested thoroughly prior to
handover to ensure its effectiveness.
Single sided, single opening 1.5H
n Where mechanical ventilation systems are
Single sided, multiple opening 2.5H
specified occupants should be provided with
clear and simple instructions on how the
Cross ventilation 5H systems work.
Total area opening n The ductwork runs affect ceiling height and
Heat gains* location of the MVHR unit and should be
% floor area
factored into the design at an early stage to
Low (‹15 W/m2) 10% prevent design clashes.
Medium (15-30 W/m2) 20% n Summer bypass should always be specified so
that heat is not recovered from the home and
High (›30 W/m2) 25% returned in to it on warm days.
n Fan noise should be kept to a minimum to
discourage residents from turning it off and
negating its purpose.
*To put this in context, adults generate ~100W when still or ~160-320W when carrying out moderate work, energy saving lights generate up to
20W/m2, TVs ~100W and ovens ~2500W. Therefore it is more likely that the ventilation required will be in the medium or high range for homes.
Source: RIBA
100
Standards
3.11.1 Meet the ventilation requirements set out in
Part F as a minimum.
3.11.2 Avoid the need for mechanical cooling by
providing dual aspect dwellings (flats and
houses) that achieve effective, natural cross
ventilation.
3.11.3 Provide a variety of window opening options to
allow controlled ventilation through smaller
openings and purge ventilation through larger
openings (or doors). (AD F stipulates that a
window that opens through less than 15˚ is not
suitable for purge ventilation).
20 Source: PassivHaus
101
3.12 Overheating
102
n External planting can help to lower See also Appendix F (energy, including
local temperatures though shading and overheating in corridors) and Appendix G (window
transpiration. Water features can lower design) and the following subsections:
external temperatures though evaporation.
3.5 Thermal comfort
n Dark coloured external materials contribute to 3.9 Aspect and orientation
increased local air temperatures known as the 3.10 Daylight and sunlight
albedo effect and heat island effect. 3.11 Ventilation and air quality
Standards
3.12.1 Carry out overheating analysis, prior to
103
3.13 Private outdoor space and external storage
104
Standards
3.13.1 Where required by the LPA, meet the 3.13.4 Rear gardens should aim to provide the
requirements of AD M Section 3B Private following:
entrances and spaces within, and connected to the
• level access from a kitchen/dining room,
dwelling (Part M, optional requirement M4(3)
living space or circulation (kitchen/diner
Wheelchair user dwellings).
is usually the preferred arrangement for
3.13.2 Provide a private open space for every dwelling families especially where there is a lawn).
at least 1.5m deep and 5m2 for a 1 bed dwelling, • paved patio area (equivalent to the minimum
rising by 1m2 for each additional person. The spatial requirements of standard 3.13.2) and
space may be a front or rear garden, balcony, with lighting and a power socket
winter garden or roof terrace. • socket for a rotary clothes line (accessible
from the patio)
3.13.3 Front gardens should aim to provide the
• turfed lawn and planting beds (where
following:
105
Bringing the outside in
large windows
and patio
doors create a
strong visual
and physical
connection
between the
home and the
garden
106
3.14 Accommodating diversity
But it is also necessary to understand the local While specialised housing for older people
demographic and consider specific housing is outside the scope of this document, the
needs. Providing two living spaces is useful for influential HAPPI report contains ten useful
most families but can be particularly important design principles. The majority are appropriate
for Muslim and Bengali cultures because it allows for all homes, but are particularly useful
cooking and eating to take place in separate when designing with older people in mind. The
rooms and for family members to socialise principles are reproduced below the standards.
separately. Bathing and toileting arrangements
can also be culturally sensitive and it is often Standards
useful to have a second WC, particularly when
this includes a shower. 3.14.1 Understand the local demographic and aim to
meet cultural needs as far as possible while
Where more bespoke provision is needed, this maintaining flexibility over the long term.
Consider the need for:
will usually be initiated by a specialist provider
who will issue a detailed brief. Requirements • additional bathrooms or washing facilities
• separate living spaces
vary widely and may relate to everyday activities • large kitchens with space for eating or
or special occasions such feasts and festivals. separate food preparation areas
Members of the Orthodox Jewish community • larger balconies.
for example may need to sleep where they have 3.14.2 Consider the need for dwellings that meet the
a view of the sky during the week-long festival needs of older people and aim to include the
HAPPI design principles.
of Succohs.
3.14.3 Consider the need for multi-generational
A literature review of publications covering the homes and homes which could be easily
modified to provide self-contained ‘bedsit’ type
design of various forms of non-mainstream accommodation for a relative, carer or lodger
housing, produced by Levitt Bernstein and to live semi-independently.
107
The 10 HAPPI design principles:
1. The new retirement homes should have generous 6. In all but the smallest developments (or those
internal space standards with potential for three very close to existing communities) multi-purpose
habitable rooms and designed to accommodate space is available for residents to meet, with
flexible layouts. facilities designed to support an appropriate
range of activities – perhaps serving the wider
2. Care is taken in the design of homes and shared
neighbourhood as a community ‘hub’ as well as
spaces and with the placement, size and detail of
guest rooms for visiting friends and families.
windows, to ensure plenty of natural light, and to
allow daylight into circulation spaces. 7. In giving thought to the public realm, design
measures ensure that homes engage positively
3. Building layouts maximise natural light and
with the street, and that the natural environment
ventilation by avoiding internal corridors and single
is nurtured through new trees and hedges and the
aspect flats, and apartments have balconies, patios
preservation of mature planting, and providing
or terraces with enough space for tables and chairs,
wildlife habitats as well as colour, shade and shelter.
as well as plants.
8. Homes are energy efficient and well insulated, but
4. In the implementation of measures to ensure
also well ventilated and able to avoid overheating
adaptability, homes are designed to be ‘care ready’
by, for example, passive solar gain, the use of native
so that new and emerging technologies, such as
deciduous planting supplemented by external blinds
telecare and community equipment, can be readily
or shutters, easily operated awnings over balconies,
installed.
green roofs and cooling chimneys.
5. Building layouts promote circulation areas as
9. Adequate storage is available outside the home
shared spaces that offer connections to the wider
together with provision for cycles and mobility aids,
context, encouraging interaction, supporting
and that storage inside the home meets the needs of
interdependence and avoiding an ‘institutional feel’,
the occupier.
including the imaginative use of shared balcony
access to front doors and thresholds, promoting 10. Shared external surfaces, such as ‘Home Zones’
natural surveillance and providing for ‘defensible that give priority to pedestrians rather than cars,
space’. and which are proving successful in other countries,
become more common, with due regard to the kinds
of navigation difficulties that some visually impaired
people may experience in such environments.’
Source: HAPPI Housing our Ageing Population: Panel for Innovation 2009 report for DCLG and DoH, chaired by Lord Best and written by
PTEa and Levitt Bernstein.
108
3.15 Aftercare and home user guides
109
Standards
3.15.1 Provide a thorough one-to-one handover with
the residents of every home with a follow-up
after one to two months. Cover the operation Typical information to include in a Home
of the systems and features within the building User Guide
and arrange it for a time when the residents are (Edited from the Code for Sustainable Homes)
not preoccupied with the process of moving in.
3.15.2 Provide a home user guide covering the Operational issues
detailed operation of the systems and features
• Design features (solar control, natural
within the building. Include the items in the
ventilation etc.)
table to the right and ensure that the equipment
and controls described and/or pictured in • Mechanical and electrical systems – including
the guide match those installed to prevent controls, efficient operation and maintenance
confusion or misunderstanding. (heating, ventilation and lighting etc.)
3.15.3 Ensure that handovers and home user guides • Renewable systems
are also provided to all future residents with
• Water use (internal and external)
versions available in different languages.
• Recycling and waste
3.15.4 Keep spare copies of home user guides and
ensure that housing management staff are • Emergency information
trained to explain the system to residents,
• Links, references and further information
answer queries and able to provide extra help
to vulnerable residents where necessary.
Site and surroundings
3.15.5 Refer to BSRIA’s free guide to Soft Landings
• Recycling and waste
for details of what to do at each stage of the
design and build process. The earlier the Soft • Sustainable Urban Drainage Systems (SuDs)
Landings procedures can be taken on board the
better the final outcome in terms of operational • Public transport
efficiency and occupant satisfaction. • Local amenities
• Links, references and further information
110
Part III
Managing the design process
111
Overview of the client’s role
This part of the handbook looks at the client’s It is extremely helpful for the design team to
role. Planning is a major milestone in any project understand the standards that are required right
and the focus here is on the pre-planning/ at the start. While many things can wait until
design stages and the role that standards play. It later, others cannot. Being clear about what is
touches on post-planning stages because of the expected puts the onus on the design team to
importance of seeing things through to the end. think ahead. Many parts of this handbook have
Further detail is provided in Appendices I and J. highlighted problems that stem from early
mistakes – a failure to consider access to plant
The client’s first task in any project is to weigh
and refuse stores, or a tendency to underestimate
up the opportunity and decide whether to
the amount of parking, wall thicknesses or the
proceed. Whatever the nature of the opportunity
size of wheelchair homes. These are all common
– client-led from the start or late involvement
pitfalls that stem from over-optimism and the
as a Section 106 partner – the client must
pressure to maximise dwelling numbers. They
decide whether the benefits outweigh the risks
can be difficult to correct later. Setting up early
and whether the project has the potential to
meetings with key stakeholders, including
satisfy the business and social objectives of
experts within the clients’ organisation, is vital.
its organisation.
Section 1.0 of Part II stresses the value of a
The design process is every bit as important as
comprehensive site analysis and the importance
the design itself and the client’s role in this is
of the landscape and urban design strategies.
critical. Unless an outside project manager has
It is important that the early stages are not
been appointed, the client must set out the initial
too rushed. All parties should feel that all
aims, produce a comprehensive brief and steer
viable options have been explored and the right
the project – ‘signing off’ each key stage along
‘diagram’ adopted.
the way and remaining in control of the budget
and the programme throughout. Ideally the client Being a good client is hard work – it always feels
also acts as a ‘design champion’, not responsible as though there is a lot to do, and indeed, there is.
for the design but well versed in design The client needs to appoint the consultant team,
principles, committed to quality and confident take responsibility for the Principal Designer role
enough to articulate opinions. He or she also under the Construction (Design and Management)
needs to liaise closely with members of the asset Regulations (CDM), produce a programme, make
management team to ensure that the approach to decisions, tackle problems head-on, organise
future maintenance informs the design process consultation, design reviews and numerous
and lessons learned are passed on. meetings and generally manage the process.
112
Tackling things calmly and methodically, and at A comprehensive checklist of the task that
the right stage, helps to keep morale high and the clients should undertake, or delegate to others,
project on track. Good communication is vital. is included as Appendix I and a checklist of CDM
responsibilities as Appendix J.
Different development scenarios pose different
challenges and housing associations work
in many scenarios in which they are not the
lead client. Design and Build and Section 106
scenarios are often particularly challenging.
These scenarios are considered later in this part
of the handbook.
A table summarising the key actions for the client
and the design team, related to the seven work
stages of the RIBA Plan of Work, is included
below and the following key pre- and post-
planning client-based activities are considered in
some detail in the next subsection:
n appointing the right team
113
Table of key actions for the client and the design team throughout the
design process
RIBA Client actions Design team actions
workstages
1 – Appoint principal designer and other key consultants and – Carry out site appraisal – identify
Monitor progress, cost and programme and keep the project brief and project execution plan up to date
confirm scope of services opportunities and constraints
Preparation – Define the key objectives of the project – Produce initial feasibility studies
and brief – Develop the project brief – Begin to develop the design concept
– Carry out desktop planning survey
Develop the shared vision
115
Captured in a diagram and short paragraph in The second crucial aspect is to be clear about
this way, a shared vision helps to get buy-in from the nature of the consultation and manage
stakeholders, acts as anchor throughout the expectations accordingly. Are residents and other
project and informs decision making. It should stakeholders essentially just being informed,
become part of the project brief and a constant or are they being invited to contribute ideas, be
reminder of what the team is trying to achieve actively involved in decision making – perhaps
and why. even have a vote? Is it appropriate to invite
everyone to the same session or hold different
Producing a clear brief and keeping sessions for different interest groups?
it up to date There are many possible techniques ranging
from visits to completed schemes (at home or
It seems obvious that every project needs a
abroad), away days, workshops, to meetings
clear brief that is kept up to date but this is
and presentations. All have their place and the
comparatively rare in practice. One of the
choice should be guided by the nature of the
objectives of this handbook is to help with
audience, or participants, and what is expected
the briefing process. Getting some generic
of them. Openness, honesty, approachability and
parameters agreed quickly allows the design
keeping people up to date are all essential facets
team to concentrate on the particular challenges
of good consultation. While the client should
and opportunities of each project. Ideas inevitably
expect to arrange and be present at all events,
evolve, requirements change and savings often
it is important that members of the project
have to be made in the course of a project
team are also involved. Designers are best
so keeping the brief up to date is a valuable
placed to explain the design concept/approach/
tracking exercise and provides clarity throughout
proposals and it is important that they get first-
the process.
hand feedback. It can be useful to engage a
professional facilitator, particularly for larger or
Consulting residents and other more controversial projects.
stakeholders
Involving the individuals and organisations likely
Setting up a formal design
to be most affected by new development is critical review process
to acceptance and often enriches the end product.
All projects benefit from design review. At least
The timing of consultation is important and as
two reviews should be built into the pre-planning
a general rule, the earlier the better. Rumour
process. The first should consider the sketch
abounds when new development is planned and
design and review the strategies that are being
it is much better to ‘hear it first’ and get reliable
adopted for all aspects of the project from urban
information directly from the people responsible.
design and landscape to waste management and
116
energy, and the second should ensure that all move to the next stage as and when appropriate.
design issues are satisfactorily resolved before Planning is perhaps the biggest milestone in
the scheme is submitted for planning. most projects and it is vital that the drawings,
the Design and Access Statement, any other
The reviews need not be long but should be
accompanying reports, and the application itself,
structured and comprehensive – the aim is to
describe the proposals accurately and do justice
achieve the best possible outcome and ensure
to the scheme.
that the shared vision has been reflected in the
design proposals and that the project brief, and It is even more important that they embody a
the standards required by it, are being met. A scheme that complies with the project brief
cross-section of members of the client team, and that the client wants to build. As part of the
including housing managers, should be present, design review process, it is imperative that the
along with key members of the project team. scheme proposals are impartially audited against
The lead client should describe the vision for the standards required. There is limited scope
the project, noting any particular opportunities to change a scheme that has planning approval
and constraints, and ask the design team to without invoking bureaucratic processes,
present the proposals before inviting structured so the client must take responsibility for the
feedback. It should be a collaborative and material submitted.
constructive process – not ‘trial by jury’.
Pre-application consultation (pre-app) with
Design Review: principles and practice 2013, the planners is usually advisable but is now
produced by CABE with others, contains useful chargeable so this important opportunity to
guidance on the design review process and get early feedback needs to be carefully timed
recommends that a Building for Life appraisal and planned.
is included. The review process is also a good
opportunity to check that the standards required Maintaining quality throughout
by the brief have been met. It is often useful to
detailed design and construction
undertake an audit prior to the review so that
117
Retaining the same team is helpful but where
this doesn’t happen, a formal handover is vital
Dealing with different
and the executive team should have a proper development scenarios
understanding of the design intent and a
commitment to uphold it. Design and build
Design and build is fast becoming the norm when
Forward planning for management
it comes to procurement, and inevitably there
and maintenance are pros and cons. One of the main difficulties
The importance of this has been touched on in when seeking to appoint a contractor, through
earlier parts of the handbook. However inspired a competitive tendering process, is striking the
a design may be, it is only likely to succeed if right balance between being clear about the
it can be managed and maintained. The client quality that is required without tying down the
must therefore set clear parameters and ensure tenderers to particular products or solutions.
that appropriate resources will continue to be Clients who say too little expose themselves to the
available over time. risk of a poor outcome – unable to defend against
Spaces that are not well maintained or managed cheap products and cost-cutting techniques.
soon fall into a vicious circle of neglect and Those who say too much risk paying too much
mis-use – or no use. – unable, or unwilling, to take advantage of a
developer’s experience or buying power even
though the cheaper solution on offer might be as
good as, or better than, the specified solution.
Having a robust performance specification, based
on a good practice set of standards that are not
too prescriptive, and being willing to listen but
also willing to say ‘no’, is the best approach.
Design and build often results in the original
design team being replaced by a new team
of executive architects – usually because the
executive team are either known to the developer
or offer a lower price. This sort of switchover
is rarely ideal but when it does happen, it is
important that all parties agree that the design
complies, or is capable of complying, with both
the statutory and the clients’ own requirements
118
as expressed in the Employer’s Requirements may require a well-advanced design (sometimes
(ERs) before the information is passed on. This taken almost to planning stage) there is then
is further justification for having a shared vision a risk that the process takes a step back when
that can be communicated to the new team, an the contract is awarded and all parties can
up to date brief that encapsulates the client’s talk freely.
current requirements, and a well developed set
of drawings that leave only the right amount Section 106 partnerships
of flexibility.
These situations, whereby lead developers seek
a partner to take on the affordable housing
Bids and competitions
element, are often the most difficult of all for
Many projects are now awarded through a housing associations, particularly when this
bidding process. The assessment criteria are happens towards the end of the design process.
usually a combination of quality, price and In most cases, the concept will have been
programme – but not always in that order. The established and many decisions irreversible.
brief often describes some sort of overall vision
Before agreeing to get involved, it is important to
and may also include detailed requirements. The
understand the original vision for the project and
competing teams need to develop their own vision
assess the extent to which it resonates with the
and add their own goals to those of the brief
prospective partner’s own objectives. It is also
and work fast to produce a winning concept that
worth visiting the site to get a feel for the area
meets the needs and expectations of all parties.
and assess whether anything important has been
The main dangers in this scenario are over- missed. Where the design proposals seem less
promising or under-pricing – or both. By than ideal, it is important to establish how much
their very nature, bids are competitive and a scope for change exists.
conservative financial offer is unlikely to win
Through a structured design review, the proposed
unless the design is exceptional and the weighting
scheme should then be evaluated against a
is biased towards quality. Here too, it is therefore
119
Checklist of important questions
Placemaking and the public realm
1. Does the scheme score at least amber for Q8 Easy to find your way around
each of the 12 Building for Life questions? Is the scheme designed to make it easy to find your
way around?
Q1 Connections
Does the scheme integrate into its surroundings Q9 Streets for all
by reinforcing connections or creating new ones, Are streets designed in a way that encourage low
whilst also respecting existing buildings and land vehicle speeds and allow them to function as social
uses along the boundaries of the development spaces?
site? Q10 Car parking
Q2 Facilities and services Is resident and visitor parking sufficient and well
Does the development provide (or is it close to) integrated so that it does not dominate the street?
community facilities, such as shops, schools Q11 Public and private spaces
workplaces, parks, play areas, pubs or cafés? Will public and private spaces be clearly defined
Q3 Public transport and designed to be attractive, well managed and
Does the scheme have good access to public safe?
transport or help reduce car dependency? Q12 External storage and amenity space
Q4 Meeting local housing need Is there adequate external space for bins and
Does the development have a mix of housing types recycling as well as vehicles and cycles?
and tenures that suit local requirements? 2. Is the affordable housing element designed
Q5 Character and specified to a decent standard, not
Does the scheme create a place with a locally significantly different from homes of other
inspired or otherwise distinctive character? tenures and reasonably well integrated?
Q6 Working with the site and its context (1.5.1)
Does the scheme take advantage of existing 3. Are cladding materials and components
topography, landscape features (including water such as doors, windows, and rainwater
courses), wildlife habitats, existing buildings, site goods sufficiently durable and can they be
orientation and microclimates? maintained?
Q7 Creating well defined streets and spaces 4. Are the streets and pavements designed to
Are buildings designed and positioned with adoptable standards and has adoption been
landscaping to define and enhance streets and agreed? (1.6.4)
spaces and are buildings designed to turn street
corners well?
120
Communal spaces The home
5. Is the affordable housing in a separate core 13. Where the nationally described space standard
(or cores) or, where combined with other has not been applied, do all homes meet at
tenures, are all homes in the core to be owned least the overall floor areas set out below,
and managed by the housing association? and provide the storage required under the
6. Is there a maximum of 120 bedspaces in these national space standard? (3.1.1):
cores, or are the dwellings non-family units, Number of Number of 1 storey 2 storey 3 storey Built-in
or is there a concierge? (2.2.6) bedrooms bedspaces dwellings dwellings dwellings storage (m)
1p 39 (37)3 1.0
7. Is there at least one lift to every home on
1b 2p 46 54 1.5
the fourth floor or above, and two lifts to all
2b 3p 57 66 2.0
homes on the seventh floor and above? (2.2.8)
4p 66 75
8. Has adequate space been allowed for 3b 4p 70 80 86 2.5
services and are the necessary areas 5p 81 88 94
accessible? (2.2.9, 2.2.10) 6p 90 97 103
9. Is communal space (with play opportunities) 4b 5p 85 92 98 3.0
121
17. Do at least 25% of homes meet Category 2
and at least 5% meet Category 3 of Part M
Volume 1 Dwellings? (3.3.5 and 3.3.8)
18. Are homes individually metered for gas, heat
and electricity? (Appendix F)
19. Has soundproofing been improved beyond
Building Regulations Part E? (3.7)
20. Does the window design take account of
privacy, aspect, orientation, daylight,
sunlight, ventilation and overheating and can
all windows be safely cleaned from inside?
(3.2.11, 3.9, 3.10, 3.11, 3.12 and Appendix G)
21. Where a DHN or communal heating
is proposed, is it appropriate for the
development and are robust specification
and management arrangements in place?
(Appendix F)
22. Are all family dwellings (3p and above) able
to receive sunlight (do they all avoid facing
only north), and are all family dwellings dual
aspect where possible? (3.9.1)
23. Does every family dwelling have some usable
private outdoor space? (3.13.1)
24. Will a choice of fixtures, fittings and finishes
be offered?
25. Can as-built drawings and operational
instructions be made available?
122
Appendices
123
Appendix A: Summary of Part II Standards
Key to the three groups of standards 1.2 Landscape and climate
and regulations: 1.2.1 Ensure that early design proposals
demonstrate a considered and sustainable
response to landscape, and climate.
Nationally defined and universally applied
1.2.2 Ensure that landscape design is not a reserved
matter at the planning stage as this allows
Nationally defined and locally applied developers to cut out, or water down, the
proposals.
Additional good practice standards
1.2.3 On larger sites, devise a landscape strategy
that includes plans for implementation,
Remember to add local planning requirements management and maintenance. Use Section
106 obligations to deliver these objectives.
and any tenure variations (see Appendix B)
1.2.4 Use the strategy to guide design development
and specification. Consider how it can be
1.0 Placemaking and the reinforced and carried through into all aspects
of public realm design.
public realm
1.1 Site appraisal 1.3 Urban design
1.1.1 Research, study and visit the site and its 1.3.1 Meet the core aspirations of Building for Life 12
by ensuring that:
surroundings (using the checklist on page 30),
take photographs and make notes. • the development is connected to, and
integrated with its surroundings
1.1.2 Gather information from local residents, local
• the layout is legible, permeable and uses
interest groups and other stakeholders.
visual clues or markers to allow people
1.1.3 Obtain a topographical survey (and where to navigate through the site and orientate
appropriate, plans of existing buildings and a themselves within it
tree condition survey) as soon as possible. • streets are connected, well-used and well-
overlooked and dead-ends and blank walls
1.1.4 Communicate the results of the site appraisal
avoided
through annotated diagrams and text and
consider the impact that the new development • landscape and buildings are designed to work
may have on the site, its surroundings and its together and materials are of high quality and
ecology. carefully detailed
• public and private space are clearly defined
and it is clear who owns what
• entrances to dwellings are prominent,
and plant rooms, bin and bike stores are
accessible but away from key pedestrian
interfaces.
124
Appendices
1.3.2 Ensure that development proposals 1.5.3 Aim to provide houses with gardens for
demonstrate: larger families even in urban locations, and
consider alternatives such as double-stacked
• how the design responds to its physical
maisonettes where density targets make
context, including the character and legibility
houses impossible.
of the area and the local pattern of building,
public space, landscape and topography 1.5.4 Take account of Local Plan policy re ‘optional
• how the scheme relates to the identified requirements’ for accessible housing but be
character of the place and to the local vision prepared to exceed these targets where there
and strategy or how bolder change is justified is evidence of higher need.
in relation to a coherent set of ideas for
the place expressed in the local vision and 1.5.5 Consider the need for specialised and/or
designated housing for older people and work
strategy or agreed locally.21 with specialist providers where appropriate.
1.3.3 Aim to meet the requirements of Secured
1.5.6 Consider the long-term implications of
By Design: New Homes 2014, Section 1 The decisions about tenure, mix and typology and
Development – Layout & Design (Planning Issues). avoid solutions that are inherently inflexible.
1.5.1 Development should be tenure blind and homes 1.6.5 Subject to local authority requirements, aim
of different tenures integrated. to confine tarmac to main feeder roads and
use paving elsewhere. Select dark colours
1.5.2 Aim to provide a good tenure mix and range to disguise oil spills particularly in parking
of dwelling sizes and types, in line with local areas. Ensure that parking bays are delineated
planning policy requirements, and taking from the carriageway by contrasting paving or
account of the site and its context. edging, not by painted lines, and use permeable
paving.
125
1.6.6 Check local planning parking requirements 1.7 Building form and composition
and reconcile this with local market research.
Ensure that appropriate provision is made 1.7.1 Ensure that the design of every building
within the site boundary to avoid increasing the demonstrates awareness of its context and
pressure on surrounding streets. Include an place within the urban design strategy and
allowance for visitor parking and provide 10% of resolve the form and composition before
this as disabled spaces (in addition to allocated undertaking pre-application consultation.
provision for wheelchair-using residents).
1.7.2 Pay attention to every element of the building
facade as the design develops and plan ahead
1.6.7 Create live frontages with frequent entrances,
to avoid unsightly flues, vents and satellite
windows, and habitable rooms at street level
while ensuring enough privacy. dishes particularly on street-facing facades.
1.6.8 Aim to meet the requirements of Secured 1.7.3 Aim to provide buildings that are ‘of their time’
By Design: New Homes 2014 and achieve but that also exhibit a timeless quality.
certification for Section 3: Ancillary Security
Requirements, where appropriate.
1.8 Open space and play
1.6.9 Prioritise the needs and safety of pedestrians
and cyclists. Consider the need for dedicated 1.8.1 Ensure that an open space strategy, including
pedestrian routes and/or cycle lanes especially a play strategy, forms part of the overall
where there is potential to connect into existing masterplan for all but the smallest sites,
or planned local networks. Provide cycle and is informed by existing and planned local
parking for visitors in addition to, and separate provision, and the views of local people.
from, provision for residents.
1.8.2 Use public open space to give a scheme its
1.6.10 Consider car-clubs and, on larger sites, identity; ensure that it is designed for everyone
investigate the potential for bus routes to be and is multi-functional.
extended or new bus stops added to serve the
new development. 1.8.3 Ensure that space is overlooked and designed
for year-round use, a large proportion of the
1.6.11 Where parking is in-curtilage, incorporate this space is green, and, where appropriate, it is
at the side of dwellings rather than in front, enclosed.
and where on street, use parallel, rather than
perpendicular arrangements. 1.8.4 Ensure that a long-term management plan is in
place.
1.6.12 Mitigate the visual impact of parking on the
1.8.5 Provide for an appropriate range of play
streetscape through comprehensive landscape
spaces, based on the guidelines in the tables on
proposals. Include tree planting in all new
pages 52 and 53.
streets; select appropriate species and space
trees accordingly, ensure that pavements are
wide enough, tree pits large enough, and that
services are installed in dedicated zones, clear
of tree and planting areas.
126
Appendices
1.9 Ecology and biodiversity 2.0 Communal spaces
1.9.1 Ensure that the site appraisal includes a habitat
2.1 Approach routes and
survey that extends beyond the site boundaries
and leads to mitigation and enhancement entrances
measures as part of the landscape strategy.
1.9.2 Include as much greenery as possible; 2.1.1 The communal approach to every Category 1
particularly low maintenance, natural planting home must meet the accessibility requirements
that is indigenous to the area, but avoid planting of AD M Section 1A Approach to the dwelling
too densely as this increases maintenance (Part M, regulation M4(1) Visitable dwellings.
costs. 2.1.2 The communal approach to every Category 2
home must meet the accessibility requirements
1.9.3 Engage the community in installing nesting
of AD M Section 2A Approach to the dwelling
boxes and other features that support wildlife
and are appropriate to the context. (Part M, regulation M4(2) Adaptable and
accessible dwellings.
1.10 SuDs and surface water 2.1.3 The communal approach to every Category 3
home must meet the accessibility requirements
run-off of AD M Section 3A Approach to the dwelling
(Part M, regulation M4(3) Wheelchair user
dwellings.
1.10.1 Where required by the local authority,
incorporate a SuDs strategy into the overall
landscape strategy and ensure that it is
2.1.4 Communal entrance doors, associated
glazing and windows must meet the security
appropriate to the context and addresses the requirements of Part Q, regulation Q1
entire surface water cycle. Unauthorised Access.
1.10.2 With reference to the CIRIA guidance and the
2.1.5 All communal entrances should be visible from
table on pages 58 and 59, appoint an engineer the public realm, clearly identified, well lit
to determine flood risk and implement an and at least partially glazed to allow views in
appropriate range of drainage techniques to and out22.
manage surface water run-off sustainably.
2.1.6 An access core serving four or more dwellings
should have an access control system with
audio-visual verification, and every dwelling
should have an entry phone with electronic
door release linked to a main front door.
2.1.7 Aim to make Category 2 the minimum standard
for the approach route and entrance. As a
minimum, and irrespective of lift provision,
ensure that the approach route is step-free and
adopts the shallowest possible gradient, and
that the main entrance has:
• a level external landing at least 1500mm
square and partially covered
• an accessible threshold (a maximum total
upstand of 15mm with a chamfered profile)
• a clear door opening width of at least 850mm
• a 300mm nib to the leading edge of the door
• automatically activated lighting
22 Based on GLA standard
127
2.1.8 Aim to meet the requirements of Secured 2.2.5 The lift and stairs should be within sight of the
By Design: New Homes 2014 and achieve entrance area, or clearly signed. Stairs should
certification for Section 2: Security of Dwellings be attractive and prominent to encourage
where considered appropriate. active, healthy lifestyle choices.
2.1.9 Provide dirt control matting, suitable for use 2.2.6 Avoid long doubled loaded corridors and ensure
by a wheelchair user, immediately inside the that communal circulation areas receive
entrance, and ensure that all internal finishes daylight where possible.
and components are high quality, durable and
easy to clean. Hard flooring, such as tiling, is 2.2.7 As a general rule, each lift-served core should
serve a maximum of 25 dwellings or 100
recommended for the entrance lobby.
bedspaces, with a maximum of eight dwellings
2.1.10 Provide an individual, A4+ size, tamper-proof per floor. Secondary security measures, such
letterbox for every dwelling, at a height suitable as fobbed doors to each at landing level that
for a wheelchair user. Letterboxes should restrict access to groups of eight flats, can
usually be grouped and located either on the allow overall numbers to be increased. This is
external wall next to the entrance (to allow for particularly useful where two lifts are provided
mail to be delivered from outside and collected as it spreads service charges.23
from inside) or located within the entrance
lobby (preferably with secondary doors to limit 2.2.8 Aim to make Category 2 the minimum standard
for all circulation areas. As a minimum,
tradesmen access to the lobby itself). Other
and irrespective of lift provision, ensure the
arrangements, such as letterboxes on every
following:
front door, should also be considered.
• all corridors and decks are at least 1200mm
wide (preferably 1500mm to allow for
2.2 Circulation areas, lifts wheelchair turning)
and stairs • all doors at entrance level have a clear
door opening width of at least 850mm and a
300mm nib to the leading edge.
2.2.1 The communal circulation areas to every
Category 1 home must meet the accessibility 2.2.9 Provide at least one lift to every home on the
requirements of AD M Section 1A Approach to fourth floor or above, and two lifts to all homes
the dwelling, of Part M, regulation M4(1) Visitable on the seventh floor or above. Provide two lifts
dwellings. to all Category 3 dwellings where possible.24
2.2.2 The communal circulation areas to every 2.2.10 Where possible, provide two lifts to every
Category 2 home must meet the accessibility Category 3 dwelling to give cover in the event of
requirements of AD M Section 2A Approach breakdown.25
to the dwelling, of Part M, regulation M4(2)
Adaptable and accessible dwellings.
2.2.3 The communal circulation areas to every
Category 3 home must meet the accessibility
requirements of AD M Section 3A Approach
to the dwelling, of Part M, regulation M4(3)
Wheelchair user dwellings.
2.2.4 Communal doors and windows must meet the
security requirements of Part Q, regulation Q1
Unauthorised Access.
23 Based on GLA standard
24 Based on GLA standard
25 Based on GLA standard
128
Appendices
2.3 Communal amenity spaces
2.3.1 Aim to ensure that every flat has access to 2.3.7 Use high quality, durable materials that
communal space that: weather well and need little maintenance,
and low energy light fittings (with timers or
• is overlooked by surrounding development
sensors) to provide ambience and safe access
• is accessible to all residents of the block
without undue glare.
• is designed to take advantage of direct
sunlight 2.3.8 Include watering points and consider the use
• has suitable management in place26. of water butts (see subsection 1.10) but avoid
irrigation systems.
2.3.2 Provide fobbed access to the space from all
cores. Aim to provide additional, secure access 2.3.9 Draw up a plan for the long-term management
directly from the street for mowers and other and maintenance of communal outdoor spaces
large maintenance equipment. Where this is not with intensive input over the first two years.
possible, ensure that one core has extra wide
doors and suitable finishes.
2.4 Undercroft and
2.3.3 Make the space as green as possible but use
grass and informal, low maintenance planting underground parking
rather than formal elements such as hedges
and topiary that rely on intensive maintenance. 2.4.1 Where communal parking is proposed,
Where extensive soft landscaping is planned, ensure that it is appropriate to the user group,
provide secure access from the street for manageable and has the potential to be
mowers and other large equipment (not just secured.
via cores).
2.4.2 Avoid underground parking for residents on
lower incomes.
2.3.4 Achieve year-round interest through the choice
of planting and ensure that the space will also
look attractive when viewed from homes above.
2.4.3 Where undercroft parking is provided,
ensure that it is surrounded by dwellings or
other active uses that create a live frontage,
2.3.5 Design for incidental play using natural
and is only used by residents of that block.
elements, and discourage boisterous play
and ball games by breaking up the space with Consider which dwelling typologies are most
planting, seating, mounding and changes of appropriate, and consider the structural and
material etc. services implications where different dwelling
types are stacked.
2.3.6 Consider the interface between any private
gardens, or terraces, and the communal space 2.4.4 Install charging points for electric cars, or
carefully. Aim for privacy screening rather than make future provision.
a solid barrier, and use railings and planting
rather than timber fencing. Avoid cheap timber
2.4.5 Aim to meet the requirements of Secured
By Design: New Homes 2014 and achieve
sheds and use neat storage ‘pods’ or integrate certification for Section 3: Ancillary Security
the external storage where possible. Consider Requirements, where considered appropriate.
whether access from private gardens to the
communal space is practical and desirable.
129
2.5 Bike and bin storage and other
ancillary spaces
2.5.1 Meet the bin storage/screening requirements of 2.5.9 Meet the requirements of Secured By Design:
Part H (H6 of AD H) to reduce bin blight. New Homes 2014 and achieve certification for
Section 3: Ancillary Security Requirements,
2.5.2 Ensure that bin stores meet the storage and
where considered appropriate.
collection requirements of the local authority.
2.5.3 Locate bin stores close to cores or within
courtyards where these are large enough. 2.6 Utilities, meters and
Where integral with the building footprint,
ensure that bin stores are not sited directly communications technology
next to, or below, a private front door, bedroom,
main living space or balcony. 2.6.1 Locate all sub-stations, building services
running across or under the site, and locate
2.5.4 Design for waste and recycling to be deposited the nearest data, power, water/sewerage, gas
and collected from outside, and avoid refuse connection points and heat networks.
chutes. Ensure that stores are:
2.6.2 Contact UK Power Networks (UKPN) to
• accessible to wheelchair users determine whether there is adequate capacity
• well lit and ventilated in the nearest electrical sub-station for the
• fitted with robust, scratch resistant, lockable, new development. Where capacity exists, apply
metal doors for connection early to ensure the capacity is
• fitted with a tap and floor gulley (within a reserved.
concrete floor laid to falls) and suitable for
hosing down. 2.6.3 Make contact with all utilities companies in
good time – they can be notoriously slow to
2.5.5 Provide small, secure cycle stores (ideally respond, provide information and/or carry out
serving 10-15 flats) either close to cores, within works.
secure courtyards or within undercroft parking
areas. Aim to achieve access from a secure 2.6.4 Check whether mobile telephone masts exist on
site and whether they can be moved/removed
outer area (the core, courtyard or undercroft).
or reinstated. Where they are to be reinstated/
2.5.6 Ensure that stores are covered and well lit, and installed on roofs, consider the potential effect
provide individual, allocated stands or hangers on the sale value of adjacent dwellings.
but avoid double stacking where possible. In
high risk areas, consider the need for individual 2.6.5 Determine the energy strategy at an early stage
to ensure space can be included in homes and
lockers within each store.
communal spaces for plant, service cupboards
2.5.7 Where feasible, provide cycle storage in a form and horizontal and vertical ductwork runs.
that is suitable for storing other ‘outdoor’ items
including prams/buggies, sports/camping 2.6.6 Where hot water is distributed through
communal spaces, especially corridors, ensure
equipment etc.
pipework is adequately insulated, the network
2.5.8 Ensure that plant rooms are not located next to is planned efficiently and corridors are suitably
entrances, or sound sensitive spaces such as ventilated.
bedrooms and main living spaces and that extra
soundproofing is incorporated as required in
subsection 3.7.
130
Appendices
2.6.7 Where gas connections exist on site, provide 2.7 Special considerations in
space externally for meters allowing for
designed enclosures to reduce their visual
mixed-use buildings
impact.
2.7.1 Ensure that the tenure, type and mix of
2.6.8 Set aside space for service risers and main accommodation are appropriate to the
service runs at an early stage, allowing for particular circumstances, taking account of
insulation where necessary. Consider how likely service charges.
these can be discreetly integrated and tamper-
proof while allowing easy access for testing, 2.7.2 Develop an integrated strategy for structure
and services in the early design stage. Keep it
repair and renewal. Allow adequate ceiling simple, and where possible, avoid a transfer
void depth for recessed light fittings and structure by devising a structural grid that
service runs. works for both the residential and non-
2.6.9 Plan for soil and vent pipes (SVPs) and residential elements.
incoming services to be accessible from
communal areas, rather than within flats, 2.7.3 Where multiple landlords are involved, allow
for separate supplies, risers, meters and boiler
wherever possible. As a minimum, provide plant. Where district or communal heating
isolation valves in communal areas to mitigate is proposed, ensure individual metering of
damage in the event of a problem and avoid resident and plant.
disturbing residents.
2.7.4 Ensure that residential entrances remain
2.6.10 Ensure that risers containing gas can be prominent, and that dedicated, residential
adequately ventilated to prevent pressure parking, and bike and bin stores are provided.
build-up in the event of a leak.
2.7.5 Provide increased soundproofing between
2.6.11 Plan for either an adequate mains connection different uses and take particular care in the
or large water tanks where sprinkler systems planning of the dwellings immediately above
are to be included. the non-residential accommodation. Consider
2.6.12 Co-ordinate SVPs terminations at roof level (to duplexes to restrict the number of bedrooms
avoid clashes with other installations such as and balconies at this level.
solar panels) and boiler flues and other outlets
on building facades. 2.7.6 Enter into dialogue with other landlords, draw
up a joint management plan to cover any areas
2.6.13 Provide multiple data connections and TV of shared responsibility and obtain agreement
signals from satellites to dwellings to allow for before completion.
connection to all broadband and TV services
(such as Sky +). Use communal dishes where
possible and consider locations carefully.
131
3.0 The home
3.1 Space standards
3.1.1 Where applied through local planning policy, Table 1
meet the nationally described space standard
which requires that: Number of Number of 1 storey 2 storey 3 storey Built-in
bedrooms bedspaces dwellings dwellings dwellings storage (m)
a. the dwelling provides at least the Gross 1p 39 (37)3 1.0
Internal (floor) Area1 (GIA) and built-in
1b 2p 50 58 1.5
storage area set out in Table 1 on the right.
b. a dwelling with two or more bedspaces has at 2b 3p 61 70 2.0
least one double (or twin) bedroom. 4p 70 79
c. in order to provide one bedspace, a single 3b 4p 74 84 90 2.5
bedroom has a floor area of at least 7.5m2 and 5p 86 93 99
is at least 2.15m wide.
6p 95 102 108
d. in order to provide two bedspaces, a double
(or twin bedroom) has a floor area of at least 4b 5p 90 97 103 3.0
11.5m2. 6p 99 106 112
e. one double (or twin bedroom) is at least 7p 108 115 121
2.75m wide and every other double (or twin) 8p 117 124 130
bedroom is at least 2.55m wide. 5b 6p 103 110 116 3.5
f. any area with a headroom of less than 1.5m is
7p 112 119 125
not counted within the GIA unless used solely
for storage (if the area under the stairs is to 8p 121 128 134
be used for storage, assume a general floor 6b 7p 116 123 129 4.0
area of 1m2 within the GIA). 8p 125 132 138
g. any other area that is used solely for storage
Notes:
and has a headroom of 900-1500mm (such
1. The GIA of a dwelling is defined as the total floorspace
as under eaves) is counted at 50% of its floor
measured between the internal faces of perimeter walls2
area, and any area lower than 900mm is not
that enclose the dwelling. This includes partitions,
counted at all.
structural elements, cupboards, ducts, flights of stairs
h. a built-in wardrobe counts towards the GIA
and voids above stairs. The Gross Internal Area should be
and bedroom floor area requirements, but
measured and denoted in square meters (m2).
should not reduce the effective width of the
room below the minimum widths set out 2. The internal face of a perimeter wall is the finished surface
above. The built-in area in excess of 0.72m2 of the wall. For a detached house, the perimeter walls are
in a double bedroom and 0.36m2 in a single the external walls that enclose the dwelling, and for other
bedroom counts towards the built-in storage houses or apartments they are the external walls and
requirement. party walls.
i. the minimum floor to ceiling height is 2.3m 3. Where a one person flat has a shower room rather than
for at least 75% of the GIA. a bathroom, the floor area may be reduced from 39m2 to
37m2.
132
Appendices
3.1.2 Aim to adopt the nationally described space 3.2.5 A second WC and basin are required in homes
standard for all new homes (except wheelchair for 5 or more people.
dwellings which will need higher space
standards). 3.2.6 A shower should be installed over the bath and
a second bathroom or shower room provided in
3.1.3 Provide at least the combined floor area of a home for 7 or more people. This may be the
living, dining and kitchen space set out below entrance level WC in a house, provided that the
and aim to ensure that the living space equates shower is installed from the start. Where the
to approximately 55% of the total L/K/D (living, shower is a floor gulley the floor should be laid
kitchen, dining (space)) floor area: to falls and the room designed as a wetroom
from the outset.
2p 3p 4p 5p 6p
22m 2
24m 2
26m 2
28m 2
30m2
3.2.7 Bathrooms should have natural light and
ventilation where possible but windows should
not be placed above the bath unless this is the
3.1.4 The main living space should be at least 2.8m
only practical option.
wide in homes for up to four people and at least
3.2m wide in larger family homes. 3.2.8 Provide straight stairs where possible.
133
3.3 Accessibility (Category 1, 2 3.3.9 Provide straight stair flights where possible
(M4(3) requires a power socket)
and 3 dwellings)
Category 1 dwellings:
3.3.10 In homes for 5 people and above, provide
the required bath and shower in separate
bathrooms where possible.
3.3.1 Meet the requirements of AD M Section 1B
Private entrances and spaces within the dwelling, 3.3.11 Provide an accessible parking space close to
(Part M, regulation M4(1) Visitable dwellings). all wheelchair homes and, where practical,
a covered carport linked to the entrance of
3.3.2 Aim to increase the WC/cloakroom to at least
‘wheelchair accessible’ dwellings.
1100mm wide and 1800mm long.
3.3.3 Ensure that stairs are at least 850mm wide and 3.3.12 Install sprinkler protection where possible,
particularly to ‘wheelchair accessible’
provide a power socket at the foot or head of the
dwellings.
stairs to facilitate the fitting of a stairlift.
3.3.4 Include as many other Category 2 requirements
as possible particularly where the space 3.4 Security
standard applies. Wider doors, nibs and the
accessible bathroom are all easily incorporated 3.4.1 Meet the security requirements of Part Q,
and benefit everyone. (The level access shower regulation Q1 Unauthorised Access.
is more difficult to justify in homes without
step-free access).
3.4.2 Consult with the local Designing Out Crime
Officer (DOCO) who will usually carry out a
crime risk analysis.
Category 2 dwellings (where required under
local planning policy):
3.4.3 Meet the requirements of Secured By Design:
New Homes 2014 and achieve certification for
3.3.5 Where required by the LPA, meet the Section 2: Security of Dwellings and Section
requirements of AD M Section 2B Private 3: Ancillary Security Requirements, where
entrances and spaces within the dwelling, (Part considered appropriate.
M, optional requirement M4(2) Accessible and
adaptable dwellings).
3.5 Thermal comfort
3.3.6 Provide straight stair flights where possible
and install a power socket at the foot or head of 3.5.1 Meet the energy efficiency requirements of Part
the stairs to facilitate the fitting of a stairlift. L1A 2013.
3.3.7 Form a soft pocket in the first floor to 3.5.2 Take a fabric first approach on new
accommodate a future through-floor lift in developments.
homes designed for older people.
3.5.3 When selecting heating systems consider
future proofing them in terms of fuel choice
Category 3 dwellings (where required under and system selection, while bearing in mind
local planning policy: maintenance, ease of use for residents and the
cost of energy bills.
3.3.8 Where required by the LPA, meet the
requirements of AD M Section 3B Private 3.5.4 Ensure adequate space for heating and
entrances and spaces within, and connected to the domestic hot water systems together with their
dwelling (Part M, optional requirement M4(3) associated service runs and distribution.
Wheelchair user dwellings).
134
Appendices
3.5.5 With reference to Appendix F, consider the 3.7 Soundproofing
type and size of the development, its heat
loads, and the management, maintenance and 3.7.1 Meet the requirements for airborne and impact
service charge implications before committing sound insulation values of AD E as a minimum.
to providing an on-site heat network. Where
heat networks are considered use the CIBSE/ 3.7.2 Aim to achieve airborne sound insulation values
that are at least 5dB better than (above) AD E,
ADE Heat Networks: Code of Practice for the UK
and impact sound insulation values that are at
to ERs.
least 5dB better (lower).
3.5.6 With reference to Appendix F, determine the
3.7.3 Ensure that separating walls between flats
most suitable low or zero carbon technology for
and corridors/stairwells/lifts/bin stores/bike
the development, taking account of its location,
stores receive additional sound insulation in
size, housing typology and resident profile, and
line with 3.7.2.
considering management, maintenance and
service charge implications. 3.7.4 Avoid installing fixed windows except in
exceptional circumstances.
3.5.7 Aim to exceed the parameters shown in AD L1A
Table 4. Refer to AD L1A 2013 for the full set 3.7.5 Where installed, ensure that mechanical
of requirements, and Appendix F for further ventilation is carefully specified and located to
information. minimise noise nuisance and lessen the risk of
occupants turning it off.
135
3.9 Aspect and orientation 3.11 Ventilation and air quality
3.9.1 Larger family homes and north-facing 3.11.1 Meet the ventilation requirements set out in
dwellings should be dual aspect, and all other Part F as a minimum.
homes where possible.27
3.11.2 Avoid the need for mechanical cooling by
3.9.2 Where possible, orientate dwellings so that providing dual aspect dwellings (flats and
the main elevation is south facing to provide a houses) that achieve effective, natural cross
controllable, sunny facade. ventilation.
3.9.3 Where dwellings face south and west and have 3.11.3 Provide a variety of window opening options to
large areas of glazing, include external shading allow controlled ventilation through smaller
devices. openings and purge ventilation through larger
openings (or doors). (AD F stipulates that a
3.9.4 Aim to orientate roofs towards south where
window that opens through less than 15˚ is not
solar panels are to be fitted.
suitable for purge ventilation).
3.9.5 Consider the impact of external noise and
3.11.4 Air intakes for buildings next to busy urban
pollution when deciding on the orientation of
roads should be as high as possible and away
homes and outdoor spaces.
from the direct source to minimise the intake
of pollutants. (AD F requires air intakes to be
3.10 Daylight and sunlight on the less polluted side of the building where
possible).
3.10.1 All habitable rooms should receive good levels
3.11.5 Where trickle vents are provided for
of daylight, especially the main living space background ventilation, their purpose should be
which should also receive direct sunlight for explained to residents in home user guides so
part of the day. as they are not closed, or taped shut, to prevent
3.10.2 Bathrooms and circulation areas should receive draughts.
daylight where possible.
3.11.6 Where MVHR is to be installed, ensure the
dwelling airtightness will be ‹3m3/h.m2 @50Pa,
3.10.3 The size and location of windows should take
specify heat recovery bypass for summer and
account of the considerations in the table on the
next page and the guidance in subsections 3.9, ensure that fan noise is no more than 25 dB(A)
3.11 and 3.12 together with Appendix G. in the living space and bedrooms, and 35 dB(A)
in the room containing the MVHR fan unit28.
3.10.4 Aim to ensure that at least 50% of the area of
a private outdoor space receives at least two
hours of sunlight in the shoulder seasons as
defined by the BRE Guide to Site Layout Planning
for Daylight and Sunlight.
136
Appendices
3.12 Overheating 3.13.3 Front gardens should aim to provide the
following:
3.12.1 Carry out overheating analysis, prior to
• a robust boundary treatment that defines
planning submission, on a range of dwellings
the junction between the public and private
with larger south and west-facing openings
realm, and is appropriate to the character of
unless these are adequately shaded. The
the building and the street
analysis should be in line with CIBSE Guide A
• an overall depth of at least 1500mm
(2015) and CIBSE TM52 (2013).
(deeper where bikes and bins are to be
3.12.2 Consider the specification of windows for accommodated) with an additional planting
control of solar gain and heat loss. zone at least 600mm deep
• storage for cycles and bins (unless provided
3.12.3 Where necessary, use movable, external
in rear gardens) designed and located to
shading to reduce solar gains on south and
west-facing facades. avoid obstructing ground floor windows and
doors, and be as unobtrusive as possible
3.12.4 Increase levels of exposed thermal mass (as required by Part H of the Building
inside the dwelling to regulate peak internal Regulations)
temperatures and combine this with measures • discreet integration of gas and electricity
that allow residents to achieve night-time meters.
ventilation. Consider tiled or thin sheet floor
finishes, rather than carpet or other soft 3.13.4 Rear gardens should aim to provide the
finishes, and exposed concrete soffits to following:
maximise the benefits of thermal mass. • level access from a kitchen/dining room,
living space or circulation (kitchen/diner
3.12.5 In urban areas avoid darker coloured external
is usually the preferred arrangement for
materials where possible.
families especially where there is a lawn).
3.12.6 Use deciduous trees and other planting to • paved patio area (equivalent to the minimum
provide shade. spatial requirements of standard 3.13.2) and
with lighting and a power socket
• socket for a rotary clothes line (accessible
3.13 Private outdoor space and from the patio)
external storage • turfed lawn and planting beds (where
appropriate)
3.13.1 Where required by the LPA, meet the • secure boundaries (typically 1800mm high,
requirements of AD M Section 3B Private robust, timber fencing between adjoining
entrances and spaces within, and connected to the gardens or 1800-2100mm high brick walls
dwelling (Part M, optional requirement M4(3) where adjoining the public realm)
Wheelchair user dwellings). • watering point (preferably a water butt)
• concrete slab suitable for a shed or storage
3.13.2 Provide a private open space for every dwelling pod and where possible, the shed or storage
at least 1.5m deep and 5m2 for a 1 bed dwelling, pod itself
rising by 1m2 for each additional person. The • secure gated access to the pavement where
space may be a front or rear garden, balcony, the garden adjoins the street
winter garden or roof terrace. • no alleys between rear gardens.
137
3.13.5 Balconies, winter gardens and roof terraces 3.15 Aftercare and home
should aim to provide the following:
user guides
• level access from the living space or
kitchen/dining room (and a bedroom where 3.15.1 Provide a thorough one-to-one handover with
appropriate but not solely from a bedroom) the residents of every home with a follow-up
• enough space for all household members to after one to two months. Cover the operation
sit together around a small table of the systems and features within the building
• solid, drained floors and arrange it for a time when the residents are
• lighting and a power socket not preoccupied with the process of moving in.
• screening and/or shading for privacy or
shade where appropriate. 3.15.2 Provide a home user guide covering the
detailed operation of the systems and features
within the building. Include the items in the
3.14 Accommodating diversity table to the right and ensure that the equipment
and controls described and/or pictured in
3.14.1 Understand the local demographic and aim to the guide match those installed to prevent
meet cultural needs as far as possible while confusion or misunderstanding.
maintaining flexibility over the long term.
Consider the need for:
3.15.3 Ensure that handovers and home user guides
are also provided to all future residents with
• additional bathrooms or washing facilities versions available in different languages.
• separate living spaces
• large kitchens with space for eating or
3.15.4 Keep spare copies of home user guides and
ensure that housing management staff are
separate food preparation areas trained to explain the system to residents,
• larger balconies. answer queries and able to provide extra help
to vulnerable residents where necessary.
3.14.2 Consider the need for dwellings that meet the
needs of older people and aim to include the
HAPPI design principles.
3.15.5 Refer to BSRIA’s free guide to Soft Landings
for details of what to do at each stage of the
design and build process. The earlier the Soft
3.14.3 Consider the need for multi-generational
Landings procedures can be taken on board the
homes and homes which could be easily
modified to provide self-contained ‘bedsit’ type better the final outcome in terms of operational
accommodation for a relative, carer or lodger efficiency and occupant satisfaction.
to live semi-independently.
138
Appendices
Appendix B: Typical tenure variations
Most developments are now mixed tenure and The checklist below follows the structure of Part
the principles of tenure-blind design – the ability II and numbers relate to the standards:
for homes to be occupied under different tenures
over time – and mitigating service charges 1.0 Placemaking and the public realm
are among the handbook’s most important
recommendations. Nonetheless, it is important (1.6.11) Car ownership may be higher among
to acknowledge that needs and expectations homeowners and different parking solutions may
may vary across sectors and that cross subsidy be appropriate.
from private sale and/or rental homes is an (1.8.5) Child density may be lower in private and
increasingly important revenue source for shared ownership homes (particularly private
affordable housing providers. rent) so it may be appropriate to dedicate less
A balance therefore has to be struck. This space to play.
checklist highlights some areas where it may
be sensible to adopt a different approach for 2.0 Communal spaces
other tenures, while avoiding very obvious
(2.1.9) The size and design of entrance lobbies
qualitative distinctions, particularly externally.
and circulation areas generally may vary, but
In practice, the majority of tenure differences
within a development, the entrances should be
are related to internal specification. These are
given equal prominence and be indistinguishable
outside the scope of the handbook but are not
by tenure.
unduly challenging to the principle of tenure
blind design. (2.2.6) The number of dwellings per core could
be safely increased, though this may limit future
For simplicity, the measures suggested here do
flexibility unless the design allows for secondary
not differentiate between private sale, private
security measures to be incorporated later.
rent (PRS) or shared ownership (SO), though as a
general rule, durability and maintenance in flats (2.3.3) The design and specification of communal
and communal areas will be a higher concern courtyards could be more ambitious where
for PRS than for outright sale. Clients may wish maintenance costs and service charges are less
to differentiate between these tenures and may of an issue, noting that it is usually relatively easy
also choose to add or remove items on a site- to modify/simplify external spaces at a later date.
specific basis.
(2.3.4) Play space may be less important.
139
(2.4.2) Underground parking may be the best (3.3.8) For tenures other than affordable rent,
solution for private rent and sale but would limit the ‘wheelchair adaptable’ requirements of
the potential to change tenure. regulation M4(3) (rather than the ‘wheelchair
accessible’ requirements) should be met.
(2.5.5) Fewer but larger cycle stores may be
acceptable but will also cut down future flexibility. (3.3.10) This standard is only relevant to
affordable housing. All ‘wheelchair adaptable’
(2.7.1) A broad range of dwelling types is likely to
dwellings need only provide a bath or shower,
be more future-proof than a high concentration of
not both.
a single typology.
(3.8.4) Curtains are not usually provided.
3.0 The home
(3.2.3) Open plan living (combined kitchen/dining/
living) is usually the preferred arrangement in
flats for private sale, PRS and SO (though less so
in houses). Kitchens will usually be fully fitted,
often with integrated appliances, cooker hoods
and pelmet lighting. In homes with three or more
bedrooms, layouts that have the potential to
provide two ‘living spaces’ (ideally a living space
and a kitchen/dining room) are highly preferable
in terms of future flexibility.
(3.2.6) Ensuites are usually expected in flats with
two or more bedrooms, and often in houses with
three or more bedrooms. While they are not ideal
in affordable housing, a second bath or shower
room is always helpful in a family home and the
space could be converted to storage if preferred.
(3.2.9) The master bedroom is usually expected to
have a built-in wardrobe.
(3.2.10) Lighting design and specification is likely
to vary.
140
Appendices
Appendix C: Furniture schedule
Type of Number of items required (by bedspace)
Furniture required in each room
space 1p 2p 3p 4p 5p 6p 7p +
Living armchair (or 'sofa seat' in addition to sofa
850 x 850 2 2 3 1 2 3 4 +1
space where required below)
settee – 2 seat (optional, as above) 850 x 1300 (item optional)
settee – 3 seat (optional, as above) 850 x 1850 1 1 1 1 1
TV 220 x 650 1 1 1 1 1 1 1 1
coffee table 500 x 1050 (or 750 1 1 1 1 1 1 1 1
diameter)
occasional table 450 x 450 1 1 1 1
storage units 500 x length shown 1000 1000 1000 1500 2000 2000 2000 +
Dining dining chair 450 x 450 2 2 3 4 5 6 7 +
space dining table 800 x length shown 800 800 1000 1200 1350 1500 1650 +
Double double bed in principal bedroom 2000 x 1500 1 1 1 1 1 1 1
bedroom double bed in other double bedroom 1350 x 1900 1 1 1 1 1 1 1
bedside table 400 x 400 2 2 2 2 2 2 2
desk and chair 500 x 1050 (+ chair) 1 1 1 1 1 1 1
chest of drawers 450 x 750 1 1 1 1 1 1 1
double wardrobe 600 x 1200 1 1 1 1 1 1 1
Twin single bed 1900 x 900 2 2 2 2 2
bedroom bedside table 400 x 400 2 2 2 2 2
chest of drawers 450 x 750 1 1 1 1 1
desk and chair 500 x 1050 (+ chair) 1 1 1 1 1
double wardrobe 600 x 1200 1 1 1 1 1
Single single bed 1900 x 900 1 1 1 1 1 1 1
bedroom bedside table 400 x 400 1 1 1 1 1 1 1
chest of drawers 450 x 750 1 1 1 1 1 1 1
desk and chair 500 x 1050 (+ chair) 1 1 1 1 1 1 1
single wardrobe 600 x 600 1 1 1 1 1 1 1
Kitchen length in mm
(1) sink top with drainer 600 x 1000 1000 1000 1000 1000 1000
1000 1000 1000
(2) cooker (or oven + hob) space 600 x 600 600 600 600 600
600 600 600 600
(3) washing machine position/worktop 600 x 630 630 630 630 630
630 630 630 630
(4) other base units 600 x length shown 600 1200 1600 1600 1600
2700 2700 +
(4a) dishwasher/worktop (included in 4) 600 x length chosen (item optional)
(5) ancillary equipment space 600 x length shown 600 600 1200 1200
(6) fridge/freezer space 600 x 600 600 600 600 600
600 600 600 600
(7) recycling bins space 600 x length shown 300 300 300 300
600 600 600 600
(8) total length of fitments (items 1 to 7) 3730 4330 4730 4730 5630
6730 7330 +
(9) wall cupboards 300 x maximum available length
Note: Item 3,5,7 may be in other rooms or spaces but should be close to the kitchen
Bathroom WC + cistern 500 x 700 1 1 1 1 1 1 1 1
bath 700 x 1700 1 1 1 1 1 1 1 1
hand wash basin 450 x 600 1 1 1 1 1 1 1 1
shower tray 750 x 750 (item optional)
WC/ WC + cistern 500 x 700 (where required)
cloakroom hand rinse basin 250 x 350 (where required)
Note: This schedule and the drawn schedules on the following pages are based
on work done by MAE architects and is included with their permission.
141
Living space furniture
220
or
500
850
450
500
1900
1900
double bed for double bed for other standard single bed
principal bedroom double bedroom
100
500
600
600
double wardrobe single wardrobe chest of drawers dressing table bedside heat source
and chair/stool table
142
Appendices
Kitchen furniture
600 1000 600 630 600 300
Key to items:
AE Ancillary equipment
1p FF WM BU RB total length 3730 BU Base unit
600
DW Dishwasher – optional
FF Fridge freezer
600 1000 600 630 1200 300
RB Recycle bins
450
WM Washing machine
2p FF WM DW BU RB total length 4330
600
BU RB
800
800
450
1650
1500
450
4500
sink unit
h
n keep the sink and hob away from corners and
ensure both have at least 400mm worktop
each side
n locate tall items (fridge/freezer and tall access from
cupboards) at the end of a run circulation
144
Appendices
Appendix E: Accessibility: examples of compliant layouts at
Category 2 and 3
2 storey 3b5p house designed to meet
Category 2 of AD M Volume 1: dwellings
(and meet the Nationally Described Space
Standard)
145
4. Hall 9. WC/cloakroom
n 900mm wide n located at entrance level
n localised narrowing to 750mm permitted n 1450 x 1800mm
5. Internal doors n basin 200mm back from front of WC
n provision for future level access shower
n 300mm nib to leading edge of doors at n strengthened walls (for grabrails)
entrance level n outward opening door
6. Internal door and hall widths 10. Stairs
Doorway (min. clear Corridor or hall (min. clear n 850mm wide (measured 450mm above
opening mm) width mm) pitch line and ignoring newel post)
750* 900 (head-on approach)
11. Door to garden
750* 1200 (not head-on approach)
775* 1050 (not head-on approach) n as main private entrance door
800 900 (not head-on approach)
12. Switches, sockets and controls
Note: *900mm doorset will meet the requirement
n 450-1200mm above FFL
7. Living room n 300mm from an inside corner
n other window handles 450-1400mm
n living room located at entrance level
n glazing to principal window to start at
above FFL (except window to living
or below 850mm above finished floor room).
level (FFL)
n one window handle 450-1200mm
above FFL
8. Kitchen
n 1200mm clear space in front of
kitchen units
146
Appendices
Summary of requirements for the first floor
of this dwelling type
13. Landing
n 900mm wide
n localised narrowing to 750mm permitted
n door and hall widths as entrance level
but no nibs required
14. Principal bedroom
n 750mm to both sides and foot of bed
n 750mm clear route to window
n bed shown as 1500 x 2000mm
17. Bathroom
n located on same floor as principal
bedroom
n access to bath, WC and basin
n bathroom typically 2150 x 2000mm
(2150 x 2150mm gives more flexibility)
18. Switches, sockets and controls
n 450-1200mm above FFL
n 300mm from an inside corner
n window handles 450-1400mm above FFL
Notes:
1. All dimensions in the summary above are minimum requirements except where noted
2. The plans shown here exceed minimum compliance in some respects
3. The notes above are a synopsis of key points and do not represent a complete list of requirements
147
2b3p ‘wheelchair accessible’ ground floor flat (or bungalow) designed to meet Category 3 of
AD M Volume 1: dwellings
148
Appendices
Summary of requirements for this 5. Internal doors
dwelling type n 850mm clear door opening
1. Approach route n 300mm nib to leading edge
n 200mm nib to following edge
n step-free access to private front n 800mm nib or 1500mm turning circle
entrance (maximum ramp 1:15) outside outward opening door in a
n 1200mm wide corner situation
2. Landing outside main private entrance 6. Hall
n level (max 1:60 fall) n 1050mm wide or 1200mm where the
n 1500 x 1500mm approach to a door not head-on
n motion-activated lighting n localised narrowing by 150mm permitted
n 1200 x 1200mm cover/canopy
7. Principal living room
3. Main private entrance
n located at entrance level
n accessible threshold n glazing to principal window to start at or
n 850mm clear door opening below 850mm above FFL
n 300mm nib to leading edge (maintained n one window handle 700-1000mm
for 1800mm beyond door) above FFL
n 200mm max. reveal depth on
leading side 8. Kitchen
n 200mm nib to following edge n located at entrance level
n 150mm nib on hinge side (to allow for n principal eating area within (or
letter box with cage) connected to) the kitchen
n 1500mm turning circle (or 1400 x n 1500mm clear space in front of kitchen
1700mm ellipse) inside entrance units and appliances
4. Wheelchair transfer/storage space n overall length of worktop 6530mm
n sink and hob in height adjustable or
n 1100mm deep and 1700mm wide easily lowered section of worktop
n 1200mm deep access space alongside (2200mm long)
n power socket for charging
9. Built-in general storage
n 2.0m2
149
10. Principal bedroom 13. Switches, sockets and controls
n 13.5m2 and 3.0m wide n 700-1000mm above FFL
n bed shown as 1500 x 2000mm n 700mm from an inside corner
n 1200 x 1200mm manoeuvring space n other window handles 450-1200mm
inside door and to both sides of bed above FFL (except to principal
n 1000mm clear to both sides and the foot living room)
of bed and in front of all furniture
14. Door to garden
n 750mm clear route to window
n strengthened ceiling for n accessible threshold
overhead hoisting n 850mm clear door opening
n 300mm nib to leading edge (maintained
11. Single bedroom
for 1800mm beyond door)
n 8.5m2 and 2.4m wide n 200mm max. reveal depth on
n bed shown as 900 x 1900mm leading side
n 1200 x 1200mm manoeuvring space n 200mm nib to following edge
inside the door
15. Private outdoor space
n 1000mm clear to one side of bed and in
front of all furniture n 1500 wide
n 750mm clear route to the window n 1500mm turning circle (or 1400 x
1700mm ellipse)
12. Bathroom
n step free access to any external stores
n located on same floor as principal (including bike and bin stores)
bedroom
n full wheelchair access to WC, basin and
1200 x 1200mm shower
n space for bath if preferred
n outward opening door
n strengthened ceiling for overhead
hoisting
Notes:
1. All dimensions in the summary above are minimum requirements except where noted
2. The plan shown here exceeds minimum compliance in some respects
3. The notes above are a synopsis of key points and do not represent a complete list of requirements
150
Appendices
Appendix F: Energy: further detail on a good
practice approach
Appendix F builds on the guidance given n Balancing the size and thermal performance
in subsection 3.5 and draws together the of windows for improved daylight and
environmental cross connections that are so sunlight without excess heat gain or loss
important in a holistic approach. (see also subsections 3.10 Daylight and
Sunlight, 3.11 Ventilation and air quality, 3.12
Building fabric Overheating and Appendix G)
Fabric efficiency should always be regarded as n Ensuring that the amount of ventilation
the first, and most important, step in reducing available both in background mode and in
energy consumption and creating sustainable full purge mode is adequate for the designed
homes. Without it, the installed mechanical and built airtightness (see also subsection
systems, such as heating and mechanical 3.11 Ventilation and air quality and 3.12
ventilation with heat recovery (MVHR) will operate Overheating)
less effectively. An energy-efficient envelope n Ensuring that heating systems are
also reduces heat loss in winter and heat gains appropriately chosen and sized for the
in summer – an essential part of protecting amount of insulation/level of airtightness,
vulnerable residents from extreme indoor with easy to use controls (see also subsection
temperatures and fuel poverty. 3.15 Aftercare and home user guides)
However, higher fabric efficiency and airtightness n Understanding how improved thermal
have led to some unintended consequences – due insulation can assist with reduced noise
largely to a failure to consider the environmental transmission (see also subsection 3.7
cross connections sufficiently. The important Soundproofing)
principles can be summarised as follows:
While specifying good practice levels of
n Ensuring that orientation of the home insulation to significantly reduce heating loads
isn’t exacerbating excess heat gain or and residents’ energy bills is a sound approach,
loss (see also subsections 3.9 Aspect and one of the more serious consequences is that
orientation, 3.11 Ventilation and air quality and dwellings can overheat. This means that homes
3.12 Overheating) can unintentionally become uncomfortably
warm during summer and even outside of
the typical summer months (discussed in
151
more detail in subsection 3.12). It is therefore including the increased thickness of external
important to ensure that where dwellings are terraces located above internal spaces and the
insulated to meet or exceed ADL1A 2013 they are knock-on implications for level access.
carefully orientated, adequately ventilated and
n Controlling the heat loss in flats by insulating
appropriately glazed and/or shaded.
the party walls and floors between dwellings
Other considerations for improved building and corridors.
fabric include:
n Orientating dwellings to make use of solar
District heat networks and
gains for warmth, but with shading options for communal heating
times of excess gains. District heat networks (DHN) consist of a central
n Maximising natural ventilation though dual plant location with a network of pipes supplying
aspect dwellings with multiple openings. heat to a number of buildings sometimes city-
wide. Communal heat networks work in the same
n Improving thermal mass by exposing way but supply heat to only one building. The
internal concrete soffits and using tiled floor centralised plant contains boilers and sometimes
finishes, accompanied by effective night-time a combined heat and power plant (CHP), and is
ventilation. most likely to be powered by gas in the UK. The
n Allowing for thicker wall build-ups when primary aim is to efficiently produce heat in a
determining building footprints to ensure that central location and pipe it to where it is needed,
this does not eat into internal space. thereby mitigating the need for individual heating
systems.
n Increasing the depth allowed for the insulated
cavity in a traditional double skin wall and Most only supply heat to residents. The power
anticipating the need for longer wall ties, is usually used for landlords’ services (with the
larger cavity trays and increased load lengths ability to export any surplus to the grid) because
on brickwork support angles. complex rules apply to the supply of electricity
to individual homes (private wire). Some of the
n Investigating the potential for Modern more advanced networks also provide cooling to
Methods of Construction (MMC) such as commercial units.
cross laminated timber (CLT) or structurally
insulated panel systems (SIPS) as a means of District and communal heating is often
generating thinner overall build-ups with the encouraged in dense urban areas, such as
same insulating properties. London, Nottingham and Manchester, where
existing district networks are available for
n Considering the impact of thicker roof build- developments to tap into, or there is high heat
ups on the assumed height of the building, demand which encourages new sources of supply.
152
Appendices
When proposing development scale heat n Where the plant room/energy centre will be
networks that are potentially served by a CHP it is sited? Communal boilers and CHP engines
useful to ask the following questions: often require a large plant room that is easily
accessible (ideally at street level) and located
n What is the size and density of the
in a position that allows the flue to run up
development? Ideally where CHP engines are
above the tallest part of the development.
to be installed, the development would have
500 or more dwellings in close proximity to n Have enough heat meters been specified
reduce the length of pipe runs. CHP engines along the network? The more heat meters
are therefore best suited to large scale, dense sited along the network the greater the chance
developments. DHN or communal heating the maintenance teams have of spotting
served by boilers can be provided at any scale any faults or efficiency issues. A heat meter
but work best at higher densities. should be provided to each dwelling to allow
for individual billing, as well as one at the
n Does the development have a high hot water
boundary of the energy centre to record plant
load? A CHP is typically sized on the domestic
room output.
hot water demand of the development because
this is a constant load all year round. Heating n Has additional space been provided in each
is seasonal and therefore best dealt with flat for equipment? Heat interface units
by additional back-up gas boilers that sit (HIUs) transfer the heat from the water in the
alongside the CHP. If the development has less network to a separate heat loop inside each
than 500 dwellings, it may be better served by dwelling. Sometimes a hot water cylinder
gas boilers. is included in the dwelling too. Adequate
space needs to be provided for the equipment
n Where will the electricity generated by the
specified. Consider access arrangements
CHP go? For legal reasons developments
for maintenance and determine whether it
do not normally private wire the electricity
is possible to design service cupboards that
generated by the CHP to each resident
allow the equipment to be accessed via a door
because it does not give them the freedom
in communal corridors.
to choose who supplies their electricity. The
excess electricity must therefore either be n Is the system easy to maintain? Provide
used in the landlords’ supply, exported to the access hatches and panels for key valves
grid (for which the owner of the CHP receives and equipment, so they can be checked and
little or no money), or a deal struck with maintained easily.
neighbouring commercial premises with an
interest in purchasing the electricity.
153
n Has the overheating risk in communal network, systems running inefficiently,
spaces been considered? Where the heat heavy maintenance and overestimated hot
network runs through the building, it often water demand during design, can all result
runs through communal corridors in order in residents’ bills being larger than they
to distribute the heat to every flat. Unless should be. The cost can be more than twice
pipework is adequately insulated, the network that of average gas bills – a great concern
is planned efficiently and corridors are suitably for residents and housing providers. This can
ventilated, excess heat can build up over time be avoided if addressed early in design and
causing corridors to overheat. through strong Employer’s Requirements.
n Who is likely to run and maintain the systems When extending an existing heat network it is
and manage the energy bills? For smaller often up to the site owner/developer to extend
sized developments it may be difficult to find the pipework, and this can cost around £3,000 or
an Energy Service Company (ESCo) to manage more, per metre. The owner of the network may
the heat network. Clients may therefore be also wish to specify the equipment and pipework
in a position where they retain responsibility installed within the dwellings in order to ensure
for the heat network and must maintain the they carry out the maintenance and bill residents.
system themselves, taking on the debt risk
of residents too. Billing companies can be Low or zero carbon technologies
brought in but often they act as middlemen
between the resident and the owner of the Low or zero carbon technologies are a useful and
plant, with very little responsibility on their responsible way to supplement the energy supply
part. Consider pre-payment meters to allow to homes. Depending on the technology selected,
residents to pay-as-they-go. renewables can contribute towards heating,
hot water and/or electrical loads either in the
n Are Employer’s Requirements being used home or as part of landlord supply for communal
to their best advantage? Where communal areas. The most commonly specified renewable
or district heat networks are considered is photovoltaic roof panels which are simple to fit
it is extremely important that Employer’s (either at the outset or as a retrofit), require little
Requirements reference the CIBSE/ADE Heat or no action from residents, are low maintenance
Networks: Code of Practice for the UK as a and generate a reasonable pay back – due in part
minimum. This guide covers responsibilities to the Government’s Feed In Tariff (FIT).
for the developer, designers, constructor,
operator and customer and sets out industry However, there are some downsides to all of the
standards. Common issues including oversized technologies and the best approach depends on
components, inadequate commissioning, a number of factors. These include the location,
insufficient heat metering across the size and type of home, the availability of other
154
Appendices
fuels, the management regime and the needs
of the occupants. The table on the next page
summarises the advantages, disadvantages and
suitability of some of the most common low and
zero carbon technologies for consideration on
developments.
Future technologies that supplement low and
zero carbon technologies, such as fuel cells or
batteries to store electricity generated from
renewables should also be considered.
155
About Pros Cons Suitability
PV panels generate • Ease of installation. • The availability of roof space to • Any project with
electricity from the • Feed in tariffs available. mount enough PV panels. electricity demand
sun’s energy. They are • They do not compete • Can have a visual impact and suitable roof
typically installed on with other heat based depending on location. space with no visual
Photovoltaics (PV)
Solar thermal panels • An efficient solution • Space for pipework and water • Individual homes (as
collect heat from the for heating water in an tank required (typically less opposed to blocks of
sun’s rays to provide individual home. practical in flats). flats) where suitable
Solar thermal
hot water. • Simple technology with • Can have a visual impact roof space is available
few issues following depending on location. with no visual
installation provided • Not suitable for space heating restrictions.
that it is properly as the panel typically collects
commissioned. heat in the summer when
heating is not required.
Wind turbines • When used in the right • Significant visual impact and • Large turbines in
generate electricity location (typically gentle ‘whooshing’ sound. rural and coastal
from wind energy. more exposed rural or • Generous space requirements locations with no
Larger turbines coastal areas) large either on roofs or on the ground. visual constraints and
are more efficient wind turbines can be If more than one turbine is adequate land area.
at generating an efficient way of proposed they should be located
electricity. Smaller producing electricity in at least 6-10m apart depending
Wind
156
Appendices
About Pros Cons Suitability
Air source heat • ASHPs are very similar • ASHP evaporators need to be • Commercial units
pumps transfer heat to VRF or spilt systems located externally to exchange requiring heating
collected from the and so make a good heat with the outside air, and/or cooling where
outside air to the efficient replacement in creating a visual impact. there are no acoustic
inside or vice versa. non-domestic units. • Noise associated with the restrictions.
• In rural areas not units could be an issue to • Rural homes not
ASHPs are an efficient
Air source heat pumps (ASHPs)
Ground source heat • In rural areas not • Ground source loops can • Commercial units
pumps work in the connected to gas, with sometimes affect the lifetime of requiring heating and/
same way as ASHPs plenty of land, or in areas foundation piles when in close or cooling where there
but transfer heat to where visual intrusions proximity. are acoustic or visual
and from the ground. are unacceptable GSHPs • Installation of bore holes or restrictions.
Ground source heat pumps (GSHPs)
can form an efficient trench loops will increase • Homes if used for low
GSHPs are an efficient
solution. construction time and temperature heating,
way of transferring
• Capable of providing both capital cost. less efficient at
3-4 times more heat
heating and cooling. • If installed on an unsuitable producing hot water.
than direct electric
• GSHPs are most efficient project (project with high heat
systems such as
when generating heat demand) the ground loops
emersion heaters.
for low temperature can over cool the ground over
GSHPs can be laid heating systems and a period of time reducing the
horizontally in when also supplying efficiency of the heat pump.
trenches or vertically cooling, so as to balance • Not suitable for residential units
in boreholes approx. and recharge the ground if used to generate only hot
100m deep. temperatures. water, the efficiency of the heat
• GSHPs are typically more pumps can drop if the demand
efficient than ASHPs as is too high, this can increase the
the ground temperature residents energy bills.
is more stable generally
and warmer in winter,
than the outside air.
157
About Pros Cons Suitability
Biomass comes in the • Good for rural locations • Local biomass suppliers are • Homes in rural
form of wood, wood where air quality is not typically available in large locations without a
chip or wood pellets, not a strict issue and city centres therefore pellets gas connection.
with pellets being the where there is no gas would have to be transported
most efficient form connection. from elsewhere in the UK or
of wood fuel. Any • Can run efficiently if left internationally.
of these fuel types to run for long periods • The burning of wood pellets
can be used in wood of time. releases substantially more
burning stoves or • Wood burning stoves NOx emissions than gas boiler
boilers to generate can be an attractive and equivalents. This reduces the air
heat for hot water and practical form of space quality, which is unacceptable
heating. heating when used as a in a number of cities. Catalysts
localised source. can be fitted to flues to reduce
emissions.
Biomass boiler
158
Appendices
Demonstrating compliance Homes are assessed against a long list of
criteria. The two most important areas of
Part L of the Building Regulations deals with compliance are as follows:
conservation of fuel and power. Part L1 deals
with domestic energy and is split into two parts. 1. Reduction in CO2 emissions: through
Approved Document L1A sets requirements improvements to the building fabric, systems
for energy efficiency measures in new homes specification and inclusion of renewable
and L1B covers the refurbishment of existing technologies. This is demonstrated by
dwellings. For the purpose of this document, comparing the Target Emission Rate (TER) and
the more onerous requirements of L1A for new the Dwelling Emission Rate (DER) calculated
buildings have been addressed. in SAP. In order to pass, The DER must be less
than, or equal to, the TER.
Although energy regulations have been largely
unaffected by the Housing Standards Review 2. Fabric energy efficiency improvements:
they have been subject to intense political debate through better fabric specification, building
and numerous changes over the past decade. orientation and careful thermal detailing.
Through AD L1A, updates to carbon reduction Compliance is demonstrated by comparing the
targets and fabric energy efficiency have been Target Fabric Energy Efficiency (TFEE) with
made in 2006, 2010 and 2013. AD L1A 2013 is the the Dwelling Fabric Energy Efficiency (DFEE)
current edition. calculated in SAP. In order to pass, the DFEE
must be less than, or equal to, the TFEE.
In order to ‘pass’ the requirements of Part
L1A, homes are assessed using the Standard Every dwelling is assessed individually through
Assessment Procedure (SAP), a piece of software an individual SAP calculation. In the case of flats,
used to calculate energy consumption and CO2 however, the results can be averaged across the
emissions. The main compliance outputs from block as the heat loss and gain is shared between
SAP are Energy Performance Certificates (EPC) them to a certain extent.
and the Part L1A checklist. These must be
provided to Building Control to allow issue of the
completion certificate.
159
AD L1A provides a list of individual limiting fabric parameters which must not be exceeded. These are as follows:
Limiting Fabric Parameters (Extract from Table 2 of AD L1A)
Element U-value/airtightness
Roof 0.20 W/(m2.K)
Wall 0.30 W/(m2.K)
Floor 0.25 W/(m2.K)
Party wall 0.20 W/(m2.K)
Swimming pool basin 0.25 W/(m2.K)
Windows, roof lights, curtain walling and pedestrian doors 2.00 W/(m2.K)
Air permeability 10.0 m3/(h.m2) at 50Pa
In practice it is very difficult to comply with the energy targets of the Building Regulations overall using the values
taken from Table 2 because the designed dwellings are compared with the values shown in Table 4 below.
It is therefore much safer to design to meet the fabric parameters of Table 4*.
These are as follows:
Notional Dwelling Specification (Extract from Table 4 taken from ADL1A)
Element U-value/airtightness
Roof 0.13 W/(m2.K)
Wall 0.18 W/(m2.K)
Floor 0.13 W/(m2.K)
Party wall 0.0 W/(m2.K)
Windows, roof lights, curtain walling and glazed doors 1.4 W/(m2.K) g-value – 0.63
Opaque doors 1.0 W/(m2.K)
Semi glazed doors 1.2 W/(m2.K)
Air permeability 5.0 m3/(h.m2) at 50Pa
*Refer to ADL1A 2013 for full set of requirements.
160
Appendices
Appendix G: Window design: what to consider
Although there are no rules requiring homes to Constraints
have windows, natural light or natural ventilation
(mechanical ventilation is technically all that n Building Regulations
is required) there are a number of regulations – AD Q 2015 (Domestic Security)
and standards that affect, or apply to, windows. Requires windows that are easily accessible
This makes it disproportionately complicated to to provide physical security equivalent to
balance the attributes, constraints, risks and PAS 24 (2012), and to be securely fixed. (See
other considerations, particularly with full height subsection 3.4 of Part II).
openings. Most of these issues have been covered
in various parts of Part II but have been brought – AD M 2015 (M4(2) Category 2 – Accessible
together here to highlight the need for careful, and adaptable dwellings)
all-round consideration to ensure a sensible Requires the handle to at least one window
outcome. in the principal living area to be 450-
1200mm above FFL and handles to all other
windows, 450-1400mm above finished
Attributes floor level (FFL) unless fitted with a remote
n natural light opening device. (See subsection 3.3 of Part
II and Appendix E).
n natural ventilation
– AD M 2015 (M4(3) Category 3 – Wheelchair
n a view out
user dwellings)
n potential to admit sunlight Requires the handle to one window in the
principal living area to be 700-1000mm
above FFL, and handles to all other
windows 450-1200mm above FFL unless
fitted with a remote opening device. (See
subsection 3.3 of Part II and Appendix E).
– AD M 2015 (M4(2) and M4(3)
Requires glazing to the principal window
of the principal living area to begin at,
or below, 850mm above FFL (or at the
minimum height reasonable to comply with
Part K). (See subsection 3.3 of Part II and
Appendix E).
161
– AD K 2013 (Protection from falling, Risks
collision and impact)
Requires that windows do not open below n Overheating and/or excessive heat loss
800mm above FFL except with adequate The desire for large windows for daylight and
guarding, and that glazing below 800mm sunlight has to be weighed against the risk
in a window, or 1500mm in a door or side of overheating and/or losing too much heat.
panel, to be of a type that ‘breaks safely’ Room function, orientation and opportunities
(as defined by BS EN 12600 and BS 6206). for cross ventilation and secure night time
It also defines the extent of external ventilation all have to be considered. (See
cleanable reach when windows are subsections 3.9, 3.10, 3.11 and 3.12).
cleaned from inside in buildings other than n Loss of privacy
dwellings. This accords with the standards Residents often feel that their privacy is
of BS 8213 for dwellings. compromised by large windows, windows
– AD F (Ventilation) with low cills, or glazed doors – particularly
Requires new dwellings to achieve when these are at street level, or abutting a
prescribed ventilation rates to dilute and communal courtyard or podium. Curtains or
remove internal pollutants and water other forms of screening are frequently used
vapour. Four types of ventilation are defined to increase privacy but the effect is often
to ensure that a mixture of background untidy, particularly when left in place all day.
ventilation, extract from kitchens and
bathrooms and purge ventilation are
achieved.
n British Standards
162
Appendices
n m
i b
j k g c d e f h
l l
163
Other considerations
n Reduced flexibility in use n Aesthetic and planning considerations
Low or full height windows (and/or doors) The size, shape, proportion, style, colour
also restrict the placement of furniture and materiality of windows, and the pattern
and radiators, and power sockets often end of fenestration, all have a significant impact
up on the ‘wrong side’ of a window. Juliet on the appearance and character of a
balconies mean that windows either have to facade. LPAs may also have strong feelings
open inwards (and be clear of furniture), or on some of these aspects, particularly in
be subdivided into fixed and opening lights in conservation areas.
which case the lower fixed lights are often very
n Glazing specification
difficult to clean because of the narrow gap.
Glass can be specified with low-e and/or solar
n Windows above kitchen units and baths control coatings. This has an impact on heat
These are not ideal as they are harder to loss, heat gains and light transmittance.
reach (for operation and cleaning) and will
require remote opening devices in Category
3 dwellings and possibly also Category 2.
However, many residents value a window
above the ‘kitchen sink’ and would prefer to
have a window above the bath than none at
all where there is no practical alternative
location.
n Secure night-time ventilation
This often relies on restrictors and is more
difficult when all opening lights are large.
164
Appendices
Good practice recommendations (additional to regulatory requirements)
1. The size of all windows should relate to 6. In any situation, full height windows should
the function of the room (living spaces generally be avoided to bedrooms except
need more light than other spaces), its where privacy is not at stake and the room
orientation (to avoid excessive heat loss or can be sensibly furnished – preferably in
gain) and its aspect (to make the most of more than one way. ‘Dummy’ lower panes,
good views). backed by a wall internally, are a possible
solution and obscure glazing helps too.
2. Both sides of all windows should be
cleanable from inside unless external 7. Habitable rooms feel better when window
access is possible. Above ground level, this cills are reasonably low (800-900mm).
will usually require reversible hinges.
8. In deep rooms on the lower floors of
3. Full height windows often can’t be fully narrow streets or courtyards and other
cleaned safely from inside so therefore situations where daylight is at a premium,
work best where they open onto a balcony taller windows are helpful as they bring
or other secure, and reasonably private, light deeper into the plan.
outdoor space.
9. Subject to privacy considerations, windows
4. Where there is no external access to full above kitchen worktops should be as wide
height windows, the overall size of the as possible to compensate for the higher
window, and the arrangement and opening cill height, provided that wall cupboards are
mechanism of the opening lights, need to not sacrificed as a result.
be more carefully considered to ensure
10. Where possible, all windows should offer
safe cleaning.
secure night time ventilation and a mix of
5. In any room, full height windows should large and small opening lights.
generally be avoided at street level and
in other locations where privacy is likely
to be compromised, unless lower panes
are obscured glass or Juliet balconies to
increase the privacy.
165
Appendix H: Checklist of client’s job management
responsibilities
The checklist below aims to help clients through the design and construction process. Key
responsibilities are summarised and related to each stage of a project. These are related to the RIBA
Plan of Work 2013, which identifies eight stages, numbered 0-7. The list is not exhaustive and each
project should develop its own list of critical actions.
www.ribaplanofwork.com/PlanOfWork.aspx
0 1 2 3 4 5 6 7
166
Appendices
n Confirm site boundaries and ownership to
Notes:
design team
• The client will be deemed to be the Principal
Designer and required to co-ordinate health and n Check Rights of Way, Easements and
safety in the pre-construction phase until he/she Covenants affecting the site and inform
appoints someone else to this role. design team
• Appoint a full team of consultants as early as possible
as this will enable a fully co-ordinated design to be n Check Rights of Light and instruct surveyor
prepared and avoid abortive work/cost. where necessary
• VAT rules in relation to construction projects are
quirky. Consult a VAT specialist to ensure any eligible n Check party wall rights
VAT relief is applied and that the design team are
aware of any physical or procedural requirements n Develop detailed brief
that must be met. n Establish which standards and codes are to
apply over and above statutory minima
1 Preparation and brief n Initial contact with planners to establish any
Section 106/CIL/Highways requirements
n Assemble site data:
n Establish a Project Risk Register –
– retrieve archive and existing drawings regularly review and identify actions to
and information mitigate perceived threats to project cost,
– locate existing Health and Safety file (if programme, safety and quality
applicable)
– locate asbestos register/survey Note:
– commission surveys and investigations • If the desktop report indicates that physical
– request and obtain record information archaeology investigations are required this will
from utility companies need to be accommodated in project programme and
budget.
– check whether any service diversions
are required to enable development
of site 2 Concept design
– commission archaeological
desktop report n Feasibility study – agree number of options
– appoint ecologist to start bio-diversity to be tested
survey, bat survey etc. n Arrange and attend design team meetings
– seek advice of Principal Designer on and design reviews
scope of pre-construction information n Arrange resident/stakeholder consultation
as appropriate
n Review and sign off proposed concept
design
167
n Acquire land following feasibility study and n Provide cheque to accompany Building
outline consents Control Application and confirm any
n Set out requirements for any special ‘optional requirements’ that have been
presentation material – physical models, imposed as planning conditions
CGIs, virtual reality models, etc. n Select contractors to tender:
– Hold pre-qualification interviews
3 Developed design – Assess company information and carry
out financial checks
n Arrange and attend design team meetings – Visit contractors’ completed projects and
and design reviews works in progress
n Agree materials, sign off the design and n Implement and apply organisations tender
instruct the planning application to be processes if applicable
lodged
n Appoint Clerk of Works where
n Provide cheque to accompany planning considered beneficial
application
n Input into Employer’s Requirements
5 Construction
n Determine level of Liquidated and
Ascertained Damages (LADs) to be included n Take part in contractor interviews and
in contract terms tender assessment
n Place advance orders with utility companies n Appoint contractor:
168
Appendices
n Attend site progress meetings n Put in place necessary insurances effective
n Arrange ‘Topping Out Ceremony’ (if from date of Practical Completion
appropriate) n Implement Defects Notification/rectification
n Arrange payment of contract certificates process and timescales
n Consult marketing team on specification of n Organise publicity photographs and press
interior finishes and fittings releases
n Consult marketing team on requirement for n Submit project for awards
show home(s)/marketing suite n Agree Final Account
n View and approve samples of finishes and n Undertake post-completion review of
fittings proposed by Contractor project with project team
n Review draft Residents Handbooks;
Note:
Operating and Maintenance (O&M) Manuals;
Health and Safety File • Timely rectification of defects will help residents.
Notes:
7 In use
• Avoid changes to the design and specification during
the construction phase as this will have programme n Carry out planned maintenance
and cost implications.
• The client will be deemed to be the Principal n Comply with warranty and guarantee
Contractor and required to co-ordinate health and conditions
safety in the construction phase until he/she appoints
someone else to this role. n Maintain Health and Safety file and make it
available to anyone you comes to work on
the building
6 Handover and close out
n Agree and initiate Post Occupancy
n Agree documentation required from Evaluation (POE)
contractor at handover
Note:
n Agree quality standard – area to be
completed in advance and used as • Check Terms of Warranties and Guarantees
and ensure planned maintenance is carried out
benchmark accordingly.
n Arrange training days for facilities staff
n Receive Residents Handbooks; O&M
Manuals; Health and Safety File
n Receive keys and documents relating to
individual dwellings
169
Appendix I: Checklist of client’s CDM responsibilities
Under the Construction (Design and Management)
Regulations 2015, the client is required to ensure
that the construction project is set up so that it
is carried out from start to finish in a way that
adequately controls the risks to the health and
safety of those who may be affected.
For full details refer to HSE Guidance document
L153 Managing Health and Safety in Construction or
to industry guidance for clients published by the
Construction Industry Training Board (CITB).
The checklist on the next page summarises the
client’s duties during key parts of the design
process.
170
Appendices
Pre-construction phase • Where there is likely to be more than one works
contractor (most projects) appoint a Principal
• Where there is more than one client, agree who will Contractor to co-ordinate health and safety in the
be the client for CDM purposes. construction phase.
• Provide a clear brief. • Ensure that a suitable construction phase plan is in
place before construction work commences.
• Set down health and safety expectations in the
briefing documentation. • Ensure that suitable welfare facilities are in place
before construction work commences.
• Set a realistic timescale and budget – allocate
sufficient time and resources to each stage of the
project. Construction phase
• Select a competent project team. Check to ensure • Co-operate with the Principal Contractor.
that designers and contractors have the necessary
knowledge, skills, experience and training to carry • Monitor the construction team to ensure health
out the tasks for which they are appointed. and safety is considered and co-ordinated in a
proportionate manner and that duty holders are
• Where there is likely to be more than one works complying with their duties.
contractor (most projects) appoint a ‘Principal
Designer’ to co-ordinate health and safety in the pre- • Agree the format and content of Health and Safety file,
construction phase. O&M Manuals and Residents Handbooks.
• Co-operate with the Principal Designer. • Check that Health and Safety file has been prepared.
171
Appendix J: Housing Standards Review: further detail
Background but it was decided that there was insufficient
evidence to support the setting of standards
In 2010, the Government initiated an industry-led or regulations.
review of the housing standards typically applied
through local planning policy, to see how they The aim was to set nationally defined standards
could be simplified to improve housing delivery. in the five key areas and offer them back to local
Under the chairmanship of Sir John Harman, planning authorities (LPAs) in the form of a
the Local Housing Delivery Group delivered its restricted menu. Subject to their ability to prove
report in 2012, recommending that the technical need and viability, LPAs would be able to select
standards considered worthy of retention, should standards from the menu but not change, or add
be dealt with through the Building Regulations, to them.
rather than through local planning. In two subject areas (accessibility and water
The exercise was therefore taken back into efficiency), it was decided that standards needed
government hands and re-named the Housing to be set at more than one level, retain a baseline
Standards Review. This became part of the Red regulation and add a higher level (or levels),
Tape Challenge, a deregulatory exercise subject described as ‘optional requirements’. There was
to ‘One-in-two-out’ whereby every (monetary) a consensus that energy should be dealt with
pound of new regulation had to be matched by entirely through planned uplifts to Part L of the
two pounds of discarded regulation. Building Regulations and this therefore ceased
to fall within the remit of the HSR, apart from
The remit of the HSR was limited to ‘technical planners’ ability to require connection to local
standards’ in five main subject areas: heat networks.
n accessibility A public consultation in summer 2013 returned
n space widespread support for the principles behind
the review and a preference for these to be
n security taken straight into regulation, rather than the
n water Government’s preferred two-stage, ‘standard-
first’ approach. The exception was the
n energy ‘Nationally Described Space Standard’, which
Other topics, including daylight, sunlight, natural ministers decided should remain an optional
ventilation and overheating, were considered planning standard.
172
Appendices
Following more work on the technical content How the new regime works
of the new regulations and space standard, a
second public consultation was held in summer Security, waste and energy are now dealt with in
2014 and was again, broadly supported. Minor the same way as all other Building Regulations
additions to Part H, to reduce ‘bin blight’, were and lie outside of the planning system. No need
also introduced. or viability testing is required.
The final package of new and amended For water efficiency, the LPA does not need to
regulations, and the nationally described space take any action unless the optional requirement
standard was published in March 2015, and can of 110 litres/person/day (equivalent to Code
be summarised as follows: Level 3/4) is felt to be necessary and viability
can be demonstrated. The Environment Agency
n accessibility: requirements taken into Building has published data identifying those parts of
Regulations and defined as three distinct the country that are considered to be ‘water-
Categories (current Part M and two higher stressed’ (and therefore warrant the higher
levels referred to as ‘optional requirements’) standard in principle), and LPAs are expected to
n space: a new optional ‘Nationally Described follow this guidance.
Space Standard’ operating through planning For accessibility, LPAs must decide whether
n security: a new, single tier Building Regulation any new homes need to exceed current Part M –
(Part Q) for new housing (renamed Regulation M4(1) Visitable Dwellings and
also referred to as Category 1). Where need and
n water: current Part G of the Building viability can be demonstrated, the Local Plan can
Regulations retained as the baseline require that a specified proportion of new homes
requirement for water efficiency and a higher should meet Regulation M4(2) Accessible and
‘optional requirement’ introduced for water- Adaptable Dwellings (also referred to as Category
stressed areas 2), the replacement standard for Lifetime Homes,
n energy: to be dealt with through Part and/or that a specified proportion should meet
L of the Building Regulations (and the Regulation M4(3) Wheelchair User Dwellings (also
planned trajectory to Zero Carbon by 2016 referred to as Category 3).
subsequently put on indefinite hold)
n waste: minor changes to Part H of to reduce
bin blight
173
Where Category 3 dwellings are considered regulation M4(1) for accessibility, and the baseline
necessary, the LPA is also required to distinguish Part G regulation for water efficiency.
between ‘wheelchair accessible’ dwellings (ready
Optional requirements are assessed under
for a wheelchair user to occupy from the outset)
Building Control, not planning. The onus is on the
and ‘wheelchair adaptable’ dwellings (capable
developer to notify the Building Control Officer
of being readily adapted to become ‘wheelchair
(BCO) who may be a local authority Building
accessible’). The GLA made a similar distinction
Inspector, or a private sector Approved Inspector
in 2008 but the HSR has now formalised the
(AI). The BCO or AI must report back to the LPA
technical differences between the ‘accessible’
who, in the event of non-compliance, will take any
and ‘adaptable’ standards at Category 3,
necessary enforcement action.
and stipulates that ‘wheelchair accessible’
requirements can only be applied to dwellings The process for adopting and assessing the
that are subject to an allocations policy. Further accessibility requirements is shown in the
detail on the implementation of the new optional diagram on the next page.
requirements has been provided in the relevant
The space standard is subject to needs and
subsections of Part II.
viability testing in the same way as the optional
Notwithstanding the requirement for each requirements, and may also be subject to
authority to demonstrate need and viability before negotiation. It must be formally adopted in the
imposing an optional requirement, developers Local Plan, but need not be confirmed as a
may consider the demands to be unachievable in planning condition. It will be assessed under the
practice, or challengeable on viability grounds, planning process although LPAs may choose to
and seek to negotiate lower requirements than enlist the help of Building Control, particularly
those set out in the Local Plan, on a site-by-site when asked to grant ‘type approval’ whereby
basis. This is more likely to apply to accessibility, generic house plans are assessed and approved
where, for example, either the topography of once, and can be rolled out across the country
a particular site, or the housing typologies without requiring further local approval.
proposed, may make it impractical to provide step
free access to the private entrance (‘the front
door’) – now a requirement for both Category 2
and Category 3 dwellings.
In order to apply to a specific project, optional
requirements must be imposed as planning
conditions attached to an approval notice. Without
this further step, dwellings need only meet
174
Appendices
Adopting and assessing the new ‘optional requirements’ for accessibility
1 2 3 4 5 6 7
Local Developer LPA confirms Developer BCB considers LPA
Planning negotiates the optional informs drawings discharges
Authority with LPA to requirement Building and inspects condition
(LPA) ensure policy (number of Control Body on site (as (or when not
Planning
publishes is appropriate Cat. 2 and (BCB) of any usual) and certified as
application
its policy to the specific Cat. 3 homes) optional notifies LPA compliant,
submitted
for optional development by imposing requirements re compliance serves
requirements a planning that have been with the enforcement
in the Local condition applied condition notice on
Plan after EIP developer)
Pre-planning Post-planning
175
The impact of the Housing Standards that have a solely ‘design’ remit
Standards Review (no ‘technical’ content) are unaffected by the
review and can still be imposed as planning
The full impact of the HSR will not be known requirements. These include documents such
for some time. In May 2015, the GLA published as Building for Life. Others cover both design and
Minor Alterations to the London Plan (MALP), a technical aspects. The clearest example of this
Draft Interim Housing SPG 2015, and a Transition is Secured by Design: New Homes 2014, owned and
Statement to reflect the changes resulting from assessed by the Association of Police Officers
the HSR. The final set of standards has yet to be (ACPO). Going forward, LPAs can continue to
finalised, pending the outcome of an Examination impose Section 1: The Development – Layout &
in Public. Design (Planning Issues) but may not require
compliance with Section 2: Security of Dwelling
Nationally, it could take some LPAs many months,
as this relates to the technical performance of
or even years, to clarify their position, and longer
the dwelling.
still, to understand the overall impact on housing
quality. Until Local Plans have been updated, As designers will testify, the line between ‘design’
new housing has been built to the new rules, and ‘technical’ is not always easy to draw. In the
and substantial data has been collected, it will absence of definitive advice from government,
be impossible to know which local areas have the tables on the next page attempt to clarify the
benefitted and which have suffered – and where status of the most widely used housing-related
the balance lies. standards and regulations.
176
Appendices
Technical standards and regulations that are relevant to new dwellings and fell
within the overall remit of the review
Standards that cannot be imposed through the planning system beyond 1 October 2015
Document title Body responsible
Secured by Design: New Homes 2014 (Section 2) ACPO
Lifetime Homes Standard Habinteg Housing Association
Wheelchair Housing Design Guide Habinteg Housing Association
2011 Site layout planning for daylight and sunlight; BRE
a guide to good practice (part only)
London Housing Design Guide 2011
(technical aspects) GLA
And all other standards (outside of regulation) affecting the technical performance of dwellings
including the following:
• daylight
• overheating and ventilation
• air quality
• sound-proofing
• materials (other than aesthetic aspects or general considerations such as durability)
177
Building regulations that remain in force, or came into force, from 1 October 2015 (defined and
managed by the Government but outside of the planning system)
New regulations and standards that are nationally defined but locally applied through the planning
process (defined and managed by the Government but invoked by LPAs)
Optional requirement M4(2) Accessible and Adaptable Dwellings (part of AD M)
Optional requirement M4(3) Wheelchair User Dwellings (part of AD M)
Optional requirement for Water Efficiency (part of AD G)
Nationally Described Space Standard
Notes:
Aspects of the regulations shown in red fall within the remit of this document.
The optional requirements and standards shown in yellow fall within the remit of this document.
178
Appendices
Non-technical standards (not regulations) that are relevant to new dwellings but
did not fall within the remit of the review and are unaffected by it
Standards that can continue to be imposed through the planning system beyond 1 October 2015
Document title Body responsible
Building for Life 12 Design for Homes/HBF/DC Cabe
Manual for Streets 2 Department for Transport
Car parking: what works where? English Partnerships
Secured by Design: New Dwellings 2014 – Section 1 ACPO
2011 Site layout planning for daylight and sunlight; BRE
a guide to good practice (part only)
London Housing Design Guide (design aspects) GLA
London Housing SPG 2015 (design aspects) GLA
And other design guides and planning policies with no technical remit relating to the dwelling
covering areas such as the following:
n urban design principles
n car parking
n cycle storage
179
Appendix K: Metrics and measurement
1. Density The diagram on the next page (reproduced from
Superdensity: the Sequel) shows how net site area
(GLA calculation methodology from the London should be measured and how this compares with
Housing SPG 2012) gross site area.
Through the London Plan (LP), the GLA uses ‘net Mixed use buildings are subject to additional
residential site area’ when calculating density29. guidance in the SPG as follows:
The SPG describes the approach that should
be taken: In calculating density in vertically mixed schemes
(i.e. where housing is on top of non-residential uses),
This relates to
the ‘red line’ planning application the size of the site should be reduced by an amount that is
site boundary and excludes adjoining footways, equivalent to the proportion of total floorspace allocated
carriageways, paths, rivers, canals, railway corridors to non-residential uses (both below and above ground,
and other existing open spaces.
It includes the proposed measured as GIA) before calculating residential density in
homes, non-residential uses in mixed-use buildings, the normal way’.
ancillary uses, car and cycle parking areas and proposed
internal access roads. It generally includes proposed on- A worked example is also provided:
site open spaces (including publicly accessible spaces),
gardens and children’s play areas. However, counting very
large, on-site, publicly accessible open spaces, such as Maccreanor Lavington worked example for
some of those proposed for some London Plan Opportunity calculating residential density on mixed
Areas, could serve to artificially lower density calculations use schemes:
and applicants proposing particularly large spaces (relative Net Site Area: 1.6ha Residential GIA: 25,200sqm including
to the size of the site) should seek to agree a bespoke 75 basement car parking spaces (78%) Non-residential GIA:
method of calculating density in discussion with boroughs, 7,000sqm (22%) Number of dwellings: 250
and where appropriate, GLA officers. It is important that
calculation of density does not penalise developers
in Dwelling Mix (unit): 1-bed – 87 (35%) 2-bed – 120 (48%)
providing adequate public amenity and open space. The LP 3-bed – 30 (12%) 4-bed – 13 (5%) Number of Habitable
expresses density both in terms of dwellings and, to take Rooms: 719
better account of the needs of different types of household, Density calculation based on 78% of the net site area
habitable rooms per hectare’. (reducing the site area by 22% – the proportion of proposed
non-residential floorspace), giving a site area for density
purposes of 1.25ha.
Density: 2003 u/ha (575hr/ha)’
29 RICS 6th edition ‘Code for Measuring Practice: a guide for surveyors and valuers’
180
Appendices
2. Gross Internal (Floor) Area (GIA) simpler methodology was defined in the course
of the Housing Standards Review and this is the
(GLA definition/methodology from the London definition included below.
Housing Design Guide, Interim version 2012)
The Gross Internal Floor Area (GIA) is the area 3. Gross Internal (Floor) Area (GIA) of
of a building measured to the internal face of the a dwelling
perimeter walls at each floor level. Measurements should
be in accordance with the RICS Guidance Note (Code of (As defined in the Nationally Described
Measuring Practice 6th Edition). The GIA includes the floor
Space Standard)
area of habitable and non-habitable rooms plus circulation,
plus are taken up by internal partitions. It does not include
the area of external private amenity space’. The GIA of a dwelling is defined as the total floorspace
measured between the internal faces of perimeter walls 30
that enclose the dwelling. This includes partitions,
Based on the RICS Code again, the document structural elements, cupboards, ducts, flights of stairs
goes on to explain what should, and should not, and voids above stairs. The Gross Internal Area should be
measured and denoted in square meters (m2).’
be included in the GIA of a dwelling but a much
30 The internal face of a perimeter wall is the finished surface of the wall. For a detached house, the perimeter walls are the
external walls that enclose the dwelling, and for other houses or apartments they are the external walls and party walls.
181
Glossary
Acronyms used with in the text
ACPO Association of Chief Police Officers LABC Local Authority Building Control (association)
AD Approved Document (of the Building Regulations) LADs liquidated and ascertained damages
AI Approved Inspector LED light emitting diode
ASHP air source heat pump L/K/D living, kitchen, dining (space)
LP London Plan
BC Building Control
LPA local planning authority
BCO building control officer
LTH Lifetime Homes (standard)
BIM building information modelling
LZC low (and) zero carbon (technology)
BRE Building Research Establishment
BS British Standard MALP Minor Amendments (to the) London Plan
BSRIA Building Services Research and Information MMC Modern Methods of Construction
Association MVHR mechanical ventilation with heat recovery
CCTV closed circuit television monitoring NAHP National Affordable Housing Programme
CDM Construction Design and Management NHBC National House Building Council
(legislation) NHF National Housing Federation
CfSH Code for Sustainable Homes NOx nitrogen oxides
CGI computer generated image NPPF National Planning Policy Framework
CHP communal heat and power
O&M Operating and Maintenance (manual)
CIBSE Chartered Institute of Building Surveyors
CITB Construction Industry Technical Board PAS Publicly Available Specification
CO2 carbon dioxide PRS private rental sector
PTAL public transport accessibility level
D&B Design and Build (contract)
PV photovoltaic
dB decibel
DCLG Department for Communities and Local RIBA Royal Institute of British Architects
Government
SAP Standard Assessment Procedure
DER dwelling emission rate
SBD Secured by Design
DFEE dwelling fabric energy efficiency
SO Shared Ownership
DHN district heat network
SPG Supplementary Planning Guidance
DPH dwellings per hectare
SuDs sustainable (urban) drainage (system)
EPC Energy Performance Certificate SVP soil (and) vent pipe
ERs Employer’s Requirements
TER target emissions rate
ESCo energy services company
TFEE target fabric energy efficiency
FEE fabric energy efficiency TPO Tree Preservation Order
FFL finished floor level
UKGBC United Kingdom Green Building Council
FIT Feed in Tariff
UKPN United Kingdom Power Network
GI green infrastructure
VAT Value Added Tax
GIA gross internal (floor) area
VOC volatile organic compound
GLA Greater London Authority
GSHP ground source heat pump WHDG Wheelchair Housing Design Guide
HCA Homes and Communities Agency ZC Zero Carbon
HIU heat interface unit
HQI Housing Quality Indicators
182
Words and phrases used within remain at an affordable price for future eligible
the text households or for the subsidy to be recycled for
alternative affordable housing provision.
Note that where possible, definitions have been
Social rented housing is owned by local
obtained from reputable published sources
authorities and private registered providers
and these have been attributed. In other cases,
(as defined in section 80 of the Housing and
including where definitions tend to vary, words
Regeneration Act 2008), for which guideline
and phrases have been defined according to their
target rents are determined through the
specific meaning within this document. These are
national rent regime. It may also be owned by
unattributed.
other persons and provided under equivalent
Access: this term refers to the methods by which rental arrangements to the above, as agreed
people with a range of needs (such as disabled with the local authority or with the Homes and
people, people with children, people whose first Communities Agency.
language is not English) find out about and use
Affordable rented housing is let by local
services and information. For disabled people,
authorities or private registered providers of
access means the freedom to participate in the
social housing to households who are eligible for
economy, in how a place is planned, and in the
social rented housing. Affordable rent is subject
social and cultural life of the community. (LP).
to rent controls that require a rent of no more
Accessibility: the ability of people to move than 80% of the local market rent (including
around an area and to reach places and facilities, service charges, where applicable).
including the elderly, disabled and those with
Intermediate housing is homes for sale and
young children.
rent provided at a cost above social rent, but
Active frontage: the edge, wall or facade of below market levels subject to the criteria in
a building or space which is well used and the affordable housing definition above. These
offers opportunity for ‘passive surveillance’ or can include shared equity (shared ownership
overlooking (e.g. street facades or elevations with and equity loans), other low cost homes for sale
numerous entrances, windows and balconies etc. and intermediate rent, but not affordable rented
which overlook the street). housing.
Affordable housing: social rented, affordable Homes that do not meet the above definition of
rented and intermediate housing, provided to affordable housing, such as ‘low cost market’
eligible households whose needs are not met housing, may not be considered as affordable
by the market. Eligibility is determined with housing for planning purposes. (NPPF).
regard to local incomes and local house prices.
Affordable housing should include provisions to
183
Affordable rented housing: See affordable Average Daylight Factor (ADF): ratio of total
housing. daylight flux incident on the working plane to
the area of the working plane, expressed as a
Air quality: Linked to air pollution, whereby good
percentage of outdoor illuminance on horizontal
air quality has low pollution levels and therefore
plane due to an unobstructed CIE standard
low airborne particulates or other harmful
overcast sky. Thus a 1% ADF would mean that
materials.
the average indoor illuminance would be one
Air source heat pumps (ASHP): transfers heat hundredth the outdoor unobstructed illuminance.
collected from the outside air to inside the (BRE).
building or vice versa.
Background ventilator: a small ventilation
Airtightness: a general descriptive term for opening designed to provide controllable whole
the resistance of the building envelope to building ventilation. (AD F:2010).
infiltration with ventilators closed. The greater
Biodiversity: this refers to the variety of
the airtightness at a given pressure difference
plants and animals and other living things in a
across the envelope, the lower the infiltration.
particular area or region. It encompasses habitat
(AD F:2010).
diversity, species diversity and genetic diversity.
Air permeability: the physical property used to Biodiversity has value in its own right and has
measure airtightness of the building fabric. It is social and economic value for human society. (LP).
defined as air leakage rate per hour per square
Biomass: the total dry organic matter or
metre of envelope area at the test reference
stored energy of plant matter. As a fuel it
pressure differential of 50 pascals (50N/m2).
includes energy crops and sewage as well as
Therefore the unit of measurement is m3/h.
arboricultural forestry and agricultural residues.
m2 @50Pa. Air tightness tests are carried out
(LP).
either on all dwellings or sample dwellings post-
construction. (AD L1A:2013). Blue roof: blue roofs are a relatively new SuDs
strategy and are designed to retain water above
Albedo: the surface reflectivity of the sun’s
the waterproofing membrane, either temporarily
radiation, whereby light coloured surfaces reflect
or permanently.
more heat than dark coloured surfaces. (LP).
Brief (project/development): the brief sets
Amenity: element of a location or neighbourhood
out the vision for a development. It is grounded
that helps to make it attractive or enjoyable for
firmly in the economic, social, environmental
residents and visitors. (LP).
and planning context. Apart from its aspirational
Ancillary spaces: spaces that serve main spaces: qualities, the brief must include site constraints
corridors, store rooms, plant rooms and so on. and opportunities, infrastructure including
(CABE).
184
energy and transport access and planning lighting, lifts, escalators, ICT networks, security,
policies. It should also set out the proposed uses, alarms, fire detection and fire protection. (BSRIA).
densities and other design requirements. (LP).
Car club: these are schemes such as city car
Brownfield land: both land and premises are clubs and car pools, which facilitate vehicle
included in this term, which refers to a site that sharing. (LP).
has previously been used or developed and is not
Capital costs: costs incurred on the purchase of
currently fully in use, although it may be partially
land, buildings, construction and equipment to be
occupied or utilised. It may also be vacant,
used in the production of goods or the delivery of
derelict or contaminated. This excludes open
services. (CABE).
spaces and land where the remains of previous
use have blended into the landscape, or have Carbon dioxide (CO2): a naturally occurring gas
been overtaken by nature conservation value or comprising 0.04% of the atmosphere. The burning
amenity use and cannot be regarded as requiring of fossil fuels releases carbon dioxide fixed by
development. (LP). plants many millions of years ago, and this has
increased its concentration in the atmosphere by
Brown roof: roof which has a layer of soil or other
some 12% over the past century. It contributes
material which provides a habitat or growing
about 60% of the potential global warming effect
medium for plants or wildlife. (LP).
of man-made emissions of greenhouse gases.
Building envelope: the structure and elements (LP).
that enclose the internal space: the walls, floor
CDM regulations: the Construction (Design
and roof construction. (CABE).
Management) Regulations 2007 help to improve
Building Regulations: Building Regulations health and safety, and manage risks on site.
apply in England and Wales and promote and (CABE).
enforce standards for most aspects of a building’s
Client team: the in-house team responsible for
construction, including structure, fire safety,
delivering the project for the client, and liaising
sound insulation, drainage, ventilation, electrical
with project partners. (CABE).
safety, water, energy efficiency and the needs
of all people, including those with disabilities, in Climate change adaptation: adjustments to
accessing and moving around buildings. natural or human systems in response to actual
or expected climatic factors or their effects,
Building services: a collective term for the
including from changes in rainfall and rising
systems required for the safe, comfortable and
temperatures, which moderate harm or exploit
efficient operation of the built environment. This
beneficial opportunities. (NPPF).
includes energy supply and distribution, heating,
air-conditioning, ventilation, refrigeration,
185
Climate change mitigation: action to reduce the Communal heating: the distribution of thermal
impact of human activity on the climate system, energy in the form of steam, hot water, or chilled
primarily through reducing greenhouse gas liquids from a central source in a building which
emissions. (NPPF). is occupied by more than one final customer, for
the use of space heating, process heating, cooling
Code for Sustainable Homes (the Code or
or hot water. It is not necessary for the heat
CfSH): the now withdrawn national standard for
supply to be within the building, only that a single
the sustainable design and construction of new
building is making use of the heat. (Gov).
homes in England. It measured sustainability
against nine categories, rating the ‘whole home’. Communities and Local Government (CLG):
The code uses a one to six-star rating, setting the Government department responsible for
minimum standards for energy and water use at planning, local government, housing and regional
each level. (CABE). development. (LP).
Combined heat and power (CHP): the generation Community Infrastructure Levy: a levy allowing
of electricity and heat simultaneously in a local authorities to raise funds from owners or
single process to improve primary energy developers of land undertaking new building
efficiency compared to the separate generation projects in their area. (NPPF).
of electricity (e.g. from power stations) and heat
Consultant team: the group of professionals you
(from local boilers). (CIBSE).
need to produce a project: architects, structural
Comfort cooling: a true air-conditioning system engineers, quantity surveyors and potentially
provides full control of air temperature, humidity, many other specialists. (CABE).
freshness and cleanliness. Systems that do not
Contractor: the industry term for a builder. There
provide full control of humidity are known as
can be a main contractor, and sub-contractors,
comfort cooling systems. (BSRIA).
and specialist sub-contractors, depending on
Commissioning: the advancement of a fixed your procurement route. (CABE).
building service after all or part of the system
Core: the shared parts inside a building which
has been installed, replaced or altered. The
provide access from a common entrance to the
system is taken from a state of static completion
front doors of private dwellings, including lift
to working order. Testing and adjusting, as
and stairs where these are part of the shared
necessary, ensure that the whole system uses
circulation.
no more fuel and power that is reasonable in the
circumstances, without compromising the need Curtilage: all the space (and buildings) used by,
to comply with health and safety requirements. and under the control of, a single household;
(AD L1A:2013). typically from the front garden wall to the rear
garden fence: see also in-curtilage.
186
Defects liability period: a period, usually 12 Design development: the iterative process of
months, set in the building contract, during which agreeing how the project will be laid out and put
the contractor must put right any failures that together, getting more and more detailed as time
have come to light. (CABE) goes on. (CABE).
Defensible space: space which is clearly owned Design review: service giving expert advice on
and maintained by an identifiable individual or the design quality of projects, which has been
household (or a landlord). provided by CABE at a national level, and by
others at regional and local level. (CABE).
Density: typically the numbers of dwellings per
hectare that a scheme or building provides (dph); Design team: the group of consultants that
density may also be expressed in terms of the develop the design. This isn’t just the architect, it
number of habitable rooms or bedspaces per includes cost consultants, structural engineers,
hectare. services engineers and potentially many types of
specialists – landscape, sustainability and so on.
Design and Access statement: a statement that
(CABE).
accompanies a planning application to explain
the design principles and concepts that have Desire lines: normally the shortest or most
informed the development and how access issues convenient route between two or more
have been dealt with. The access element of the destinations.
statement should demonstrate how the principles
Detailed design: the documents that describe the
of inclusive design, including the specific needs
design in detail – materials, services, structure
of disabled people, have been integrated into the
and all the various products that they are made
proposed development and how inclusion will be
of. (CABE).
maintained and managed. (LP).
Development: this refers to development in
Design and Build: a method of construction
its widest sense, including buildings, and in
where the constructor or building contractor
streets, spaces and places. It also refers to both
is partly or entirely responsible for design
redevelopment, including refurbishment, as well
development and quality as well as the delivery of
as new development. (LP).
the building. (BSRIA).
Disabled people: a disabled person is someone
Design champion: a person at senior level in an
who has an impairment, experiences externally
organisation who promotes the benefits of good
imposed barriers and self-identifies as a disabled
design, and supports and challenges colleagues
person. (LP).
to maintain design quality in their activities.
(CABE).
187
District heat network: the distribution of thermal Employer’s Requirements (ERs): what the brief
energy in the form of steam, hot water or chilled is called in some procurement routes. (CABE).
liquids from a central source of production
Energy Centre: The location for central heat and/
through a network to multiple buildings or sites
or power plant. (CIBSE).
for the use of space heating or process heating,
cooling or hot water. (Gov). Energy efficiency: this is about making the
best or most efficient use of energy in order
Diversity: the differences in the values, attitudes,
to achieve a given output of goods or services,
cultural perspective, beliefs, ethnic background,
and of comfort and convenience. This does not
sexuality, skills, knowledge and life experiences
necessitate the use of less energy, in which
of each individual
in any group of people
respect it differs from the concept of energy
constitute the diversity of that group. This term
conservation. (LP).
refers to differences between people and is used
to highlight individual need. (LP). Energy Performance Certificate (EPC): this is a
certificate that confirms the energy rating of the
Dual aspect: a home (or room) with windows
dwelling from A to G, where A is the most efficient
on two or more walls that allows for views,
and G is the least efficient. The better the rating,
daylight (and usually ventilation) in more than one
the more energy efficient the dwelling is, and the
direction.
lower the fuel bills are likely to be. The energy
Dwelling Emission Rate (DER): the DER is the performance of the building is shown as a carbon
estimated CO2 emissions per m2 per year (KgCO2 / dioxide (CO2) based index. EPCs are generated
m2 /year) for the dwelling as designed. It accounts using approved software by accredited energy
for energy used in heating, fixed cooling, hot assessors: see Standard Assessment Procedure.
water and lighting which is used to demonstrate (CfSH).
compliance with AD L1A. (CfSH).
Energy service company (ESCo): a company
Dwelling Fabric Energy Efficiency (DFEE): see offering a total energy supply service that takes
Fabric Energy Efficiency (FEE). responsibility for provision, financing, operation
and maintenance of energy facilities. (CIBSE).
Ecological networks: these link sites of
biodiversity importance. (LP). Export to grid: whereby excess electricity
generated by renewables is fed back into the
Embodied energy: embodied energy is the
national electrical grid.
amount of resources consumed to produce a
material. Production includes the growing or Extract ventilation: the removal of air directly
mining and processing of the natural resources from a space or spaces to outside. Extract
and the manufacturing, transport and delivery of ventilation may be by natural means (e.g. by
the material. (LP). passive stack ventilation) or by mechanical
188
means (e.g. by an extract fan or central system). Green infrastructure (GI): the multifunctional,
(AD F:2010). interdependent network of open and green
spaces and green features (e.g. green roofs). It
Fabric Energy Efficiency (FEE): energy demand
includes the Blue Ribbon Network but excludes
for space heating and cooling expressed in
the hard-surfaced public realm. This network
kilowatt-hours of energy demand per square
lies within the urban environment and the
metre per year (kWh/m2 /year). This is used to
urban fringe, connecting to the surrounding
demonstrate compliance with AD L1A. (CfSH).
countryside. It provides multiple benefits for
Fabric first (approach): Maximising the people and wildlife including: flood management;
performance of the components and materials urban cooling; improving physical and mental
that make up the building fabric itself, before health; green transport links (walking and cycling
considering the use of mechanical or electrical routes); ecological connectivity; and food growing.
building services systems. Green and open spaces of all sizes can be part of
green infrastructure provided they contribute to
Families: households with at least one child
the functioning of the network as a whole. (LP).
under 18: see also family home and larger family
home. Greening: the improvement of the appearance,
function and wildlife value of the urban
Family home: for the purposes of this handbook,
environment through soft landscaping. It can also
this is defined as having 3 or 4 bedspaces – see
result in cooler local temperatures. (LP).
also larger family home.
Greywater harvesting: collection and re-use of
Feed-in Tariff: feed-in Tariffs were introduced
waste water (bathing washing, laundry) for toilet
in April 2010 as the main financial incentive to
flushing, irrigation, and other non-potable uses.
encourage uptake of renewable electricity-
(BSRIA).
generating technologies. (Energy Savings Trust).
General needs housing: housing of any tenure
Fuel cell: electro-chemical device that produces
designed for people without ‘special needs’.
electricity and heat on-site (BSRIA).
Ground source heat pumps (GSHP): transfers
Fuel poverty: being unable to afford to keep one’s
heat collected from the ground to inside the
home adequately heated.
building or vice versa.
Green roof/wall: planting on a roof or wall to
G-value: the fraction of incident solar radiation
provide climate change, amenity, food growing
transmitted by a window, expressed as a number
and recreational benefits. For further information
between 1 and 0, whereby 1 indicates maximum
please see:
solar heat gain and 0 no solar heat gain. Solar
www.london.gov.uk/sites/default/files/living-
control glass has a low G-value, typically 0.4
roofs.pdf (LP).
or lower.
189
Habitable room: living, dining, kitchen/dining* Inclusive design: inclusive design creates an
or bedroom (*sometimes habitable rooms environment where everyone can access and
are defined by floor area by local authorities benefit from the full range of opportunities
usually for density calculation purposes e.g. only available to members of society. It aims to
kitchen/diners of 12m2 or larger are regarded as remove barriers that create undue effort,
habitable rooms). separation or special treatment, and enables
everyone to participate equally in mainstream
Heat interface unit (HIU): an integrated solution
activities independently, with choice and dignity.
for delivering and recording the heat consumed
(LP).
by an individual dwelling served from a district
heating scheme. The HIU consists of a pre- In-curtilage: any element (usually a parking
fabricated assembly of components that form space) that is within the curtilage (or plot) of a
the interface between the heat network and the dwelling – see also curtilage.
dwelling’s heating system. It may include a plate
Indoor air quality: attributes of the respirable
heat exchanger for the production of hot water
atmosphere inside a building including gaseous
and a heat exchanger to separate the two circuits
composition, humidity, temperature and
together with control valves and a heat meter.
contaminants. (BSRIA).
(CIBSE).
Infiltration: the uncontrolled exchange of air
Heat meter: device which measures the heat
between inside a building and outside through
delivered, typically from a district heating
cracks, porosity and other unintentional
systems to a consumer. (CIBSE).
openings in a building, caused by pressure
High density: above 80 dwellings per hectare difference effects of the wind and/or stack effect.
(dph) or 250 habitable rooms per hectare. (AD F:2010).
High rise: residential buildings of 9 storeys Landlord supply: the electricity supply for
and above. the landlord areas such as corridors and
communal spaces.
Home user guide: a guide for occupants of the
dwelling that contains necessary details about Larger family home: for the purposes of this
the everyday use of the home in a form that is handbook, this is defined as a home with 5 or
easy for users to understand. (CfSH). more bedspaces: see also family home.
‘Hyperdensity’: above 350 dwellings per hectare. Lifecycle costing: the costs over the 30-60 year
(Superdensity: the Sequel). lifetime of the building or project. This includes
running and maintenance costs and the costs for
people working there. (CABE).
190
Lifetime Homes (LTH): a standard owned by Low-emissivity glass (Low-e): a coating applied
Habinteg Housing Association that defines 16 to glass to reduce its emissivity and therefore the
criteria to make homes accessible and adaptable amount of heat lost through the window pane.
(superseded by regulation M4 (2): or Category 2:
Low and zero carbon technologies (LZC):
of Part M Volume 1 (dwellings)).
includes renewable technologies like
Light transmittance: the amount of natural photovoltaics, solar water heating, biomass but
light received through a window, the higher the also includes low carbon technologies like CHP
percentage or decimal, the more natural light and heat pumps. (CIBSE).
received.
Low density: below 40 dwellings per hectare, or
Linear views (as part of a townscape view): 120 habitable rooms per hectare.
linear views are narrow views to a defined object
Low rise: up to and including 4 storey residential
from an urban space of a building or group of
buildings.
buildings within a townscape setting. (LP).
Massing: the volume and shape of the building, in
Local Planning Authority (LPA): the public
‘blocks’, rather than what it looks like. (CABE).
authority whose duty it is to carry out specific
planning functions for a particular area. All Mechanical ventilation: airflow system driven by
references to local planning authority apply to electrically powered fans, supplying air and/or
the district council, London Borough Council, extracting air from a building.
County Council, Broads Authority, National Park
Mechanical ventilation with heat recovery
Authority and the Greater London Authority, to
(MVHR): in a mechanical ventilation air handling
the extent appropriate to their responsibilities.
unit heat recovery can be used to transfer heat
(NPPF).
from extracted air to the supply air. During
Local Plan: the plan for the future development summer heat bypass should be used to prevent
of the local area, drawn up by the local planning heat being transferred back into a building.
authority in consultation with the community. In
Medium density: 40 to 80 dwellings per hectare
law this is described as the development plan
or 120 to 250 habitable rooms per hectare.
documents adopted under the Planning and
Compulsory Purchase Act 2004. Current core Medium rise: 5 to 8 storey residential buildings.
strategies or other planning policies, which
Mixed tenure (housing): a development which
under the regulations would be considered to be
provides homes for householders from at least
development plan documents, form part of the
two different tenure groups (mixed tenure core
Local Plan. The term includes old policies which
means households from at least two tenure
have been saved under the 2004 Act. (NPPF).
groups living in the same ‘block’ i.e. sharing
access and circulation areas).
191
Mixed use development: development for a Open space: all land that is predominantly
variety of activities on single sites or across wider undeveloped other than by buildings or structures
areas such as town centres. (LP). that are ancillary to the open space use. The
definition covers the broad range of types of open
Modern methods of construction (MMC): modern
space, whether in public or private ownership and
methods of construction is a collective term used
whether public access is unrestricted, limited or
to describe a number of construction methods
restricted. (LP).
that differ from conventional construction
methods such as brick and block. MMC can Opportunity areas: (specifically relating to GLA
include the following techniques: London Plan) London’s principal opportunities
for accommodating large scale development to
n off-site manufactured
provide substantial numbers of new employment
n volumetric, off-site manufactured and housing, each typically more than 5,000 jobs
and/or 2,500 homes, with a mixed and intensive
n panellised, off-site manufactured
use of land
and assisted by good public transport
n hybrid, off-site manufactured accessibility. (LP).
n sub-assemblies and components, and non Overheating: overheating is a widely used term
off-site manufactured modern methods of but it is not precisely defined or understood.
construction. (NHBC). It implies that building occupants feel
uncomfortably hot and that this discomfort is
Natural ventilation: natural airflow through fixed
caused by the indoor environment. Generally
vents, doors or openable windows and louvres,
this is taken to mean that the temperature in the
due to differences in thermal and pressure
building is too high for comfort. (CIBSE).
gradients. (BSRIA).
Passive design principles: things that are in-built
Neighbourhood plan: a plan prepared by a Parish
to your project – for example natural ventilation
Council or Neighbourhood Forum for a particular
and daylight, and the shape, form, materials and
neighbourhood area (made under the Planning
orientation of the building. (CABE).
and Compulsory Purchase Act 2004). (NPPF).
Passive stack ventilation/stack effect: a
Net/gross area: the relationship, usually
ventilation system using ducts from terminals
expressed as a percentage, between the net and
in the ceilings of rooms to terminals on the roof
gross areas of a building i.e. (net area divided by
that extract air to outside by a combination of the
gross area) x 100.
natural stack effect and the pressure effects of
wind passing over the roof of the building. Stack
effect is the pressure differential between inside
and outside a building caused by differences in
192
the density of the air due to an indoor/outdoor Private (space): space, which may be indoor
temperature difference. (AD F:2010). or outdoor, used by, and under the control of
an individual or a single household. Effectively
Passive surveillance: naturally occurring
the space between the garden gate and rear
overlooking (usually from the home to the
boundary fence in houses and the space beyond
public realm), facilitated by windows, doors and
the front door and out onto the balcony for flats.
balconies.
Private wire arrangement: an arrangement
Performance gap: the difference between the
where electricity generated on or in the vicinity of
calculated predicted (design stage) energy
the site is fed directly to dwellings by dedicated
consumption and carbon emissions of a building
power supplies. This is not permitted for
and its performance in use.
individual residential units in the UK without
Photovoltaics (PV): the direct conversion of solar direct power purchase agreements.
radiation into electricity by the interaction of light
Procurement: the acquisition of appropriate
with electrons in a semiconductor device or cell.
goods and/or services. There are various routes
(LP).
to procure. (CABE).
Planning condition: a condition imposed on a
Project team/project delivery team: the group
grant of planning permission (in accordance with
of consultants and contractors delivering the
the Town and Country Planning Act 1990) or a
project for the client. In some situations these are
condition included in a Local Development Order
integrated, in others they are separate. (CABE).
or Neighbourhood Development Order. (NPPF).
Public realm: space between, and within,
Pollution: anything that affects the quality of
buildings that is publicly accessible, including
land, air, water or soils, which might lead to an
streets, squares, forecourts, parks and open
adverse impact on human health, the natural
spaces. (LP).
environment or general amenity. Pollution can
arise from a range of emissions, including smoke, Public (space): space (usually outdoor) which is
fumes, gases, dust, steam, odour, noise and light. accessible to any member of the general public.
(NPPF).
Public transport accessibility levels (PTALs):
Private housing: homes provided for market or detailed and accurate measure of the accessibility
outright sale. of a point to the public transport network in
London, taking into account walk access time and
Private rented sector (PRS): all non-owner-
service availability. PTALs reflect:
occupied self-contained dwellings that are being
rented out as housing (not including forms of n walking time from the point-of interest to the
affordable housing). (LP). public transport access points
193
n the reliability of the service modes available Right to Light: a legal right which one property
n the number of services available within the
may acquire over the land of another. If a
catchment building or wall is erected on this land which
reduces the light in the obstructed property to
n the level of service at the public transport below sufficient levels, then the right to light
access points – i.e. average waiting time. is infringed. The owner or the tenant of the
PTALs do not consider: obstructed property may seek legal redress, for
the removal of the obstruction and/or damages.
n the speed or utility of accessible services (BRE).
n crowding, including the ability to board Section 106 agreements: these agreements
services; or, ease of interchange. (LP). confer planning obligations on persons with
Purge ventilation: manually controlled an
interest in land in order to achieve the
ventilation of rooms or spaces at a relatively high implementation of relevant planning policies
rate to rapidly dilute pollutants and/or water as authorised by Section 106 of the Town and
vapour. Purge ventilation may be provided by Country Planning Act 1990. (LP).
natural means (e.g. an openable window) or by Shared space (also referred to as communal
mechanical means (e.g. a fan). (AD F:2010). space): space, which may be indoor or outdoor,
Rainwater harvesting: collecting water from used by a specific group of people, not usually
roofs via traditional guttering and through down including members of the general public (typically
pipes to a storage tank. It can then be used for a entrance lobbies, cores and courtyards).
variety of uses such as watering gardens. (LP). Shared Ownership: see affordable housing.
Renewable energy: energy derived from a source Sign-off: agreeing a particular aspect is finalised
that is continually replenished, such as wind, and defined, and won’t be revisited. This process
wave, solar, hydroelectric and energy from plant can be referred to as gateways and milestones
material, but not fossil fuels or nuclear energy. within a project’s funding. Changes made after
Although not strictly renewable, geothermal design has been signed off are likely to result in
energy is generally included. (LP). extra time and cost. (CABE).
Retrofit: the addition of new technology or Social rented housing: see affordable housing.
features to existing buildings in order to
make
them more efficient and to reduce their Solar gain: heat gains in a building, typically
environmental impacts. (LP). through a window, from the sun’s thermal energy.
Solar panels: see photovoltaics or solar thermal.
194
Solar shading: a shading device such as an Sustainable communities: places where people
internal or external blind, shutter, louvre, brise want to live and work, now and in the future; that
soleil or curtain etc. that reduces the amount of meet
the diverse needs of existing and
future
solar gain a building receives. residents, are sensitive to their environment and
contribute to a high quality of life. They are safe
Solar thermal panels: panels that collect heat
and inclusive, well planned, built and run, and
from the sun’s rays to provide hot water.
offer equality of opportunity and good services for
Special needs housing: housing that includes all. (LP).
special features designed for particular people or
Sustainable development: this covers
groups of people who require special features in
development that meets
the needs of the
the home environment.
present without compromising the ability of
Stakeholder: people and groups who are affected future generations to meet their own needs. The
by, or have a financial or practical interest in, the Government has set out five ‘guiding principles’
outcome of your project. (CABE). of sustainable development: living within the
planet’s environmental limits; ensuring a strong,
Standard Assessment Procedure (SAP):
healthy and just society; achieving a sustainable
the Government’s approved methodology for
economy; promoting good governance; and using
assessing the energy performance of new
sound science responsibly. (LP).
dwellings for AD L1A. The procedure accounts
for energy used in space heating and cooling, Sustainable urban drainage systems (SuDs):
hot water provision, fixed lighting and auxiliary an alternative approach from the traditional
equipment. The indicators of energy performance ways of managing runoff from buildings and
are energy consumption per unit floor area, hardstanding. They can reduce the total amount,
energy cost rating (SAP rating), environmental flow and rate of surface water that runs directly
impact rating based on CO2 emissions (EI rating) to rivers through stormwater systems. (LP).
and dwelling CO2 emission rate (DER). They are
Soil (and) vent pipes (SVP): pipework for the
used in the production of energy performance
removal of sewage waste from a building whilst
certificates (EPCs) and to demonstrate
regulating the air pressure in the pipes through
compliance with AD L1A. (CfSH).
vents at roof level.
‘Superdensity’: above 150 dwellings per hectare
Target Emissions Rate (TER): the target emission
(dph) or 500 habitable rooms per hectare
rate is the maximum allowable CO2 emissions per
(Superdensity).
m2 (KgCO2/m2 /year) arising from energy used
Surface water: rainwater lying on the surface or in heating, cooling, hot water and lighting which
within surface water drains/sewers. (LP). would demonstrate compliance with AD L1A.
(CfSH).
195
Target Fabric Energy Efficiency (TFEE): see Volatile organic compounds (VOC): emissions
Fabric Energy Efficiency (FEE). from furnishings and some structural materials
which may have a deleterious effect on
Thermal bridge: informal term given to any
occupants. VOCs are commonly found in the
part of the building envelope where there is an
solvents of glues and non-water-based paints and
increased heat flow compared with adjacent
varnishes, and in some preservative treatments.
parts. (BRE: Reducing Thermal bridging at junctions
(CfSH).
when designing and installing solid wall insulation)
‘Wheelchair accessible’ dwelling: Category
Thermal mass: the ability of a material to store
3 dwelling constructed to be suitable for
heat, ideally in step with a building’s daily heating
immediate occupation by a wheelchair user
and cooling cycle – example materials include
housing where the planning authority specifies
concrete and masonry products.
that optional requirement M(4)(2)(b) applies.
Trickle vents: thin air vents, usually cut into the (AD M Volume 1: Dwellings, 2015)
head of window frames, used for background
‘Wheelchair adaptable’ dwelling: Category
ventilation in homes.
3 dwelling constructed with the potential to
Urban heat island: an urban area significantly be adapted for occupation by a wheelchair
warmer than the surrounding countryside. This user where the planning authority specifies
is a manmade issue due to dark coloured hard that optional requirement M(4)(2)(a) applies.
surfaces absorbing heat. London is an example of (AD M Volume 1: Dwellings, 2015).
an urban heat island.
Wind turbines: convert wind energy to electrical
U-value: or thermal transmittance of a building power using a wind turbine (BSRIA).
element or component, is a measure of its ability
Winter gardens: a glazed enclosed balcony with
to conduct heat from a warmer environment
or without openable panes that shelters residents
to a cooler environment. It is expressed as:
from the elements.
the quantity of heat (in Watts) that will flow
through one square metre of area divided by the Zero Carbon: a term applied to a building’s use,
difference in temperature (in degrees K) between with zero net energy consumption, and zero
the internal and external environment, and thus carbon emissions annually. There are many
the unit is W/m2.K. (BRE). issues about definition, primarily around whether
on-site or off-site measures can be taken into
Value engineering: the process of improving
account. (CABE).
the ‘value’ of the project, in relation to function.
Design quality often needs to be defined as a
value in this process, or else it can be sidelined
as not a basic function. (CABE).
196
References and further reading
Note that this list is not exhaustive and excludes National disability authority: Building for everyone,
references to the Approved Documents of the 2002
Building Regulations. It includes references to http://universaldesign.ie/Built-Environment/
some documents which are no longer in current Building-for-Everyone/#figBfE11EntireSeriesBooks
use but which may provide useful background.
Older Persons’ Housing design; A European Good
Practice Guide, 2007
Accessibility www.brighton-hove.gov.uk/content/housing/
general-housing/welhops-welfare-housing-
CABE: Design and access statements: How to
policies-senior-citizens-0
write, read and use them, 2007 http://webarchive.
nationalarchives.gov.uk/20110118095356/http:/
www.cabe.org.uk/files/design-and-access- Environment/sustainability
statements.pdf
British Standards: BS 8206:2008: Lighting for
CABE: The principles of inclusive design. Buildings, 2008
(They include you), 2006
BSRIA: The Illustrated Guide to Renewable
http://webarchive.nationalarchives.gov.
Technologies, 2008
uk/20110118095356/http:/www.cabe.org.uk/files/
https://www.bsria.co.uk/information-
the-principles-of-inclusive-design.pdf
membership/bookshop/publication/illustrated-
GLA: Wheelchair accessible housing: Draft best guide-to-renewable-technologies
practice guidance, 2007
BSRIA: The Illustrated Guide to Ventilation, 2009
https://www.london.gov.uk/sites/default/files/
https://www.bsria.co.uk/information-
gla_migrate_files_destination/archives/bpg-
membership/bookshop/publication/illustrated-
wheelchair-acc-housing.pdf
guide-to-ventilation
Habinteg Housing Association: Lifetime Homes,
BSRIA: The Illustrated Guide to Electrical Building
2011
Services 3rd edition, 2014
www.lifetimehomes.org.uk
https://www.bsria.co.uk/information-
Habinteg with Thorpe, S: The wheelchair housing membership/bookshop/publication/illustrated-
design guide. 2nd edition, 2006 guide-to-electrical-building-services-3rd-edition
www.brebookshop.com/samples/190679.pdf
197
BSRIA: The Illustrated Guide to Mechanical Building National Measurement & Regulation Office: Heat
Services 2nd edition, 2012 Network (metering and billing) regulations, 2014
https://www.bsria.co.uk/information- https://www.gov.uk/guidance/heat-networks
membership/bookshop/publication/illustrated-
NHBC: Designing Homes for the 21st Century, 2013
guide-to-mechanical-building-services-2nd-
www.zerocarbonhub.org/sites/default/files/
edition
resources/reports/Designing_Homes_for_
BSRIA: the Soft Landings Framework, 2014 the_21st_Century-Lessons_for_Low_Energy_
https://www.bsria.co.uk/services/design/soft- Design(NF50).pdf
landings/free-guidance
NHBC: Overheating in New Homes, A review of the
CABE: Sustainable design, climate change and the evidence, 2012
built environment, 2007 www.zerocarbonhub.org/sites/default/files/
http://webarchive.nationalarchives.gov. resources/reports/Overheating_in_New_
uk/20110118095356/http:/www.cabe.org.uk/files/ Homes-A_review_of_the_evidence_NF46.pdf
sustainable-design-and-climate-change.pdf
NHBC: Understanding Overheating – Where to start,
CIBSE/ADE: CP1 Heat Networks: Code of Practice 2012
for the UK, 2015 www.zerocarbonhub.org/sites/default/files/
www.cibse.org/Knowledge/CIBSE-other- resources/reports/Understanding_Overheating-
publications/CP1-Heat-Networks-Code-of- Where_to_Start_NF44.pdf
Practice-for-the-UK
NHBC: Sustainable Technologies, The Experience of
CIBSE: Guide A Environmental Design Guide, 2015 Housing Associations, 2015
www.cibse.org/knowledge/cibse-guide/cibse- www.bre.co.uk/filelibrary/nsc/Documents%20
guide-a-environmental-design-new-2015 Library/Not%20for%20Profits/NF63_
Sustainable_technologies_experience_of_HAs.
CIBSE: TM52 The Limits of Thermal Comfort:
pdf
Avoiding Overheating, 2013
www.cibse.org/knowledge/cibse-tm/tm52-limits- Sofie Pelsmakers: The Environmental Design
of-thermal-comfort-avoiding-overheatin Pocketbook. 2nd edition, 2015
www.ribabookshops.com/book/the-
GLA: Sustainable Design and Construction SPG,
environmental-design-pocketbook/74334
2014
https://www.london.gov.uk/file/18489/ P. Littlefair: BRE Guide to Site Layout Planning for
download?token=wkL8tUqw Daylight and Sunlight. 2nd edition, 2011
www.brebookshop.com/details.jsp?id=326792
198
Water Efficiency Calculator for New Dwellings, 2009 Housing quality including
http://sites.wrcplc.co.uk/partgcalculator space standards
Zero Carbon Hub: Overheating in homes, An
Building for Life standard: A better place to live,
introduction for planners, designers and property
2005
owners, (undated)
www.buildingforlife.org
www.zerocarbonhub.org/sites/default/files/
resources/reports/Overheating_in_Homes- Building for Life 12: Delivering great places to live,
Where_to_Start_Introduction_for_Planners_ 2008
Designers_and_Property_Owners.pdf http://webarchive.nationalarchives.gov.
uk/20110118095356/http:/www.cabe.org.uk/files/
Health-related issues delivering-great-places-to-live.pdf
CABE: Actions for housing growth: creating a legacy
CABE: Physical activity and the built environment,
of great places, 2007
2006
http://webarchive.nationalarchives.gov.
www.planethealthcymru.org/sitesplus/
uk/20110118095356/http://www.cabe.org.uk/
documents/886/physical-activity-and-the-built-
files/actions-for-housing-growth.pdf
environment1.pdf
CABE: Buildings and spaces: why design matters,
Modern methods of construction 2006
http://webarchive.nationalarchives.gov.
CABE: Design and modern methods of construction, uk/20110118095356/http://www.cabe.org.uk/
(undated) files/buildings-and-spaces.pdf
http://webarchive.nationalarchives.gov.
uk/20110118095356/http://www.cabe.org. CABE: Creating excellent buildings: A guide for
uk/files/design-and-modern-methods-of- clients, 2003
construction.pdf http://webarchive.nationalarchives.gov.
uk/20110118095356/http:/www.cabe.org.uk/files/
NHBC: A Guide to Modern Methods of Construction, creating-excellent-buildings.pdf
2006
www.nhbcfoundation.org/Publications/Guide/A- CABE: The cost of bad design, 2006
guide-to-modern-methods-of-construction-NF1 http://webarchive.nationalarchives.gov.
uk/20110118095356/http:/www.cabe.org.uk/files/
the-cost-of-bad-design.pdf
CABE: Design champions, (undated)
http://webarchive.nationalarchives.gov.
uk/20110118095356/http:/www.cabe.org.uk/files/
design-champions.pdf
199
CABE: Design reviewed urban housing: Lessons Homes and Communities Agency: Design and
learnt from projects reviewed by CABE’s expert quality standards, 2007 (No longer in use)
design panel, 2004 https://www.gov.uk/government/uploads/system/
http://webarchive.nationalarchives.gov. uploads/attachment_data/file/313392/design_
uk/20110118095356/http:/www.cabe.org.uk/files/ quality_standards.pdf
design-review-ed-urban-housing.pdf
Homes and Communities Agency: Design and
CABE: What home buyers want: Attitudes and quality strategy, 2007 (No longer in use)
decision making among consumers, 2006 www.rudi.net/files/paper/optional_file/Design_
http://webarchive.nationalarchives.gov. and_quality_strategy.pdf
uk/20110118095356/http://www.cabe.org.uk/
HTA, LBA, PRP and PTE with Design for Homes:
files/what-home-buyers-want.pdf
Recommendations for living at Superdensity. NHBC,
GLA: Housing SPG, November 2012 2007
https://www.london.gov.uk/file/5341/ www.designforhomes.org/wp-content/
download?token=GUwNl-wT uploads/2012/03/Superdensity2.pdf
GLA: Housing SPG (Draft Interim), May 2015 National Housing Federation: Higher density
https://www.london.gov.uk/file/22781/ housing for families: a design and specification
download?token=d8iISRv4 guide, 2004
GLA: The London Plan (Further Alterations to the Order from www.housing.org.uk
London Plan – FALP), March 2015
National Housing Federation: Standards and
https://www.london.gov.uk/what-we-do/
quality in development: a good practice guide
planning/london-plan/past-versions-and-
(2nd edition), (Drury, A. 2008)
alterations-london-plan/further-alterations-
www.hatc.co.uk/knowledge/publications/guide-
london#Stub-62953
to-standards-quality-in-development
Homes and Communities Agency: HQI: Housing
Quality Indicators form (version 4), 2007 Security
(No longer in use)
https://www.gov.uk/government/uploads/system/ ACPO: Secured by design – New Homes, 2014
uploads/attachment_data/file/366634/721_hqi_ www.securedbydesign.com/wp-content/
form_4_apr_08_update_20080820153028.pdf uploads/2014/02/SBD-NewHomes14-lowres.pdf
Office of the Deputy Prime Minister: Safer places:
The planning system and crime prevention, 2004
https://www.gov.uk/government/uploads/system/
uploads/attachment_data/file/7784/147627.pdf
200
Site appraisal/development potential CABE: Design reviewed urban housing: Lessons
learnt from projects reviewed by CABE’s expert
CABE and English Heritage: Guidance on tall design panel, 2004
buildings, 2007 http://webarchive.nationalarchives.gov.
www.designcouncil.org.uk/sites/default/files/ uk/20110118095356/http:/www.cabe.org.uk/files/
asset/document/guidance-on-tall-buildings_0. design-review-ed-urban-housing.pdf
pdf
CABE. Green space strategies: A good practice
English Partnerships: The Brownfield guide: guide, 2006
A practitioner’s guide to land reuse in England. 6 https://www.designcouncil.org.uk/sites/default/
parts and 6 annexes, 2006 files/asset/document/open-space-strategies.pdf
http://collections.europarchive.org/
tna/20100911035042/http:/englishpartnerships. CABE: Involving young people in the design and care
co.uk/landsupplypublications.htm of urban spaces: What would you do with this space?
2004
CABE: Creating successful masterplans: A guide for http://webarchive.nationalarchives.gov.
clients, 2004 uk/20110118095356/http:/www.cabe.org.uk/files/
http://webarchive.nationalarchives.gov. what-would-you-do-with-this-space.pdf
uk/20110118095356/http:/www.cabe.org.uk/files/
creating-successful-masterplans.pdf CABE: It’s our space: A guide for community groups
working to improve public space, 2007
CABE: Community led spaces: A guide for local http://webarchive.nationalarchives.gov.
authorities and community groups, 2010 uk/20110118095356/http://www.cabe.org.uk/
http://locality.org.uk/wp-content/uploads/ files/its-our-space.pdf
Community-led-spaces_FINAL_Nov10.pdf
CABE: Making Contracts Work For Wildlife’, 2006
CABE and NHF: Decent homes need decent spaces, http://webarchive.nationalarchives.gov.
2010. uk/20110118095356/http://www.cabe.org.uk/
www.designcouncil.org.uk/sites/default/files/ files/making-contracts-work-for-wildlife.pdf
asset/document/decent-homes-need-decent-
spaces.pdf CABE: Managing green spaces: Seven ingredients
for success, 2010
CABE: Decent parks? Decent behaviour?, 2005. http://webarchive.nationalarchives.gov.
http://webarchive.nationalarchives.gov. uk/20110118095356/http:/www.cabe.org.uk/files/
uk/20110118095356/http://www.cabe.org.uk/ managing-green-spaces.pdf
files/decent-parks-decent-behaviour.pdf
201
CABE: Paved with gold: the real value of good street English Partnerships and Housing Corporation:
design, 2007 Delivering quality places: Urban design compendium
http://webarchive.nationalarchives.gov. 2, (2007)
uk/20110118095356/http:/www.cabe.org.uk/files/ http://udc.homesandcommunities.co.uk/
paved-with-gold.pdf urban-design-compendium?page_
id=5610&%3B%3Bpage=180
CABE: Start with the park: Creating sustainable
urban green spaces in areas of housing growth and Frith, M., Harrison: S. Decent homes, decent
renewal, 2005 spaces. Neighbourhoods Green, 2005
http://webarchive.nationalarchives.gov. www.neighbourhoodsgreen.org.uk/upload/
uk/20110118095356/http://www.cabe.org.uk/ public/documents/webpage/dhds%20reduced.pdf
files/start-with-the-park.pdf
GLA: Shaping Neighbourhoods Play and Informal
CABE: This way to better streets: 10 case studies on Recreation SPG, 2012
improving street design, 2007 https://www.london.gov.uk/what-we-do/
https://www.designcouncil.org.uk/sites/default/ planning/london-plan/past-versions-and-
files/asset/document/10%3Dcase-studies-this- alterations-london-plan/further-alterations-
way-to-better-streets.pdf london#Stub-62953
CABE: What its like to live there: The view of Institute of Highways Engineers: Home zone
residents on the design of new housing, 2005 design guidelines, 2002
http://webarchive.nationalarchives.gov. www.theihe.org/wp-content/uploads/2013/08/
uk/20110118095356/http:/www.cabe.org.uk/files/ HomeZoneGudelinesv2.pdf
what-its-like-to-live-there.pdf
Llewellyn-Davies for English Partnerships:
Department for Communities and Local The urban design compendium, 2000
Government: Manual for streets, 2007 http://collections.europarchive.org/
https://www.gov.uk/government/uploads/ tna/20100911035042/http://englishpartnerships.
system/uploads/attachment_data/file/341513/ co.uk/qualityandinnovationpublications.htm
pdfmanforstreets.pdf
London Housing Federation: Think Big: Delivering
English Partnerships: Car parking: What works family homes for Londoners, (undated)
where? 2006 www.rudi.net/files/Thinkbig.summary.pdf
http://collections.europarchive.org/
National Housing Federation: Edible estates:
tna/20100911035042/http://englishpartnerships.
A good practice guide to growing for social
co.uk/qualityandinnovationpublications.htm
landlords, 2014
www.neighbourhoodsgreen.org.uk/upload/
public/Edible%20Estates/Edible%20Estates.pdf
202
National Housing Federation: Greener
Neighbourhoods: A Good Practice Guide to Managing
Green Space, 2011
www.neighbourhoodsgreen.org.uk/upload/
public/documents/webpage/Greener-
neighbourhoods-weblinks-2110.pdf
National Housing Federation: No parking: Making
low or zero parking work on higher density housing
schemes, 2006
http://sampac.nl/EUKN2015/www.eukn.org/
dsresourcee523.pdf?objectid=149421
Natural England and Neighbourhoods Green:
A natural estate, 2007
www.neighbourhoodsgreen.org.uk/upload/
public/A%20natural%20estate.pdf
Play England: Design for play: A guide to creating
successful play spaces, 2008
www.playengland.org.uk/media/70684/design-
for-play.pdf
Play England: Managing risk in play provision:
Implementation guide, 2012
www.playengland.org.uk/media/172644/
managing-risk-in-play-provision.pdf
203
The National Housing Federation supports and promotes
the work that housing associations do and campaigns for
better housing and neighbourhoods.
D45
www.housing.org.uk