Scaffold Erection & Dismantling Rev: 00: Task Risk Assessment
Scaffold Erection & Dismantling Rev: 00: Task Risk Assessment
Package – 2, PSJV
Document No.
1
EPC 2 – DUQM REFINERY PROJECT MEI
Package – 2, PSJV
Potential Risk
(1,2,3,4,5)Probability
Hazard (With no controls in Residual
(1,2,3,4,5)Severity
Hazards Effects / place) Risk
Sequence of (Potential to cause harm Consequence Legal Ranking
Recovery
Risk Rating
Sl. Tasks /Job (Health, Injury, Property s (The harm Requirements (with
Control Measures Measures
No Steps damage, environment which could (If Any) controls in
etc.) possibly place)
occur)
1. Collision of vehicle • Property Ministerial Follow traffic management procedure Site First Aid
Overturning, run damage Decision No. Ensure vehicle is in a good and road PSJV &
over 286/2008 worthy condition.
Towell
Mechanical failure Regulation of Vehicle is equipped with IVMS
• Personal all drivers are defensive driving Emergency
Personnel Ejecting Occupational LOW
Injury Safety and Health trained Response
out of the vehicles Driver shall not use mobile
for procedure to
Dust • Fatality phone (calls/texts) or taking food
Mobilization of Establishments be initiated
Fire & Explosions while driving.
Personnel and Fuel / oil spill 3 3 9 Provision of
• Chemical Ensure driver competency as required
Equipment to Straying of material Oil Spillage
Spillage by the project.
site Not wearing seat belt Vehicle inspected and accepted by Kit.
PSJV.
All passengers to fasten seat
belt during the journey.
Inculcate safe driving behaviour
through continuous training,
monitoring and corrective actions
Ensure a well define equipment /
vehicle access route with signs
Install signage and warnings
Documented daily inspection of
2
EPC 2 – DUQM REFINERY PROJECT MEI
Package – 2, PSJV
3
EPC 2 – DUQM REFINERY PROJECT MEI
Package – 2, PSJV
5
EPC 2 – DUQM REFINERY PROJECT MEI
Package – 2, PSJV
1 2 3 4 5
SEVERITY Never Heard of in Incident has Happens Happens several
heard EPC industry occurred in several times times per year in
People Assets Environment Reputation
of in EPC Petrofac per year in a location
industry projects Petrofac
projects
4
Minor health Minor Minor Limited
2 2 LOW RISK 6 8 10
effect / injury damage effect impact
9
Major health Localised Localised Considerable
3 3 6 MEDIUM RISK 12 15
effect / injury damage effect impact
Permanent total
disability or Major Major National 12 16
4 4 8 20
1 fatality damage effect impact (ALARP) HIGH RISK
6
EPC 2 – DUQM REFINERY PROJECT MEI
Package – 2, PSJV
Reputation
2 Limited impact Some local public concern. Some local media and political attention may effect company’s operations
Regional public concern. Extensive adverse local media attention. Adverse stance of local government / action
3 Considerable impact
groups.
National public concern. Extensive adverse attention in national media. Regional / national policies with
4 National impact
potentially restrictive measures and impact on grant of licenses etc
International public concern. Extensive adverse attention in international media. National / international
5 International impact
policies with potentially severe impact on access to new areas, grant of licenses etc
7
EPC 2 – DUQM REFINERY PROJECT MEI
Package – 2, PSJV
LOW RISK Acceptable, however task should be reviewed to establish if risk can be reduced further
(1-6)
HIGH RISK Task must not proceed. The hazard should be eliminated or further control measures put in a place to reduce the risk to
(15-25) tolerable level. The controls should be re-assessed for adequacy prior to task commencement.
LIST OF ATTENDEES
8
EPC 2 – DUQM REFINERY PROJECT MEI
Package – 2, PSJV