Section B-B: C/L of Roadway
Section B-B: C/L of Roadway
8a
07 07
C/L OF ROADWAY 08
04
75 MM AV THICK FRL 510.045 PIER REINF.
R.C.C.W.C IN C.C M-30
SECTION B-B
05
8c
07 07
8b
04
PIER REINF.
SECTION C-C
SECTION Y-Y
8b
C 8c 05
B 08 8a 04 8c 8b
SECTION OF PIER
PERPENDICULAR TO TRAFFIC A A
D D
07 07 SURFACE
C B REINF. (ALL
AROUND)
E
F F
CL 4NOS 12TOR
REINF. DETAILS OF PIER
3NOS 8TOR SURFACE RING
E 6NOS 12TOR
01 MESH 8TOR @ 75 C/C
SECTIONAL PLAN
OF PEDESTAL
1. ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIY.
2. Ø INDICATES H.Y.S.D. BARS CONFORMING TO I.S. 1786.
CL 3. CLEAR COVER TO REINF. 75 MM FOR FOOTING & 40MM FOR OTHER.
4. GRADE OF CONCRETE M:30.
5. SIZE OF COARSE AGGREGATE AS PER M.O.R.T. & H. SPECIFICATION.
6. ALL LAP SHOULD BE 56 TIMES THE DIA OF BAR NOT MORE THAN
20% BAR SHALL BE LAPPED AT A SECTION.
03 7. ALL RENIF. PROVIDED SHALL BE H.Y.S.D BARS ONLY & SHALL BE OF
TESTED QUALITY.
8TOR @ 75 C/C MESH IN TWO 8. ALL THE REINF. BARS SHALL BE CLEAN & FREE FROM DIRT
LAYER MILLSCALE RUST ETC. & SHALL BE BENT COLD TO SHAPES AND
DIMENSION INDICATED AND SHALL BE PLACED EQUALLY SPACED AS
3NOS 8TOR SURFACE RING SHOWN WELDINGS OF BARS SHALL NOT BE ALLOWED.
9. SHAPE SIZE & LENGTH OF REINF. BARS SHOWN IN THE DRG. SHALL
4NOS 12TOR BE VERIFIED BY PROPER ZIG MARKING BEFORE CUTTING THE REINF.
6NOS 12TOR 10. READ THIS DRG. ALONG WITH GENERAL ARRANGEMENT DRG.
PLAN OF FOOTING 200 200 200 200 11. VERT. REINF. OF PIER SHAFT SHALL BE ANCHORED IN FOOTING &
PIER CAP BEFORE CASTING OF FOOTING & PIER CAP, AND REINF. OF
SECTION D-D SECTION E-E SECTION F-F
CHAIR SHALL BE ANCHORED IN PIER CAP BEFORE CASTING OF PIER
CAP.