Task Name Responsible Status Due Date: Team Objectives & Plan
Task Name Responsible Status Due Date: Team Objectives & Plan
Delayed
2.08 Canopy Manzoor 23/12/2019
On Track
Sensitive #
On Track
4.01 Podium Roof Martin/ Anand Not Started 29/12/2019
4.04 Waterproofing Martin/ Anand Not Started 29/12/2019
4.03 Roof Works Martin/ Anand Not Started 02/01/20
4.06 Tower B Roof Martin Delayed 11/01/20
4.08 Slab closure/ firestopping Ismail Not Started 30/12/2019
Additional Works
Works missed from original scope and/ or Martin/ Team 02/01/20
additions/ adaptations required on site On Track
MIR
All MIR Team Completed 02/01/20
WIR
All WIR Team Completed 02/01/20
Programming/reporting
Schedules/Reports Glenn Completed 02/01/20
Look aheads/ Trackers Glenn 02/01/20
Completed
Weekly Progress table Glenn Completed 29/12/2019
Presentation Slides Martin/ Glenn Completed 29/12/2019
Document Management
Doc Control Dalia/ Dyna/ Naveed On Track 02/01/20
Contractor DC coordination Dalia/ Dyna/ Naveed On Track
Access Equipment
Access equipment per cluster Martin/ Team 02/01/20
Delayed
Sensitive #
Contractor
PGSA
Giugiaro
Alumco
Lindner
All
PGSA/ Giugiaro
PGSA/ Alumco
PGSA/ Giugiaro/
Alumco
PGSA/ Lindner/
Alumco
Bawani/ Lindner
Giugiaro/Ridco
PGSA/Ridco
Alumco/Baytur
Alumco/Baytur
Sensitive #
Lindner/Baytur
PGSA/Baytur
PGSA/Al Bawani
PGSA/Al Bawani
Alumco/Al Bawani
PGSA/Al Bawani
PGSA/UNEC
Sensitive #
Next Steps
Ensure façade/ Envelope related Stage 2 Works are fully coordinated on sites and consider programme
Ensure the Façade Works are coordinated with Stage 2 Contractor on Parcel. Daily bullet point update to be issued to Martin B by 5pm
in coordination with site planner
Ensure the Façade Works are coordinated with Stage 2 Contractor on Parcel. Daily bullet point update to be issued to Martin B by 5pm
in coordination with site planner ( Already being done by Nasser)
Ensure the Façade Works are coordinated with Stage 2 Contractor on Parcel. Daily bullet point update to be issued to Martin B by 5pm
in coordination with site planner
Ensure the Façade Works are coordinated with Stage 2 Contractor on Parcel. Daily bullet point update to be issued to Martin B by 5pm
in coordination with site planner
Ensure the Façade Works are coordinated with Stage 2 Contractor on Parcel. Daily bullet point update to be issued to Martin B by 5pm
in coordination with site planner
Winch brackets to be removed and allow Lindner to contiune with their scope
Additional works to be assessed against original scope and dilaps. Contracts/ Commercial to then be advised
DAH scope to be managed by façade team to ensure inspections are being carried out correctly and in a timely manner
DAH scope to be managed by façade team to ensure inspections are being carried out correctly and in a timely manner
Ensure all logs are checked daily and ensure outstanding items are closed out (Letters, RFIs/SD etc.)
Coordinate with HSE and site to have current status of BMUs, Cradles, TCs, MEWPS, Scaffold to ensure status of all equipment is
known and reported accurately to the Client
Sensitive #
28-Dec-19
Weekly TASK LIST
Comments
Not Started
On Track
Delayed
Completed
Completed
Coordination among
stackholders
(SAPL/DAH/BAYTUR/PGSA)
done with BAYTUR to
superimpose Propping Layout
on PGSA drawing as revision.
BAYTUR committed to
resubmit revised Propping
Layout by 26-Dec-19 (Today).