Professional Documents
Culture Documents
Internship Report: Maintenance Department
Internship Report: Maintenance Department
MAINTENANCE DEPARTMENT
MUHAMMAD SALMAN
INTERNEE
From 1 of April 2021 to 12th of May 2021
st
Table of Contents
ACKNOWLEDGEMENT ................................................................................................................................... 2
CHAPTER 01 .................................................................................................................................................. 3
INTRODUCTION ............................................................................................................................................. 3
1.1 Introduction ............................................................................................................................................ 3
1.2 Our Strategic Vision for the Future ......................................................................................................... 3
1.2.1 Specialization ................................................................................................................................... 3
1.2.2 Operational Excellence .................................................................................................................... 4
1.2.3 Globalization .................................................................................................................................... 4
1.2.4 Commercial Excellence ................................................................................................................... 4
1.2.5 Sustainability Focus ......................................................................................................................... 4
1.3 Avient Has ............................................................................................................................................... 5
1.4 Products .................................................................................................................................................. 6
CHAPTER 02 .................................................................................................................................................. 7
SAFETY........................................................................................................................................................... 7
2.1 Safety in Plant ......................................................................................................................................... 7
2.2 Safety Precautions .................................................................................................................................. 7
2.3 Action in Emergency ............................................................................................................................... 8
2.4 Health Policy ........................................................................................................................................... 8
CHAPTER 03 .................................................................................................................................................. 9
INTERNSHIP ................................................................................................................................................... 9
3.1 Internship Program ................................................................................................................................. 9
3.2 Introduction of Department ................................................................................................................... 9
3.2.1 Inspection ......................................................................................................................................... 9
3.2.2 Engineering ...................................................................................................................................... 9
3.2.3 Preventive Maintenance ................................................................................................................. 10
3.2.4 Clerical Jobs ................................................................................................................................... 10
3.3 Preventive Maintenance ....................................................................................................................... 10
3.4 Safety, Maintenance and Corrective Operations.................................................................................. 11
3.5 Conclusion ............................................................................................................................................. 11
1|Page
ACKNOWLEDGEMENT
Thanks to Almighty Allah, who gave me the opportunity to complete this Internship.
This internship report Is prepared for Avient Corporation Pakistan Private Limited,
Korangi SITE Master Batch Business Unit, Karachi.
Secondly, I would like to express my deepest thanks Mr. Rizwan (Engineering
Head), who gave me the opportunity and believe in me guided me with his
experience and Mr. Sohail (Incharge Maintenance Department) who believe in me
and taught me many things. I also want to thank Mr. Asif and Mr. Farhan for
cooperating and making sure his presence and providing technical support during
different inspection tests and maintenance. Mr. Tahmas Ali and Mr. Haseeb who
share the knowledge of the electrical related systems along with all Maintenance
Technician and staff of Maintenance Department.
I am also grateful to the supervisor, technicians, operators and other staff members of Avient
Pakistan Ltd who were most cordial and helpful to me during the tenure of internship.
2|Page
CHAPTER 01
INTRODUCTION
1.1 Introduction
The world is evolving in amazing and dynamic ways. To maintain and improve the
quality of life around the globe and conserve our natural resources, it will take
specialized sustainable material solutions that deliver on the promise of innovation
while protecting the planet.
We’re Avient, and we’re here to help your business meet the demands of the rapidly
changing world that lies before us. Wherever you operate around the globe, whatever
industries you serve, our reach, resources, and reliable performance will elevate your
operational efficiency, speed to market, and sustainability efforts.
We are a next-level materials company offering powerful collaboration designed to
give you everything you need to overcome next-level challenges and propel your
business ahead of the competition.
At Avient, our vision is to create specialized and sustainable material solutions that transform
customer challenges into opportunities, bringing new products to life for a better world.
To realize this ambitious vision, we have built our business on the following strategic pillars that
we believe lift us above our competition and over any challenges that may come our way.
1.2.1 Specialization
Our innovative material capabilities differentiate us by providing specialized solutions for our
customers.
3|Page
1.2.2 Operational Excellence
With a relentless focus on continuous improvement, we safely and responsibly deliver superior
quality to every customer, every time.
1.2.3 Globalization
As a true global company, we meet customer needs reliably and responsively wherever they
operate.
We work closely with customers to solve their challenges and deliver exceptional value.
Because sustainability is an essential element to the future we see over the horizon, we enhance
our strong strategic foundation with sustainability cornerstones that provide guideposts for our
corporate responsibility and customer-centered innovation as we pioneer our paths forward. They
are: People, Products, Planet, and Performance.
4|Page
1.3 Avient Has
5|Page
1.4 Products
The production department uses various raw polymer including thermoplastics
(some are resins) to provide finish goods of master batches. They added additives
for strength and other properties and pigments for colours. Products include:
Poly Carbonate (PC)
Poly ethylene terephthalate (PET)
Ploy vinyl chloride (PVC)
Poly propylene (PP)
Poly propylene terephthalate (PPT)
Low density poly ethylene (LDPE)
Linear Low density poly ethylene (LLDPE)
Styrene acrylonitrile (SAN)
Ethyl vinyl acrylate (EVA)
Poly butylene terephthalate (PBT)
6|Page
CHAPTER 02
SAFETY
There are two types of reels for hydrants, HOSE REEL and HOSE REEL HOSE.
Hose reel hose has a triple function i.e. on/off, Jet and smuggling. There is a retention
pit for recycling of water in case of fire which has an area of 400m3. Also has a diesel
storage tank both underground and above ground has a capacity of 16000 liters and
1620 liters for emergency supply. There is a CO2 gas suppression system for die
fumes high temperature.They also install scrubbers for ammision of gases to protect
the environment. Every time they test the scrubbers. Recently Company has install
Reverse Osmosis (RO) plant. There is also a pump room for hydrants in case power
failure it works on emergency plan. A SUZUKI van stand by for emergency
casualities.
There are some safety measures given below
7|Page
Area of Fire Extinguishers, Hydrants, Fire Alarms and Control Panels must
be clear.
DO 6’S everywhere, don’t smoke except designated area.
8|Page
CHAPTER 03
INTERNSHIP
3.2.1 Inspection
Routine Inspection include to check the facilities of the plant and needed repairs.
This ensures the efficiency and condition of the equipment. Inspection depends on
the use of the equipment. During maintenance items inspected and check the
feasibility of repairs. Maintenance items fitness to be checked when received by the
vendors.
3.2.2 Engineering
9|Page
3.2.3 Preventive Maintenance
This involves the maintenance of the existing plant. Minor installation of the
equipment and maintenance before it gets out of order. Responsible also to prevent
the breakdowns by applying lubrications, repairs and adjustments.
1. Preventive Maintenance
2. Safety, Maintenance and corrective operations
10 | P a g e
Then log out tag out system install
Check the amperes of the Solid-State Relay (SSR*)
Check the solenoid valves* as they working properly.
Check the extruder’s safety shields.
Then we repair or maintain the any other accessories. Sometimes we change the SSR
and sometimes we change the solenoid valves. During preventive maintenance we
also changed the vacuum pump pipes. Sometimes we change the heating element of
the different heating zone. During preventive of the granular mixers, we change the
magnetic safety switch and check the rpm of the mixers to ensure that it work
properly. To check the rpm of the mixer we paste a strip on it then use solar gun after
starting the mixer.
After maintenance we hand over the machine to the related operator. Then he checks
and if it works properly, he said ok. Then we documented the maintenance and check
list fill up provided by the clerical staff. When machine is ok then operator signed it
and as well as we signed. The typical preventing hours on machine is 8 hours.
3.5 Conclusion
Avient is multinational company and working very accurately. Maintenance Department is playing very
important role here and the team is also very talented and enthusiastic. And specifically Team Leader
Head of Engineering Mr. Rizwan. Here I learn many thing which i never knew and experience new things,
11 | P a g e
Specially SAMACO and Preventive Maintenance, which play very important role in meeting the required
target and Health and Safety of employees. I also take part in project and share some ideas and learn
how a project is done what are necessary things to do. In the end i suggest that Lock out and tag out
should be installed by the machine operator and uninstall by Maintenance operator.
12 | P a g e