This document outlines the calculations required to determine conductor and hardware requirements for an overhead transmission line project. It explains how to calculate the quantity of conductors, insulators, joints, dampers, and grounding materials needed based on factors like total line length, number of circuits and strings, tower types, percentage of sag and breakage allowance. The calculations provided will allow one to determine the necessary materials for the conductor, shield wire, and grounding systems based on the specifications of the transmission line design.
This document outlines the calculations required to determine conductor and hardware requirements for an overhead transmission line project. It explains how to calculate the quantity of conductors, insulators, joints, dampers, and grounding materials needed based on factors like total line length, number of circuits and strings, tower types, percentage of sag and breakage allowance. The calculations provided will allow one to determine the necessary materials for the conductor, shield wire, and grounding systems based on the specifications of the transmission line design.
This document outlines the calculations required to determine conductor and hardware requirements for an overhead transmission line project. It explains how to calculate the quantity of conductors, insulators, joints, dampers, and grounding materials needed based on factors like total line length, number of circuits and strings, tower types, percentage of sag and breakage allowance. The calculations provided will allow one to determine the necessary materials for the conductor, shield wire, and grounding systems based on the specifications of the transmission line design.
This document outlines the calculations required to determine conductor and hardware requirements for an overhead transmission line project. It explains how to calculate the quantity of conductors, insulators, joints, dampers, and grounding materials needed based on factors like total line length, number of circuits and strings, tower types, percentage of sag and breakage allowance. The calculations provided will allow one to determine the necessary materials for the conductor, shield wire, and grounding systems based on the specifications of the transmission line design.
Total T/Line Length x No. of Strings x Nos. of circuit x Percentage of SAG.
Total T/Line Length = No of Strings = No of Circuits = Percentage SAG = STRING CALCULATION:- Total T/Line Length x No. of Strings x Nos. of Circuit x Percentage of SAG. a) JS-CR Total Heavy Angle Towers quantity x No of Strings Heavy Angle Tower quantities = No of Strings = Note: JS-CR are to be installed in wide side angle only. b) SS-CR Total No. of suspension Towers x No. of Strings per tower x no of circuits per tower. Total No. of Suspension Towers = Total No. of Strings per Tower = Total No. of Circuits per Towers = c) ST-CR Total No. of Tension Towers x No. of Strings per tower x no of circuits. Total No. of Tension Towers = Total No. of Strings per Circuit = Total No. of Circuits = SUSPENSION INSULATORS:- (Total JS-CR String sets + Total SS-CR String set) x No. of insulators per Strings x Percentage of Breakage Allowance. Total JS-CR String Sets = Total SS-CR String Sets = No. of Insulators per Strings = Percentage of Breakage Allowance = TENSION INSULATORS:- Total No. of Tension String x No. of Insulators per String x 2 x Percentage of Breakage Allowance. Total No. of Tension Strings = Total No. of Insulators per String = As one Tension String set include Hardware, 2 No. of Tension Clamp Compression Type along with 2 no. of Aluminum Jumper Terminal therefore overall equation is multiplied by Factor of 2. Percentage of Breakage Allowance = MID SPAN JOINTS MS-CR:- Total Calculated Conductor length/length of one reel of AASC Cairo. Total Calculated Conductor Length = Length of one REEL of AASC Cairo = REPAIR SLEEVE RS-CR:- Total No. of Mid Span Joints/2. STOCK BRIDGE DAMPERS:- 1. Total No. of Towers (Suspension and Tension) x 2. No. of Vibration Dampers per Circuit x 3. Total No of circuits 1. 2. 3. SHEILDWIRE SUSPENSION FITTING (SF-9):- Total No. of Suspension Towers = Tension Fitting (TF-9) = Total No. of Tension Towers = MID SPAN JOITNS (MS-9):- Total length of Alumoweld Shield wire /Length of REEL for AWS. STOCK BRIDGE VIBRATION DAMPERS:- Total No. of Towers (Suspension + Tension) x No of Vibration Dampers per Tower 1. 2 GROUNDING MATERIAL:- Total No. of Towers (Suspension + Tension)