CHECK ITEMS
YES NO
1 Broken wires
2 Severe localized abrasion or scraping,
3 Kinking, crushing, bird caging, or any other damage to the rope structure,
4 Evidence of heat damage,
5 Crushed, deformed, or worn end attachments,
6 Severe corrosion of the rope, end attachments or fittings,
7 Missing or illegible sling identifications
8 Others
SLEEVE: YES NO
1 Crack or Undercut
3 Others
OVERALL COMMENTS:
Date: Date:
PT. TRANSAVIA OTOMASI PRATAMA
3 x 18 MW COAL FIRED POWER PLANT PROJECT
CHECK ITEMS
YES NO
1 Missing illegible sling identification, (identfikasi Sling terlepas atau tidak terbaca )
2 Acid or caustic burns, (Terkena asam atau terbakar)
3 Melting or charring of any part of the sling, (bagian dari sling hangus ter bakar atau sudah aus)
4 Holes, tears, cuts, or snags, (berlubang, sobek, terpotong, atau sobek)
5 Broken or worn stitching in load bearing splices,( sambungan penghubung jahitan rusak )
6 Excessive abrasive wear, (pemakaian berlebih mengakibatkan pengelupasan)
7 Knots in any part of the sling, ( ada ikatan pada bagian sling)
8 Discoloration and brittle or stiff areas on any part of the sling,
9 Pitted, corroded, cracked, bent, twisted, gouged, or broken fittings
10 Others
OVERALL COMMENTS:
Date: Date:
Location: Skedule Inspeksi : Bulanan
DATA: USER ( Main Contractor / Sub-Contractor ):
1 TYPE SHACKLE Reference No.
2 Shackle Diameter (mm): Inspection Date:
3 Pin Dia (mm): Date of Next Inspection:
4 SWL: Color Code:
CHECK ITEMS
YES NO