INTRODUCTION
Baupanel system represents a very cost effective alternative applied to exterior walls of buildings,
whether built with integrated system or as a supplement to an existing structure of reinforced
concrete or other material such as rolled steel.
- Lightweight: Because it has a weight of about 200 Kp/m2 in gray work (panel with shotcrete
applied), compared to approximately 280 Kp/m2 weighing a traditional nasturtium wall.
-Space Saving: With an enclosure formed with a panel BPC-100, which has a thick gray work
completed in approximately 17.5 cm, we are saving about 7.5 cm in front of an enclosure to the
nasturtium with 25 cm thick , which translates to an increase in building floor space.
-Better thermal performance: It has a lot thermal resistance more than traditional enclosures,
which translates into significant energy savings.
It is based on the use of panels with expanded polystyrene core density Kp/m3 15, confined
between double galvanized steel mesh of 600 N/mm2 strength, jointed with galvanized steel
connectors, at 80 per m2 panel.
The special design of polystyrene core with waveform, favours the adherence of micro-
concrete structure of 25 N/mm2 which is projected at a rate of 3 cm. per side at least, pose after
their set, a structural part of high compressive strength when used as a bearing wall.
The polystyrene core, besides acting as a support for the structural concrete provides
thermal and acoustic insulation to the building, providing inertia to the two layers of structural
concrete work jointed because of the presence of connectors between the galvanized mesh,
which allow adhesion of concrete, at the same time preventing their shrinkage cracking. This type
of panel is called BPN (normal simple Panel).
1
Avda. Poeta Muñoz Rojas 10B. Pol. Ind. de Antequera, 29200 Málaga
BauPanel System S.L.
info@baupanel.com / www.baupanel.com
As required by the basic rule EHE-08, a panel has been designed to complement as described
above with the addition of corrugated armor 5 mm diameter steel B-500S, of the reason of 5
units per lineal meter of panel. This feature is essential to the use of Baupanel panel as a
structural element in Spain since the EHE-08 requires the use of corrugated steel in reinforced
concrete structural elements.
The panel with corrugated steel reinforcements called BPR (Panel simple reinforced).
Baupanel system has granted DIT (Technical Approval) issued by the Eduardo Torroja
Institute. This document supports the use of the system as a structural element in Spain and
certifies that it is compatible with the basic rules of concrete structures, EHE-08.
This document gives a detailed technical description of the panels that make up the
system, providing guidelines for calculating and certifying that the system has successfully
passed several tests to support its use as a structural element in our country.
2
Avda. Poeta Muñoz Rojas 10B. Pol. Ind. de Antequera, 29200 Málaga
BauPanel System S.L.
info@baupanel.com / www.baupanel.com
Then we will analyze the behavior before wind overloads the system enclosures
executed by Baupanel System .
Wind loads, we are going to calculate as CTE DB-AE, calculating even in an extreme
case of a panel subjected to hurricane wind speed 180 km / h, focusing on the enclosure.
Let's do the calculations, assimilating the enclosure in a forged vain subjected to the own
enclosure’s weight, plus an overlay of the 1.5 cm of cement mortar and a superficial wind load
uniformly distributed over the entire surface of the vain.
Consider, for example, a building of 12 storeys high, located near the sea, so we have an
environment IIIa according to EHE-08, having to apply a coating on the exterior frame of 4.5 cm,
which resulting in an average thickness of 5 cm micro-concrete on the outside. On the inside is a
layer of micro-concrete of 3.5 cm (3 cm indoor coating as type I). The height between floors is 3
meters and the closings are considered at bi-articulated its junction with the floor slabs.
We will analyze a series of cases with different overloads of wind where we compare the
maximum moment in the centre of the vain with the moment resistance of each type of panel,
which increases with the same section. If the vain moment exceeds the resistance moment of
the panel it will to increase the wall with supplementary armor or to resort to an panel thicker
3
Avda. Poeta Muñoz Rojas 10B. Pol. Ind. de Antequera, 29200 Málaga
BauPanel System S.L.
info@baupanel.com / www.baupanel.com
Calculate the most unfavourable wind load for the building (on the upper floors), as the CTE in
force in Spain, specifically under DB-AE (Action in the Building).
Where:
Ce = Exposure of coefficient
Assuming that the building is in urban area (IV), values associated with the degree of roughness
are (according to Annex D.2 DB-AE):
An 12-story building has an elevation of Z = 36 meters, considering that each floor is 3 meters
high
⎛Z⎞ ⎛ 36 ⎞
F = K * Ln⎜ ⎟ = 0,22 * Ln⎜ ⎟ = 1,0532 (Selecting the largest of the 2 values of Z).
⎝L⎠ ⎝ 0,30 ⎠
C e = F ( F + 7 K ) = 1,0532 * (1,0532 + (7 * 0,22)) = 2,7311 (Value of Coefficient Ce).
⎛ v2 ⎞
Therefore, the expression of the wind load is: qe = ⎜⎜ ⎟⎟ * 2,73
⎝ 16 ⎠
4
Avda. Poeta Muñoz Rojas 10B. Pol. Ind. de Antequera, 29200 Málaga
BauPanel System S.L.
info@baupanel.com / www.baupanel.com
⎝ ⎠ ⎝ ⎠
vertical closure.
CALCULUS OF BPR PANELSUBJECTED TO A BENDING LOAD OF WIND
DATA OF VAIN
CALCULATION OF ARROWS
Instant
. Force 0,3115 cm
Deferred Force 0,4672 cm
Total Force 0,7787 cm
Active Force 0,5808 cm
As the separation between reinforcement exceeds the width of the panel (112.5 cm) despise them. We see
that, for usual wind solicitations in Spain, simply use a panel TP-100 (the minimum used for external walls),
without reinforced armor
5
Avda. Poeta Muñoz Rojas 10B. Pol. Ind. de Antequera, 29200 Málaga
BauPanel System S.L.
info@baupanel.com / www.baupanel.com
⎛ v2 ⎞ ⎛ 50 2 ⎞
Substituting: qe = ⎜ ⎟ * 2,73 = ⎜
⎜ 16 ⎟⎟ * 2,73 = 426,56 Kp / m which is the wind overload applied to a
2
⎜ 16 ⎟
⎝ ⎠ ⎝ ⎠
vertical closure.
CALCULUS OF BPR PANELSUBJECTED TO A BENDING LOAD OF WIND
DATA OF VAIN
CALCULATION OF ARROWS
As the separation between reinforcement exceeds the width of the panel (112.5 cm) It was despise them. It
has selected a panel TP-160 for not having reinforced armor.
6
Avda. Poeta Muñoz Rojas 10B. Pol. Ind. de Antequera, 29200 Málaga
BauPanel System S.L.
info@baupanel.com / www.baupanel.com
DATA OF VAIN
CALCULATION OF ARROWS
Here is another example of the same case with panel TP-120 and a vertical reinforcement consisting Ø8
every 66 cm. It has the advantage of reducing the section of floor space and win panel, but the disadvantage
of requiring labor to place the reinforcements. Large pieces of façade is more advisable to adopt a panel
section that does not require reinforcement.
7
Avda. Poeta Muñoz Rojas 10B. Pol. Ind. de Antequera, 29200 Málaga
BauPanel System S.L.
info@baupanel.com / www.baupanel.com
CONCLUSIONS
Use of the system Baupanel as an closure element Façades is perfectly viable under conditions
that provide the Spanish rules mandatory, with the minimum thickness used for exterior panel
(BP-100).
This example was made for a building taller than the average if we applied a residential use (12
plants) and plant height of 3 m and should be studied separately in cases that have heights
greater than that provided in this case.
We see that the panel perfectly resists hurricane winds analyzed, admissible deformations and
can decide at the planning stage the thickness of the panels and make a choice taking into
account the possibility of placing additional reinforcements or to use panels of larger section.
8