Q1: ANSWER

For the inventory sourcing time interval for the inventory sourcing interval reduction. In
aluminum case their prime inventory which is simply too high. in order that they must search for
change or try and reduce now limit.
• For present manufacturing we'd like demand based system. As we see order bidding could be
a long process and keeping inventory available for known demand again may be a challenge. So
best resources needed either to forecast demand and maintain the minimum level to satiate the
immediate need with the method of sourcing.
• For the assembly level they will ask suppliers to open a production shop near their
manufacturing bases to meet their inventory needs.

Inventory Counting Practice and Its Importance:


The latest wheeled coach inventory counting method is called cycle counting where
inventory is separated into pieces and a specific subset of inventory is counted/audited on
a particular day put at a specific place rather than counting the current stock again and
again. By dividing into ABC groups, the most important is counted more frequently and
less important is counted less frequently. Depending on their stock counting and use, they
count and intend to purchase inventory. The wheeled coach is very important because
they make informed decisions in good time based on cycle counting, increase accuracy
and retain the best buying power of discounts among their 45 rivals, which is their key
competitive advantage. Cycle tallying can be a tool for examining where the count of a
certain number of items obtains the tally for the overall warehouse. When a cycle number
is performed, there are two deductions that are made. The fundamental induction is that
in order to assess the accuracy of the things within the stockroom as a whole, it is
possible to use the accuracy of the things within the time count.

Implement:
In fact to have the ABC matrix, we need to define the overall percentage of the annual use of
the item, rank items from highest to lowest and then classify them into the category. Chesis,
aluminum and plywood are the largest group of components in the provided example and
unavailability would affect the complete stoppage of the production line. They account for 50
percent of the overall value of pieces, so these are products for the company listed as A. Tyres
and axels, engines, etc. will be the second B category objects, which are once again useful items
but also do not form the foundation as in the case of A listed items. Last is emergency supplies,
first aid kits, nuts and bolts, etc., which are of lesser value and can easily Discovered on the
market.
High value items such as truck chassis, aluminum board plates and plywood, which together
make up 70 to 80 percent of purchase items, are categorized as category items. Such things,
which could be 15% in terms of numbers, are closely followed and cycle tests are carried out on
a weekly basis.
Recommendation:
The move that will be taken as a wheeled coach manager is to do ABC analysis and enforce tight
physical control of the stockroom. In addition, introduce a cycle counting system and ensure
that notifications for certain items not originally included on the bill of material are provided for
engineering adjustments. To the extent feasible stockrooms would be consolidated.

Q2: ANSWER:
The organization should use the Waterfall venture approach to managers/development as 8
tasks are on the fundamental path and there is a dependence-related approach, so it is not
feasible until affirming the previous one.

The stages that can recognized from the 9 Activities - are arranging and undertaking execution.

Extent of the task -

The job is to express the ERP process at Hershey's covering deals and acquisition assessment.
This includes the development of RFPs for sellers, the investigation of merchant reaction,
advancement of business cases and endorsement of management that prompts the start of
project establishment.

Task Duration = 26

Basic Path: ABDEFGHI

Slack for every action = 0 aside from C which has a leeway of 3 as demonstrated underneath.

ZSD