MMSPL
MMSPL
MMSPL
PRIVATE LIMITED
CONTENTS:
2.0 Management
3.0 Enlistment/Registrations
Brief Introduction:
The firm intends to contribute its efforts towards planning, designing and
specially construction of civil engineering projects in various disciplines with
highest standards of QA/QC. Quality Assurance and Quality Control are
extremely important aspects of any engineering or construction project without
which successful completion of the project can’t be imagined. In fact, these two
The firm is also associated with the local architects and has necessary office and
field equipment’s in its custody. The intentions are to provide appropriate
services to the clients in the following disciplines of civil engineering: -
Conceptual studies
Carry out pre-feasibility and feasibility studies
CEO
Ehsan-Ul-Haq
Management:
Consultants
Architects
Qadri Associates
Asadullah Varzgani & Associates
Interior Designers
Legal Advisors
2.
4. Irrigation Department
Employment
No Name of Employee Degree & University Designation with Company
Since (Date)
Finance
1. Saddam Hussain ACMA 2016
Manager
2. Muzammil Abdullah Diploma Supervizor 2015
3. Abdul Rehman Fuuast University HR 2016
Accounts
4. Hasan Raza Federal Urdu University 2016
Manager
5. Kubra Bibi FUUAST ISB Admin Officer 2016
EQUIPMENT
China
6 Road Roller 1 1980-90 10-15 Ton Good working.
Shahzor
Sheep Foot
8 1 China/Pak 1986 1-3 Ton Good working.
Roller
1300-2600
16 Cars 4 Toyota 1983-95 Good working.
cc
Remarks / Make /
No. Unit Quantity
Description Ownership Status
3 Concrete Mixers No 4
Good/Own
4 Concrete Vibrators No 05 Good/Own
Remarks / Make /
No. Unit Quantity
Description Ownership Status
12 No 2 Good/Own
Die for pipe threading
13 Thimble punching machine No 2
Good/Own
14 L key set No 2 Set Good/Own
18 Pliers/Nose pliers No 12
Good/Own
19 Chisel No 12 Good/Own
20 Hammer No 10 Good/Own
DIRECTOR
CM CM
Labour Labour
MEGA MANAGEMENT SERVICES
PRIVATE LIMITED
As per site Actual Condition, the construction will be carried out in two
sections A and B.
3. Immediately after the letter of NTP mobilization activity will start at site. This
will include following:
Excavation
Material for the back fill shall consist of suitable material excavated or from
borrow / structural excavation. Suitable material shall have dry density
according to AASHTO or any other material as approved by the Engineer.
Material for back fill, obtained and approved as provided above will be placed
in horizontal layers of uniform thickness in conformity with lines, grades,
sections and dimensions as shown on the drawings. The layers of loose
material shall be as specified in the specifications. The material will be spread
as per classification of the material in order to achieve the required density /
compaction.
For the back filling, spreading of suitable excavated material will be done with
the help of wide blade mechanical equipment like tractor in the horizontal
layer of specified thickness are as per site requirement.
BUILDING WORKS
After studying the issued drawing for construction, proper shop drawings will
be prepared after carrying out the survey at site and indicating the physical
Lean Concrete will be laid as per thickness approved in shop drawings. Lean
Concrete will be mixed in concrete mixer as per quantity of the concrete.
At every opening proper RCC lintel will be provided cast in-situ. All RCC lintels
will be made after fixing of proper formwork according to size of the lintel.
Steel reinforcement as per approved shop drawing/bar bending schedule will
be fabricated and fixed within the formwork and after closing of formwork
When the super structures reaches to soffit level of the slab, proper false
work in shape of scaffolding will be provided and proper formwork for the
beams and slab will be erected. After checking the levels of formwork cut and
After completion of one lift of super structure any super structure for
subsequent structure will follow on same steps. Finishing work will start
inside the building which include plastering, flooring, plumbing, sewerage,
tiling, carpentry & joinery and painting works.
Excavation
Lean Concrete
Concreting of Slab
Electrification
Plastering
Flooring
Tile Work
Painting
Roof Treatment
To maintain the quality of concrete, concrete mixer will be provided at site for
mixing. The concrete of foundation, beams and roof slabs will be done by concrete
lift.
9. Steel:
Bar bending schedule approval Steel Bar fabrication Half Product Storage and
transportation column steel fixing Inspection Beam and Slab
steel bar fixing Inspection.
1. In accordance with the construction drawing, I Con Builders will provide the steel
bar layout drawing and bar bending schedule to the engineers for approval.
1. Methodology;
Wall surface cleaning up; the Brick/Brick work should be checked before plaster,
the loose edge joint and the edge joint which is not full and gap between break
work should be filled solidly with mortar; the ash on the wall should be cleaned
4. Moistening: ash on the wall surface should be cleaned up. The wall surface
should be moistened by water one day before the plaster work. If the wall is still
5. Plaster of mat coat mortar: plaster of mat coat mortar should be started after
the bottom layer dried 60% to 70%. If the bottom layer mortar is too much dry,
it should be moistened by water. It should be press polished along the trowel
grain by steel trowel or plastic trowel and then wash the dirty parts of the mat
coat by brush.
wire netting at two sides should no less than 100mm. the wire netting should be
hanged firmly, smoothly and the plaster work should not be affected. Sketch of
nailed metal lath on brick wall (without ceiling) the edges of opening, distribution
boxes and channels should be plastered uprightly and foursquarely, smoothly
1. Internal wall paint procedure: Repair and smooth the base layer, protection of
doors, windows etc finished items, bottom layer coat, surface layer coat.
14. FINISHES
2. stone Cladding procedure: Wall base treatment, alignment, laying and fixing of
tiles, filling with the matching colour mortar, surface cleaning.
6. Door’s windows and furniture: Door’s windows and indoor furniture shall be
custom made by specialist and fixed by our Carpenters as per engineer’s
approval
Project Manager and Quality Control Manager will closely monitor the progress of
the project, whereas project progress will be reviewed on fortnightly basis and any
float on +ve and –ve side will be taken in consideration and due remedial steps will
be taken. The progress of the project will be reduced by 25-30% in winter season:
however measures will be taken to increase progress in summer season. The work
schedule is prepared keeping in view the weather conditions of the region.
Proper safety measures will be taken at site. All the labour involved in hazardous
works will be bound to adopt safety measures such as use of safety helmets. Proper
sign boards and instruction boards will be fixed at site for guidance. First aid facility
will be provided at site which will be looked after by a male nurse, who can handle
any emergency situation at site Prevention from fire and fire extinguisher would be
available at site.
The general layout plan for mobilization will be prepared in accordance with the
proposed locations given in the “Permanent Site access and Layout Plan”. The layout
The primary activity of mobilization is to arrange the roads to access the site and all
the necessary points where the temporary buildings and the plants are to be located.
According to site conditions temporary access roads deal a great importance for the
sake of optimum transportation costs. These service roads should be put in service
gradually when they are needed.
Electrical Energy is to be taken into account as the source of the power for running all
the system and the plants. Until supply of power from the electric network, generators
shall be used temporarily. The electric power is going to be put into service by
transformers. Stand-by generators will be ready at site to avoid the stoppage of work
due to breakdown or shutdown of the electricity. Water arrangement at site will be
ensured to fulfill the requirements of construction by the time being.
The following offices and accommodation shall be constructed mostly using the
Containers provided with board wall cladding;
Engineer’s office
Contractor’s and subcontractor’s offices
Workers and Staff accommodation facilities
In addition to the above mentioned facilities, there will be workshop and store.
Site camp office block shall be adequately planned to house the project site
management and all the team members of the group.
Project Manager’s office shall be the most equipped office with regard to the facilities
and the staff. Key role of the Project Manager demands the availability of all the
relevant record and reasonable staff to provide any information to the concerned
people from the Employer’s Office, the Engineer’s Office or the project Management
Since the Deputy Project Manager is directly responsible to Project Manager in all site
related matters, attending the meetings with Client / Consultant along with Project
Manager hence should be able to handle the Project Manager’s office as officiating
Project Manager in his absence as such his office would be the nearest one to the PM’s
office in the Office Block.. Although his authorities are only limited to site activities but
Planning Engineer shall prepare the work schedules with regard to the activities like;
Construction schedules
Planning Engineer shall not only prepare the program but also shall monitor the
implementation of the schedules, timely procurement, preparation of monthly, weekly
and daily progress report.
Conference Room shall be provided at site for Project Manager to arrange daily/weekly
meeting to discuss the progress, site issues and remedies with the Consultants, his
team member and the visiting delegations also.
Site laboratory shall be set up at site as per the requirements given in the documents.
This laboratory shall be fully equipped and functional for the purpose of performing the
maximum possible testing of the materials such as aggregates, concrete, FDTs etc.
Technical staff meeting the requirements set by the Contract shall be deputed to
operate the lab procedures under the control of Material Engineer who ensures Quality
Control and Quality Assurance.
This office shall be set up to deal with daily wages labors, maintain their daily
attendance and provide same to Account section fortnightly.
Alongside all the above facilities Engineering Management Services provides separate
facilities for the following:
Mechanical Workshop
Fabrication Yard
Rest of the open area shall be developed to receive and store the aggregates and
materials required in construction phase.
Within the premises of this yard two other yards shall be developed;
Storage
Fabrication
STORAGE
Storage area shall be used for bulk storage of the reinforcement bars and other
sections of the steel to be used in the project. However these reinforcement bars
placed on elevated from the ground.
This area shall be provided with bar straightening, cutting and bending machines.
Skilled and semi-skilled worker shall cut and bend the Bars using these machines.
All the new materials will be staked over there. A Store Officer will be in-charge of
store along with two store keepers and helpers. This section will ensure that all the
demand of material from site personnel and office personnel is timely met.
Block No 1 shall be allotted to the senior most staff up to Engineer grade and Block 2
shall be allotted to Supervisor, foreman and like.
Financial Capability
Attachments:
NTN Number:
Works in hand