Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 14

GREEN VISION

BOQ NO.9 - (Rev. 02)


MYA IN CREATIVE - JEDDAH, KSA
ELECTRICAL WORKS
EXTERNAL WORKS

S.N Description Quantity Unit Rate Total Price (SR)

DIVISION 26 - ELECTRICAL WORKS

1 Low voltage electrical power conductors and cables

Supply, installation, connection, termination at both ends and testing


of the single & multi core copper conductors 0.6/1 KV, XLPE
insulated and PVC sheathed low voltage cables complete with all
termination accessories including all required conduits and or
sleeves complete with fittings & connectors, required cable
supports, cable saddles, cable glands, cable cleats, labels & tags
and all other related ancillary works as shown in the drawings and
as per standard.

(for power cables to underground pump room)

(MDP-5 to DP-PR)

A 1-4Cx25 mm² Cu/XLPE/PVC sheathed cable 65 LM 25.00 1625.00

B 1-1Cx16 mm² Cu/PVC (G/Y) Ground cable 65 LM 12.60 819.00

(MDP-5 to FP-CP)

C 1-4Cx150 mm² Cu/XLPE/PVC sheathed cable 120 LM


1-3Cx120 mm² Cu/XLPE/PVC sheathed cable 120 LM 55.80 6696.00
D 1-1Cx70 mm² Cu/PVC (G/Y) Ground cable 120 LM 21.00 2520.00

(MDP-5 to JP-CP)

E 1-4Cx50 mm² Cu/XLPE/PVC sheathed cable 60 LM


1-3Cx50 mm² Cu/XLPE/PVC sheathed cable 60 LM 35.00 2100.00
F 1-1Cx25 mm² Cu/PVC (G/Y) Ground cable 60 LM 22.00 1320.00

(CH-03, CHILLER UNIT 03 to New SMDP 2 at GV 1 building)


New MCP PNL to SMDP-GV1)
G 1-3.5Cx240 mm² Cu/XLPE/PVC 384 LM
1-4Cx(240/120N) mm² Cu/XLPE/PVC 282 LM 85.00 23970.00
H 1-1Cx240 mm² Cu/PVC (G/Y) ground cable 192 LM
1-1Cx150 mm² Cu/PVC (G/Y) ground cable 188 LM 35.00

(MDP-5 to PP-GH)

I 1-4Cx16 mm² Cu/XLPE/PVC sheathed cable 40 LM 20.00 800.00

J 1-1Cx16 mm² Cu/PVC (G/Y) Ground cable 40 LM 12.40 496.00

(S.E.C. LVDP to MDP-1)

K 1-4Cx300mm² Cu/XLPE/PVC 420 LM


1-4Cx(300/150N)mm² Cu/XLPE/PVC 360 LM 85.00 30600.00
L 1-1Cx300 mm² Cu/PVC (G/Y) ground cable 180 LM 60.00 10800.00

05/26/2021
Emcan Consultants and Engineers
Page 1 of 14
GREEN VISION
BOQ NO.9 - (Rev. 02)
MYA IN CREATIVE - JEDDAH, KSA
ELECTRICAL WORKS
EXTERNAL WORKS

TO DIVISION SUMMARY 81,746.00

05/26/2021
Emcan Consultants and Engineers
Page 2 of 14
GREEN VISION
BOQ NO.9 - (Rev. 02)
MYA IN CREATIVE - JEDDAH, KSA
ELECTRICAL WORKS
EXTERNAL WORKS

S.N Description Quantity Unit Rate Total Price (SR)

DIVISION 26 - ELECTRICAL WORKS

1 Low voltage electrical power conductors and cables


(Continued…)

(S.E.C. LVDP to MDP-2)

M 1-4Cx300mm² Cu/XLPE/PVC 420 LM


1-4Cx(300/150N)mm² Cu/XLPE/PVC 360 LM 85.00 30600.00
N 1-1Cx300 mm² Cu/PVC (G/Y) ground cable 180 LM 60.00 10800.00

(S.E.C. LVDP to MDP-3)

O 1-4Cx300 mm² Cu/XLPE/PVC 420 LM


1-4Cx(300/150N)mm² Cu/XLPE/PVC 366 LM 85.00 31110.00
P 1-1Cx300 mm² Cu/PVC (G/Y) ground cable 183 LM 60.00 10980.00

(S.E.C. LVDP to MDP-4)

Q 1-4Cx300mm² Cu/XLPE/PVC 420 LM


1-4Cx(300/150N)mm² Cu/XLPE/PVC 366 LM 85.00 31110.00
R 1-1Cx300 mm² Cu/PVC (G/Y) ground cable 183 LM 60.00 10980.00

2 Grounding and bonding for electrical systems

Supply, installation, cable connections and testing of grounding


system complete with all components such as grounding
conductors, grounding rods, inspection pits, earth bars, clamps,
connectors, earthing boss, conduits, exothermic weld connections,
work shall include bonding of all equipment to main grounding grid,
and all other related items and ancillary works as shown in the
drawings and as per standard.

for underground pump room

A 1C 10 mm² Cu/PVC to equipment & panel 80 LM 18.90 1512.00

B 1C 16 mm² Cu/PVC to equipment & panel 45 LM 21.00 945.00

C 1C 50 mm² Cu/PVC to equipment & panel 31 LM 28.00 868.00

D All required raceways & other accessories LS


(Please provide the brief details of the raceway installation 1
i.e route and height) - HT remarks

05/26/2021
Emcan Consultants and Engineers
Page 3 of 14
GREEN VISION
BOQ NO.9 - (Rev. 02)
MYA IN CREATIVE - JEDDAH, KSA
ELECTRICAL WORKS
EXTERNAL WORKS

TO DIVISION SUMMARY 128,905.00

05/26/2021
Emcan Consultants and Engineers
Page 4 of 14
GREEN VISION
BOQ NO.9 - (Rev. 02)
MYA IN CREATIVE - JEDDAH, KSA
ELECTRICAL WORKS
EXTERNAL WORKS

S.N Description Quantity Unit Rate Total Price (SR)

DIVISION 26 - ELECTRICAL WORKS

2 Grounding and bonding for electrical systems


(Continued…)

for electrical room

E 1C 120 mm² Cu/PVC copper grounding cable 12 LM 25.00 300.00


(to MDP-5 panel connected to main grid)

F 1C 10 mm² Cu/PVC copper grounding cable 8 LM 10.00 80.00


(to PP-GH panel connected to main grid)

3 Underground ducts and raceways for electrical systems

Rigid PVC conduits

Supply and installation of rigid PVC conduits/ducts complete with all


accessories including holders, brackets, supports, end caps and all
other related items and ancillary works as shown in the drawings
and as per standards.

(for power cables to underground pump room)

A 100mm. Diameter, PVC 160 LM 26.75 4280.00

(for power production area, new guard house electrical room)

B 50mm. Diameter, PVC 5 LM 15.75 78.75

C 75mm. Diameter, PVC 80 LM 21.00 1680.00

D 110mm. Diameter, PVC 865 LM 27.56 23839.40

F 40mm. Diameter, PVC 10 LM 15.00 150.00

g 110mm. Diameter, PVC 40 LM 28.00 1120.00


(for chiller no. 3 new MCP PNL cables to GV 1 SMDP-GV1 building)

(for fire alarm cables)

G 75mm. Diameter, PVC 173 LM 21.00 3633.00

H 50mm. Diameter, PVC 10 LM 15.75 157.50

I 40mm. Diameter, PVC 4 LM 15.00 60.00

05/26/2021
Emcan Consultants and Engineers
Page 5 of 14
GREEN VISION
BOQ NO.9 - (Rev. 02)
MYA IN CREATIVE - JEDDAH, KSA
ELECTRICAL WORKS
EXTERNAL WORKS

TO DIVISION SUMMARY 35,378.65

05/26/2021
Emcan Consultants and Engineers
Page 6 of 14
GREEN VISION
BOQ NO.9 - (Rev. 02)
MYA IN CREATIVE - JEDDAH, KSA
ELECTRICAL WORKS
EXTERNAL WORKS

S.N Description Quantity Unit Rate Total Price (SR)

DIVISION 26 - ELECTRICAL WORKS

3 Underground ducts and raceways for electrical systems


(Continued…)

Concrete electrical manhole

Supply and installation of concrete manhole complete with cast iron


frame and cover, conduits, bitumen paint, water resistant seal for
any opening, work shall include excavation, backfilling, ground
reinstatement and all other related items and ancillary works as
shown on the drawings and as per standards.

(for power cables to underground pump room)

F 1250mm. x 1250mm. x 1250 mm. (LxWxD) 3 No. 8300.00 24900.00

(for fire alarm cables to underground pump room)

G 400mm. x 400mm. x 500 mm. (LxWxD) 2 No. 6500.00 13000.00

H 600mm. x 600mm. x 750 mm. (LxWxD) 2 No. 6500.00 13000.00

(for power cables)

H 600mm. x 600mm. x 750 mm. (LxWxD) 2 No. 6500.00 13000.00

I 1500mm. x 1500mm. x 1500 mm. (LxWxD) 2 No. 9000.00 18000.00

J 1800mm. x 1800mm. x 1800 mm. (LxWxD) 2 No. 9000.00 18000.00

K 2000mm. x 2000mm. x 1800 mm. (LxWxD) 1 No. 9300.00 9300.00

L 750mm. x 750mm. x 850 mm. (LxWxD) 1 No. 6500.00 6500.00

J 1400mm. x 1400mm. x 1400 mm. (LxWxD) 1 No. 8300.00 8300.00


(for chiller no. 3 new MCP PNL cables to GV SMDP-GV1 building)

4 Cable trays for electrical systems

Supply and installation of hot dipped galvanized very heavy duty


cable trays, complete with all accessories such as mounting
supports and brackets, fixing materials, cable tray cover, grounding
system and all other ancillary works as shown on the drawings and
as per standard.

(for chiller no. 3 new MCP PNL cables to GV 1 SMDP-GV1,


cable tray shall be installed in GV1 building)

Perforated cable tray, 100mm. 75mm side height, 2.0mm. thickness

A 500mm. 400mm (wide) 83 LM 57.75 4793.25

05/26/2021
Emcan Consultants and Engineers
Page 7 of 14
GREEN VISION
BOQ NO.9 - (Rev. 02)
MYA IN CREATIVE - JEDDAH, KSA
ELECTRICAL WORKS
EXTERNAL WORKS

TO DIVISION SUMMARY 128,793.25

05/26/2021
Emcan Consultants and Engineers
Page 8 of 14
GREEN VISION
BOQ NO.9 - (Rev. 02)
MYA IN CREATIVE - JEDDAH, KSA
ELECTRICAL WORKS
EXTERNAL WORKS

S.N Description Quantity Unit Rate Total Price (SR)

DIVISION 26 - ELECTRICAL WORKS

5 Sub main distribution panel boards

Installation, wiring & cable connections, testing and commissioning


of Sub- main distribution panel board as per IEC standard, the panel
board shall be complete with all protective devices, measuring
instruments, incoming and outgoing circuit breakers, circuit breaker
tripping accessories, circuit breaker protection, contactors & relays
where required and necessary, non type tested enclosure as per
IEC, indication lamps, terminal blocks, tin plated busbars,
labels/tags, padlocks where specified & required, where specified
panel shall have complete accessories to interface with fire alarm
system for shutting down. Contractor's scope of work shall also
include all required fixing materials, required supports and brackets,
grounding and bonding of equipment to main grounding grid, cable
cleats, labels, required calibrated testing instruments and all other
items and accessories, and ancillary works required for the
complete installation and operation of Lighting, small power and
distribution panel boards as shown in the drawings and as per
standard.

A SMDB 2 GV1 1 No.


with 1600AT/1600AF, ACB, complete with bus bars,
enclosure. (refer to drawing for information)

A MCP PNL
with 1000AT/1000AF, MCCB, complete with bus bars, 1 No.
enclosure. (refer to drawing for information)
please provide DWG - HT remarks

B Connectivity of new SMDB 2GV1 MCP PNL to existing 1 LS


MDB 2 GV1 scope include supply, installation of cables
4C-(300/150N) mm² Cu/XLPE/PVC for phase and
1C-150mm² Cu/PVC for protective earthing, cable trays,
and all required supports and accessories.

C 1-4Cx(300/150N)mm² Cu/XLPE/PVC 36 LM 85.00 3060.00

D 1-1Cx150 mm² Cu/PVC (G/Y) ground cable 36 LM 35.00 1260.00

05/26/2021
Emcan Consultants and Engineers
Page 9 of 14
GREEN VISION
BOQ NO.9 - (Rev. 02)
MYA IN CREATIVE - JEDDAH, KSA
ELECTRICAL WORKS
EXTERNAL WORKS

TO DIVISION SUMMARY 4,320.00

05/26/2021
Emcan Consultants and Engineers
Page 10 of 14
GREEN VISION
BOQ NO.9 - (Rev. 02)
MYA IN CREATIVE - JEDDAH, KSA
ELECTRICAL WORKS
EXTERNAL WORKS

S.N Description

DIVISION SUMMARY

DIVISION 26 - ELECTRICAL WORKS

Page 1 of 6

Page 2 of 6

Page 3 of 6

Page 4 of 6

Page 5 of 6

05/26/2021
Emcan Consultants and Engineers
Page 11 of 14
GREEN VISION
BOQ NO.9 - (Rev. 02)
MYA IN CREATIVE - JEDDAH, KSA
ELECTRICAL WORKS
EXTERNAL WORKS

TO BILL SUMMARY

05/26/2021
Emcan Consultants and Engineers
Page 12 of 14
GREEN VISION
BOQ NO.9 - (Rev. 02)
MYA IN CREATIVE - JEDDAH, KSA
ELECTRICAL WORKS
EXTERNAL WORKS

Total Price (SR)

81,746.00

128,905.00

35,378.65

128,793.25

4,320.00

05/26/2021
Emcan Consultants and Engineers
Page 13 of 14
GREEN VISION
BOQ NO.9 - (Rev. 02)
MYA IN CREATIVE - JEDDAH, KSA
ELECTRICAL WORKS
EXTERNAL WORKS

246,029.65

05/26/2021
Emcan Consultants and Engineers
Page 14 of 14

You might also like