Development Plan of Spam Drinking Water Distribution System in Central Cimahi Sub-District
Development Plan of Spam Drinking Water Distribution System in Central Cimahi Sub-District
Development Plan of Spam Drinking Water Distribution System in Central Cimahi Sub-District
DRINKING WATER
DISTRIBUTION SYSTEM IN
CENTRAL CIMAHI SUB-DISTRICT
Muhammad Agung Satria1 and Benno Rahardyan2
Environmental Engineering
Faculty of Civil and Environmental Engin eering, Institut Teknologi Bandung
Jl. Ganesha No. 10 Bandung 40132
1magungs3@gmail.com and 2benno@ftsl.itb.ac.id
OBJECTIVES
• The purpose of this thesis is to provide considerations and alternatives related to planning the
development of clean water distribution networks in Cimahi Tengah District.
• The objectives of this thesis are:
1. To increase the coverage of clean water services in Cimahi City by distributing clean water
distribution systems in Cimahi Tengah sub-district.
2. To determine clean water distribution channels to serve drinking water needs in Cimahi
Tengah District.
2
AREA DESCRIPTION
3
EXSISTING CONDITION
4
EXISTING CONDITIONS
1
• UPT Air Minum Kota Cimahi Pipeline
Network
5
• UPT Air Minum Kota Cimahi Piping
Network Schematic
5
PLANNING
6
PLANNING
45,00
• Total water demand 40,00
2039
35,00
Non
30,00
Area Total Domestic
Total (L/s)
Domestic Total
Population Needs
Needs (L/det)
25,00
Served (L/det)
(L/det)
20,00
Baros 27657 16,97 2,70 19,66
15,00
Cigugur Tengah 61138 37,50 2,51 40,01
10,00
1
PLANNING
Time Usage Factor Water Usage
00.00-01.00 1,03 4,31%
01.00-02.00 1,03 4,30%
• Daily Water Usage Pattern 02.00-03.00 1,03 4,31%
03.00-04.00 1,03 4,29%
• Source: Cimahi City Water Use, July 2020 04.00-05.00 1,04 4,34%
05.00-06.00 1,04 4,35%
06.00-07.00 1,03 4,27%
07.00-08.00 0,98 4,09%
08.00-09.00 0,98 4,07%
09.00-10.00 0,98 4,07%
10.00-11.00 0,99 4,13%
11.00-12.00 0,99 4,11%
12.00-13.00 0,98 4,10%
13.00-14.00 0,99 4,13%
14.00-15.00 1,00 4,17%
15.00-16.00 1,00 4,16%
16.00-17.00 1,00 4,16%
17.00-18.00 1,00 4,15%
18.00-19.00 0,83 3,47%
19.00-20.00 0,93 3,86%
20.00-21.00 1,03 4,28%
21.00-22.00 1,03 4,28%
22.00-23.00 1,03 4,29%
23.00-24.00 1,03 4,29% 8
WATER DISTRIBUTION
ALTERNATIVE 1
• Alternative 1uses a branch water
distribution pattern.
• Has a headloss range of 0.97 m/km –
9.31 m/km
• Has a minimum pressure of 5.22 m and
maximum of 26.68 m.
• Has a velocity range of 0.59 m/s – 1.99
m/s
9
WATER DISTRIBUTION
ALTERNATIVE 2
• Alternative 2 uses a branch and loop
water distribution pattern.
• Has a headloss range of 0.86 m/km –
9.50 m/km
• Has a minimum pressure of 5.38 m and
maximum of 25.67 m.
• Has a velocity range of 0.37 m/s – 1.99
m/s
10
ALTERNATIVE SELECTION
Alternative 1 Alternative 2
Use as little energy as possible
1. Reservoir type Ground Ground
2. Distribution system Gravitational Gravitational
Ease of Installation
Reservoir height from ground level (m) 0 0
Minimum cost as possible
1. Pipe length (m) 11373.49 16282.64
2. Number of pipe segment 28 34
3. Number of Node 29 31
4. Number of Pipe Diameter Variations 4 4
5. Number of pipe diameter above200 mm 10 7
6. Maximum Pipe Diameter(mm) 300 300
7. Number of Loop 0 4
Peak Discharge Hydrolysis Criteria (Time 17.00)
1. Minimum velocity (m/s) 0.59 0.37
2. Maximum velocity (m/s) 1.99 1.99
3. Minimum pressure (m) 5.22 5.38
4. Maximum pressure (m) 26.68 47.89
5. Minimum headloss (m/km) 0.97 0.86
6. Maximum headloss (m/km) 9.31 9.50
11
SCORING ATTRIBUTE CRITERIA
• Simple Additive Weighting (SAW) method is a simple and most frequently used multi
attribute decision selection technique.
• Based on average weighting.
• Requires a decision matrix normalization process (x) to a scale that can be compared
with all available alternative ratings
Scorin
No Criteria Attribute
g
A1 Pipe length 5 Cost
A2 Headloss 5 Cost
A3 Pressure left 5 Benefit
A4 Number of segment 4 Cost
A5 Velocity 5 Benefit
A6 Pipe diameter > 200mm 4 Cost
12
ALTERNATIVE SCORING RESULTS
Criteria
Alternative
• Criteria Based Decision Matrix A1 A2 A3 A4 A5 A6
1 11373.49 9.31 5.22 28 0.59 10
2 16282.64 9.50 5.38 34 0.37 7
Criteria
Alternative
A1 A2 A3 A4 A5 A6
• Normalized Matrix 1 0.70 0.98 1 0,82 1 0,7
2 1 1 1,03 1 1,59 1
Criteria
Alternative Total
A1 A2 A3 A4 A5 A6
• Therefore Alternative 2 is selected. 1 3.49 4.9 5 3.29 5 2.8 24,49
2 5 5 5.15 4 7.97 4 31,13
13
SELECTED SYSTEM COST BUDGET PLAN
14
CONCLUSION
• In the distribution system development plan for Central Cimahi District, the debit of
135.55 L / second is aimed at improving the services of the Sub-Districts Baros, Cigugur
Tengah, Karangmekar, Setiamanah, Cimahi, and Padasuka.
• Based on the high difference in elevation, the distribution system uses a gravity system.
• The total budget for the selected system costs is the total procurement of pipes plus the
total cost for installing pipes is Rp. 11,414,250,877.28