You are on page 1of 51

COLLINS PARK

ARTIST/WORKFORCE
HOUSING
224 23rd STREET +
227 22nd STREET
MIAMI BEACH, FL 33139

Request for a Certificate of


Appropriateness and Variances
for a Mixed Use Building

City of Miami Beach


Historic Preservation Board
Final Submittal
April 5, 2021

Shulman
Associates Architecture Interior Design Urban Design Graphic Design · 100 NE 38 Street Miami, FL 33137 305 438 0609 shulman-design.com AR 0012763 ©2021 Shulman + Associates
G-1.01 SITE DIAGRAM

23RD STREET

ARTIST
WORKFORCE
HOUSING AREA OF
WORK

LIBERTY AVENUE MALL


COLLINS PARK GARAGE

COLLINS AVENUE
PARK AVENUE

MIAMI CITY BALLET MIAMI BEACH


REGIONAL LIBRARY

UNIFIED
DEVELOPMENT
PARCEL
LOT SIZE = 43,256 SF

22ND STREET

Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p02
G-1.02 ZONING DATA AND DRAWING LIST
DRAWING LIST

G-1.00 COVER
G-1.01 SITE DIAGRAM
G-1.02 ZONING DATA AND DRAWING LIST
G-1.03 LOCATION MAP
G-1.04 ZONING AND HISTORIC DISTRICT MAP
G-1.05 PEDESTRIAN AXIS
G-1.06 VEHICLE & PEDESTRIAN RESPONSE
G-1.07 URBAN RESPONSE
G-1.08 CARVING THE FACADE
G-1.09 SITE PLAN
REQUESTED VARIANCES - REFER TO G-1.10 FAR DIAGRAMS
SHEET G-1.11 FOR VARIANCE DIAGRAMS G-1.11 VARIANCE DIAGRAMS
G-1.12 SITE IMAGES
VARIANCE #1 G-1.13 SITE IMAGES
70,894 SF G-1.14 CONTEXT IMAGES
70,894 SF
114,150
VARIANCE FROM CITY CODE SECTION 114,150
70,894 SF G-1.15 CONTEXT IMAGES
114,150 G-1.16 CONTEXT IMAGES
142-1132(D) TO PERMIT AN ENTRANCE
G-1.17 CONTEXT IMAGES
CANOPY WITH A WIDTH OF 20 FEET G-1.18 CONTEXT IMAGES
G-1.19 CONTEXT IMAGES
VARIANCE #2 G-1.20 CONTEXT IMAGES
G-1.21 CONTEXT IMAGES
VARIANCE FROM CITY CODE SECTION G-1.22 CONTEXT ELEVATIONS
130-64 TO PERMIT A TWO WAY SERVICE G-1.23 CONTEXT ELEVATIONS
DRIVEWAY WITH A WIDTH OF 16 FEET
A-1.00 GROUND FLOOR PLAN
A-1.01 SECOND FLOOR PLAN
A-1.02 THIRD & FOURTH FLOOR PLANS
VARIANCE #3 A-1.03 FIFTH FLOOR PLAN
A-1.04 SIXTH & SEVENTH FLOOR PLANS
VARIANCE FROM CITY CODE SECTION A-1.05 ROOF PLAN
130-101 D TO PERMIT A REDUCTION
IN THE NUMBER OF LOADING SPACES A-1.50 LIGHTING PLAN - GROUND FLOOR RCP
REQUIRED
A-2.00 BUILDING ELEVATIONS
A-2.01 BUILDING ELEVATIONS
REQUIRED: 3 LOADING SPACES
A-2.02 BUILDING ELEVATIONS
PROVIDED: 2 LOADING SPACES A-2.03 BUILDING ELEVATIONS

A-3.00 BUILDING SECTIONS


A-3.01 BUILDING SECTIONS
A-3.02 BUILDING SECTIONS
A-3.03 BUILDING SECTIONS
A-3.04 LINE OF SIGHT ANALYSIS
A-3.05 LINE OF SIGHT ANALYSIS
A-3.50 CANOPY DRAWINGS
A-3.51 CANOPY DRAWINGS
LOADING REQUIREMENTS SUMMARY A-3.52 BENCH DRAWINGS
LOADING
Retail REQUIREMENTS=SUMMARY3,709 sf Retail - 2000 sf to 10,000 sf = 1 space required +
LOADING REQUIREMENTS Variance requested, refer to sheet
Retail Dorm
Ballet Units ==SUMMARY
3,709
10 sf
units Retail - 2000- 50
Residennal sf to
to10,000 sf == 1
100 units 2 space
spacesrequired
required+ 2 Loading Spaces Provided Variance
Ballet
Retail Dormhousing
Units Units == 80
10 units
3,709 sf Residennal
Retail 2000- 50 to 100 units 2 spaces required G-1.11 forrequested, refer to sheet
variance diagrams A-4.00 PERSPECTIVE
Workforce units TOTAL-LOADING sf to 10,000
SPACES sf = 13 space
spacesrequired
required+ 2 Loading Spaces Provided
G-1.11 forrequested,
variance diagrams
Workforce Variance refer to sheet A-4.01 PERSPECTIVE
Ballet Dormhousing
Units Units = 80
10 units TOTAL LOADING
Residennal - 50 toSPACES 3 spaces required
100 units = 2 required 2 Loading Spaces Provided
G-1.11 for variance diagrams
Workforce housing Units = 80 units TOTAL LOADING SPACES = 3 spaces required A-4.02 PERSPECTIVE
A-4.03 PERSPECTIVE
A-4.04 PERSPECTIVE

A-5.00 PROPOSED MATERIALS


Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p03
G-1.03 LOCATION MAP

Scale = NTS

Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p04
G-1.04 ZONING AND HISTORIC DISTRICT MAP

ZONING MAP HISTORIC DISTRICT MAP


224 23rd Street Miami Beach Architectural
District
Ocean Drive / Collins Ave
Historic District

Site
Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p05
G-1.05 REINFORCING THE PEDESTRIAN AXIS
LIBERTY AVE.
PEDESTRIAN BRIDGE

23RD STREET

ARTIST /
COLLINS PARK WORKFORCE
GARAGE HOUSING

COLLINS AVENUE
PARK AVENUE
MIAMI CITY BALLET
PUBLIC LIBRARY

22ND STREET

Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p06
G-1.06 VEHICLE & PEDESTRIAN ACCESS

23RD STREET
ARTIST / WORKFORCE
HOUSING ENTRANCE

ARTIST /
WORKFORCE
COLLINS PARK GARAGE
HOUSING
BALLET
DORMS

COLLINS AVENUE
ENTRANCE
PARK AVENUE

MIAMI CITY BALLET


PUBLIC LIBRARY

22ND STREET

Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p07
G-1.07 URBAN CONTEXTUAL RESPONSE

Liberty ave.
ARTIST / WORKFORCE COLLINS PARK GARAGE
HOUSING

Elevated colonnade

Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p08
G-1.08 CARVING THE 23RD STREET FACADE

Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p09
G-1.09 SITE PLAN

T.O. BULKHEAD
88’-0” / 97.00’ NGVD

18’-0”
SERVICE YARD

SCALE: 1/32” = 1’-0”


Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p010
G-1.10 FAR DIAGRAMS

L
C
2'-6" 86'-5" 27'-2" 25'-8" 8'-3"
4'-0" 23'-6" 30'-0" 30'-0" 30'-0" 23'-6" 9'-0"

2'-6"

4'-6"
2 BEDROOM 2 BEDROOM
650 SF STUDIO 1 BEDROOM 1 BEDROOM 1 BEDROOM 654 SF
419 SF 1 BEDROOM STUDIO
557 SF 557 SF 542 SF
472 SF 403 SF

34'-0"

30'-0"
THIRD FLOOR F.F.E.
27'-0" / 36.00' NGVD

14'-4"

23'-9"
STOR. ELEC RM. L.V.

34'-8"

26'-6"
STUDIO STUDIO STUDIO STUDIO STUDIO
414 SF 443 SF 400 SF 419 SF 410 SF
2 BEDROOM STUDIO 2 BEDROOM
703 SF 428 SF 667 SF

6'-9"
6'-0"
14'-8" 10'-1" 10'-0" 3'-0" 10'-0" 3'-0" 10'-0" 13'-0" 13'-0" 3'-0" 10'-0" 3'-0" 15'-0" 7'-2"

12'-0"
17'-7" 13'-11" 26'-0" 30'-0" 30'-0" 23'-6" 9'-0"

THIRD & FOURTH FLOOR


10,653 SF

EXISTING EXISTING ARTIST WORKFORCE


LIBRARY LIBRARY LIBRARY HOUSING
GROUND FLOOR 23,289 SF 6,673 SF
SECOND FLOOR 19,967 SF 10,791 SF
THIRD FLOOR 10,653 SF
GROUND FLOOR SECOND FLOOR FORTH FLOOR 10,653 SF
EXISTING (LIBRARY) = 23,289 SF EXISTING (LIBRARY) = 19,967 SF
FIFTH FLOOR 10,708 SF
PROPOSED (ARTIST WORKFORCE HOUSING) = 6,673 SF PROPOSED (ARTIST WORKFORCE HOUSING) = 10,791 SF
GROUND FLOOR AREA = 29,962 SF SECOND FLOOR AREA = 30,751 SF SIXTH FLOOR 10,708 SF
L

L
C

C
2'-6" 35'-10" 16'-0" 87'-5" 8'-3"

SEVENTH FLOOR
2'-6" 35'-10" 16'-0" 87'-5" 8'-3"
4'-0" 23'-6" 30'-0" 30'-0" 30'-0" 23'-6" 9'-0"
10,708 SF
2'-6"

2'-6"
4'-6"

2 BEDROOM
650 SF STUDIO
419 SF
1 BEDROOM
472 SF
1 BEDROOM
541 SF
1 BEDROOM
541 SF
1 BEDROOM
557 SF STUDIO
2 BEDROOM
654 SF ROOF 0 SF
433 SF

ARTIST WORKFORCE
34'-0"

30'-0"

34'-0"

ROOF

HOUSING
77'-0" / 86.00' NGVD ALUMINUM
MECHANICAL

FIFTH FLOOR F.F.E.


47'-0" / 56.00' NGVD
MECHANICAL
EQUIPMENT AREA
SCREEN
TOTAL (EACH USE) 43,256 SF 70,894 SF
14'-4"

14'-4"
23'-9"

STOR. ELEC RM. L.V.

EXISTING LIBRARY T
PROTECTING

TOTAL FLOOR AREA


CANOPY

114,150 SF
34'-8"

34'-8"
26'-6"

STUDIO STUDIO STUDIO STUDIO STUDIO PAVED ROOF DECK / FITNESS AREA
414 SF 443 SF 400 SF 419 SF 410 SF 2,357 SF
2 BEDROOM STUDIO 2 BEDROOM ROOF DECK
703 SF 428 SF 667 SF
78'-0" / 87.00' NGVD

MAX ALLOWED FLOOR AREA


6'-9"

133,419 SF
6'-0"

6'-0"

14'-8" 10'-1" 10'-0" 3'-0" 10'-0" 3'-0" 10'-0" 13'-0" 13'-0" 3'-0" 10'-0" 3'-0" 15'-0" 7'-2" LINE OF WALL MOUNTED TRAFFIC DECK /
12'-0"

12'-0"

17'-7" 13'-11" 26'-0" 30'-0" 30'-0" 23'-6" 9'-0" RETRACTABLE AWNING ABOVE PAVED ROOFING

(48,516 SF x 2.75)
FIFTH TO SEVENTH FLOOR ROOF PLAN
Shulman 10,708 SF 0 SF
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p011
G-1.11 VARIANCE DIAGRAMS
ENTRY CANOPY
20’-0”

VARIANCE #1

VARIANCE FROM CITY CODE


SECTION 142-1132(D) TO PERMIT
AN ENTRANCE CANOPY WITH A
WIDTH OF 20 FEET

VARIANCE #2

VARIANCE FROM CITY CODE


SECTION 130-64 TO PERMIT A
TWO-WAY SERVICE DRIVEWAY
TWO WAY WITH A WIDTH OF 16 FEET
SERVICE
DRIVEWAY
16’-0” VARIANCE #3

VARIANCE FROM CITY CODE


SECTION 130-101 D TO PERMIT A
REDUCTION IN THE NUMBER OF
LOADING SPACES REQUIRED

REQUIRED: 3 LOADING SPACES


PROVIDED: 2 LOADING SPACES

LOADING SPACE
10’ X 20’ LOADING SPACE
10’ X 20’

Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p012
G-1.12 SITE IMAGES
AVE
VD
BL
E

Y
1
D
DA
ERT
LIB

4 3
23R
DS
T

2
VE
KA
PAR

22N
DS
T
AVE
INS
LL
CO

21S
TS
T

20T
HS
T

Photos taken March 11, 2021


1 2

3 4
Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p013
G-1.13 SITE IMAGES
AVE
VD
BL
E

Y
D
DA
ERT
LIB

23R
2 ST
D

1 4
VE

3
KA
PAR

22N
DS
T
AVE
INS
LL
CO

21S
TS
T

20T
HS
T

Photos taken March 11, 2021


1 2

3 4
Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p014
G-1.14 CONTEXT IMAGES
AVE
VD
BL
E

Y
D
DA
ERT
LIB

23R 4
DS
T 3 2
1
VE
KA
PAR

22N
DS
T
AVE
INS
LL
CO

21S
TS
T

20T
HS
T

Photos taken March 11, 2021


1 2

3 4
Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p015
G-1.15 CONTEXT IMAGES
AVE
VD
BL
E

Y
2
D
DA
ERT
1
LIB

23R
DS
T

4
VE
KA

3
PAR

22N
DS
T
AVE
INS
LL
CO

21S
TS
T

20T
HS
T

Photos taken March 11, 2021


1 2

3 4
Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p016
G-1.16 CONTEXT IMAGES
AVE
VD
BL
E

Y
D
DA
ERT
LIB

4 3
T

2 1
DS
23R
VE
KA
PAR

22N
DS
T
AVE
INS
LL
CO

21S
TS
T

20T
HS
T

Photos taken March 11, 2021


1 2

3 4
Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p017
G-1.17 CONTEXT IMAGES
2

3
VD
BL
DE
DA
4
1
T
DS
23R
VE
KA
PAR

22N
DS
T
AVE
INS
LL
CO

21S
TS
T

20T
HS
T

Photos taken March 11, 2021


1 2
G-1.15 CONTEXT IMAGES

3 4
Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p018
G-1.18 CONTEXT IMAGES
3

AVE
VD
BL
E

Y
D
DA T
LIB
ERT
4

1
DS
23R
VE
KA

2
PAR

22N
DS
T
AVE
INS
LL
CO

21S
TS
T

20T
HS
T

Photos taken March 11, 2021


1 2

3 4
Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p019
G-1.19 CONTEXT IMAGES
AVE
VD
BL
E

Y
D
DA
ERT
1
LIB
T
DS

2
23R
VE
KA

3
PAR

22N
DS
T
AVE
INS

4
LL
CO

21S
TS
T

20T
HS
T

Photos taken March 11, 2021


1 2

3 4
Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p020
G-1.20 CONTEXT IMAGES
AVE
VD
BL
E

Y
D
DA
ERT
LIB
T
DS
23R
VE
KA
PAR

22N
DS
T

4
AVE

3
INS

2
LL

1
CO

21S
TS
T

20T
HS
T

Photos taken March 11, 2021


1 2

3 4
Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p021
G-1.21 CONTEXT IMAGES
AVE
VD
BL
E

Y
D
DA
ERT
LIB
T
DS
23R
VE
KA
PAR

22N
1 DS
T
AVE
INS
LL
CO

21S
TS
T

20T
HS
T

Photos taken March 11, 2021


1

Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p022
G-1.22 CONTEXT ELEVATIONS
3

1
AVE
VD
BL
DE RTY
DA
2
E
LIB

23R
DS
T
1
AVE

2
K
PAR

22N
DS
T
AVE

3
S
LLIN
CO

21S
TS
T

1
20T
HS
T

Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p023
G-1.23 CONTEXT ELEVATIONS
4

AVE
VD
BL
DE RTY
DA
E
LIB

23R
DS
5 T
AVE

6
K
PAR

22N
DS
T

4 5
AVE
S
LLIN

6
CO

21S
TS
T

4
20T
HS
T

Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p024
A-1.00 GROUND FLOOR PLAN

26’-11”

7’-10”
13’-0”

LOADING SPACE
1 LOADING SPACE
10’ X 20’ 2
10’ X 20’
5’-0”

SCALE: 1/16” = 1’-0”


Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p025
A-1.01 SECOND FLOOR PLAN

2 BEDROOM
DIRECTOR’S
UNIT
647 SF

SCALE: 1/16” = 1’-0”


Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p026
A-1.02 THIRD & FOURTH FLOOR PLANS

SCALE: 1/16” = 1’-0”


Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p027
A-1.03 FIFTH FLOOR PLAN

SCALE: 1/16” = 1’-0”


Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p028
A-1.04 SIXTH & SEVENTH FLOOR PLANS

SCALE: 1/16” = 1’-0”


Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p029
A-1.05 ROOF PLAN

SCALE: 1/16” = 1’-0”


Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p030
A-1.50 LIGHTING - GROUND FLOOR RCP
C.L. C.L. LIGHTED PATH AWNING
BOLLARDS DOWNLIGHTING 18.0' NGVD
11'-6" AFF
30'-0" 30'-0" 20'-0"

1'-4"
TREE UPLIGHTING TREE UPLIGHTING
LINEAR RECESSED EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. CEILING
PATHWAY LIGHTING 21.0' NGVD
IN CEILING C.L. C.L. 14'-6" AFF

CEILING
21.0' NGVD
14'-6" AFF
30'-0"

C.L.
EQ.EQ.
RETAIL
3,700 SF
LIGHTING IN
PLANTER
LOBBY

SCREEN GROUND FLOOR F.F.E.


LIGHTING 0'-0" / 9.00' NGVD

LIGHTING IN
BALLET PORCH
8'-6" 8'-6" 8'-6"

FPL VAULT
23'-10" X 20'-0"

LIGHTING IN
PLANTER

BRICK LIGHTING
AT ADA RAMP

Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p031
A-2.00 BUILDING ELEVATIONS

SMOOTH STUCCO
COLUMN FINISH NORTH ELEVATION
SCALE: 1/16” = 1’-0”
Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p032
A-2.01 BUILDING ELEVATIONS

SOUTH ELEVATION
SCALE: 1/16” = 1’-0”
Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p033
A-2.02 BUILDING ELEVATIONS

EAST ELEVATION
Shulman SCALE: 1/16” = 1’-0”
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p034
A-2.03 BUILDING ELEVATIONS

WEST ELEVATION
Shulman SCALE: 1/16” = 1’-0”
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p035
A-3.00 BUILDING SECTIONS
POWDER COATED ALUMINUM MECHANICAL 6” DIA. STAINLESS STEEL BOLLARD
EQUIPMENT SCREEN - 2X12 VERTICAL FINS DESIGN BASIS: CALPIPE SECURITY
WITH 5” OPEN AIR SPACING BOLLARD WITH STANDARD FLAT TOP (TYP.)

POWDER COATED ALUMINUM IMPACT EXTERIOR BUILDING SOFFIT AT SERVICE


RESISTANT STOREFRONT SYSTEM - CLEAR DRIVEWAY
GLASS GLAZING - NO LOW-E COATING
ROOF INSULATION AND ROOFING SYSTEM
POWDER COATED ALUMINUM PIPE RAILING AT MECHANICAL EQUIPMENT AREA

POWDER COATED ALUMINUM AND GLASS


IMPACT RESISTANT WINDOW ASSEMBLY -
FIXED & CASEMENT

SCALE: 1/16” = 1’-0”


Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p036
A-3.01 BUILDING SECTIONS
PRE-ENGINEERED POWDER COATED
PERFORATED ALUMINUM PANEL SCREEN
WITH GRAPHICS

POWDER COATED ALUMINUM IMPACT


RESISTANT STOREFRONT SYSTEM -
CLEAR GLASS GLAZING - NO LOW-E
COATING

PRE-ENGINEERED COMPOSITE WOOD


RAISED ROOF BLANK DECK SYSTEM

MOTORIZED OVERHEAD COILING GATE AT


TRASH ROOM

ROOF ACCESS POWDER COATED


ALUMINUM TRELLIS

POWDER COATED ALUMINUM AND GLASS


IMPACT RESISTANT WINDOW ASSEMBLY -
FIXED & CASEMENT

SCALE: 1/16” = 1’-0”


Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p037
A-3.02 BUILDING SECTIONS
POWDER COATED ALUMINUM
MECHANICAL EQUIPMENT SCREEN - 2X12
VERTICAL FINS WITH 5” OPEN AIR SPACING

POWDER COATED ALUMINUM IMPACT


RESISTANT STOREFRONT SYSTEM -
CLEAR GLASS GLAZING - NO LOW-E
COATING

MOTORIZED OVERHEAD COILING GATE AT


SERVICE DRIVE

ROOF ACCESS POWDER COATED


ALUMINUM TRELLIS

PRE-ENGINEERED COMPOSITE WOOD


RAISED ROOF BLANK DECK SYSTEM

IMPACT RESISTANT POWDER COATED


ALUMINUM DOOR & SIDELITE W/CLEAR
GLAZING

MASONRY AND CONCRETE BALCONIES


WITH 3.5” WIDE OPEN AIR SLOTS

11’-6”

Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p038
A-3.03 BUILDING SECTIONS
POWDER COATED ALUMINUM
MECHANICAL EQUIPMENT SCREEN - 2X12
VERTICAL FINS WITH 5” OPEN AIR SPACING

POWDER COATED ALUMINUM IMPACT


RESISTANT STOREFRONT SYSTEM -
CLEAR GLASS GLAZING - NO LOW-E
COATING

ROOF ACCESS POWDER COATED


ALUMINUM TRELLIS

PRE-ENGINEERED COMPOSITE WOOD


RAISED ROOF BLANK DECK SYSTEM

IMPACT RESISTANT POWDER COATED


ALUMINUM DOOR & SIDELITE W/CLEAR
GLAZING

MASONRY AND CONCRETE BALCONIES


WITH 3.5” WIDE OPEN AIR SLOTS

Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p039
A-3.04 LINE OF SIGHT ANALYSIS
23RD STREET

SCALE: 1/16” = 1’-0”


Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p040
A-3.05 LINE OF SIGHT ANALYSIS
LIBERTY AVE / PASEO

SCALE: 1/16” = 1’-0”


Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p041
A-3.50 CANOPY DRAWINGS

WC WC

LOBBY LOBBY

EQ. EQ.

EQ. EQ.
OFFICE OFFICE

45'-10"

45'-10"
HANGERS
RECESSED LIGHT
FIXTURES
SLOPE TO
DRAIN
EQ. EQ.
LINE OF EDGE OF
BUILDING ABOVE
EQ. EQ.
25'-9"

25'-9"
ALUMI
LINE OF EDGE OF
9'-2"

9'-2"
BUILDING ABOVE

SIDEWALK

1'-6"
6.50' NGVD
CANOPY
18.0' NGVD 20'-0" 20'-0"

BACK OF CURB AS PER CITY


OF MIAMI BEACH CODE
CLEAR ANODIZED
ORDINANCE 142-1132(d)
ALUMINUM COMPOSITE
CLADDING

CANOPY REFLECTED CEILING PLAN CANOPY PLAN

Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p042
A-3.51 CANOPY DRAWINGS
SLOPE TO

SECOND FLOOR
17'-0" (26.0 NGVD)

4'-4"
4'-4"
2'-0" 1'-0"

2'-0" 1'-0"
CLEAR ANODIZED
CANOPY ALUMINUM COMPOSITE
CLADDING

19'-4"
18.0' NGVD 9'-2"
CANOPY

14'-4"
18.0' NGVD
11'-6"

11'-6"
GROUND FLOOR
6.50' NGVD
SIDEWALK SIDEWALK
6.50' NGVD 6.50' NGVD

ELEVATION ELEVATION

SECOND FLOOR
17'-0" (26.0 NGVD)
2'-0" 1'-0"

2'-0" 1'-0"
2 A1.2 2 A1.2
CANOPY
18.0' NGVD
CANOPY
18.0' NGVD
11'-6"

GROUND FLOOR 11'-6"


6.50' NGVD
SIDEWALK
6.50' NGVD
9"
SECTION SECTION
Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p043
A-3.52 BENCH DRAWINGS
POWDER COATED ALUMINUM 1 1/2” FLATBAR
HANDRAIL, TYP.

CONCRETE PLANTER WITH CANTILEVERED


CONCRETE BENCH. MIAMI BEACH RED COLOR
FINISH TO BE INCLUDED IN CONCRETE
MIXTURE
TOP OF WALL
TOP
12.0' OF WALL
NGVD
12.0' NGVD

3'-0"
5'-0"

5'-0"

3'-0"
5'-0"

5'-0"

2'-0"
1'-6"

1'-6"
GROUND FLOOR

2'-0"
1'-6"

1'-6"
GROUND FLOOR
7.0' NGVD
7.0' NGVD
ELEVATION
ELEVATION
POWDER COATED ALUMINUM 1 1/2” FLATBAR
HANDRAIL, TYP.

CONCRETE PLANTER WITH CANTILEVERED


CONCRETE BENCH. MIAMI BEACH RED COLOR
FINISH TO BE INCLUDED IN CONCRETE
MIXTURE
5'-0"
5'-0"

3'-0"
5'-0"

3'-0"
4'-1"

5'-0"

2'-0"
1'-6"
4'-1"

GROUND FLOOR

2'-0"
1'-6"
GROUND FLOOR
7.0' NGVD

2'-0"
7.0' NGVD

2'-0"
TOP OF WALL
TOP
12.0' OF WALL
NGVD
3'-0" 20'-0" 3'-0" 12.0' NGVD
3'-0" 20'-0" 3'-0"
26'-0"
26'-0" PLAN SECTION

Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p044
A-4.00 PERSPECTIVES

Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p045
A-4.01 PERSPECTIVES

Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p046
A-4.02 PERSPECTIVES

Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p047
A-4.03 PERSPECTIVES

Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p048
A-4.04 PERSPECTIVES

Shulman
Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p049
A-5.00 PROPOSED MATERIALS

STUCCO FINISH CLEAR GLASS & ALUMINUM VERTICAL STUCCO REVEALS PERFORATED METAL SCREEN
WINDOWS & DOORS
3/4” SMOOTH STUCCO FINISH, WHITE CHANNEL SCREED/ CONTROL JOINT BASIS: POMA METALS ALUMINUM 1/8” THICK
FRAME FINISH: CLEAR ANODIZED OR 3/4” WIDE x 3/4” DEEP ALLOY 6061,6005,6063 IN ACCORDANCE
GREY TO MATCH SCREEN WITH ASTM STANDARDS.
BASIS: FRY REGLET PCS-75-75
PATTERN: 3/4” ROUND HOLES, 15/16” TYP.
COLOR: GREY SPACING, STAGGERED PATTERN

FINISH : THREE COAT KYNAR 500 FINISH,


Shulman GREY

Associates Collins Park Artist-Workforce Housing - HPB Final Submittal ©2021 Shulman + Associates 04/05/2021 p050
Shulman