Final Report for Topographic & Bathymetric Survey of JEDI Phase 2A

CHAPTER 1
PREFACE

01. Purpose of Topographic and Bathymetric Survey Work

The survey and drawing of river and drainage is aimed at the preparation of a
good complete and eligible map for planning of the JEDI Project. The map will
contain elevation and planimetric data which is clear, accurate and in
accordance with field condition being surveyed. The cross section will be
performed the sediment surfaces and bed level of canal, drainage or basin. The
longitudinal profile will be performed right and left bank height, sediment height
and bed level. The strips map will be completed by contour interval will be 0.5
m for flat areas and 1.0 m for hilly area.

02. Scope of Topographic and Bathymetric Survey Work

1. Bench Mark Installation


2. Connecting to Reference Point
 GPS Survey • Leveling Route Survey
3. Traversing
4. Leveling
5. Longitudinal Survey
6. Cross Section survey
 Tachymetric Survey Method • Bathymetric Survey Method
7. Computation and Drawing

0.3. Project Location.

The Project location for Topographic and Bathymetric Survey Work of Jakarta
Emergency Dredging Initiative Project Phase 2A is shown in Figure1.

PT. ATLASBUMI SEMESTA Chapter 1 – Page 1


Final Report for Topographic & Bathymetric Survey of JEDI Phase 2A

Figure 1.1. Project Location

PT. ATLASBUMI SEMESTA Chapter 1 – Page 2


Final Report for Topographic & Bathymetric Survey of JEDI Phase 2A

0.4. PROJECT LOCATION FIGURES

1. West Banjir Canal.

Coordinates :
(06° 06’ 04.93” S ; 106° 46’ 02.80”E) to
(06° 07’ 24.41” S ; 106° 46’ 29.23” E)

PT. ATLASBUMI SEMESTA Chapter 1 – Page 3


Final Report for Topographic & Bathymetric Survey of JEDI Phase 2A

2. Lower Angke Drain

Coordinates :
(06° 07’ 24.41” S ; 106° 46’ 29.23” E) to
(06° 09’ 28.28” S ; 106° 46’ 02.77” E)

PT. ATLASBUMI SEMESTA Chapter 1 – Page 4


Final Report for Topographic & Bathymetric Survey of JEDI Phase 2A

3. Grogol Sekretaris

Coordinates :
(06° 09’ 28.28” S ; 106° 46’ 02.77” E ) to
(06° 34’ 56.88” S ; 106° 12’ 11.22” E

PT. ATLASBUMI SEMESTA Chapter 1 – Page 5


Final Report for Topographic & Bathymetric Survey of JEDI Phase 2A

4. Cideng Thamrin

Coordinates :
(06° 10’ 53.96” S ; 106° 48’ 51.47”E) to
(06° 11’ 38.69” S ; 106° 49’ 13.91” E)
Note : Cideng Thamrin will be continued in Phase 2A Addendum

PT. ATLASBUMI SEMESTA Chapter 1 – Page 6


Final Report for Topographic & Bathymetric Survey of JEDI Phase 2A

5. Waduk Sunter Selatan

Coordinates :
(06° 08’ 44.96” S ; 106° 53’ 35.72”E) to
(06° 08’ 39.70” S ; 106° 53’ 04.61” E)

PT. ATLASBUMI SEMESTA Chapter 1 – Page 7


Final Report for Topographic & Bathymetric Survey of JEDI Phase 2A

6. Waduk Sunter Utara

Coordinates :
(06° 07’ 32.80” S ; 106° 51’ 48.80”E) to
(06° 07’ 40.80” S ; 106° 52’ 12.67” E)

PT. ATLASBUMI SEMESTA Chapter 1 – Page 8


Final Report for Topographic & Bathymetric Survey of JEDI Phase 2A

7. Waduk Sunter Timur III

Coordinates :
(06° 07’ 37.39” S ; 106° 53’ 43.30”E) to
(06° 07’ 37.64” S ; 106° 53’ 49.48” E)

PT. ATLASBUMI SEMESTA Chapter 1 – Page 9