CHAPTER 4
WORK RESULT
2. GPS OBSERVATION
KAMAL DRAIN
Traversing : 9.70 Km
Leveling : 4.85 Km
Longitudinal Profile & Strip Map : 5.07 Km
Cross Section : 78 Section
TANJUNGAN DRAIN
Traversing : 4.00 Km
Leveling : 2.05 Km
Longitudinal Profile & Strip Map : 2.00 Km
Cross Section : 40 Section
CAKUNG FLOODWAY
Traversing : 25.15 Km
Leveling : 12.05 Km
Longitudinal Profile & Strip Map : 11.68 Km
Cross Section : 196 Section
Bathymetric Survey Cross Section : 36 Section
To make easier for identification during design period, every cross section
have taken pictures. The complete documentation is attached.