Final Report for Topographic and Bathymetric Survey of JEDI Phase 2A (Addendum)

CHAPTER 4
WORK RESULT

01. WORK RESULT

1. INSTALLATION OF NEW BENCH MARK

New Bench Mark Installation : 12 Points


1. Kamal Drain : Bench Mark KM1 and Bench Mark KM2
2. Tanjungan Drain : Bench Mark TJ1 and Bench Mark TJ2
3. Pakin Jelakeng Kalibesar : Bench Mark PK1 and Bench Mark PK2
4. Krukut Cideng Drain : Bench Mark KC1 and Bench Mark KC2
5. Krukut Lama Drain : Bench Mark KL1 and Bench Mark KL2
6. Cakung Floodway : Bench Mark CK1 and Bench Mark CK2

The Description of Bench Mark is attached

Figure 4.1 Installation of Bench Mark

PT. ATLASBUMI SEMESTA Final Report 2A Addendum- Chapter 4 – Page 1


Final Report for Topographic and Bathymetric Survey of JEDI Phase 2A (Addendum)

2. GPS OBSERVATION

GPS Observation and Calculation : 14 Points


Reference Points : Bench Mark CT 01 and Bench Mark CT 02.

The GPS Configuration :

Figure 4.2. GPS Configuration

The complete result of GPS Survey is attached

PT. ATLASBUMI SEMESTA Final Report 2A Addendum- Chapter 4 – Page 2


Final Report for Topographic and Bathymetric Survey of JEDI Phase 2A (Addendum)

3. LEVELING CONNECTION TO REFERENCE POINTS

Total length of leveling : 16.2 km


Routes of Leveling Connection :

Figure 4.3. Leveling Routes Connection

PT. ATLASBUMI SEMESTA Final Report 2A Addendum- Chapter 4 – Page 3


Final Report for Topographic and Bathymetric Survey of JEDI Phase 2A (Addendum)

4. CROSS SETION AND LONGITUDINAL SURVEY

KAMAL DRAIN
Traversing : 9.70 Km
Leveling : 4.85 Km
Longitudinal Profile & Strip Map : 5.07 Km
Cross Section : 78 Section

TANJUNGAN DRAIN
Traversing : 4.00 Km
Leveling : 2.05 Km
Longitudinal Profile & Strip Map : 2.00 Km
Cross Section : 40 Section

PAKIN KALIBESAR JELAKENG DRAIN


Traversing : 10.00 Km
Leveling : 5.05 Km
Longitudinal Profile & Strip Map : 4.91 Km
Cross Section : 102 Section

KRUKUT CIDENG DRAIN


Traversing : 7.00 Km
Leveling : 3.25 Km
Longitudinal Profile & Strip Map : 3.25 Km
Cross Section : 65 Section

KRUKUT LAMA DRAIN


Traversing : 7.00 Km
Leveling : 3.50 Km
Longitudinal Profile & Strip Map : 3.49 Km
Cross Section : 68 Section

PT. ATLASBUMI SEMESTA Final Report 2A Addendum- Chapter 4 – Page 4


Final Report for Topographic and Bathymetric Survey of JEDI Phase 2A (Addendum)

CAKUNG FLOODWAY
Traversing : 25.15 Km
Leveling : 12.05 Km
Longitudinal Profile & Strip Map : 11.68 Km
Cross Section : 196 Section
Bathymetric Survey Cross Section : 36 Section

02. DOCUMENTATION OF CROSS SECTION

To make easier for identification during design period, every cross section
have taken pictures. The complete documentation is attached.

PT. ATLASBUMI SEMESTA Final Report 2A Addendum- Chapter 4 – Page 5